CN201809778U - Excavated disk pile foundation for iron tower of power transmission lines - Google Patents

Excavated disk pile foundation for iron tower of power transmission lines Download PDF

Info

Publication number
CN201809778U
CN201809778U CN2010205668134U CN201020566813U CN201809778U CN 201809778 U CN201809778 U CN 201809778U CN 2010205668134 U CN2010205668134 U CN 2010205668134U CN 201020566813 U CN201020566813 U CN 201020566813U CN 201809778 U CN201809778 U CN 201809778U
Authority
CN
China
Prior art keywords
foundation
pile
excavated
disk
main pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205668134U
Other languages
Chinese (zh)
Inventor
郭咏华
杨宗奇
曹志民
郭杰
文永庆
雷光杰
邓锦辉
蔡武军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hennan Electric Power Survey and Design Institute
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN2010205668134U priority Critical patent/CN201809778U/en
Application granted granted Critical
Publication of CN201809778U publication Critical patent/CN201809778U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an excavated disk pile foundation for an iron tower of power transmission lines. The excavated disk pile foundation comprises a main pile, wherein a chassis is arranged at the bottom of the main pile, and at least one disk is arranged in the middle of the main pile. In the utility model adopting the technical scheme, the foundation comprises a main pile and a plurality of disks, wherein the main pile and the disks are in close contact with the undisturbed soil. The foundation has better capability of resisting horizontal loads and pressing loads, especially can resist larger up-pulling force and has good stability. The diameter of each disk is smaller, so that the stability is better; the personal safety of workers can be ensured in the excavating processes; the construction is convenient, the excavated surface is small, the young crop compensation cost is reduced, the labor intensity is low, and the advantage of good bearing performance of the undisturbed foundation soil is fully utilized; and moreover, the vegetation deterioration is reduced, the soil and water losses are avoided, and the environment is protected.

Description

Iron tower of power transmission line is drawn and is dug the dish pile foundation
Technical field
The utility model relates to a kind of basis of iron tower of power transmission line, specifically designs a kind of iron tower of power transmission line basis of digging the dish stake of drawing.
Background technology
In mountain route, when adopting shown in Figure 1 isometrical pile foundation, it is very big to consume amount of concrete.Employing is drawn when digging spread foundation, and as shown in Figure 2, it is still bigger to consume amount of concrete.
Under condition, draw that to dig dish pile foundation diameter littler than drawing the diameter that digs spread foundation, buried depth can reach 5-18m, belongs to deep foundation.Because the bellend size is less, is difficult for the hole of collapsing, and more easily guarantees constructor's safety.In addition, the earth volume of its excavation of foundation pit is few, and is very little to the influence of surrounding environment, also do not have the unnecessary earthwork to need to handle basically.
Summary of the invention
The purpose of this utility model provide a kind of have preferably pull out and press down weight bearing power in the opposing and can reduce drawing of vegetation deterioration and dig a dish stake formula iron tower of power transmission line basis.
For achieving the above object, the utility model is by the following technical solutions:
The utility model comprises king pile, in the bottom of described king pile the chassis is set, and at the middle part of described king pile at least one dish is set.
Adopt the utility model of technique scheme, this fundamental mode is made up of king pile and a plurality of dish, and king pile closely contacts with undisturbed soil with dish, has the ability of resisting horizontal loading preferably and pressing down load, especially can resist bigger uplift force, good stability.The diameter of dish is less, stability better, it is secure that the workman draws when digging personal safety, easy construction, the excavation face is little, has reduced compensation for crops usefulness, and labour intensity is low, has made full use of the good advantage of original state foundation soil load-carrying properties, and reduced vegetation deterioration, avoided soil erosion, be beneficial to environmental protection.
Description of drawings
Fig. 1 is traditional equal diameter pile foundation.
Fig. 2 digs spread foundation for drawing.
Fig. 3 is a structural representation of the present utility model.
Fig. 4 is the structural representation of another example in the utility model.
The specific embodiment
As shown in Figure 3, Figure 4, the utility model comprises king pile 1, in the bottom of king pile 1 chassis 3 is set, and the utility model is provided with at least one dish 2 at the middle part of king pile 1.The number of dish 2 can only be one, as shown in Figure 3, also can be two, can also be a plurality of, as shown in Figure 4.
In when construction, the stake hole is adopted manually to draw and is scraped out the hole, the workman draw dig dish local time, carry out hole enlargement and handle.The number that dish is set is many more, and the ability of its resistance to plucking, resistance to compression and anti-horizontal loading is just strong more.
Draw and dig the dish collaborative work that the dish pile foundation is utilized king pile and pile body, bear top iron tower load jointly, have and resist horizontal loading preferably and press down the ability that load acts on repeatedly, especially can resist bigger uplift force effect, good stability.It is compared with traditional basis, and following characteristics are arranged: draw and dig the dish pile foundation and effectively utilized undisturbed soil, good stability, stressed rationally; The excavation of foundation pit earth volume is little, and construction technology is simple, does not need large-scale construction equipment, and is easy to operate; Save concrete; Can reduce vegetation deterioration, avoid more soil erosion, be beneficial to environmental protection.

