CN201738932U - Support structure of loess tunnel with extra-large cross-section - Google Patents

Support structure of loess tunnel with extra-large cross-section Download PDF

Info

Publication number
CN201738932U
CN201738932U CN 201020286588 CN201020286588U CN201738932U CN 201738932 U CN201738932 U CN 201738932U CN 201020286588 CN201020286588 CN 201020286588 CN 201020286588 U CN201020286588 U CN 201020286588U CN 201738932 U CN201738932 U CN 201738932U
Authority
CN
China
Prior art keywords
loess tunnel
section
tunnel
large cross
extra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020286588
Other languages
Chinese (zh)
Inventor
李雷
梁文灏
刘培硕
刘赪
李国良
杨国柱
赵秋林
杨木高
谢君泰
李凌志
刘小刚
王新东
马洪程
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN 201020286588 priority Critical patent/CN201738932U/en
Application granted granted Critical
Publication of CN201738932U publication Critical patent/CN201738932U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a support structure of a loess tunnel with an extra-large cross-section. Larger distortion or even collapse accidents happened easily in the construction process of the loess tunnel. At present, aiming at the loess tunnel with the large cross-section, a core soil short steps reservation method is successfully applied for digging the 140m2 loess tunnel with the large cross-section. A capacitor-resistor diode network (CRD) method is adopted to solve the construction of digging a new 120m2 loess tunnel of 25m burial depth under an existing railway. As the excavation cross-section of the loess tunnel is larger and larger, the construction is more and more difficult and dangerous. The utility model comprises a preliminary stage support, an arch wall secondary lining and an inverted arch. A small canal advance support is arranged along the outline line of the arch part of the tunnel and a waterproof layer is arranged between the preliminary stage support and the arch wall secondary lining. When effectively ensuring the construction safety of the loess tunnel with the extra-large cross-section, the utility model has the advantages of simple construction procedure, large excavation space, high tunnel construction speed, and facilitates the operation of large-scale machinery.

Description

A kind of supporting and protection structure of extra-large cross-section loess tunnel
Technical field
The utility model relates to tunnel-like, is specifically related to a kind of supporting and protection structure of extra-large cross-section loess tunnel.
Background technology
Moderate finite deformation even landslide accident easily take place in the loess tunnel construction process, and current, at large-section loess tunnel, successful Application is reserved the short benching tunnelling method of core soil and is solved excavation area 140m 2The construction of large-section loess tunnel, and adopt the CRD method to solve buried depth 25m, excavation area 120m 2New loess tunnel under wear existing railway construction.Along with the further increasing of loess tunnel excavated section, it is big that its difficulty of construction and risk also progressively become.Though side heading method can be controlled sedimentation effectively, but construction step preface is various, construction space is narrow and small, construction speed is slow, construction costs is higher, especially at long distance, extra-large cross-section loess tunnel group's construction, safe, quick, economic construction be realized, suitable supporting and protection structure measure and reasonable excavation method must be adopted.
The utility model content
The technical problem that the utility model solved provide a kind of simple in structure, effectively guarantee the supporting and protection structure and the job practices thereof of extra-large cross-section loess tunnel construction safety.
For solving above-mentioned technical problem, the technical scheme that the utility model is taked:
The utility model comprises preliminary bracing, arch wall secondary lining, inverted arch, and its special character is: the outline line along the arch, tunnel is provided with the ductule advance support, is provided with waterproofing course between preliminary bracing and the arch wall secondary lining.
Above-mentioned preliminary bracing by the upright profile steel frame of sprayed mortar, frame, set anchor pole and hang steel mesh reinforcement and constitute.
The inverted arch of above-mentioned preliminary bracing partly comprises sprayed mortar and the upright profile steel frame of frame.
Above-mentioned waterproofing course is made of nonwoven and splash guard.
Compared with prior art, the beneficial effects of the utility model:
The utility model is when effectively guaranteeing the extra-large cross-section loess tunnel construction safety, and its working procedure is simple, and the excavation space is big, is convenient to the big machinery operation, and Tunnel Construction Schedule is fast.
Description of drawings
Fig. 1 is a structure cross-sectional drawing of the present utility model;
Fig. 2 is a working procedure cross-sectional drawing of the present utility model;
Fig. 3 is a working procedure longitudinal plan of the present utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
Referring to Fig. 1, the utility model comprises preliminary bracing 2, arch wall secondary lining 3, inverted arch 4, is provided with ductule advance support 1 along the outline line of arch, tunnel, is provided with waterproofing course between preliminary bracing 2 and the arch wall secondary lining 3.
Preliminary bracing 2 by the upright profile steel frame of sprayed mortar, frame, set anchor pole and hang steel mesh reinforcement and constitute.
The inverted arch of preliminary bracing 2 partly comprises sprayed mortar and the upright profile steel frame of frame.
Waterproofing course is made of nonwoven and splash guard.
Referring to Fig. 2,3, the step of implementing job practices of the present utility model is:
(1), along arch, tunnel excavation outline line, perform ductule advance support 1;
(2), 5 the excavation and stay core soil of under ductule advance support 1 protection, topping bar, excavate drilling depth is a Pin steelframe distance at every turn, performs the part of topping bar of preliminary bracing 2 then;
(3), excavation central core soil 6;
(4), step 7 and right side get out of a predicament or an embarrassing situation 10 in the staggered excavation left side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step left side of preliminary bracing 2 and the right side part of getting out of a predicament or an embarrassing situation then;
(5), step 8 and left side get out of a predicament or an embarrassing situation 9 in the staggered excavation right side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step right side of preliminary bracing 2 and the left part of getting out of a predicament or an embarrassing situation then;
(6), carry out the excavation of the inverted arch part soil body 11, excavate 5 Pin steelframe distances at every turn, perform the inverted arch part of preliminary bracing 2 then, immediately following performing inverted arch 4;
(7), perform the waterproofing course of 3 of preliminary bracing 2 and arch wall secondary linings, carry out the lining cutting reinforcing bar binding then;
(8), cast arch wall secondary lining 3.

