CN201799830U - Spiral pin remover - Google Patents

Spiral pin remover Download PDF

Info

Publication number
CN201799830U
CN201799830U CN2010205103355U CN201020510335U CN201799830U CN 201799830 U CN201799830 U CN 201799830U CN 2010205103355 U CN2010205103355 U CN 2010205103355U CN 201020510335 U CN201020510335 U CN 201020510335U CN 201799830 U CN201799830 U CN 201799830U
Authority
CN
China
Prior art keywords
leading screw
bearing pin
screw
pin
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205103355U
Other languages
Chinese (zh)
Inventor
卫进虎
李霞
丁志义
王明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Pingyang Industry Machinery Co Ltd
Original Assignee
Shanxi Pingyang Industry Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Pingyang Industry Machinery Co Ltd filed Critical Shanxi Pingyang Industry Machinery Co Ltd
Priority to CN2010205103355U priority Critical patent/CN201799830U/en
Application granted granted Critical
Publication of CN201799830U publication Critical patent/CN201799830U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to the disassembly of hinge pins of large structural members, particularly relates to a spiral pin remover for performing hinge pin disassembly, which solves the problems that disassembly of the hinge pins of the conventional structural member is time-saving, labor-saving and difficult. The spiral pin remover comprises a screw rod with one end capable of directly or indirectly being fixed with a bolt hole on a hinge pin to be disassembled, and a support frame which is used for supporting the screw rod to ensure that the screw rod is perpendicular to the end surface of the hinge pin to be disassembled and can move along the direction perpendicular to the end surface of the hinge pin to be disassembled, wherein a nut which can be propped against the support frame is arranged at the other end of the screw rod; and the position where the support frame is matched with the screw rod is positioned between the end part where the screw rod is fixed on the hinge pin to be disassembled and the nut. The spiral pin remover has a simple and reasonable structure and good use effect, is time-saving and labor-saving, and is applicable to the hinge pin assembly when a hydraulic support used for a long time underground is repaired.

