CN201810987U - Water circulating system - Google Patents
Water circulating system Download PDFInfo
- Publication number
- CN201810987U CN201810987U CN2010205137741U CN201020513774U CN201810987U CN 201810987 U CN201810987 U CN 201810987U CN 2010205137741 U CN2010205137741 U CN 2010205137741U CN 201020513774 U CN201020513774 U CN 201020513774U CN 201810987 U CN201810987 U CN 201810987U
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- filter
- valve
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Filtration Of Liquid (AREA)
Abstract
The utility model discloses a water circulating system, which comprises a clear water reservoir, a high-position water tower and a filter workshop, wherein the clear water reservoir is connected to the high-position water tower through a water tower pipe section and is connected to a produced water pipe network joint through a produced water pipe; the high-position water tower is connected to the filter workshop through a filter water pipe; a connecting pipe section is connected between the filter water pipe and the produced water pipe and is used for feeding water which is sent to a produced water pipe network to the filter workshop; a connecting valve is arranged on a connecting steel pipe; a filter valve is arranged on the filter water pipe; and a pipe network valve is arranged on the produced water pipe. A new pipe section is added and a single supply mode is replaced by a double supply mode, so that the requirement on produced water is met and the aims of protecting the environment, saving energy, reducing consumption, bringing convenience and rapidness are fulfilled.
Description
Technical field
It is long apart from the ore slurry pipeline transporting system that the utility model belongs to, and is specifically related to a kind of novel water circulation system cheaply.
Background technique
In the long-distance pipe transporting system, dehydrating plant is produced water originally by the outside supply, but after sloughing ore pulp in the concentrate pipeline, the water about 1,000 sides is arranged every day.A large amount of water are behind deckered stock chest; Enter cesspool, beat to accident pool by sewage pump again; This part water flows into collecting pit through the accident pool precipitation, after being filtered by heavy formula filter again; Flow into clear water reserviors, water quality is enough to satisfy the standard of producing needs water quality.
Existing clear water reserviors two trends of having come out, one is pumped directly to the mountain top water tower for producing water normal demand in the station by horizontal pump; Two by three clean waterpumps with the unnecessary production grid that is pumped to; But excessive because of producing the water demand sometimes, can occur under-supply.
The model utility content
In order to address the above problem, the utility model discloses a kind of water circulation system, comprise collecting pit, clear water reserviors, high-order water tower and filtration plant, collecting pit is fed to clear water reserviors by heavy formula filter with water, clear water reserviors are connected to high-order water tower by a water tower pipeline section, by all one's life water producing pipe be connected to and produce the grid contact, high-order water tower filters water pipe by one and is connected to filtration plant, between filtration water pipe and production water pipe, be connected with one and connect pipeline section, be used for delivering to filtration plant delivering to the water of producing grid.
Wherein, on the connection steel pipe, the connection valve is installed, on the filtration water pipe, Filter valve is installed, on the production water pipe, supply lines valve is installed.Described Filter valve and supply lines valve are manually operated valves.
Further, four water pumps are housed on clear water reserviors, wherein one is used for water pump is delivered to high-order water tower, and three are used for water pump is delivered to the production grid.
Further, the described connection steel pipe steel pipe that is the common material of DN150.
The utility model with previous single supply model, changes to two supplying modes by after newly adding pipeline section, is enough to ensure the demand of producing water, does useful environmental protection, energy-saving and cost-reducing, convenient and swift really, adequate logistic support.
Description of drawings
Fig. 1: improved water circulation system.
Description of reference numerals:
The 1-filtration plant; The 2-cesspool;
The 3-accident pool; The 4-collecting pit;
The heavy formula filter of 5-; The 6-clear water reserviors;
The high-order water tower of 7-; 8-connects steel pipe;
The 9-Filter valve; The 10-supply lines valve;
11-produces the grid access point.
Embodiment
Below in conjunction with accompanying drawing the utility model is specifically described.
Dehydrating plant produces a large amount of water every day, and a large amount of water enter cesspool 2 behind deckered stock chest, as shown in Figure 1, beaten to accident pool 3 by sewage pump again; This part water flows into collecting pit 4 through accident pool 3 post precipitations, after being filtered by heavy formula filter 5, flows into clear water reserviors 6 again, and water quality is enough to satisfy the standard of producing needs water quality.
As shown in Figure 1, clear water reserviors 6 are connected to high-order water tower by a water tower pipeline section, by all one's life water producing pipe be connected to and produce grid contact 11, the clear water reserviors 6 of collecting pit 4 also filter water pipe by heavy formula filter 5 high-order water towers 7 by one and are connected to filtration plant, four water pumps are housed on clear water reserviors 6, and wherein 7, three on the high-order water tower of confession is used for water pump is delivered to the production grid, the pumping pressure of three pumps can reach 1.0Mpa, and can regulate.
