CN201729605U - Tower crane grillage frame pedestrian platform - Google Patents

Tower crane grillage frame pedestrian platform Download PDF

Info

Publication number
CN201729605U
CN201729605U CN2010201817248U CN201020181724U CN201729605U CN 201729605 U CN201729605 U CN 201729605U CN 2010201817248 U CN2010201817248 U CN 2010201817248U CN 201020181724 U CN201020181724 U CN 201020181724U CN 201729605 U CN201729605 U CN 201729605U
Authority
CN
China
Prior art keywords
welded
platform
tower crane
wedge shape
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201817248U
Other languages
Chinese (zh)
Inventor
王建军
张连文
王枫
谢平光
周生玉
常铁山
史先岗
王厚貞
王铁柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN2010201817248U priority Critical patent/CN201729605U/en
Application granted granted Critical
Publication of CN201729605U publication Critical patent/CN201729605U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a tower crane grillage frame pedestrian platform, which relates to building machinery. A platform screen board and a platform beam are directly welded, the inner end of the platform beam 5 is connected with a wedge-shaped socket 4 through a wedge-shaped plugboard 5-1, and the outer end of the platform beam 5 is connected with a climbing frame main string upright column 2 through an inclined stay bar. A connecting plate 7 is welded at the outer end of the platform beam 5, an inclined socket 1 is welded on the lower portion of the climbing frame main string upright column 2, and one end of the inclined stay bar 3 is plugged into a hole of the inclined socket 1 while the other end is welded with a connecting seat 3-1 and hinged with the connecting plate 7 through a hinge shaft 9. The inclined stay bar 3, the climbing frame main string upright column 2 and the platform beam 5 are in triangular connection, thereby having fine strength and stability and being safe and reliable. In addition, the tower crane grillage frame pedestrian platform is easy in installation and detachment, and a cotter pin is arranged on the lower portion of the wedge-shaped board, thereby guaranteeing the platform and the clamping frame against falling off and having fine safety.

Description

Tower crane well cabinet frame People's Bank of China walks on stage
Technical field
The utility model relates to a kind of vehicle for construction, and the People's Bank of China that is specifically related to use on the tower crane walks on stage.
Background technology
The walking platform that musts be guarded or looked after all the time in the process that the tower crane car uses, People's Bank of China walks on stage and is horizontally fixed on the frame column support periphery that climbs, for the operating personal walking, place small-sized material instrument etc.The People's Bank of China that uses walks on stage at present, is to weld connecting panel, the bottom bolt on the frame master string column that climbs.Its shortcoming is:
1, be welded to connect plate plate inconvenience on main string, postwelding is yielding, transportation collision, cause ugly, load onto platform after, platform is uneven, and is not attractive in appearance.
2, bolted connection becomes flexible easily, comes off, and People's Bank of China's platform stable is poor, has safety hazard.
3, walk on stage and crossbeam by bolted connection, the hole on the crossbeam and walk on stage on the hole be difficult to guarantee that with one heart tie bolt is installed difficulty, and the expanded metal lath on walking on stage sometimes and bolt interfere, and causes the on-site installation difficulty.
Summary of the invention
In order to solve the problems of the technologies described above, the utility model provides a kind of tower crane well cabinet frame People's Bank of China to walk on stage, the direct welding fabrication of web plate and landing beam of walking on stage, landing beam is inner to be connected with the wedge shape socket by the wedge shape plate, and the landing beam outer end is connected with the frame master string column that climbs by hound, installs easily, be easy to dismounting, spring cotter is arranged at the bottom of clap board, and the frame that guarantees to walk on stage and climb can not come off, and safety performance is good.
The utility model is achieved by the following technical solution: a kind of tower crane well cabinet frame People's Bank of China walks on stage, it is to be welded by the landing beam and the web plate of walking on stage, landing beam is fixed on the frame master string column that climbs of well cabinet frame periphery, it is characterized in that: at the inner bottom welding of landing beam wedge shape plate, at the frame master string column outside welding wedge shape socket that climbs, described wedge shape plate is inserted in the described wedge shape socket; Described landing beam outer end is connected with the frame master string column that climbs by hound.
Bottom in the landing beam outer end is welded to connect plate, and the oblique cutting seat is welded in the bottom that is positioned at the wedge shape plate at the frame master string column that climbs, and hound lower end oblique cutting is in the hole of described oblique cutting seat; The hound upper end is welded to connect seat, and described Connection Block is a mountain font support, and hinged by jointed shaft and described connecting panel.
Described wedge shape plate lower end is provided with spring cotter.Described hound and oblique cutting seat junction are provided with spring cotter.
Good effect of the present utility model is:
1, platform is connected by clap board with the frame master string that climbs, and is very easy to install, and is easy to dismounting, greatly reduces the dismounting time.
2, cotter-pin hold is arranged at the bottom of clap board, can not come off by the spring cotter frame that guarantees to walk on stage and to climb, and safety performance is good.
3, walk on stage and the direct welding fabrication of crossbeam, easy to make, rigidity, intensity and planeness all guarantee easily.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the utility model structural representation.
Fig. 2 is the I place partial enlarged drawing of Fig. 1.
Fig. 3 is the A-A section-drawing of Fig. 2.
Fig. 4 is the II place partial enlarged drawing of Fig. 1.
Fig. 5 is the B-B rotation profile of Fig. 4.
Fig. 6 is the III place partial enlarged drawing of Fig. 1.
Fig. 7 is the C-C section-drawing of Fig. 6.
Among the figure: 1, oblique cutting seat, 2, the frame master string column that climbs, 3, hound, 3-1, Connection Block, 4, the wedge shape socket, 5, landing beam, 5-1, wedge shape plate, 6, the platform web plate, 7, connecting panel, 8, spring cotter, 9, jointed shaft.
The specific embodiment
As shown in Figure 1, 2, 3: a kind of tower crane well cabinet frame People's Bank of China walks on stage, it is to be welded by the landing beam 5 and the web plate 6 of walking on stage, landing beam 5 is fixed on the frame master string column 2 that climbs of well cabinet frame periphery, it is characterized in that: at landing beam 5 inner bottom welding wedge shape plate 5-1, at frame master string column 2 outsides welding wedge shape socket 4 that climbs, described wedge shape plate 5-1 is inserted in the described wedge shape socket 4; Described landing beam 5 outer ends are connected with the frame master string column 2 that climbs by hound 3.The direct welding fabrication of web plate and landing beam of walking on stage, easy to make, rigidity, intensity and planeness all guarantee easily.
Shown in Fig. 4,5,6,7: the bottom in landing beam 5 outer ends is welded to connect plate 7, and oblique cutting seat 1 is welded in the bottom that is positioned at wedge shape plate 5-1 at the frame master string column 2 that climbs, and hound 3 one ends are inserted in the hole of described oblique cutting seat 1; Hound 3 other ends are welded to connect a 3-1, and described Connection Block 3-1 is a mountain font support, and hinged by jointed shaft 9 and described connecting panel 7.Hound 3 forms triangle with the frame master string column 2 that climbs with landing beam 5 and is connected, and intensity and good stability are safe and reliable.
Described wedge shape plate 5-1 lower end is provided with spring cotter 8.Described hound 3 is provided with spring cotter 8 with oblique cutting seat 1 junction.Can not come off by the spring cotter frame that guarantees to walk on stage and to climb, safety performance is good.