Description

Spiral pin removal
Technical field
The utility model relates to the bearing pin dismounting of large-sized structural parts, specifically is a kind of spiral pin removal of implementing the bearing pin dismounting.
Background technology
Mine hydraulic bracket is when carrying out repair demolition, because the big bearing pin of band screw is after using a period of time through the down-hole on the support, the axis hole mating surface can deform because of reasons such as wearing and tearing, corrosion, so very difficult during the bearing pin dismounting.
And general way all is to implement dismounting by servicing unit, for example: be fixed with the rod member that impact block and end can be threaded with the screw on the pin roll end face-be the impacting type pin removal on it, during use, be threaded fixing with screw on the pin roll end face Rod end, outwards knock impact block, utilize the outside impact of impact block that bearing pin is extracted.The required impact of this dismounting mode is bigger, exert oneself is directly given power into people worker, need multiple impact, bearing pin could be extracted, very waste time and energy, and for the used hydraulic support in the down-hole for a long time, implement and be still the comparison difficulty: because the type body of hydraulic support is all bigger now, pin diameter all exists
Figure BSA00000248870800011
More than, weight is generally all about 80 kilograms, and bearing pin is after using distortion, and the impact that produces by impact block often can not overcome the frictional force between bearing pin and the axis hole, also just bearing pin can't be extracted, and causes dismantling ending in failure.
Summary of the invention
The utility model exists when at present implementing dismounting at the bearing pin of large-sized structural parts in order to solve wastes time and energy, dismantle problems such as difficult, and a kind of spiral pin removal is provided.
The utility model is to adopt following technical scheme to realize: spiral pin removal, comprise can be the directly or indirectly fixing leading screw of an end, be used to support leading screw and make it and wait to tear pin roll end face vertical also energy edge open and wait to tear open the mobile bracing frame of pin roll end face vertical direction (being leading screw self axial direction) with waiting to tear open screw on the bearing pin, the other end of leading screw is equipped with the nut that can offset with bracing frame, and the cooperation place of bracing frame and leading screw is in leading screw and waits to tear open the fixing end of bearing pin with between the nut.
During use, bracing frame is vertically stood on the surface that the large-sized structural parts bearing pin waits to tear open the place, and the leading screw end directly or indirectly fixed with waiting to tear open on the bearing pin screw, nut and the bracing frame adjusted on the leading screw offset, and bracing frame just in time is folded between large-sized structural parts and the nut; Then by spanner, nut on the turn leading screw produces pressure to bracing frame, and be passed on the large-sized structural parts by bracing frame, simultaneously, leading screw moves outward, outwards traction bearing pin to be torn open, like this, large-sized structural parts with wait to tear open bearing pin and be subjected to direction opposite effect power respectively, make to produce relative motion between bearing pin and the structural member, and then realize extracting of bearing pin.And in unloading process, realize lever principle, effectively reduced ARTIFICIAL FORCE used when bearing pin is dismantled by spanner.
The utility model is simple and reasonable for structure, and result of use is good, and is time saving and energy saving, is applicable to carry out the bearing pin dismounting when long-time used hydraulic support is reprocessed in the down-hole.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Among the figure: the 1-large-sized structural parts; 2-bearing pin to be torn open; The 3-crossover sub; The 4-bracing frame; The 5-leading screw; The 6-nut; The 7-screw.
The specific embodiment
As shown in Figure 1, spiral pin removal, comprise can be the directly or indirectly fixing leading screw 5 of an end, be used to support leading screw 5 and make it and wait to tear bearing pin 2 end faces vertical also energy edge open and wait to tear open the mobile bracing frame 4 of bearing pin 2 end face vertical direction (being leading screw self axial direction) with waiting to tear open screw on the bearing pin 27, the other end of leading screw 5 is equipped with the nut 6 that can offset with bracing frame 4, and the cooperation place of bracing frame 4 and leading screw 5 is in leading screw 5 and waits to tear open the fixing end of bearing pin 2 with between the nut 6.
During concrete enforcement, leading screw 5 is used for and waits to tear open the end that screw 7 is fixed on the bearing pin 2 being equipped with crossover sub 3, described crossover sub 3 one ends are provided with and wait to tear open the screw thread that screw 7 is fixed on the bearing pin 2, the other end is fixed with leading screw 5 ends with demountable structure (as screw connection structure etc.), in order to indirect realization leading screw 5 ends with wait to tear open the fixing of screw 7 on the bearing pin 2.
The purpose that is provided with of crossover sub is: the bearing pin of 1, considering large-sized structural parts 1 is diversified in specifications, wait to tear open that there is inconsistency in the size of screw on the bearing pin, when implementing dismounting at the bearing pin of different size, only need to change crossover sub, and need not to change leading screw, make pin removal described in the utility model can be applicable to the bearing pin dismounting of different size; 2, in long-time use, the screw thread that screw cooperates on the bearing pin is fragile with waiting to tear open, and during the thread damage of crossover sub, the crossover sub that more renews gets final product, and need not to change leading screw, can effectively reduce the use cost of pin removal described in the utility model.
Described demountable structure is easy to for a person skilled in the art realize, and can realizes that for example: square toes are adopted in leading screw 5 ends with multiple structure, crossover sub 3 and the stiff end setting of leading screw 5 and the square inner bore of leading screw end square toes coupling;
Support frame as described above 4 also is easy to realize for a person skilled in the art, and can realize with multiple structure, wherein, the most easy structure is as follows: by gripper shoe, constitute with two pillars of gripper shoe vertical fixing, offer on the gripper shoe for leading screw and pass and be in through hole between two pillars.

Claims (3)

1. spiral pin removal, it is characterized in that: comprise that an end can directly or indirectly go up the fixing leading screw (5) of screw (7) with bearing pin to be torn open (2), be used to support the bracing frame (4) that leading screw (5) moves its vertical also energy edge with bearing pin to be torn open (2) end face and bearing pin to be torn open (2) end face vertical direction, the other end of leading screw (5) is equipped with the nut (6) that can offset with bracing frame (4), and the cooperation place of bracing frame (4) and leading screw (5) is between the fixing same nut in end (6) of leading screw (5) and bearing pin to be torn open (2).
2. spiral pin removal according to claim 1, it is characterized in that: leading screw (5) is used for going up the fixing end of screw (7) with bearing pin to be torn open (2) and is equipped with crossover sub (3), described crossover sub (3) one ends are provided with and bearing pin to be torn open (2) is gone up the fixing screw thread of screw (7), and the other end is fixed with demountable structure and leading screw (5) end.
3. spiral pin removal according to claim 1 and 2 is characterized in that: support frame as described above (4) is by gripper shoe, constitute with two pillars of gripper shoe vertical fixing, offers on the gripper shoe for leading screw to pass and be in through hole between two pillars.
CN2010205103355U 2010-08-27 2010-08-27 Spiral pin remover Expired - Fee Related CN201799830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205103355U CN201799830U (en) 2010-08-27 2010-08-27 Spiral pin remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205103355U CN201799830U (en) 2010-08-27 2010-08-27 Spiral pin remover

