Prior art keywords
room
room body
skid
station
door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205101400U
Other languages
Chinese (zh)
Inventor
关越
向波
杨晓秋
陈彰兵
杜通林
何丽梅
杨焜
张朱慧
石游
郭江菊
朱云
史乾
江兵
郭晋川
林成玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Engineering and Construction Corp
Original Assignee
China National Petroleum Corp Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp Engineering Design Co Ltd filed Critical China National Petroleum Corp Engineering Design Co Ltd
Priority to CN2010205101400U priority Critical patent/CN201802090U/en
Application granted granted Critical
Publication of CN201802090U publication Critical patent/CN201802090U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses an electric control equipment skid-mounted room of a natural gas engineering station, which comprises a room body. A door is arranged in the middle of one side of the room body, an inspection passage which crosses the room body is disposed in the room body at the position facing the door, the room body is in a steel skid-mounted structure and is fixedly mounted on a steel skid-mounted bottom beam, a small wiring chamber with a lock is arranged at the head of the outer end of the room body, heating and ventilating equipment is disposed on a wall opposite to the door, an illuminating lamp and a fire detector are arranged at the top of the room body, a low-voltage power distribution unit and an uninterruptable power supply (UPS) are disposed in the room body, cabinets of the low-voltage power distribution unit and the uninterruptable power supply (UPS) are arranged in parallel, a communication cabinet and a meter cabinet are arranged on the right side of the inspection passage and the opposite side of the low-voltage power distribution unit in parallel, and a tool cabinet is disposed on the left side of an entrance of the door. The electric control equipment skid-mounted room has the advantages that a station assorted system is integrated in the small skid-mounted room so as to reduce wiring of field installation and electrical and self-control communication equipment, and the electric control equipment skid-mounted room adopts techniques of integration, electromagnetic interference prevention, heat dissipation, ventilation and the like, and realizes skid-mounting of electrical and control equipment of the station.

Description

Control panel skid room, field, gas engineering station
Technical field
The utility model relates to a kind of skid mounted equipment room, especially relates to control panel skid room, field, a kind of gas engineering station.
Background technology
A middle-size and small-size station major part of gas engineering is positioned at remote districts, geomorphic feature mostly is mountain area, hills, Desert of Gobi, main electricity consumption process facility comprises pump or heating and anti-freezing equipment etc., in the conventional design, generally will stand a supporting power supply-distribution system, automatic control system, communication system etc. are installed concentratedly in permanent construction.Along with the development of gas field exploration development technique, for the characteristics of gas field rolling development, time phasing, present design scheme shows following shortcoming:
1) building is once finished design, and fixation means repeats, and reorganization and expansion is more; Particularly have only the well station in several years campaign, the equipment recycling rate of waterused is low, and the design cycle is long, and Technological Economy is relatively poor.
2) strong and weak electricity equipment install to disperse, and floor space is bigger, and house wiring, cable installation period is long.
3) the ambient conditions difference of field, middle-size and small-size station is big, the building pattern is various, as: northern area cold in winter, the south summer high temperature, the desert area day and night temperature is big, Chongqing of Sichuan local climate humidity, lightening activity are frequent, and the design of the electric and control system in the field, station of gas engineering, buying, construction etc. should not realize standardization.
In recent years, system's skid technology such as the Electric Drive of drilling engineering, control, communication increasingly mature, integrated and equipment skidization provides feasibility for the overall technology of the power supply-distribution system at station, automatic control system, communication system.
The utility model content
The utility model has overcome shortcoming of the prior art, control panel skid room, field, a kind of gas engineering station is provided, throttling in conjunction with field, gas engineering station is antifreeze, chemical agent injects, separate emptying, dehydration (taking off hydrocarbon), measure metering, well head control panel demands such as (WHCP), to stand corollary system, comprise power supply-distribution system, automatic control system, communication system equipment is integrated in the skid cabin, reduce the wiring of on-the-spot installation and electric installation, adopt integrated, anti-electromagnetic interference, technology such as heat dissipation ventilation, the skidization of the electric and control appliance of field, realization station.
The technical solution of the utility model is: control panel skid room, field, a kind of gas engineering station, comprise the room body, and have door at the middle part of room body one side, in the room body, be provided with the passage of patrolling and examining that crosses the room body over against the door place; The room body adopts steel skid structure, is fixedly installed on the sled bottom steel beam; Position, external termination is provided with the wiring cell of band door lock in the room; Be provided with heating and ventilating equipment at door on to side wall; Be provided with lighting and fire detector at body top, room; Low-voltage distribution equipment and UPS uninterrupted power supply(ups) are set in the room body, and the rack of the two is arranged in juxtaposition; Patrol and examine the passage right side, the low-voltage distribution equipment offside has been arranged in juxtaposition communication cabinet and instrument rack; Be provided with Tool Cabinet in door inlet left side.
Be provided with expanding location on UPS uninterrupted power supply(ups) right side and communication cabinet left side.Described room body adopts and adds thick insulation layer, is provided with interlayer in room body base, is provided with metal raceway in interlayer, and the floor in the room body is openable movable floor, is provided with the equipotential terminal row in room body bottom.Described wiring cell bottom is the outlet cabinet, and top is air-conditioner outdoor unit, is provided with partition wall between wiring cell and body inside, room, and the little chamber interior of wiring is concentrated power cable plug assembly or control cables plug assembly or signal cable plug assembly are set.
Compared with prior art, the utility model has the advantages that: the site plants such as a middle-size and small-size station electric power, automatic control, communication that are primarily aimed at gas engineering, adopt technology such as integrated, quick grafting, anti-tampering, heat dissipation ventilation, realize the skidization of the electric and control appliance of field, gas gathering and transportation station, concrete manifestation is as follows:
1) strong and weak electricity apparatus arrangement compactness in the steel skid room body, equipment such as distribution, control automatically, communication, cathodic protection all adopt the modular functionality design, satisfy field, gas gathering and transportation station technology for distribution and control, communicating requirement.
2) the utility model room body size and weight design, equipment fixedly satisfy the movement requirement and the integral hoisting requirement of the inner Class IV highway in gas field.Electric and control appliance is comparatively complicated when the scene, in the time of should not adopting independently the outdoor equipment dispersed placement, adopts steel skid room body, effectively dwindle floor space, the convenient transport of station, can move fast as required and install, shorten the duration of a project, save investment.
3) room body top cover and shell mechanism compactness, firm have good thermal insulation, rain-proof dust-proof function, are convenient to Fast Installation, lift and move.
4) steel skid room body electric, all adopt the connector mode to connect from electric control cable turnover line, be convenient to Fast Installation, dismounting and the maintenance of cable.Electromagnetic compatibility (EMC) characteristic is considered in comprehensive wiring, guarantees the monitor protective system stable and reliable operation.
Description of drawings
The utility model will illustrate by example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is a layout schematic diagram of the present utility model.
The specific embodiment
Control panel skid room, field, novel natural gas engineering station as shown in Figure 1, comprise: room body 1, wiring cell 2, heating and ventilating equipment 3, lighting and fire detector 4, low-voltage distribution equipment 5, UPS uninterrupted power supply(ups) 6, communication cabinet 7, instrument rack 8, Tool Cabinet 9, expanding location 10, wherein:
1) room body
Room body 1 adopts steel skid structure, and internal unit is fixedly installed on the sled bottom steel beam, and substructure height is about 180mm.Weight generally is no more than 5.5 tons, satisfies the movement requirement and the integral hoisting requirement of the inner Class IV highway in gas field, and is easy for installation.The room body possesses windproof, rainproof, sun-proof, dust prevention, for the abominable scene of ambient temperature conditions, adopts measures such as adding thick insulation layer.
Be provided with interlayer in the base, be used for the prying body inside cable and connect, the strong and weak electricity circuit lays in the base metal raceway along different paths respectively, and satisfies the comprehensive wiring related request, and movable floor can be opened in the room body, is convenient to patrol and examine.Body bottom, room is provided with working grounding and protection grounding equipotential terminal row, and utilizes steel skid room body structure to do the lightning protection protection.
2) wiring cell
Body 1 external end head position in room is provided with the wiring cell 2 of band door lock, and wiring cell bottom is the outlet cabinet, and top is air-conditioner outdoor unit.Be provided with partition wall between wiring cell and body inside, room, inner concentrating is provided with power cable, control cables, signal cable plug assembly, as skid room external cable tie point, can realize quick movement and frequent resettlement, plug connector can adopt patterns such as aviation plug-in unit, wiring terminal, industrial plug connector as required.
3) heating and ventilating equipment
Be provided with heating and ventilating equipment 3 at skid room door on to side wall, heating and ventilating equipment can be an air-conditioner, the operate as normal of equipment such as, instrument electric to guarantee, communication.And can equipment such as electric heater, mechanical ventilation be set, to guarantee indoor normal working temperature according to the ambient temperature conditions of territory of use.The heating and ventilating equipment power supply is taken from low-voltage distribution equipment, and can realize control automatically according to temperature, and distribution utilizes the base metal raceway to lay.
4) lighting and fire detector
Skid roof portion is provided with lighting and fire detector 4.Lighting can be according to door state automatic shutter, and illumination is by the power supply of UPS uninterrupted power supply(ups), doublely does emergency lighting, and distribution is along secretly applying in the roof.Fire detector can be realized automatic warning function by control system.
5) low-voltage distribution equipment
Low-voltage distribution equipment 5 is set in the room body, comprises: each 1 of low-tension switch cabinet, motor control center (MCC) are arranged in and patrol and examine the passage left side.Cabinet adopts light-duty cabinet (nominal short-cirucit capacity 10kA), the side outlet, installs by wall, possess anti-directly, electrical shock protection indirectly.Be used for low pressure (380/220V, the operation/control/protection of AC) incoming power operation, surge protection, low-temperature measurement, feeding circuit and motor circuit.Adopt bus to connect between low-voltage distribution equipment, the turnover cable adopts inlet wire mode down, power distribution equipment quantity requires to be controlled at the 2-3 face according to power load, and the throttling of satisfying the gathering station field is antifreeze, chemical agent injects, separate emptying, dehydration (taking off hydrocarbon), the power supply and the Motor Control requirement of measuring the power load of metering, well head control panel (WHCP) etc.Power cable and control cables are connected to the wiring cell along the base wire casing.
6) UPS uninterrupted power supply(ups)
UPS uninterrupted power supply(ups) 6 is as the back-up source of automatic control equipment, communication equipment, emergency lighting, the about 3kVA-10kVA of rated capacity.UPS rack and low-voltage distribution equipment are arranged in juxtaposition, and adopt and concentrate group screen, reduce floor space, and the rack bottom is provided with batteries, and rack top is provided with the UPS main frame and feeds out switch.UPS device turnover cable is connected with each relevant device in prying body inside along the base wire casing.Mechanical ventilation and cabinet intraoral illumination are set in the rack.
7) communication cabinet
Communication cabinet 7 arranges and patrols and examines the passage right side that the low-voltage distribution equipment offside effectively reduces electromagnetic interference.The communication data transmission system can adopt wireless system for transmitting data, optical communication system or Global Link gsm system; And can transmit automatic control data, video photo, industrial television video image, speech and office network data as required.Signal cable is connected to the wiring cell along the base wire casing.
8) instrument rack
Instrument rack 8 is positioned at door right side, skid room, is arranged in juxtaposition with communication cabinet, is convenient to patrol and examine and operate.Concentrate control terminal unit/programmable logic controller far away (RTU/PLC) and the urgent stopping production system (or being called the IPS of instrument protection system) of being provided with in the instrument rack.Be used for collection, processing and monitoring station field technological parameter, comprise (the F﹠amp of internal heat system; G), the information of well head control panel (WHCP), other technology the complete sets of equipment PLC.Realize a station unattended process control, metering and safety operation, and by exchanges data and the control of communication port realization with gas field development SCADA system centre.
According to complex process degree and expansion requirement, can simplify configuration, select the programmable logic controller (PLC) of different safety class (SIL-1/SIL-2/SIL-3 level), take into account the control function of urgent stopping production system, internal heat system.Control cables is connected to the wiring cell along the base wire casing.
9) Tool Cabinet
In door inlet left side 1 Tool Cabinet 9 is set, is used for place tool and standby redundancy etc., comprise screwdriver, spanner etc., be convenient to the personnel of patrolling and examining and obtain.
10) expanding location
Dotted line is depicted as expanding location among Fig. 1, and wherein ups power device right side expanding location is used for the expansion of low voltage distribution system, and the UPS rack is corresponding to move to right; Communication cabinet left side expanding location is used for the expansion of instrument or communication system, and in steel skid room body current potential transmitter or cathodic protection station equipment is set as required.

Claims (4)

1. control panel skid room, field, a gas engineering station, comprise the room body, have door, in the room body, be provided with the passage of patrolling and examining that crosses the room body over against the door place at the middle part of room body one side, it is characterized in that: the room body adopts steel skid structure, is fixedly installed on the sled bottom steel beam; Position, external termination is provided with the wiring cell of band door lock in the room; Be provided with heating and ventilating equipment at door on to side wall; Be provided with lighting and fire detector at body top, room; Low-voltage distribution equipment and UPS uninterrupted power supply(ups) are set in the room body, and the rack of the two is arranged in juxtaposition; Patrol and examine the passage right side, the low-voltage distribution equipment offside has been arranged in juxtaposition communication cabinet and instrument rack; Be provided with Tool Cabinet in door inlet left side.
2. control panel skid room, field, gas engineering according to claim 1 station is characterized in that: be provided with expanding location on UPS uninterrupted power supply(ups) right side and communication cabinet left side.
3. control panel skid room, field, gas engineering according to claim 1 station, it is characterized in that: described room body adopts and adds thick insulation layer, in room body base, be provided with interlayer, in interlayer, be provided with metal raceway, floor in the room body is openable movable floor, is provided with the equipotential terminal row in room body bottom.
4. control panel skid room, field, gas engineering according to claim 1 station, it is characterized in that: described wiring cell bottom is the outlet cabinet, top is air-conditioner outdoor unit, be provided with partition wall between wiring cell and body inside, room, the little chamber interior of wiring is concentrated power cable plug assembly or control cables plug assembly or signal cable plug assembly is set.
CN2010205101400U 2010-08-31 2010-08-31 Electric control equipment skid-mounted room of natural gas engineering station Expired - Lifetime CN201802090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205101400U CN201802090U (en) 2010-08-31 2010-08-31 Electric control equipment skid-mounted room of natural gas engineering station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205101400U CN201802090U (en) 2010-08-31 2010-08-31 Electric control equipment skid-mounted room of natural gas engineering station

Publications (1)

Publication Number Publication Date
CN201802090U true CN201802090U (en) 2011-04-20

Family

ID=43871598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205101400U Expired - Lifetime CN201802090U (en) 2010-08-31 2010-08-31 Electric control equipment skid-mounted room of natural gas engineering station

Country Status (1)

Country Link
CN (1) CN201802090U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104731049A (en) * 2015-01-09 2015-06-24 中国石油天然气股份有限公司 Skid-mounted integration method for power distribution, control and communication systems of oil and gas field station
US9212499B1 (en) 2013-06-24 2015-12-15 Teton Energy Consulting, LLC Skid mounted utility system
CN105804445A (en) * 2016-05-06 2016-07-27 中国寰球工程公司 Skid-mounted mobile control room
CN110045766A (en) * 2019-04-24 2019-07-23 上海宝临电气集团有限公司 A kind of cabinet intelligent monitoring identifying system
CN110159002A (en) * 2019-04-24 2019-08-23 上海宝临电气集团有限公司 A kind of automatically controlled letter integrated mobile electrical equipment
CN110285323A (en) * 2019-05-16 2019-09-27 中石化石油工程技术服务有限公司 Natural gas line based on SCADA system standardizes integration module

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9212499B1 (en) 2013-06-24 2015-12-15 Teton Energy Consulting, LLC Skid mounted utility system
CN104731049A (en) * 2015-01-09 2015-06-24 中国石油天然气股份有限公司 Skid-mounted integration method for power distribution, control and communication systems of oil and gas field station
CN104731049B (en) * 2015-01-09 2017-09-01 中国石油天然气股份有限公司 A kind of distribution of oil gas field station, control, communication system sledge dress integrated approach
CN105804445A (en) * 2016-05-06 2016-07-27 中国寰球工程公司 Skid-mounted mobile control room
CN110045766A (en) * 2019-04-24 2019-07-23 上海宝临电气集团有限公司 A kind of cabinet intelligent monitoring identifying system
CN110159002A (en) * 2019-04-24 2019-08-23 上海宝临电气集团有限公司 A kind of automatically controlled letter integrated mobile electrical equipment
CN110159002B (en) * 2019-04-24 2024-05-03 上海宝临电气集团有限公司 Electric control signal integrated mobile electrical equipment
CN110285323A (en) * 2019-05-16 2019-09-27 中石化石油工程技术服务有限公司 Natural gas line based on SCADA system standardizes integration module

Similar Documents

Publication Publication Date Title
CN201802090U (en) Electric control equipment skid-mounted room of natural gas engineering station
CN205070192U (en) Novel electric control cabinet
CN203312656U (en) An intelligent energy-saving-type outdoor switching station
CN107222027A (en) A kind of efficient real time comprehensive managing and control system of power distribution room
CN106058702A (en) Modular intelligent box type substation
CN219164999U9 (en) Oil gas place production information integration sledge and sledge cabinet thereof
CN104424785A (en) Wireless distribution-type video contact network switch monitor system and wireless distribution-type video contact network switch monitor method
CN103887725A (en) All indoor transformer station
CN219498725U (en) Energy storage integrated preassembled transformer substation
CN211063537U (en) Direct-current remote power supply for long-distance tunnel
CN202383493U (en) Automatic control device for heating and ventilation of transformer substation
CN209787687U (en) Modularization integral type device cabinet
CN208707801U (en) The multi-party supervision site ingress/egress points of one kind monitors environmental surveillance mobile device automatically
CN104362733B (en) A kind of prefabricated uninterruptible power system
CN110112670A (en) Preassembled transformer station is minimized on a kind of column
CN207282986U (en) A kind of intelligent integrated cabinet
CN105356345A (en) Combined intelligent box-type transformer station
CN204156379U (en) A kind of Combined intelligent box-type transformer substation
CN204290470U (en) A kind of prefabricated uninterruptible power system
CN111884342A (en) New energy comprehensive power environment monitoring system
CN108695753A (en) Integral intelligent photovoltaic substation
CN212410583U (en) Movable carbon monoxide monitoring device
CN210041091U (en) Compact photovoltaic power generation system switch station
CN203056385U (en) Power supply system of intelligent building and integrated power supply cabinet system
CN105449555A (en) Control box for intelligent protection system of power transmission and distribution grid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180111

Address after: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6

Patentee after: China Petroleum Engineering Construction Co Ltd

Address before: 610017 Sichuan province Chengdu Xiaoguan Temple Backstreet No. 25

Patentee before: Engineering Design Co., Ltd., China Petroleum Group

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20110420

CX01 Expiry of patent term