CN201744265U - Circulating system for treating pollutant discharge - Google Patents
Circulating system for treating pollutant discharge Download PDFInfo
- Publication number
- CN201744265U CN201744265U CN2010202564839U CN201020256483U CN201744265U CN 201744265 U CN201744265 U CN 201744265U CN 2010202564839 U CN2010202564839 U CN 2010202564839U CN 201020256483 U CN201020256483 U CN 201020256483U CN 201744265 U CN201744265 U CN 201744265U
- Authority
- CN
- China
- Prior art keywords
- chimney
- purify
- dense smoke
- purifying
- flue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a set structure of a circulating system for treating pollutant discharge. A liquid atomizing device, a heavy smoke purifying and separating chamber and a purifying and filtering control device are arranged in a heavy smoke passage; secondary purification control, the chimney internal purification set and the secondary purification chimney internal set are arranged in the chimney, and the clean smoke gas is discharged after purification. The circulating system for treating the pollution discharge of smoke passage of the chimney, is suitable for the thermal power stations, metallurgical plants, cement brick plants and enterprises with severe dust pollution to carry out energy saving, discharge reduction and pollution reduction, effectively optimizes the environments of cities, countryside and resident living areas, promotes the economical development, and performs the positive function of making benefits to mankind.
Description
[technical field]
The utility model relates to a kind of technical field that is used to administer the circulatory system of industrial chimney flue disposal of pollutants.
[background technology]
At present, the various flue gas concentrations that various industrial chimney flues are discharged pollute higher, and thick smoke rises on high sometimes, and the thick smoke of shape such as explosion of atomic bomb lift-off all fails to reduce the environmental pollution of classes such as this gas, cigarette, dirt.As coal-fired Thermal Power Station, ironmaking, sintering, cement factory of enterprise such as bake bricks, the smoke pollution surrounding environment of emerging influences people's respiratory health.The conventional water that adopts, mist precipitation subduction smoke stratification concentration, all fail to obtain desirable purification and filter.The utility model is exactly further to optimize to purify, and for effectively useless cigarette, the waste gas got rid of being turned waste into wealth, plays the effect of energy-saving and emission-reduction, optimizes space environment.The utility model is exactly to solve this this structure design that is used to administer the circulatory system of chimney flue disposal of pollutants.
[summary of the invention]
The purpose of this utility model provides the structure design of a kind of use in the circulatory system of administering the disposal of pollutants of industrial chimney flue, utilize the process of various liquid gas purifications and filtering and purifying exactly, the filter of distinct program and liquefaction purify purpose and the effect that dense smoke pollutes to reach.
In order to realize above-mentioned purpose, the utility model is a kind of circulatory system that is used to administer the disposal of pollutants of industrial chimney flue, and it is to utilize the gravity of various liquid air-flows and filter purifier to repeat the effect that repeatedly filters, liquefies and reach and reduce disposal of pollutants.The utility model is that the technical scheme that problem adopted of its technological invention of solution is: shape and structure is by upright chimney, enter floss hole through harmful dense smoke, enter the dense smoke flue by producing thick smoke, by producing fog liquefaction device, purifying dense smoke differentiation chamber and directly enter and purify the filter control device, through the blowdown by-pass valve control, purify for the second time flue box entering again; Purify control for the second time and filter, be provided with by purifying in setting and the double purification chimney in the chimney again, purify the back then and discharge clear clean flue gas contexture.Curb environmental pollution to reach really, the effective effect and the purpose of energy-saving and emission-reduction.
[description of drawings]
Below in conjunction with drawings and Examples to the utility model further instruction.
Fig. 1 is the concrete cutaway view of implementing of the utility model.
Illustrate 1 one kinds of circulatory systems of administering disposal of pollutants: 1, chimney, 2, dense smoke flue, 3, produce fog liquefaction device, 4, purify dense smoke differentiation chamber, 5, purify the filter control device, 6, blowdown sedimentation basin, 7, the blowdown by-pass valve control, 8, row's sediment discharge hole, 9, purify control for the second time, 10, purify for the second time flue box, 11, clear pollutant hole, 12, the second blowdown mud chamber, 13, purify setting in the chimney, 14, be provided with 15, harmful dense smoke enters floss hole, 16, purify the back and discharge clear clean flue gas in the double purification chimney.
[specific embodiment]
A kind of apparatus structure of administering the circulatory system of disposal of pollutants shown in Fig. 1, the harmful dense smoke that is produced by factory enter floss hole 15 and enter dense smoke flue 2 and connect by producing fog liquefaction device 3, purifying dense smoke differentiation chamber 4 and purify filter control device 5 and be connected blowdown by-pass valve control 7; Purify for the second time flue box 1O and connect and purify control 9 for the second time and filter, again by purify in the chimney be provided with 13 and the double purification chimney in be provided with 14, purify the back then and discharge clear clean flue gas 16 contextures.
At a kind of apparatus structure of administering the circulatory system of pollution emission reduction shown in Fig. 1, be provided with in the dense smoke flue 2 and produce fog liquefaction device 3 and purify dense smoke differentiation chamber 4, carry out the atomizing first time and purify back blowdown sedimentation basin 6, purify filter control device 5 then, purify filter control device 4 and be provided with, be arranged with blowdown sedimentation basin 6, purify that filter control device 5 is provided with blowdown by-pass valve control 7, row's sediment discharge hole 8 is arranged on down by producing fog liquefaction device 3.
