CN101963285B - Water circulation system and water circulation technology - Google Patents
Water circulation system and water circulation technology Download PDFInfo
- Publication number
- CN101963285B CN101963285B CN 201010269889 CN201010269889A CN101963285B CN 101963285 B CN101963285 B CN 101963285B CN 201010269889 CN201010269889 CN 201010269889 CN 201010269889 A CN201010269889 A CN 201010269889A CN 101963285 B CN101963285 B CN 101963285B
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- valve
- tower
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention discloses a water circulation system, which comprises a collection tank (4), a clear water reservoir (6), a high water tower (7) and a filter plant (1). The collection tank (4) supplies water to the clear water reservoir (6) through a heavy filter (5); the clear water reservoir (6) is connected to the high water tower (7) through a water tower pipe section and is connected to a production water pipe network joint (11) through a production water pipe; the high water tower (7) is connected to the filter plant (1) through a filtering water pipe; and a connecting steel pipe (8) is connected between the filtering water pipe and the production water pipe and is used for conveying water conveyed to the production water pipe network to the filter plant (1), wherein a connecting valve is arranged on the connecting steel pipe; a filtering valve is arranged on the filtering water pipe; and a pipe network valve is arranged on the production water pipe. The invention also discloses a water circulation method adopting the system. By newly arranging pipe sections, the former single supply mode is changed into a double-supply mode, the requirement for production water is fully met, and the system and the technology exactly contribute to environmental protection, energy conservation, consumption reduction, convenience, rapidness and potent assurance.
Description
Technical field
The invention belongs to length apart from the ore slurry pipeline transporting system, be specifically related to a kind of novel water circulation system cheaply and water circulation craft.
Background technique
In the long-distance pipe transporting system, dehydrating plant is produced water originally by the outside supply, but after sloughing ore pulp in the concentrate pipeline, the water about 1,000 sides is arranged every day.A large amount of water are behind deckered stock chest; Get into cesspool, beat to accident pool by sewage pump again; This part water flows into collecting pit through the accident pool deposition, after being filtered by heavy formula filter again; Flow into clear water reserviors, water quality is enough to satisfy the standard of producing needs water quality.
Existing clear water reserviors two trends of having come out, one is pumped directly to the mountain top water tower by horizontal pump supplies to produce in the station water normal demand; Two by three clean waterpumps with the unnecessary production grid that is pumped to; But excessive because of producing the water demand sometimes, can occur under-supply.
Summary of the invention
In order to address the above problem; The invention discloses a kind of water circulation system; Comprise collecting pit, clear water reserviors, high-order water tower and filtration plant, collecting pit is fed to clear water reserviors clear water reserviors, high-order water tower and filtration plant through heavy formula filter with water, and clear water reserviors are connected to high-order water tower through a water tower pipeline section; Through all one's life water producing pipe be connected to and produce the grid contact; High-order water tower filters water pipe through one and is connected to filtration plant, between filtration water pipe and production water pipe, is connected with one and connects pipeline section, is used for delivering to filtration plant with delivering to the water of producing grid.
Wherein, on the connection steel pipe, the connection valve is installed, on the filtration water pipe, Filter valve is installed, on the production water pipe, supply lines valve is installed.Said Filter valve and supply lines valve are manually operated valves.
Further, four water pumps are housed on clear water reserviors, wherein one is used for water pump is delivered to high-order water tower, and three are used for water pump is delivered to the production grid.
Further, the said connection steel pipe steel pipe that is the common material of DN150.
The invention also discloses and adopt said system to carry out the method for water cycle, specifically be, when high-order water tower undersupply, close Filter valve and supply lines valve, open the connection valve, deliver to filtration plant delivering to the water of producing grid.
The present invention with previous single supply model, changes to two supplying modes through after newly adding pipeline section, is enough to ensure the demand of producing water, does useful environmental protection, energy-saving and cost-reducing, convenient and swift really, adequate logistic support.
Description of drawings
Fig. 1: improved water circulation system.
Description of reference numerals:
The 1-filtration plant; The 2-cesspool;
The 3-accident pool; The 4-collecting pit;
The heavy formula filter of 5-; The 6-clear water reserviors;
The high-order water tower of 7-; 8-connects steel pipe;
The 9-Filter valve; The 10-supply lines valve;
11-produces the grid access point.
