CN201789259U - High-speed railway tunnel leakage cable clamp - Google Patents

High-speed railway tunnel leakage cable clamp Download PDF

Info

Publication number
CN201789259U
CN201789259U CN2010202163636U CN201020216363U CN201789259U CN 201789259 U CN201789259 U CN 201789259U CN 2010202163636 U CN2010202163636 U CN 2010202163636U CN 201020216363 U CN201020216363 U CN 201020216363U CN 201789259 U CN201789259 U CN 201789259U
Authority
CN
China
Prior art keywords
support body
clamping plate
speed railway
clamp groove
leaky cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202163636U
Other languages
Chinese (zh)
Inventor
石磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an long Shuo Railway Engineering Co., Ltd.
Original Assignee
石磊
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石磊 filed Critical 石磊
Priority to CN2010202163636U priority Critical patent/CN201789259U/en
Application granted granted Critical
Publication of CN201789259U publication Critical patent/CN201789259U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a high-speed railway tunnel leakage cable clamp, which comprises a main frame. The main frame consists of a frame body, a connector and a clamping plate, the connector is arranged on the frame body, the clamping plate is mounted at the end of the frame body, and cable clamping grooves are arranged at the ends of both the clamping plate and the frame body. The high-speed railway tunnel leakage cable clamp has the advantages of reasonable design, simple structure, firmness, durability, fire prevention, rust prevention, safe and reliable working performance and speediness and convenience for construction and installation.

Description

High-speed railway tunnel leaky cable anchor clamps
Technical field
The utility model relates to a kind of anchor clamps that set up high-speed railway tunnel optical cable, is specifically related to a kind of high-speed railway tunnel leaky cable anchor clamps.
Background technology
Modern Railroad Communication System need be installed in the tunnel and set up leaky cable for solving the shielding of tunnel, mountain area to signal, and whether leaky cable is installed firm, is directly connected to the unimpeded and traffic safety of communication of high-speed railway.The cable cleat that wherein is used for fixing leaky cable is a critical component of guaranteeing cable security.At present, the cable cleat that uses on the common railway line does not have protector, in case the clamping plate bolt looseness, cable just may come off and float towards train, directly threatens the safety of driving.In addition, according to Ministry of Industry and Information and Ministry of Railways's relevant document spirit, build overlapping investment in order to reduce communication infrastructure, allow communication infrastructure operator in railway tunnel, to build leaky cable, mounted base station, realize that railway tunnel movable signal field intensity covers, thereby satisfy passenger's demand to communication in taking train.Participate in building if any two tame operators, generally need two cables are installed, and adopt present employed anchor clamps, two cables can only be installed respectively, have both increased expense, nor attractive in appearance.
The utility model content
The purpose of this utility model is the deficiency that exists at prior art, and a kind of high-speed railway tunnel leaky cable anchor clamps are provided, and this anchor clamps service behaviour is safe and reliable, construction install convenience.
For achieving the above object, the utility model adopt technical scheme be: a kind of high-speed railway tunnel leaky cable anchor clamps, it is characterized in that: comprise main frame, described main frame is made up of support body, the clamping plate that are arranged on the connector on the support body and are installed in the support body end, and the end of described clamping plate and the end of support body all have the clamp groove.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: described support body is provided with the protection hook and the protection hook is positioned at the clamping plate below.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: the quantity of described support body is one, and described support body is a U-shaped or Z-shaped, and the quantity of described clamping plate is one.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: the end of described clamping plate and the end of support body all have the clamp groove of an arc, and the clamp groove of two arcs is oppositely arranged.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: described support body is that the end of described U-shaped support body and Z-shaped support body respectively is equipped with clamping plate by a U-shaped support body and the integrated stand that Z-shaped support body is formed.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: the end of described clamping plate has the clamp groove of an arc, the end of described U-shaped support body and Z-shaped support body respectively has the clamp groove of an arc, and the clamp groove of described U-shaped support body end and Z-shaped support body end and the clamp groove of clamping plate end are oppositely arranged.
Above-mentioned high-speed railway tunnel leaky cable anchor clamps, its characteristics are: described connector is an expansion bolt.
The utility model compared with prior art has the following advantages:
(1) the utility model is reasonable in design, and is simple in structure, quick for installation, convenient;
(2) fire prevention, antirust, long service life;
(3) reliable working performance, safety.
(4) time saving and energy saving, high efficiency reduces labour intensity, saves labour cost.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment 1.
Fig. 2 is the structural representation of the utility model embodiment 2.
Fig. 3 is the structural representation of the utility model embodiment 3.
Description of reference numerals:
The 1-main frame; The 2-support body; 3-protects hook; The 4-connector;
The 5-leaky cable; The 6-clamping plate; 7-clamp groove.
Embodiment
Embodiment 1
A kind of high-speed railway tunnel leaky cable anchor clamps as shown in Figure 1, comprise main frame 1, described main frame 1 is made up of support body 2, the clamping plate 6 that are arranged on the connector 4 on the support body 2 and are installed in support body 2 ends, and the end of the end of described clamping plate 6 and support body 2 all has clamp groove 7.Install for convenient construction, described connector 4 is an expansion bolt.
Described support body 2 is provided with protection hook 3 and protection hook 3 is positioned at clamping plate 6 belows.When leaky cable 5 owing to the loosening of clamping plate 6 can be held by the protection hook 3 of leaky cable 5 belows when coming off, avoid causing bigger accident because of leaky cable 5 comes off.
The quantity of described support body 2 is one, and described support body 2 is a U-shaped, and the quantity of described clamping plate 6 is one.The clamp groove 7 that the end of the end of described clamping plate 6 and support body 2 all has 7, two arcs of clamp groove of an arc is oppositely arranged, and constitutes the clamp groove of a similar circle, and this circle clamp groove is used for clamping leaky cable 5.
Embodiment 2
As shown in Figure 2, the difference of present embodiment and embodiment 1 only is: support body 2 is for Z-shaped.Other structures are identical with embodiment 1.
Embodiment 3
A kind of high-speed railway tunnel leaky cable anchor clamps as shown in Figure 3, comprise main frame 1, described main frame 1 is made up of support body 2, the clamping plate 6 that are arranged on the connector 4 (expansion bolt) on the support body 2 and are installed in support body 2 ends, and the end of the end of described clamping plate 6 and support body 2 all has clamp groove 7.Described support body 2 is that the end of described U-shaped support body and Z-shaped support body respectively is equipped with clamping plate 6 by a U-shaped support body and the integrated stand that Z-shaped support body is formed.The end of clamping plate 6 has the clamp groove 7 of an arc, and the end of described U-shaped support body and Z-shaped support body respectively has the clamp groove 7 of an arc, and the clamp groove of described U-shaped support body end and Z-shaped support body end and the clamp groove of clamping plate 6 ends are oppositely arranged.The clamp groove of the clamp groove of U-shaped support body end and clamping plate 6 ends constitutes the clamp groove of a similar circle, the clamp groove of the clamp groove of Z-shaped support body end and clamping plate 6 ends also constitutes the clamp groove of a similar circle, and these two circular clamp grooves all are used for clamping leaky cable 5.
Be provided with protection hook 3 on U-shaped support body and the Z-shaped support body, and protection hook 3 is positioned at clamping plate 6 belows.When leaky cable 5 owing to the loosening of clamping plate 6 can be held by the protection hook 3 of leaky cable 5 belows when coming off, avoid causing bigger accident because of leaky cable 5 comes off.
Support body 2 of the present utility model, protection hook 3 all adopt the Q235 low-carbon steel plate to make, support body 2 thick 6mm, and protection hook 3 thick 4mm form by the mould time processing, and clamping plate 6 adopt the steel plate of thickness 10mm.Above accessory is all by zinc-plated processing.Main frame 1 is fixed on the tunnel wall by M12 * 130 stainless steel expansion bolts 4; clamping plate 6 and protection hook 3 adopt M10 * 25 and M10 * 20 half-round head square neck bolts to be fixed on the support body 2 respectively; only need during construction the part of hanging of leaky cable 5 is pushed in the clamp groove 7, screwing up with a wrench gets final product.When setting up two leaky cables 5, keep its centre-to-centre spacing greater than 300mm, to prevent to produce mutually electromagnetic interference.

Claims (7)

1. high-speed railway tunnel leaky cable anchor clamps, it is characterized in that: comprise main frame (1), described main frame (1) is made up of support body (2), the clamping plate (6) that are arranged on the connector (4) on the support body (2) and are installed in support body (2) end, and the end of the end of described clamping plate (6) and support body (2) all has clamp groove (7).
2. high-speed railway according to claim 1 tunnel leaky cable anchor clamps is characterized in that: described support body (2) is provided with protection hook (3) and protection hook (3) is positioned at clamping plate (6) below.
3. high-speed railway according to claim 1 and 2 tunnel leaky cable anchor clamps is characterized in that: the quantity of described support body (2) is one, and described support body (2) is a U-shaped or Z-shaped, and the quantity of described clamping plate (6) is one.
4. high-speed railway according to claim 3 tunnel leaky cable anchor clamps is characterized in that: the end of the end of described clamping plate (6) and support body (2) all has the clamp groove (7) of an arc, and the clamp groove (7) of two arcs is oppositely arranged.
5. high-speed railway according to claim 1 and 2 tunnel leaky cable anchor clamps, it is characterized in that: described support body (2) is that the end of described U-shaped support body and Z-shaped support body respectively is equipped with clamping plate (6) by a U-shaped support body and the integrated stand that Z-shaped support body is formed.
6. high-speed railway according to claim 5 tunnel leaky cable anchor clamps, it is characterized in that: the end of described clamping plate (6) has the clamp groove (7) of an arc, the end of described U-shaped support body and Z-shaped support body respectively has the clamp groove (7) of an arc, and the clamp groove of the clamp groove of described U-shaped support body end and Z-shaped support body end and clamping plate (6) end is oppositely arranged.
7. high-speed railway according to claim 1 and 2 tunnel leaky cable anchor clamps is characterized in that: described connector (4) is an expansion bolt.
CN2010202163636U 2010-06-04 2010-06-04 High-speed railway tunnel leakage cable clamp Expired - Lifetime CN201789259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202163636U CN201789259U (en) 2010-06-04 2010-06-04 High-speed railway tunnel leakage cable clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202163636U CN201789259U (en) 2010-06-04 2010-06-04 High-speed railway tunnel leakage cable clamp

Publications (1)

Publication Number Publication Date
CN201789259U true CN201789259U (en) 2011-04-06

Family

ID=43821210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202163636U Expired - Lifetime CN201789259U (en) 2010-06-04 2010-06-04 High-speed railway tunnel leakage cable clamp

Country Status (1)

Country Link
CN (1) CN201789259U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967911A (en) * 2013-01-29 2014-08-06 江苏华彤新能源科技有限公司 Mounting bolt special for leaking cable
CN107516854A (en) * 2017-10-27 2017-12-26 江苏华鹏电缆股份有限公司 A kind of detachable branched cable hanging head hook structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967911A (en) * 2013-01-29 2014-08-06 江苏华彤新能源科技有限公司 Mounting bolt special for leaking cable
CN107516854A (en) * 2017-10-27 2017-12-26 江苏华鹏电缆股份有限公司 A kind of detachable branched cable hanging head hook structure

Similar Documents

Publication Publication Date Title
CN107317292B (en) Ground laying device for leaky cable
CN201789259U (en) High-speed railway tunnel leakage cable clamp
CN201435295Y (en) Transformer dual-hugging rod thread jointing clamp convenient for installation
CN105350691A (en) Curtain wall side hanging device
CN203783224U (en) 110kV cable terminal tower optimization structure convenient to operate and maintain
CN216061732U (en) Anti-falling device for power transmission line iron tower
CN202528989U (en) High-speed rail and common rail rerailer
CN209838443U (en) Clip chain self-sealing type lap joint tunnel waterproof board
CN113690811A (en) Fireproof high-speed leaky-cable clamp
CN202847730U (en) Outer side rerailer and high-common universal rerailer
CN205452985U (en) Novel cable bearer
CN214900036U (en) Interval pre-buried spout spool of track traffic
CN200975558Y (en) Assembled compound material cable stand
CN215055217U (en) Improved steel pipe fastener
JP4846480B2 (en) Rigid train line termination structure
CN104499385A (en) F sectional steel connecting structure for medium-low-speed magnetic levitation system
CN215439200U (en) Elevator guide rail bracket with adjustable spacing
CN204901275U (en) Instrument instrument installation fixed structure
CN204921606U (en) T type bolt convenient to installation
CN212534842U (en) Roof protection system
CN219673018U (en) Basalt fiber composite material's photovoltaic module frame connecting piece
CN217789241U (en) Fast-assembling branch box of cable
CN203419143U (en) Installing mechanism for top plate of through passage
CN216355732U (en) Fireproof high-speed leaky-cable clamp
CN216585936U (en) Pre-buried board frock subassembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180930

Address after: 710000 2B302 three, 2 West unit of Lanxi City Garden, 6 East Street, Xingshan temple, Xi'an, Shaanxi.

Patentee after: Xi'an long Shuo Railway Engineering Co., Ltd.

Address before: 710061 Lanxi City Garden No. 6, East Hing Street, Xingshan temple, Xi'an, Shaanxi 2B302

Patentee before: Shi Lei

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: High-speed railway tunnel leakage cable clamp

Effective date of registration: 20190202

Granted publication date: 20110406

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: Xi'an long Shuo Railway Engineering Co., Ltd.

Registration number: 2019990000108

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110406