In upright chimney 1, be provided with and purify control 9 for the second time and purify flue box 10 for the second time, clear pollutant hole 11, the second blowdown mud chamber 12 all are arranged on the bottom of chimney 1, purify in the chimney be provided with 13 and the double purification chimney in middle and upper part in the chimney 1 of two-layer setting in 14 fens is set, purify the back and discharge the topmost exit that clear clean flue gas 16 is located at chimney 1.
In parallel dense smoke flue 2, be provided with and produce fog liquefaction device 3, purify dense smoke differentiation chamber 4 and purify filter control 5, be provided with to purify for the second time to purify in control 9 and the double-deck primary purification chimney in upright chimney 1 and be provided with 13, be provided with 14 in the double purification chimney, the circulatory system of whole a kind of disposal of pollutants is the circulatory system structure of the improvement disposal of pollutants of the dual double purification of branchs, filter composition.
This utility model is a kind of to be used to administer the apparatus structure of the circulatory system of pollution emission reduction, can play the effect of administering the disposal of pollutants of chimney flue, the factory of enterprise that is widely used in Thermal Power Station, metallurgical ironmaking, cement, brick field, dust pollution weight carries out energy-saving and emission-reduction, reduces and pollute, effectively play the environment of optimizing city, rural area and resident living area space easily, promote economic development, guarantee people's life health plays the positive role that promotes the well-being of mankind and serve.
Claims (3)
1. circulatory system of administering disposal of pollutants is characterized in that: enter floss hole (15), dense smoke flue (2) by harmful dense smoke and connect and produce fog liquefaction device (3), purify dense smoke differentiation chamber (4) and purification filter control device (5) is connected blowdown by-pass valve control (7); Connect and purify control (9) for the second time by purifying for the second time flue box (10) in the chimney (1), (13) are set are connected and (14) are set in the double purification chimney, purify back discharge clear clean flue gas (16) contexture with purifying in the chimney.
2. a kind of circulatory system of administering disposal of pollutants according to claim 1, it is characterized in that: in parallel dense smoke flue (2), be provided with to produce fog liquefaction device (3) and purify dense smoke and break up chamber (4), just enter then and purify filter control device (5), be arranged with blowdown sedimentation basin (6), purify filter control device (5) and be provided with blowdown by-pass valve control (7), row sediment discharge hole (8) is arranged on down.
3. a kind of circulatory system of administering disposal of pollutants according to claim 1 and 2, it is characterized in that: in upright chimney (1), be provided with to purify for the second time and control (9) and purify flue box (10) for the second time, clear pollutant hole (11), the second blowdown mud chamber (12) all are arranged on the bottom of chimney (1), purify interior be provided with (14) of setting (13) and double purification chimney in the chimney and divide the two-layer middle and upper part that is arranged in the chimney (1), the clear clean flue gas of discharge (16) is located at the topmost exit of chimney (1) after purifying.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202564839U CN201744265U (en) | 2010-07-13 | 2010-07-13 | Circulating system for treating pollutant discharge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202564839U CN201744265U (en) | 2010-07-13 | 2010-07-13 | Circulating system for treating pollutant discharge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201744265U true CN201744265U (en) | 2011-02-16 |
Family
ID=43578938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202564839U Expired - Fee Related CN201744265U (en) | 2010-07-13 | 2010-07-13 | Circulating system for treating pollutant discharge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201744265U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101890273A (en) * | 2010-07-13 | 2010-11-24 | 申中梁 | Circulating system for treating pollution emission |
-
2010
- 2010-07-13 CN CN2010202564839U patent/CN201744265U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101890273A (en) * | 2010-07-13 | 2010-11-24 | 申中梁 | Circulating system for treating pollution emission |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205127642U (en) | Dust removal purification system of lime production line | |
CN201894904U (en) | Dual-cylinder rotational-flow bubbling dust removal and desulfurization gas cleaning device | |
CN105999888B (en) | A kind of technique for realizing glass furnace cigarette minimum discharge | |
CN203413699U (en) | Multifunctional oil fume purifier | |
CN101190395A (en) | Fire smoke cooling-down dust removing purifier | |
CN109140451A (en) | A kind of flue gas purifying technique and equipment of the processing of animal innoxious burning | |
CN103961992A (en) | Air purification device | |
CN201744265U (en) | Circulating system for treating pollutant discharge | |
CN206045690U (en) | Novel combination type fume purifier of fume | |
CN105413365B (en) | A kind of air contaminant treatment device and method | |
CN204987898U (en) | Ceramic kiln wet -type tail gas processing apparatus | |
CN203323152U (en) | Building integration biomass burning flue gas purifying heat recovery unit based on natural material utilization | |
CN103203155A (en) | Production line for treatment of waste gas from melting of secondary aluminum of electric furnace | |
CN101890273A (en) | Circulating system for treating pollution emission | |
CN2894800Y (en) | Dust collector | |
CN101301572B (en) | Dry-wet mixed type dust-removing and desulfurizing integrated device | |
CN104028101B (en) | Flue gas desulfurizing and hydrargyrum-removing integral system and technique | |
CN203990300U (en) | For the device of purifying and stive-aromatic hydrocarbons organic exhaust gas | |
CN203724939U (en) | Water curtain and photo-oxidation integrated internal power type waste gas purifier | |
CN205957182U (en) | Novel flash distillation mineralize mineralization garbage disposer | |
CN112807912A (en) | High-efficiency dust removing device | |
CN205261767U (en) | Air purifier | |
CN205360915U (en) | Automatic lift haze belt cleaning device | |
CN1701838A (en) | Technology for radically treating industrial coal flue dust contamination by waterlogging to remove dust and sulphur | |
CN202762279U (en) | Novel desulphurization device of waste gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110216 Termination date: 20120713 |