Embodiment
Below in conjunction with accompanying drawing the present invention is specifically described.
Dehydrating plant produces a large amount of water every day, and a large amount of water gets into cesspool 2 behind deckered stock chest, as shown in Figure 1, is beaten to accident pool 3 by sewage pump again; This part water flows into collecting pit 4 through accident pool 3 post precipitations, after being filtered by heavy formula filter 5, flows into clear water reserviors 6 again, and water quality is enough to satisfy the standard of producing needs water quality.
As shown in Figure 1, clear water reserviors 6 are connected to high-order water tower through a water tower pipeline section, through all one's life water producing pipe be connected to and produce grid contact 11; High-order water tower 7 filters water pipe through one and is connected to filtration plant; Four water pumps are housed on clear water reserviors 6, and wherein one supplies 7, three on high-order water tower to be used for water pump is delivered to the production grid; The pumping pressure of three pumps can reach 1.0Mpa, and can regulate.
Respectively open a hole being conducted on the filtration water pipe of filtration plant 1 with being conducted on the production water pipe of producing grid; Connection steel pipe 8 with the common material of DN150 links to each other these two pipelines, is being conducted to the manual Filter valve 9 that installs a DN150 on the filtration water pipe of filtration plant additional then; Being conducted to the manual supply lines valve 10 that installs a DN250 on the production water pipe of producing grid additional, suitably select position of opening at two Guan Shangke, make that distance is short as far as possible between two pipelines, to practice thrift steel pipe.
In ordinary production, connect on the steel pipe 8 valve close, Filter valve 9 and supply lines valve 10 open, the water pump in the clear water reserviors 6 is delivered to high-order water tower 7 and is produced grid.When water is under-supply, change supplying mode, connect on the steel pipe 8 valve open, Filter valve 9 is closed with supply lines valve 9, delivers to filtration plant 1 with delivering to the water of producing grid.
Claims (2)
1. a water circulation system comprises collecting pit (4), clear water reserviors (6), high-order water tower (7) and filtration plant (1), and collecting pit (4) is fed to clear water reserviors (6) through heavy formula filter (5) with water; Clear water reserviors (6) are connected to high-order water tower (7) through a water tower pipeline section; Through all one's life water producing pipe be connected to and produce grid contact (11), high-order water tower (7) filters water pipe through one and is connected to filtration plant (1), it is characterized in that: be connected with one between the water pipe and connect steel pipe (8) filtering water pipe and produce; Be used for to deliver to the water of producing grid and deliver to filtration plant (1); On connection steel pipe (8), the connection valve is installed, on the filtration water pipe, Filter valve (9) is installed, on the production water pipe, supply lines valve (10) is installed; Said Filter valve (9) is a manually operated valve; Said supply lines valve (10) is the manual supply lines valve of DN250, and four water pumps are housed on clear water reserviors (6), and wherein one is used for water pump is delivered to high-order water tower; Three are used for water pump is delivered to the production grid, and said connection steel pipe (8) is the steel pipe of the common material of DN150.
