CN201763359U - Leakage water treatment node structure of tunnel construction joints - Google Patents

Leakage water treatment node structure of tunnel construction joints Download PDF

Info

Publication number
CN201763359U
CN201763359U CN2010205208376U CN201020520837U CN201763359U CN 201763359 U CN201763359 U CN 201763359U CN 2010205208376 U CN2010205208376 U CN 2010205208376U CN 201020520837 U CN201020520837 U CN 201020520837U CN 201763359 U CN201763359 U CN 201763359U
Authority
CN
China
Prior art keywords
pipe
groove
tunnel
joint
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205208376U
Other languages
Chinese (zh)
Inventor
吕康成
李振江
万利
杨仲尼
张长安
刘传利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN2010205208376U priority Critical patent/CN201763359U/en
Application granted granted Critical
Publication of CN201763359U publication Critical patent/CN201763359U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a leakage water treatment node structure of tunnel construction joints, comprising a groove disposed at a construction joint; the groove is extended to a tunnel water discharging channel from a water outlet of the leakage water; a semicircular tube is disposed in the groove; a lower end of the semicircular tube is communicated and connected with the tunnel water discharging channel by a bending tube; an upper end of the groove is provided with a circular tube; the part of the circular tube is located in the semicircular tube; the upper end of the circular tube is provided with a bend; the outer wall of the circular tube is coated with silica gels; mortars are coated on the silica gels; the part on the mortars corresponding to the bend is provided with a water injection hole which is connected with the circular tube by the bend. The leakage water treatment node structure of tunnel construction joints of the utility model can treat the leakage water of tunnel construction joint well, detect the treatment effect of leakage water, and maintain the construction joints at any time.