Claims (4)

1. the supporting and protection structure of an extra-large cross-section loess tunnel, comprise preliminary bracing (2), arch wall secondary lining (3), inverted arch (4), it is characterized in that: the outline line along the arch, tunnel is provided with ductule advance support (1), is provided with waterproofing course between preliminary bracing (2) and the arch wall secondary lining (3).
2. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 1 is characterized in that: described preliminary bracing (2) by sprayed mortar, the upright profile steel frame of frame, set anchor pole and hang steel mesh reinforcement and constitute.
3. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 1 and 2 is characterized in that: described preliminary bracing (2) inverted arch partly comprises sprayed mortar and the upright profile steel frame of frame.
4. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 3, it is characterized in that: described waterproofing course is made of nonwoven and splash guard.
CN 201020286588 2010-08-09 2010-08-09 Support structure of loess tunnel with extra-large cross-section Expired - Fee Related CN201738932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020286588 CN201738932U (en) 2010-08-09 2010-08-09 Support structure of loess tunnel with extra-large cross-section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020286588 CN201738932U (en) 2010-08-09 2010-08-09 Support structure of loess tunnel with extra-large cross-section

Publications (1)

Publication Number Publication Date
CN201738932U true CN201738932U (en) 2011-02-09

Family

ID=43554210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020286588 Expired - Fee Related CN201738932U (en) 2010-08-09 2010-08-09 Support structure of loess tunnel with extra-large cross-section

Country Status (1)

Country Link
CN (1) CN201738932U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906974A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN102213099A (en) * 2011-05-23 2011-10-12 中铁二院工程集团有限责任公司 Composite liner structure of four-track large-span wall-foundation arched tunnel
CN102268993A (en) * 2011-06-30 2011-12-07 广东省长大公路工程有限公司 Method for excavating tunnel in high liquid limit soil
CN103670427A (en) * 2013-12-24 2014-03-26 中铁十九局集团第三工程有限公司 Cross excavation support late-dismantling type tunnel construction method
CN105863681A (en) * 2016-06-27 2016-08-17 西北大学 Quick protecting method for sloughing and sand sliding of roof of excavated sandy loess tunnel
CN107035383A (en) * 2017-04-26 2017-08-11 中铁第勘察设计院集团有限公司 The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN107849917A (en) * 2015-11-25 2018-03-27 Hyun工程建设株式会社 Utilize the method for tunnel construction and the device suitable for it of advance support and Lagging support

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906974A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN102213099A (en) * 2011-05-23 2011-10-12 中铁二院工程集团有限责任公司 Composite liner structure of four-track large-span wall-foundation arched tunnel
CN102268993A (en) * 2011-06-30 2011-12-07 广东省长大公路工程有限公司 Method for excavating tunnel in high liquid limit soil
CN102268993B (en) * 2011-06-30 2013-10-23 广东省长大公路工程有限公司 Method for excavating tunnel in high liquid limit soil
CN103670427A (en) * 2013-12-24 2014-03-26 中铁十九局集团第三工程有限公司 Cross excavation support late-dismantling type tunnel construction method
CN107849917A (en) * 2015-11-25 2018-03-27 Hyun工程建设株式会社 Utilize the method for tunnel construction and the device suitable for it of advance support and Lagging support
CN105863681A (en) * 2016-06-27 2016-08-17 西北大学 Quick protecting method for sloughing and sand sliding of roof of excavated sandy loess tunnel
CN107035383A (en) * 2017-04-26 2017-08-11 中铁第勘察设计院集团有限公司 The supporting construction of extra-large cross-section loess tunnel and its excavation method

Similar Documents

Publication Publication Date Title
CN101906974A (en) Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN201738932U (en) Support structure of loess tunnel with extra-large cross-section
CN201786361U (en) Supporting structure for railway crossing under loess tunnel with extra-large section
CN101906975A (en) Supporting structure for extra-large cross-section loess tunnel underpass railway and construction method thereof
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN202560245U (en) Multifunctional trolley with freely retractable arms
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN103046933B (en) Shield station-crossing tunneling and station parallel construction method
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN101539021B (en) Road tunnel excavation method
CN102953737B (en) Construction method for inverted arch of VI-level water-enriched surrounding rock tunnel
CN104480868B (en) On tear beam method open across the highway bridge of railway in operation
CN101886390B (en) All casing static pressure pile pulling technology in narrow space
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN107035383A (en) The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN107905814B (en) Large span loess tunnel top bar CD construction method
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN204898672U (en) Discard device of pulling out of pile foundation
CN205805574U (en) A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN100464035C (en) Metro engineering pile foundation underpinning construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20180809