Publications (1)

Publication Number Publication Date
CN201799830U true CN201799830U (en) 2011-04-20

Family

ID=43869347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205103355U Expired - Fee Related CN201799830U (en) 2010-08-27 2010-08-27 Spiral pin remover

Country Status (1)

Country Link
CN (1) CN201799830U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328196A (en) * 2011-05-30 2012-01-25 泰安力博机电科技有限公司 Vibration type pin pulling device
CN102416560A (en) * 2011-10-14 2012-04-18 泰安力博机电科技有限公司 Built-in hydraulic automatic pin pulling device
CN102554603A (en) * 2012-02-15 2012-07-11 重庆大江工业有限责任公司 Hydraulic pin puller for detaching hydraulic support
CN102649226A (en) * 2012-04-29 2012-08-29 沧州供电公司 Detaching tool of cylindrical pin of connecting rod of disconnecting switch
CN102699664A (en) * 2012-02-01 2012-10-03 四川都江机械有限责任公司 Detacher for differential mechanisms
CN109333447A (en) * 2018-11-28 2019-02-15 中铁重工有限公司 Pin removal suitable for large-scale fitting body and method of pulling pin

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328196A (en) * 2011-05-30 2012-01-25 泰安力博机电科技有限公司 Vibration type pin pulling device
CN102328196B (en) * 2011-05-30 2014-01-15 力博重工科技股份有限公司 Vibration type pin pulling device
CN102416560A (en) * 2011-10-14 2012-04-18 泰安力博机电科技有限公司 Built-in hydraulic automatic pin pulling device
CN102416560B (en) * 2011-10-14 2013-10-09 力博重工科技股份有限公司 Built-in hydraulic automatic pin pulling device
CN102699664A (en) * 2012-02-01 2012-10-03 四川都江机械有限责任公司 Detacher for differential mechanisms
CN102554603A (en) * 2012-02-15 2012-07-11 重庆大江工业有限责任公司 Hydraulic pin puller for detaching hydraulic support
CN102649226A (en) * 2012-04-29 2012-08-29 沧州供电公司 Detaching tool of cylindrical pin of connecting rod of disconnecting switch
CN109333447A (en) * 2018-11-28 2019-02-15 中铁重工有限公司 Pin removal suitable for large-scale fitting body and method of pulling pin

Similar Documents

Publication Publication Date Title
CN201799830U (en) Spiral pin remover
CN2928396Y (en) Assembling and disassembling tool for flange
CN202010699U (en) Novel clamp ring for locking roll bearing pedestal
CN108381461A (en) A kind of efficient bearing disassembling device
CN202780427U (en) Flywheel detaching device
CN204094726U (en) A kind of heavy pin shaft fast assembling-disassembling frock
CN203470477U (en) Quick back-up roll replacement device for strip rolling mill
CN210757505U (en) Pin puller of bridge girder erection machine
CN203390874U (en) Bearing detaching device
CN205270661U (en) Fluid pressure type construction steel bar equipment of buckling
CN212192961U (en) Tower mill shaft coupling pin installation dismounting device
CN201922232U (en) Machine for disassembling and assembling automobile principal axis pin
CN202016034U (en) Stud disassembling sleeve
CN211073419U (en) Ejector pin device for parts
CN204470942U (en) A kind of attaching/detaching apparatus of oil material roller
CN203918911U (en) A kind of draught fan impeller special dismounting frock
CN202304413U (en) Fixture for disassembling and assembling trunnion of sintering pallet
CN2400620Y (en) Expansion nut
CN202517249U (en) Device for detaching guide vane sleeve of hydroturbine
CN205904948U (en) Centrifugal fan shaft coupling dismounting device
CN205000387U (en) Central authorities articulated spacer, central articulated mounting and mechanical equipment
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN212479766U (en) High-frequency vibration heavy-load connecting device
CN217001721U (en) Oil-water well wellhead casing short-circuit dismounting device
CN204804783U (en) Oil pumping machine horse head connecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110420

Termination date: 20140827

EXPY Termination of patent right or utility model