Description

Construction joint of tunnel percolating water punishment node structure
Technical field
The utility model relates to a kind of node structure, particularly a kind of construction joint of tunnel percolating water punishment node structure.
Background technology
Percolating water is very big to the safe operation influence in tunnel, the percolating water in tunnel mainly occurs in the constuction joint place of liner structure, the punishment of existing construction joint of tunnel percolating water mainly is: a seam is respectively cut with concrete cutting machine commonly used in the both sides along the seepage constuction joint, cut concrete between joint-cutting with clink, and make it to form the semicircle shape section at the bottom of the extension slot; The plastic pipe of cross section semicircle shape is buckled in the bottom of concrete pit then, is formed the aquaporin of crossing of a complete circular cross section by two semicircles; At last with material capping plastics semicanals such as mortars.The weak point of above-mentioned way is: the one, and excessive to the loss of liner structure, the basal area of raggle reaches 10 * 10cm 2About; The 2nd, the capping layer later stages such as mortar are difficult to adapt to the swell-shrinking deformation of constuction joint, occur the crack easily and cause capping layer coming off; The 3rd, can't carry out break and detect, if having problems and can not in time find in the punishment engineering; The 4th, can not dredge maintenance to the passage of impeded drainage during the tunnel operation.
The utility model content
The purpose of this utility model is to overcome above-mentioned deficiency of the prior art, and a kind of punishment node structure of construction joint of tunnel percolating water is provided.The utility model can play good effect to the punishment of construction joint of tunnel percolating water, and can the punishment effect of percolating water be detected, and can be at any time to its maintenance.
For achieving the above object, the technical solution adopted in the utility model is: construction joint of tunnel percolating water punishment node structure, it is characterized in that: comprise the groove that is arranged on the constuction joint place, described groove extends to the tunnel drainage passage from the position more than the EXIT POINT of percolating water always, the semicircle pipe is installed in the described groove, the lower end of described semicircle pipe is connected with the tunnel drainage passage by bend pipe, the upper end of described groove is provided with a pipe, the part of described pipe is positioned at semicircle pipe inside, the upper end of described pipe is provided with elbow, the outer wall of described semicircle pipe scribbles silica gel, be coated with mortar on the described silica gel, position corresponding with elbow on the described mortar is provided with water injection hole, and described water injection hole is connected by elbow with pipe.
Above-mentioned construction joint of tunnel percolating water punishment node structure obliquely in the lining cutting of being close to the groove both sides is provided with a plurality of holes in lining cutting, be provided with screw in described hole.
Above-mentioned construction joint of tunnel percolating water punishment node structure, described constuction joint is positioned at the central authorities of groove, and the central authorities of described mortar are provided with deformation joint.
Above-mentioned construction joint of tunnel percolating water punishment node structure is coated with one deck fireproof paint on described mortar.
The utility model compared with prior art has the following advantages: 1, adopt the punishment node structure of the utility model construction joint of tunnel percolating water, can reduce the degree of depth that lining cutting is dug, reduce the damage to the lining cutting globality; 2, semicircle pipe, the silica gel that is arranged on the constuction joint place in the punishment node structure of the utility model construction joint of tunnel percolating water has certain elasticity, and spread upon on the mortar on the silica gel deformation joint is set, can be along with constuction joint flexible, semicircle pipe, silica gel and mortar synchronization telescope can not cause the drawing crack of semicircle pipe, silica gel and mortar; 3, by elbow pipe and semicircle pipe are carried out water filling,, guarantee to use the present invention to carry out the validity of construction joint of tunnel percolating water punishment to detect the silica gel sealing effect; 4, can carry out later maintenance to the punishment node structure of the utility model construction joint of tunnel percolating water, thereby avoid digging once more the normal operation that lining cutting influences the tunnel.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is an overall structure schematic diagram of the present utility model.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the I-I sectional view among Fig. 2.
Fig. 4 is the II-II sectional view among Fig. 2.
Fig. 5 is a later maintenance schematic diagram of the present utility model.Description of reference numerals:
The 1-constuction joint; The 2-groove; 3-semicircle pipe;
4-draining duct; 5-silica gel; The 6-screw;
The 7-mortar; The 8-fireproof paint; The 9-deformation joint;
The 10-pipe; The 11-water injection hole; The 12-drainage channel;
13-water blockoff plug; The 14-wire rope; The 15-spheroid;
The 16-rotary machine; 17-shutoff plug; The 18-bend pipe;
The 19-elbow.
The specific embodiment
As Fig. 1, Fig. 2, the punishment node structure of Fig. 3 and a kind of construction joint of tunnel percolating water shown in Figure 4, comprise the groove 2 that is arranged on constuction joint 1 place, described groove 2 extends to tunnel drainage passage 12 from the position more than the EXIT POINT of percolating water always, in the described groove 2 semicircle pipe 3 is installed, the lower end of described semicircle pipe 3 is connected with tunnel drainage passage 12 by bend pipe 18, the upper end of described groove 2 is provided with a pipe 10, the part of described pipe 10 is positioned at semicircle pipe 3 inside, the upper end of described pipe 10 is provided with elbow 19, the outer wall of described semicircle pipe 3 scribbles silica gel 5, be coated with mortar 7 on the described silica gel 5, position corresponding with elbow 19 on the described mortar 7 is provided with water injection hole 11, and described water injection hole 11 is connected by elbow 19 with pipe 10.When construction joint of tunnel percolating water is punished, determine that by observing lining construction stitches the EXIT POINT of 1 percolating water earlier, and choose described EXIT POINT with the upper part arbitrarily a bit as digging point, measure the length that tunnel drainage passage 12 is put in described cutting, choose a length less than digging the semicircle pipe 3 of point to tunnel drainage passage 12 length, described semicircle pipe 3 is for to be cut into the PVC pipe along its length; From described cutting point, until tunnel drainage passage 12, the diameter of the spacing of joint-cutting and described semicircle pipe 3 about equally at the downward parallel joint-cutting in constuction joint 1 both sides for the usefulness concrete power saw; The concrete that cuts between joint-cutting with clink forms groove 2, with concrete cutting machine groove 2 is repaired, and makes the bottom of groove 2 slightly be wider than the oral area of groove 2; Described semicircle pipe 3 is embedded groove 2 bottoms form semicircle shape draining duct 4, and described draining duct 4 is connected with described tunnel drainage passage 12 with the bend pipe 18 of a diameter greater than semicircle pipe 3 diameters; With the zone between silica gel 5 sealing semicircle pipes 3 and groove 2 cell walls; A pipe 10 is inserted in upper end at described groove 2, and the part of described pipe 10 extend in the described semicircle pipe 3, and the upper end of described pipe 10 has elbow 19, with the zone between silica gel 5 sealing pipes 10 and groove 2 cell walls; By elbow 19 water filling in pipe 10, flushing pipe 10 and semicircle pipe 3, block the end of drainage channel 12 then with water blockoff plug 13, from elbow 19 water filling and continuing for some time once more in pipe 10, check silica gel 5 sealing effects, 5 places have water to ooze out as silica gel, then chisel out the silica gel 5 that water oozes out the place with clink, smear silica gel 5 again; 5 places do not have water to ooze out as silica gel, then use mortar 7 capping semicircle pipe 3 and pipes 10.
As shown in Figure 5, can finish the later maintenance of construction joint of tunnel percolating water punishment by this set, owing to contain a large amount of dirts in the water that leaks out in the constuction joint 1, As time goes on, water flow into the process of drainage channel 12 from draining duct 4, can pile up some mineral stain dirts at the tube wall of semicircle pipe 3, can stop up draining duct 4 along with the continuous richness of mineral stain dirt is long-pending, as chiseling punishment again again, normal operation to the tunnel has brought great inconvenience, but by reserving water injection hole 11 at elbow 19 places, and with shutoff plug 17 with water injection hole 11 shutoff, safeguard in later stage draining regularly duct 4, concrete is to turn on shutoff plug 17, from seizing wire 14 of water injection hole 11 insertions, the lower end of wire rope 14 has a spheroid 15, and the upper end of wire rope 14 links to each other with rotary machine 16.By the rotation of rotary machine 16, drive wire rope 14 and rotate, and then drive spheroid 15 swings, spheroid 15 impacts foulant and causes it and comes off, and maintenance is finished in water flushing again.
On described mortar 7, be coated with one deck fireproof paint 8.Smearing fireproof paint 8 can be to mortar 7 isolation of preventing fires.
Obliquely in the lining cutting of being close to groove 2 both sides in lining cutting, be provided with a plurality of holes, in described hole, be provided with screw 6.Bore a plurality of holes by oblique in the lining cutting of being close to groove 2 both sides in lining cutting, insert screw 6 and tighten in described hole, can make good being fixed on the tunnel-side of lining cutting around the groove 2, the lining cutting when avoiding constructing around the groove 2 is dropped.
Described constuction joint 1 is positioned at the central authorities of groove 2, and the central authorities of described mortar 7 are provided with deformation joint 9.On mortar 7 capping layers, use sheet metal along the standardized road of the bearing of trend of groove 2 deformation joint 9, described deformation joint 9 overlaps with constuction joint 1, owing to be subjected to Temperature Influence, constuction joint 1 has flexible function, so deformation joint 9 and described deformation joint 9 and constuction joint 1 are set to coincide, to satisfy temperature influence, deformation joint 9 on the mortar 7 can have certain dilatability, can not cause when constuction joint 1 stretches mortar 7 drawing cracks are come off, and PVC semicircle pipe 3 and silica gel 5 all have certain elasticity, can not stretching and drawing crack silica gel 5 and PVC semicircle pipe 3 because of mortar 7 when temperature influence.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every according to the utility model technical spirit to any simple modification, change and equivalent structure transformation that above embodiment did, all still belong in the protection domain of technical solutions of the utility model.