Respectively open a hole being conducted on the filtration water pipe of filtration plant 1 and being conducted on the production water pipe of producing grid, connection steel pipe 8 with the common material of DN150 links to each other these two pipelines, is being conducted to the manual Filter valve 9 that installs a DN150 on the filtration water pipe of filtration plant additional then; Being conducted to the manual supply lines valve 10 that installs a DN250 on the production water pipe of producing grid additional, suitably select position of opening at two Guan Shangke, make that distance is short as far as possible between two pipelines, to save steel pipe.
In ordinary production, connect on the steel pipe 8 valve close, Filter valve 9 and supply lines valve 10 open, the water pump in the clear water reserviors 6 is delivered to high-order water tower 7 and is produced grid.When water is under-supply, change supplying mode, connect on the steel pipe 8 valve open, Filter valve 9 and supply lines valve 9 are closed, and deliver to filtration plant 1 with delivering to the water of producing grid.
Claims (5)
1. water circulation system, comprise collecting pit (4), clear water reserviors (6), high-order water tower (7) and filtration plant (1), collecting pit (4) is fed to clear water reserviors (6) by heavy formula filter (5) with water, it is characterized in that: clear water reserviors (6) are connected to high-order water tower (7) by a water tower pipeline section, by all one's life water producing pipe be connected to and produce grid contact (11), high-order water tower (7) filters water pipe by one and is connected to filtration plant (1), between filtration water pipe and production water pipe, be connected with one and connect steel pipe (8), be used for delivering to filtration plant (1) delivering to the water of producing grid.
2. water circulation system according to claim 1 is characterized in that: on connection steel pipe (8) the connection valve is installed, on the filtration water pipe Filter valve (9) is installed, on the production water pipe supply lines valve (10) is installed.
3. water circulation system according to claim 2 is characterized in that: described Filter valve (9) and supply lines valve (10) are manually operated valves.
4. according to each described water circulation system of claim 1-3, it is characterized in that: four water pumps are housed on clear water reserviors (6), and wherein one is used for water pump is delivered to high-order water tower, and three are used for water pump is delivered to the production grid.
5. according to each described water circulation system of claim 1-3, it is characterized in that: described connection steel pipe (8) is the steel pipe of DN150.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205137741U CN201810987U (en) | 2010-09-02 | 2010-09-02 | Water circulating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205137741U CN201810987U (en) | 2010-09-02 | 2010-09-02 | Water circulating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201810987U true CN201810987U (en) | 2011-04-27 |
Family
ID=43893927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205137741U Expired - Fee Related CN201810987U (en) | 2010-09-02 | 2010-09-02 | Water circulating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201810987U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101963285A (en) * | 2010-09-02 | 2011-02-02 | 云南大红山管道有限公司 | Water circulation system and water circulation technology |
-
2010
- 2010-09-02 CN CN2010205137741U patent/CN201810987U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101963285A (en) * | 2010-09-02 | 2011-02-02 | 云南大红山管道有限公司 | Water circulation system and water circulation technology |
CN101963285B (en) * | 2010-09-02 | 2012-12-12 | 云南大红山管道有限公司 | Water circulation system and water circulation technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203197017U (en) | Water supply and water return system of bar water-cooling device | |
CN201810987U (en) | Water circulating system | |
CN101963285B (en) | Water circulation system and water circulation technology | |
CN205024802U (en) | Energy -saving rainwater recycling system | |
CN201354770Y (en) | Cooling water circulation device for pumps | |
CN104294880A (en) | Roof rainwater recycling device of environment-friendly building | |
CN203939492U (en) | A kind of clear water water filling integrated device | |
CN204860391U (en) | Gardens irrigation equipment | |
CN203649012U (en) | Hot rolled strip laminar cooling circulating water system | |
CN202671263U (en) | Water treatment system with secondary reverse osmosis concentrated water branch reflux | |
CN203653356U (en) | Short-process recovery and comprehensive utilization treatment system for drained water waste heat of coal mine | |
CN210367180U (en) | Emulsion liquid supply system used in underground coal mine | |
CN208949003U (en) | A kind of thermal power plant, steam power plant's waste water hierarchical synthesis processing system | |
CN203392954U (en) | Mineral separation, water-saving and emission reduction equipment | |
CN203509943U (en) | Pipe system for grinding coolant concentrated filtering and chip removal system | |
CN206173049U (en) | Container formula reverse osmosis makes water machine | |
CN202148563U (en) | Water supply pressure reduction system | |
CN205171582U (en) | Life water, production water line water supply system | |
CN204569863U (en) | Pipeline coal transporting water delivery process unit under a kind of large drop ground potential condition | |
CN204606678U (en) | A kind of for the two W type floating roof structure of large-scale External floating roof tank | |
CN220648691U (en) | Seawater culture drainage waste heat recovery and constant temperature system | |
CN212053005U (en) | Energy-saving water supply system for high-rise building | |
CN215063148U (en) | Large-scale recirculated cooling water station side drainage handles economizer system | |
CN201574433U (en) | Rainwater utilization system in factory | |
CN214829510U (en) | Resource allocation device for long-distance pipeline coal conveying by using mine water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110427 Termination date: 20110902 |