Claims (2)

1. an iron tower of power transmission line is drawn and is dug the dish pile foundation, and it comprises king pile (1), it is characterized in that: in the bottom of described king pile (1) chassis (3) is set, and at the middle part of described king pile (1) at least one dish (2) is set.
2. iron tower of power transmission line according to claim 1 is drawn and is dug the dish pile foundation, it is characterized in that: at the middle part of described king pile (1) two dishes (2) are set.
CN2010205668134U 2010-10-19 2010-10-19 Excavated disk pile foundation for iron tower of power transmission lines Expired - Fee Related CN201809778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205668134U CN201809778U (en) 2010-10-19 2010-10-19 Excavated disk pile foundation for iron tower of power transmission lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205668134U CN201809778U (en) 2010-10-19 2010-10-19 Excavated disk pile foundation for iron tower of power transmission lines

Publications (1)

Publication Number Publication Date
CN201809778U true CN201809778U (en) 2011-04-27

Family

ID=43892719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205668134U Expired - Fee Related CN201809778U (en) 2010-10-19 2010-10-19 Excavated disk pile foundation for iron tower of power transmission lines

Country Status (1)

Country Link
CN (1) CN201809778U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817380A (en) * 2012-02-20 2012-12-12 中国科学院寒区旱区环境与工程研究所 Measure for enhancing electric transmission line tower footing frozen soil foundation stability
CN103643695A (en) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 Prefabricated fish belly type nested slab foundation
CN103643693A (en) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 Prefabricated cross-shaped nested wing plate foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817380A (en) * 2012-02-20 2012-12-12 中国科学院寒区旱区环境与工程研究所 Measure for enhancing electric transmission line tower footing frozen soil foundation stability
CN102817380B (en) * 2012-02-20 2015-03-11 中国科学院寒区旱区环境与工程研究所 Measure for enhancing electric transmission line tower footing frozen soil foundation stability
CN103643695A (en) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 Prefabricated fish belly type nested slab foundation
CN103643693A (en) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 Prefabricated cross-shaped nested wing plate foundation
CN103643695B (en) * 2013-12-09 2015-12-02 中国科学院武汉岩土力学研究所 A kind of prefabricated fish belly type nested type wing plate basis
CN103643693B (en) * 2013-12-09 2016-01-20 中国科学院武汉岩土力学研究所 A kind of prefabricated cross nested type wing plate basis

Similar Documents

Publication Publication Date Title
CN203821412U (en) Supporting structure with scattered row piles and continuous walls
CN201809778U (en) Excavated disk pile foundation for iron tower of power transmission lines
CN203035085U (en) Punching and rod inserting machine
CN202117068U (en) Micropile plate-type composite foundation
CN100516382C (en) Finishing construction method for sandstone hilly land house foundation
CN102995643B (en) Underground-space steel truss foundation pit supporting structure and construction method thereof
CN105297764B (en) Marine wind electric field fan single-pile foundation and its construction method
CN201292534Y (en) Pylon foundation of transmission line
CN201809781U (en) Cross shaped foundation of transmission line iron tower
CN202425290U (en) Supportable spade
CN110055994A (en) A kind of suction cylindrical structure
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN202124863U (en) Screw anchor excavated composite foundation
CN202194152U (en) Power steel pipe tower base
CN202194146U (en) Single-row-pile foundation pit bracing structure
CN204023580U (en) The double steel sheet piling pit supporting construction of a kind of inclination assembling
CN207891897U (en) A kind of protective slope structure of side slope
CN116306142A (en) Root key pile foundation selection and root key arrangement method for power transmission line
CN206956747U (en) Arc double-row steel pipe pile cofferdam
CN201809777U (en) Silently-pressed mini-group-pile foundation for transmission line towers
CN201588222U (en) Superposed digging/embedding foundation
CN203034462U (en) A steel truss support structure for a ground pit of underground space
CN203080540U (en) Iron tower foundation of power transmission line
CN203514325U (en) Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles
CN103416119B (en) Portable land roller for farmland

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20161019

CF01 Termination of patent right due to non-payment of annual fee