Claims (4)

1. construction joint of tunnel percolating water is punished node structure, it is characterized in that: comprise being arranged on the groove (2) that constuction joint (1) is located, described groove (2) extends to tunnel drainage passage (12) always from the position more than the EXIT POINT of percolating water, semicircle pipe (3) is installed in the described groove (2), the lower end of described semicircle pipe (3) is connected with tunnel drainage passage (12) by bend pipe (18), the upper end of described groove (2) is provided with a pipe (10), the part of described pipe (10) is positioned at semicircle pipe (3) inside, the upper end of described pipe (10) is provided with elbow (19), the outer wall of described semicircle pipe (3) scribbles silica gel (5), be coated with mortar (7) on the described silica gel (5), described mortar (7) is gone up the position corresponding with elbow (19) and is provided with water injection hole (11), and described water injection hole (11) is connected by elbow (19) with pipe (10).
2. construction joint of tunnel percolating water according to claim 1 punishment node structure is characterized in that: obliquely in the lining cutting of being close to groove (2) both sides be provided with a plurality of holes in lining cutting, be provided with screw (6) in described hole.
3. construction joint of tunnel percolating water punishment node structure according to claim 2, it is characterized in that: described constuction joint (1) is positioned at the central authorities of groove (2), and the central authorities of described mortar (7) are provided with deformation joint (9).
4. construction joint of tunnel percolating water punishment node structure according to claim 3 is characterized in that: be coated with one deck fireproof paint (8) on described mortar (7).
CN2010205208376U 2010-09-07 2010-09-07 Leakage water treatment node structure of tunnel construction joints Expired - Fee Related CN201763359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205208376U CN201763359U (en) 2010-09-07 2010-09-07 Leakage water treatment node structure of tunnel construction joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205208376U CN201763359U (en) 2010-09-07 2010-09-07 Leakage water treatment node structure of tunnel construction joints

