CN201787326U - Automatic transformer charging device - Google Patents

Automatic transformer charging device Download PDF

Info

Publication number
CN201787326U
CN201787326U CN2010202545471U CN201020254547U CN201787326U CN 201787326 U CN201787326 U CN 201787326U CN 2010202545471 U CN2010202545471 U CN 2010202545471U CN 201020254547 U CN201020254547 U CN 201020254547U CN 201787326 U CN201787326 U CN 201787326U
Authority
CN
China
Prior art keywords
way valve
transformer
tracheae
charging device
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202545471U
Other languages
Chinese (zh)
Inventor
解海翔
刘建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Alstom Baoshan Transformers Co., Ltd.
Original Assignee
SHANGHAI ELECTRIC GROUP Co AREVA SHANGHAI TRANSFORMER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRIC GROUP Co AREVA SHANGHAI TRANSFORMER CO Ltd filed Critical SHANGHAI ELECTRIC GROUP Co AREVA SHANGHAI TRANSFORMER CO Ltd
Priority to CN2010202545471U priority Critical patent/CN201787326U/en
Application granted granted Critical
Publication of CN201787326U publication Critical patent/CN201787326U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an automatic transformer charging device, which comprises transformer inside and a compressed air cylinder. The compressed air cylinder is connected to an air inlet hole of a two-position three-way valve through an air cylinder relief valve and a first air pipe, an air outlet hole of the two-position three-way valve is connected to a first end of a three-way valve communicated with the transformer inside through a second air pipe, a second end of the three-way valve is connected to a pressure gauge through a third air pipe, a third end of the three-way valve is connected to a pressure feedback port of the two-position three-way valve through a fourth air pipe, and an exhaust hole of the two-position three-way valve is connected to the outside. The automatic transformer charging device has the advantages that the device automatically charges a transformer at any time under unattended conditions, ensures internal insulation of the transformer without being affected by moisture during storage or transport, greatly saves cost and also guarantees product quality.

Description

The transformer self-filler
Technical field
The utility model relates to a kind of inflator, relates in particular to a kind of inflator of transformer.
Background technique
Large oil immersed formula transformer is in transportation process, for reducing hauled weight, transformer inside is oil-filled and only charge into dry air or high pure nitrogen, the gas that charges into must be moisture free, and for making extraneous gas can not enter transformer inside, its internal gas has malleation (0.025MPa), thereby avoid the moisture in the atmosphere to enter transformer inside, pollute TRANSFORMER INSULATING MATERIAL, insulating part is made moist, and then reduce or lose the performance of insulating material.The inner a spot of moisture contamination of transformer is fatal for transformer.
May there be leak source in the transformer fuel tank weld seam or the sealing surface of transformer in transit, causes gas leakage, and pressure is descended; Gas also can make the transformer internal pressure produce conversion with the variation of ambient temperature in addition, when pressure is increased to 0.10MPa when above, may make oil tank of transformer produce distortion, thereby cause weld cracking, and gas leaks fully, and insulation is made moist.
At present, the transformer transportation process takes the variation of carving monitoring transformer internal gas pressure, a lot of transformer production producers can send the special messenger to escort transformer, escort personnel will repeatedly be checked gas pressure every day, when transformer pressure goes beyond the scope, escort personnel can the manual unlocking valve be inflated transformer or is exitted.The high-power transformer hundreds of ton that generally weighs, haulage time is longer, and particularly when sea-freight and railway transport, condition is very arduous, so transformer inflation transportation is a headachy problem that perplexs the industry always.
Summary of the invention
The utility model technical issues that need to address have provided a kind of transformer self-filler, are intended to solve the above problems.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions:
The utility model comprises: transformer inside; Also comprise a compressed air bottle; Described compressed air bottle is connected to the inlet hole of two-position three-way valve by the gas cylinder reduction valve and first tracheae; The air outlet hole of two-position three-way valve is connected to first end of the three-way valve that communicates with transformer inside by second tracheae; Second end of three-way valve is connected to pressure gauge by the 3rd tracheae; The 3rd end of three-way valve is connected to the air pressure feedback port of two-position three-way valve by the 4th tracheae; The exhaust port of two-position three-way valve be connected outward.
Compared with prior art, the beneficial effects of the utility model are: can be under unattended situation, and be the transformer inflation automatically at any time, guarantee the storage of transformer built-in electrical insulation or do not make moist in transit, save cost greatly, also guarantee quality of product simultaneously.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the enlarged view of two-position three-way valve among Fig. 1.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is described in further detail:
By Fig. 1, Fig. 2 as seen: the utility model comprises: transformer inside 1; Also comprise a compressed air bottle 2; Described compressed air bottle 2 is connected to the inlet hole 51 of two-position three-way valve 5 by the gas cylinder reduction valve 3 and first tracheae 4; The air outlet hole 52 of two-position three-way valve 5 is connected to first end of the three-way valve 7 that communicates with transformer inside 1 by second tracheae 6; Second end of three-way valve 7 is connected to pressure gauge 9 by the 3rd tracheae 8; The 3rd end of three-way valve 7 is connected to the air pressure feedback port 53 of two-position three-way valve 5 by the 4th tracheae 10; The exhaust port 54 of two-position three-way valve 5 be connected outward.
The utility model is combined into three-way valve compressed air bottle, gas cylinder reduction valve, two-position three-way valve, pressure gauge is in the same place by tracheae, forms a kind of gas pressure and can be to its device of inflation automatically can judged in the transformer.
The two-position three-way valve that adopts in the utility model is the product of prior art.
This two-position three-way valve working principle: utilize gas pressure to make main valve plug motion and gas and changing is flowed to, added control signal pressure rises gradually during pressurized control. and when air pressure was increased to the operating pressure of spool, main valve just commutated; Added gas control signal pressure reduces when unloading pressure-controlled, when being reduced to a certain force value, and the main valve commutation.
On gas circuit, the two-bit triplet solenoid valve has an inlet hole " 3 " (connecing gas cylinder), an air outlet hole " 2 " (connecing the transformer body), an exhaust port " 1 ".
During inflation: the dry gas in the gas cylinder arrives " 3 " port of two-position three-way valve by reduction valve and tracheae, be the long state of opening at this moment between " 3-2 ", so gas is inflated in transformer by port " 2 ", in the time of inflation, feed back to reaction force of main valve plug of two-position three-way valve by the three-way valve on the transformer, when pressure is increased to certain value (0.025MPa), the main valve plug action, " 3-2 " is separated, stops to the transformer air feed; When the transformer internal pressure is reduced to certain value (0.015), " 3-2 " reopens, when transformer is increased to certain value owing to the gas pressure that expands with heat and contract with cold (0.05MPa), and the outside exhaust of " 1 " port (to 0.025MPa).