2. the system of employing water cycle carries out the method for water cycle, and the water circulation system that this method is used comprises collecting pit (4), clear water reserviors (6), high-order water tower (7) and filtration plant (1), and collecting pit (4) is fed to clear water reserviors (6) through heavy formula filter (5) with water; Clear water reserviors (6) are connected to high-order water tower (7) through a water tower pipeline section; Through all one's life water producing pipe be connected to and produce grid contact (11), high-order water tower (7) filters water pipe through one and is connected to filtration plant (1), is connected with one between the water pipe and connects steel pipe (8) filtering water pipe and produce; Be used for to deliver to the water of producing grid and deliver to filtration plant (1); On connection steel pipe (8), the connection valve is installed, on the filtration water pipe, Filter valve (9) is installed, on the production water pipe, supply lines valve (10) is installed; It is characterized in that: when high-order water tower (7) undersupply; Close Filter valve (9) and supply lines valve (10), open the connection valve, deliver to filtration plant (1) delivering to the water of producing grid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010269889 CN101963285B (en) | 2010-09-02 | 2010-09-02 | Water circulation system and water circulation technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010269889 CN101963285B (en) | 2010-09-02 | 2010-09-02 | Water circulation system and water circulation technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101963285A CN101963285A (en) | 2011-02-02 |
CN101963285B true CN101963285B (en) | 2012-12-12 |
Family
ID=43516291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010269889 Active CN101963285B (en) | 2010-09-02 | 2010-09-02 | Water circulation system and water circulation technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101963285B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102226500B (en) * | 2011-05-18 | 2013-05-08 | 云南大红山管道有限公司 | Device and method for increasing production water pressure for terminal dehydrating station |
CN105384267A (en) * | 2014-09-04 | 2016-03-09 | 苏州汤始建华管桩有限公司 | Pipe pile production circulation water system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2609639Y (en) * | 2002-11-15 | 2004-04-07 | 李日德 | Ceramic waste water filter device |
CN101069792A (en) * | 2007-03-09 | 2007-11-14 | 广东省大宝山矿业有限公司 | Dimension block-ore production environment-protective treatment system |
CN101177324A (en) * | 2006-11-10 | 2008-05-14 | 中国矿业大学(北京) | Mine water down-hole treatment system |
CN201062805Y (en) * | 2007-07-17 | 2008-05-21 | 孟昭捷 | High-efficiency multifunction stove |
CN201810987U (en) * | 2010-09-02 | 2011-04-27 | 云南大红山管道有限公司 | Water circulating system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100400959B1 (en) * | 2001-04-23 | 2003-10-10 | 창신섬유 주식회사 | The water supply system of the water for dyeing with a water purifier and water saving |
-
2010
- 2010-09-02 CN CN 201010269889 patent/CN101963285B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2609639Y (en) * | 2002-11-15 | 2004-04-07 | 李日德 | Ceramic waste water filter device |
CN101177324A (en) * | 2006-11-10 | 2008-05-14 | 中国矿业大学(北京) | Mine water down-hole treatment system |
CN101069792A (en) * | 2007-03-09 | 2007-11-14 | 广东省大宝山矿业有限公司 | Dimension block-ore production environment-protective treatment system |
CN201062805Y (en) * | 2007-07-17 | 2008-05-21 | 孟昭捷 | High-efficiency multifunction stove |
CN201810987U (en) * | 2010-09-02 | 2011-04-27 | 云南大红山管道有限公司 | Water circulating system |
Also Published As
Publication number | Publication date |
---|---|
CN101963285A (en) | 2011-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209277276U (en) | A kind of reservoir drainage pipeline of the hydraulic engineering with choke preventing function | |
CN101963285B (en) | Water circulation system and water circulation technology | |
CN205024802U (en) | Energy -saving rainwater recycling system | |
CN101933447A (en) | Constant temperature heating system of hothouse | |
CN203683252U (en) | Water preparing system for emulsion for mobile small mine working face | |
CN201810987U (en) | Water circulating system | |
CN205776490U (en) | A kind of system for reclaiming rainwater | |
CN204475356U (en) | Subway station open-cut foundation ditch precipitation well water reutilization system | |
CN201354770Y (en) | Cooling water circulation device for pumps | |
CN203048620U (en) | Backwashing water system device of continuous casting machine | |
CN203653356U (en) | Short-process recovery and comprehensive utilization treatment system for drained water waste heat of coal mine | |
CN201832476U (en) | Drip filter | |
CN101956545B (en) | Skid-mounted integrated movable water injection device | |
CN204860391U (en) | Gardens irrigation equipment | |
CN203329458U (en) | Backflushing type returned liquid filter station | |
CN202853206U (en) | Well water recharge system | |
CN202124660U (en) | Novel efficient circulating-purification parkerising device | |
CN102168581B (en) | Split precipitation type hanging scaffold water tank for automatic pollution discharge of vertical shaft | |
CN203558893U (en) | Oil-water recovery device of accident pool in coal tar hydrogenation unit | |
CN214467892U (en) | Automatic liquid supply device of environment-friendly hydraulic support concentrated solution | |
CN204569863U (en) | Pipeline coal transporting water delivery process unit under a kind of large drop ground potential condition | |
CN202388546U (en) | Washing system of machine tool of slicing machine | |
CN204098194U (en) | A kind of dewatering installation | |
CN102409573A (en) | Recycling method of pulping wastewater | |
CN103657249A (en) | Continuous casting machine back washing water system device and method for recycling back washing water of continuous casting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |