CN201801485U - Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position - Google Patents

Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position Download PDF

Info

Publication number
CN201801485U
CN201801485U CN2010205476740U CN201020547674U CN201801485U CN 201801485 U CN201801485 U CN 201801485U CN 2010205476740 U CN2010205476740 U CN 2010205476740U CN 201020547674 U CN201020547674 U CN 201020547674U CN 201801485 U CN201801485 U CN 201801485U
Authority
CN
China
Prior art keywords
embedded pipe
coke oven
pipe laying
mounting position
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205476740U
Other languages
Chinese (zh)
Inventor
李其高
杨建新
刘明周
刘仁峰
罗劲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2010205476740U priority Critical patent/CN201801485U/en
Application granted granted Critical
Publication of CN201801485U publication Critical patent/CN201801485U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model relates to a pre-embedded pipe for a base ejection plate of a coke oven with accurate mounting position. The pre-embedded pipe is composed of the following components: a pre-embedded pipe body, a base which is connected with the bottom of the pre-embedded pipe, and an end cover provided at the other end of the pre-embedded pipe body. The pre-embedded pipe is also provided with a position marker at the top end of the end cover. The pre-embedded pipe can prevent entering of concrete and other foreign objects into the pre-embedded pipe for preventing obstruction. Furthermore the pre-embedded pipes are respectively in a central line in a longitudinal direction and a transverse direction. The user requirement for the mounting quality is satisfied.

Description

Has the installation site pre-pipe laying of coke oven base roof plate accurately
Technical field
The utility model relates to pit kiln, specifically belongs to the pre-pipe laying of coke oven base roof plate.
Background technology
Coal is as a kind of important strategic Energy resources, is the important behave that improves its service efficiency, protection environment to the deep processing of coal and to the recovery of by-product.The research and development of capacity coke oven and use are the further behaves that the coal Energy resources is improved its service efficiency, protection environment.
The pre-pipe laying of coke oven base roof plate is civil engineering specialty and the important critical process that is connected of brickwork specialty; Pre-pipe laying directly influences building by laying bricks or stones and using of coke oven.Pre-pipe laying is not only measured many, as the pre-pipe laying of JNDK55-07 Formed Coke Furnace big 4288 (coke roof 91.73X16.2m), and installation quality require high, institute's pipe laying vertically, laterally all will be on a medullary ray, otherwise, can be influential to the installation quality of the pre-pipe laying of coke oven base roof plate.Yet, at present whether the pre-pipe laying of its coke oven base roof plate is on a medullary ray, rely on the mode of artificial visually examine or employing backguy, therefore, be difficult to guarantee that institute's pipe laying from vertically seeing on the medullary ray, from laterally seeing the also installation quality on a medullary ray, causes constructing and can't satisfy user's requirement with high quality.
The utility model content
The purpose of this utility model is to overcome the deficiency that prior art exists, provide a kind of and can not only prevent that concrete and other foreign material enter pre-pipe laying in installation, and the pre-pipe laying vertical, horizontal of base roof plate all respectively has a medullary ray of one's own, deviation is in minimum span of control, and what guarantee installation quality has an installation site pre-pipe laying of coke oven base roof plate accurately.
Realize the technical measures of above-mentioned purpose:
Have the installation site pre-pipe laying of coke oven base roof plate accurately, by pre-buried tube body, the base that is connected with pre-buried tube body bottom, the end cap of the other end of pre-buried tube body is formed, and it is characterized in that: the top at end cap is provided with location marker.
It is characterized in that: location marker is cruciform or linear.
The utility model compared with prior art, it can not only prevent that concrete and other foreign material enter pre-pipe laying in installation, the phenomenon that can not result in blockage, and the pre-pipe laying vertical, horizontal of institute all respectively has a medullary ray of one's own, installation quality satisfies customer requirements.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 and Fig. 3 are criss-cross end cap plan structure synoptic diagram for location marker among Fig. 1
Fig. 4 is rectilinear end cap plan structure synoptic diagram for location marker among Fig. 1.
Embodiment
Be described further below in conjunction with accompanying drawing:
Have the installation site pre-pipe laying of coke oven base roof plate accurately, by pre-buried tube body 1, the base 2 that is connected with pre-buried tube body 1 bottom, the end cap 3 of the other end of pre-buried tube body 1 is formed.Its on top of end cap 3 whole processing or with screw thread or screw in addition quarter the mode of retouching connect cruciform or linear location marker 4, be preferably on cruciform or the linear location marker 4 and coat eye-catching colour; Cruciform or linear location marker 4 must guarantee its intersection verticality or linearity; End cap 3 is flute profile or band chock plug.