Claims (1)

1. a transformer self-filler comprises: transformer inside; It is characterized in that: also comprise a compressed air bottle; Described compressed air bottle is connected to the inlet hole of two-position three-way valve by the gas cylinder reduction valve and first tracheae; The air outlet hole of two-position three-way valve is connected to first end of the three-way valve that communicates with transformer inside by second tracheae; Second end of three-way valve is connected to pressure gauge by the 3rd tracheae; The 3rd end of three-way valve is connected to the air pressure feedback port of two-position three-way valve by the 4th tracheae; The exhaust port of two-position three-way valve be connected outward.
CN2010202545471U 2010-07-09 2010-07-09 Automatic transformer charging device Expired - Fee Related CN201787326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202545471U CN201787326U (en) 2010-07-09 2010-07-09 Automatic transformer charging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202545471U CN201787326U (en) 2010-07-09 2010-07-09 Automatic transformer charging device

Publications (1)

Publication Number Publication Date
CN201787326U true CN201787326U (en) 2011-04-06

Family

ID=43819288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202545471U Expired - Fee Related CN201787326U (en) 2010-07-09 2010-07-09 Automatic transformer charging device

Country Status (1)

Country Link
CN (1) CN201787326U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102923389A (en) * 2012-11-06 2013-02-13 保定天威集团有限公司 Method for storing ascending flanged base of transformer
CN106292762A (en) * 2016-09-13 2017-01-04 山东电力设备有限公司 A kind of method that transformator is carried out gas pressure on-line monitoring and automatic inflating device
CN107965664A (en) * 2017-11-22 2018-04-27 中国西电电气股份有限公司 A kind of device and method that automatic inflating device deflation is carried out to transformer

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102923389A (en) * 2012-11-06 2013-02-13 保定天威集团有限公司 Method for storing ascending flanged base of transformer
CN106292762A (en) * 2016-09-13 2017-01-04 山东电力设备有限公司 A kind of method that transformator is carried out gas pressure on-line monitoring and automatic inflating device
CN107965664A (en) * 2017-11-22 2018-04-27 中国西电电气股份有限公司 A kind of device and method that automatic inflating device deflation is carried out to transformer

Similar Documents

Publication Publication Date Title
CN204730988U (en) Inlet manifold air tightness detection apparatus
CN201787326U (en) Automatic transformer charging device
CN202203417U (en) Novel stop valve for air-conditioner
CN102426081B (en) Positive pressure detection equipment for tightness of large-capacity power lithium ion battery and detection method thereof
CN103234714B (en) A kind of high-capacity dynamical lithium-ion explosion-proof valve leak-testing apparatus and detection method thereof
CN106525351A (en) Detection device and method for sealing performance of lithium ion power batteries
CN203090878U (en) Safety protection device for closed container
CN201628612U (en) Pressure testing device of oil immersed transformer
CN202418623U (en) Ultra-low temperature check valve
CN201408106Y (en) Movable coil support system with large load structure
CN208751804U (en) It is a kind of for detecting the tooling of electric machine controller air-tightness
CN103091051A (en) Leakage test device for oil bottom shell
CN204422158U (en) The static leak locator of water seal
CN202106540U (en) Gas source structure of bottle blowing machine sealing cylinder
CN103323184B (en) High-speed transplanter box parts airtight test device
CN202947842U (en) Leakage detection device for air suction pipe of compressor
CN205402233U (en) A multi -functional water injection head for liquefied gas cylinder
CN204731649U (en) A kind of pressure control device for storage tank nitrogen envelope
CN220189858U (en) Simple structure solves lithium cell notes liquid process moisture absorption and takes place scrapped part of battery
CN202382910U (en) Device for testing air tightness of ship tanks
CN207231723U (en) A kind of engine components air-leakage test high-performance sealed device
CN203431258U (en) High pressure regulator
CN203131102U (en) Valve core of ball valve
CN210196996U (en) Sealing device for electric light source gas storage tank
CN217490912U (en) Composite impact box with buffer box and beneficial to flat temperature

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI ELECTRIC ALSTOM BAOSHAN TRANSFORMERS CO.,

Free format text: FORMER NAME: SHANGHAI ELECTRIC AREVA BAOSHAN TRANSFORMERS CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200444 No. 3588 Hu Tai Road, Shanghai

Patentee after: Shanghai Electric Alstom Baoshan Transformers Co., Ltd.

Address before: 200444 No. 3588 Hu Tai Road, Shanghai

Patentee before: Shanghai Electric Group Company AREVA Shanghai Transformer Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20130709