CN201794085U - High pile foundation structure for transmission line tower - Google Patents

High pile foundation structure for transmission line tower Download PDF

Info

Publication number
CN201794085U
CN201794085U CN2010205436847U CN201020543684U CN201794085U CN 201794085 U CN201794085 U CN 201794085U CN 2010205436847 U CN2010205436847 U CN 2010205436847U CN 201020543684 U CN201020543684 U CN 201020543684U CN 201794085 U CN201794085 U CN 201794085U
Authority
CN
China
Prior art keywords
foundation
pile
foundation pile
shear wall
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205436847U
Other languages
Chinese (zh)
Inventor
章东鸿
李敏生
何天胜
金晓华
黄炳权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN2010205436847U priority Critical patent/CN201794085U/en
Application granted granted Critical
Publication of CN201794085U publication Critical patent/CN201794085U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a high pile foundation structure for a transmission line tower, consisting of a plurality of high pile structure assemblies, wherein each high pile structure assembly comprises a first foundation pile, a second foundation pile, a third foundation pile used for connecting tower feet, a connecting beam, a first shear wall and a second shear wall; and two ends of the connecting beam are respectively connected with the first foundation pile and the second foundation pile, two ends of the first shear wall are respectively connected with the second foundation pile and the third foundation pile, and two ends of the second shear wall are respectively connected with the first foundation pile and the third foundation pile. The high pile foundation structure for the transmission line tower has the advantages of effectively increasing the resistance torque of the section of the foundation, improving the stress performance of the high pile foundation, greatly reducing the quantities and construction cost of the high pile foundation with greater exposure height and enhancing the durability as well as the capability of resisting accidental load of the foundation structure.

Description

A kind of high pile foundation structure of iron tower of power transmission line
Technical field
The utility model relates to a kind of basic mounting structure of iron tower of power transmission line, especially relates to high pile foundation structure.
Background technology
The height that the reinforced concrete foundation mounting structure of iron tower of power transmission line bassets is determined by topography and geomorphology.Under some special topography and geomorphologies, the height that requires basic mounting structure to basset is bigger, at this moment just probably will use high pile foundation structure, refers to that promptly the stake in the foundation structure exposes the basic mounting structure that extends certain altitude outside native face.In the prior art, high pile foundation structure adopts highrise pile cap structure as shown in fig. 1 usually.Because the iron tower of transmission line of electricity has four column foots 1 usually, each column foot 1 supports by a highrise pile cap foundation structure, wherein each cushion cap foundation structure all comprises some expose outside ground 2 and upwardly extending stakes 3, cast when certain altitude each cushion cap of 34 of connection is set, the column foot 1 of iron tower just is arranged on this cushion cap.
Because the foundation structure of iron tower except that bearing vertical force, also can be born the horizontal force of certain ratio, when stake exposes to the height on ground when big, this horizontal force will produce bigger moment of flexure effect in stake.Adopt existing highrise pile cap basis, its stake that exposes is for cylindrical, the cross section resistance moment is little, be unfavorable for resisting the big effect moment of flexure that the big horizontal force of iron tower produces on higher cushion cap, the quantity that needs to strengthen the cross section of shape or increase stake, cause engineering quantity to strengthen, also relatively poor for the control of basis displacement and distress in concrete simultaneously.
Summary of the invention
The high pile foundation structure of the iron tower of power transmission line that the purpose of this utility model provides that a kind of cross section resistance moment is big, engineering quantity and cost cost are little.
Technical solution of the present utility model is: a kind of high pile foundation structure of iron tower of power transmission line, it is made up of some high pilework assemblies, wherein each high pilework assembly comprises first foundation pile, second foundation pile and is used to be connected the 3rd foundation pile of column foot, and coupling beam, second shear wall and the 3rd shear wall, wherein the coupling beam two ends connect first foundation pile and second foundation pile respectively, the first shear wall two ends connect second foundation pile and the 3rd foundation pile respectively, and the second shear wall two ends connect first foundation pile and the 3rd foundation pile respectively.
High pilework assembly comprises three foundation piles, link into an integrated entity respectively by two shear walls and multiple tracks coupling beam between the foundation pile, improved the stress performance of foundation pile, improved the cross section resistance moment of whole assembly, the size of foundation pile is corresponding to be reduced, reduced engineering quantity and cost cost, can effectively improve the durability performance on basis in addition, effectively displacement of control basis and distress in concrete.
Described the 3rd foundation pile be positioned at iron leg position and other two away from the iron tower center, the bending resistance square ability on the direction that more helps improving the standard.
Describedly be higher than described first foundation pile and second foundation pile is short in the 3rd foundation pile, help saving quantity of material, strengthen the aesthetic measure on basis.
Also be provided with horizontal supporting plate in the described high pilework assembly, play reinforcement, strengthen the stable effect of shear wall.
The utility model has the advantages that: effectively improved basic cross section resistance moment, improved the stress performance of high pile foundation, can reduce engineering quantity and construction costs significantly for revealing high bigger high pile foundation, improve the durability performance of foundation structure, the ability of resisting accidental load is also promoted.
Description of drawings
Accompanying drawing 1 is the schematic diagram of high pile foundation structure in the prior art;
Accompanying drawing 2 is the structural representation of the utility model embodiment;
Accompanying drawing 3 is the vertical view of the utility model embodiment;
1, column foot, 2, ground, 3, stake, 4, cushion cap, 5, first foundation pile, 6, second foundation pile, the 7, the 3rd foundation pile, 8, coupling beam, 9, first shear wall, 10, second shear wall, 11, horizontal supporting plate.
The specific embodiment
Embodiment:
Consult Fig. 2-3, high pile foundation structure for a kind of iron tower of power transmission line, it is made up of some high pilework assemblies, wherein each high pilework assembly comprises first foundation pile 5, second foundation pile 6 and the 3rd foundation pile 7 that is used to be connected column foot 1, and coupling beam 8, first shear wall 9 and second shear wall 10, wherein coupling beam 8 two ends connect first foundation pile 5 and second foundation pile 6 respectively, the two ends of first shear wall 9 connect second foundation pile 6 respectively and the 3rd foundation pile 7, the second shear walls 10 two ends connect first foundation pile 5 and the 3rd foundation pile 6 respectively.
Consult Fig. 3, in the present embodiment, column foot 1 is 4, and four the 3rd foundation piles 7 lay respectively on the column foot position at more close iron tower center, and the 3rd foundation pile 7 is higher than first foundation pile 5 and second foundation pile 6.Three foundation piles are cylindrical stake, and every six meters, a horizontal supporting plate 11 that links into an integrated entity with coupling beam 8 are set, and by concrete reinforcement structure beam slab foundation pile are connected with shear wall.
Coupling beam can be provided with twice or multiple tracks according to height of foundation, and horizontal supporting plate also can link into an integrated entity with coupling beam.
Present embodiment is compared with the highrise pile cap structure of same height, by shear wall and coupling beam are set, the quantity of foundation pile can be kept to three by four, the diameter of each foundation pile is reduced to 1.3 meters by 1.6 meters, has cancelled the structure of cushion cap in addition, reduce difficulty of construction, the base concrete amount reduces 50%, and basic steel consumption also reduces by 45%, and the integrated engineering cost can reduce about 40%, in addition, can also improve the performance of incidental loads such as shock resistance.
Above-listed detailed description is specifying at one of the utility model possible embodiments, this embodiment is not in order to limit claim of the present utility model, allly do not break away from the equivalence that the utility model does and implement or change, all should be contained in the claim of this case.