Publications (1)

Publication Number Publication Date
CN201763359U true CN201763359U (en) 2011-03-16

Family

ID=43715968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205208376U Expired - Fee Related CN201763359U (en) 2010-09-07 2010-09-07 Leakage water treatment node structure of tunnel construction joints

Country Status (1)

Country Link
CN (1) CN201763359U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104061017A (en) * 2014-07-08 2014-09-24 中交第二公路勘察设计研究院有限公司 Tunnel maintainable type pressure reducing and water draining method and device for water rich stratum
CN106640154A (en) * 2017-01-13 2017-05-10 中交四公局第工程有限公司 Treatment method and structure for water seepage of tunnel lining circular construction joint crack
CN109113768A (en) * 2018-11-06 2019-01-01 中南大学 A kind of lining construction seam waterproof construction and waterproof method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104061017A (en) * 2014-07-08 2014-09-24 中交第二公路勘察设计研究院有限公司 Tunnel maintainable type pressure reducing and water draining method and device for water rich stratum
CN106640154A (en) * 2017-01-13 2017-05-10 中交四公局第工程有限公司 Treatment method and structure for water seepage of tunnel lining circular construction joint crack
CN109113768A (en) * 2018-11-06 2019-01-01 中南大学 A kind of lining construction seam waterproof construction and waterproof method

Similar Documents

Publication Publication Date Title
CN101943006B (en) Treatment method of water leakage of construction joints of tunnel
CN204530733U (en) Underground construction deep-well precipitation well head plugging structure
CN107905224B (en) Anchoring structure for improving anti-pulling force of anchor rod by expanding head of expansion cement in perforated steel pipe and construction method
CN205296175U (en) High pressure -bearing depth of water excavation supporting stock structure
CN105114106B (en) A kind of Tunnel Water Leakage controlling device
CN108166517A (en) For the shut-in well method and well-sealing device of superelevation floor height hydraulic pressure dewatering well of deep well
CN201763359U (en) Leakage water treatment node structure of tunnel construction joints
CN205422815U (en) Big flood underground mine tunnel waterwall
CN103821114B (en) A kind of reservoir culvert method for blocking discarded under seepage pressure effect
CN206554042U (en) A kind of lining waterproof structure of seepage tunnel
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN205875188U (en) Pressure -bearing precipitation well plugging device
CN207420594U (en) Underground traffic hole concrete anti-seepage structure
CN202927358U (en) A steel liner repair structure of a large-diameter concrete non-bearing pipeline fissure
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN109667586B (en) Grouting method of double-layer well wall grouting system
CN204356738U (en) A kind of concrete face rockfill dam upstream face structure of preventing face slab dislocation
CN207194452U (en) Underground chamber outer wall wall pipeline hole waterproof embedding pipe fittingses device
CN206521773U (en) Tapered end leak plugging structure after a kind of prestressed anchor cable stretching
CN216381425U (en) Single line tunnel invert filling surface infiltration processing system
CN104912057B (en) Construction method of underground continuous wall
CN210459133U (en) Gravity dam foundation drainage structures
CN204023526U (en) A kind of discharge structure that reduces embedded penstock external water pressure
CN204139229U (en) A kind of Metro Deep Excavation dewatering well Accrete clearing device
CN102296618A (en) Sleeve with anchor rod penetrating through diaphragm wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20120907