Claims (2)

1. have the installation site pre-pipe laying of coke oven base roof plate accurately, by pre-buried tube body, the base that is connected with pre-buried tube body bottom, the end cap of the other end of pre-buried tube body is formed, and it is characterized in that: the top at end cap is provided with location marker.
2. as claimed in claim 1 have an installation site pre-pipe laying of coke oven base roof plate accurately, and it is characterized in that: location marker is cruciform or linear.
CN2010205476740U 2010-09-29 2010-09-29 Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position Expired - Fee Related CN201801485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205476740U CN201801485U (en) 2010-09-29 2010-09-29 Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205476740U CN201801485U (en) 2010-09-29 2010-09-29 Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position

Publications (1)

Publication Number Publication Date
CN201801485U true CN201801485U (en) 2011-04-20

Family

ID=43871000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205476740U Expired - Fee Related CN201801485U (en) 2010-09-29 2010-09-29 Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position

Country Status (1)

Country Link
CN (1) CN201801485U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103387836A (en) * 2013-07-31 2013-11-13 中国二十二冶集团有限公司 Method for mounting coke oven roof buried pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103387836A (en) * 2013-07-31 2013-11-13 中国二十二冶集团有限公司 Method for mounting coke oven roof buried pipe

Similar Documents

Publication Publication Date Title
CN203965278U (en) One is concrete slump proving installation movably
CN103389251A (en) A compression strength rebound detecting method for pumping mountain sand and concrete
CN201801485U (en) Pre-embedded pipe for base ejection plate of coke oven with accurate mounting position
CN203961052U (en) A kind of new type block wall body structure
CN204940809U (en) A kind of storehouse, ground top board lighting and ventilation well construction of square slope wall type
CN203403056U (en) Central calibration device for furnace head in building of coke furnace
CN202370152U (en) Non-run-through hollow brick for resisting earthquake by shear check block
CN204385786U (en) Multi-functional prestressed concrete pipe pile antibending shear resistance system
CN202329184U (en) Kiln feeding port structure
CN102979245A (en) Building cement board
CN202575495U (en) Suspension detection device
CN202462595U (en) Detachable curing shelf of test specimens in standard curing room
CN201801486U (en) Embedded pipe for top plate of coke oven base
CN205314128U (en) Plastic power communication well of integral type
CN204552756U (en) A kind of Super Long Tunnel sole plate sliding layer
CN202948020U (en) Concrete shrinkage crack test die
CN202440822U (en) Push aid for secondary grouting of concrete grout
CN201763013U (en) Summerhouse with flat top
CN202829851U (en) Novel brick holding circle structure
CN203034896U (en) Chimney provided with a plurality of holes
CN202899420U (en) Thermal-insulation building block
CN207407675U (en) A kind of frame structure for roller kiln bottom
Chen et al. Numerical study of wind-driven rain distribution on low-rise buildings with different roof styles
CN201858951U (en) Space fine-adjusting instrument for mounting pre-embedded pipes of coke oven foundation roof
CN207536549U (en) Finished bin hopper support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110420

Termination date: 20170929

CF01 Termination of patent right due to non-payment of annual fee