Claims (4)

1. the high pile foundation structure of an iron tower of power transmission line, it is characterized in that: it is made up of some high pilework assemblies, wherein each high pilework assembly comprises first foundation pile, second foundation pile and is used to be connected the 3rd foundation pile of column foot, and coupling beam, first shear wall and second shear wall, wherein the coupling beam two ends connect first foundation pile and second foundation pile respectively, the first shear wall two ends connect second foundation pile and the 3rd foundation pile respectively, and the second shear wall two ends connect first foundation pile and the 3rd foundation pile respectively.
2. the high pile foundation structure of a kind of iron tower of power transmission line according to claim 1, it is characterized in that: described the 3rd foundation pile is positioned on the column foot position at more close iron tower center.
3. the high pile foundation structure of a kind of iron tower of power transmission line according to claim 1 and 2, it is characterized in that: described the 3rd foundation pile is higher than described first foundation pile and second foundation pile.
4. the high pile foundation structure of a kind of iron tower of power transmission line according to claim 3 is characterized in that: also be provided with horizontal supporting plate in the described high pilework assembly.
CN2010205436847U 2010-09-25 2010-09-25 High pile foundation structure for transmission line tower Expired - Fee Related CN201794085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205436847U CN201794085U (en) 2010-09-25 2010-09-25 High pile foundation structure for transmission line tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205436847U CN201794085U (en) 2010-09-25 2010-09-25 High pile foundation structure for transmission line tower

Publications (1)

Publication Number Publication Date
CN201794085U true CN201794085U (en) 2011-04-13

Family

ID=43849005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205436847U Expired - Fee Related CN201794085U (en) 2010-09-25 2010-09-25 High pile foundation structure for transmission line tower

Country Status (1)

Country Link
CN (1) CN201794085U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544589A (en) * 2015-12-15 2016-05-04 贵州电力设计研究院 Beam-column foundation structure of stand tower in large karst cave

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544589A (en) * 2015-12-15 2016-05-04 贵州电力设计研究院 Beam-column foundation structure of stand tower in large karst cave

Similar Documents

Publication Publication Date Title
CN202152463U (en) Foundation pressure-bearing beam plate type wind power generation tower foundation
CN201762717U (en) Structure for connecting prestressed pipe pile and cushion cap
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN202379602U (en) Steel tube concrete crane truss
CN101255699A (en) Novel structure inclined inserting digging hole pile foundation
CN201794085U (en) High pile foundation structure for transmission line tower
CN201794087U (en) Cylindrical foundation component
CN102852154A (en) Composite pile foundation
CN203373735U (en) Prefabricated concrete tubular pile with external longitudinal webs
CN103726505B (en) Offshore wind plant wind turbine foundation
CN203855992U (en) Novel foundation strengthening structure
CN102852155A (en) Composite pile foundation
CN203373769U (en) Draught fan foundation ring supporting structure arranged on soft soil foundation
CN202500146U (en) Steel-structure assembly type bearing platform tubular pile foundation
CN201151913Y (en) Novel structure obliquely inserted excavation pile base
CN202899150U (en) Draught fan base of offshore wind power station
CN203613552U (en) Independent foundation of beam and slab structure
CN203411988U (en) Independent medium-sized pile foundation
CN210766845U (en) Assembled bracket foundation
CN202577315U (en) Hollow support beam for foundation pit support
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN207314518U (en) One kind is exempted to support layered assembling type steel structure
CN201137153Y (en) Pole tower base
CN221072556U (en) High assembled frame construction suitable for marine high pile platform
CN213897208U (en) Narrow foundation tower foundation for power transmission

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP03 Change of name, title or address

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Guangdong Electric Power Design Institute of CEEC

Address before: 510600 No. 846 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: Guangdong Electric Power Design Institute

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Company limited of China Energy Engineering Group Guangdong Electric Power Design Institute

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute of CEEC

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20170925