Claims (4)

1. a tower crane well cabinet frame People's Bank of China walks on stage, it is to be welded by landing beam (5) and the web plate of walking on stage (6), landing beam (5) is fixed on the frame master string column (2) that climbs of well cabinet frame periphery, it is characterized in that: at the inner bottom welding of landing beam (5) wedge shape plate (5-1), at frame master string column (2) outside welding wedge shape socket (4) that climbs, described wedge shape plate (5-1) is inserted in the described wedge shape socket (4); Described landing beam (5) outer end is connected with the frame master string column (2) that climbs by hound (3).
2. tower crane well cabinet frame according to claim 1 People's Bank of China walks on stage, it is characterized in that: the bottom in landing beam (5) outer end is welded to connect plate (7), oblique cutting seat (1) is welded in the bottom that is positioned at wedge shape plate (5-1) at the frame master string column (2) that climbs, and hound (3) lower end oblique cutting is in the hole of described oblique cutting seat (1); Hound (3) upper end is welded to connect seat (3-1), and described Connection Block (3-1) is a mountain font support, and hinged by jointed shaft (9) and described connecting panel (7).
3. tower crane well cabinet frame according to claim 1 People's Bank of China walks on stage, and it is characterized in that: described wedge shape plate (5-1) lower end is provided with spring cotter (8).
4. tower crane well cabinet frame according to claim 2 People's Bank of China walks on stage, and it is characterized in that: described hound (3) is provided with spring cotter (8) with oblique cutting seat (1) junction.
CN2010201817248U 2010-04-24 2010-04-24 Tower crane grillage frame pedestrian platform Expired - Fee Related CN201729605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201817248U CN201729605U (en) 2010-04-24 2010-04-24 Tower crane grillage frame pedestrian platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201817248U CN201729605U (en) 2010-04-24 2010-04-24 Tower crane grillage frame pedestrian platform

Publications (1)

Publication Number Publication Date
CN201729605U true CN201729605U (en) 2011-02-02

Family

ID=43520761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201817248U Expired - Fee Related CN201729605U (en) 2010-04-24 2010-04-24 Tower crane grillage frame pedestrian platform

Country Status (1)

Country Link
CN (1) CN201729605U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102234073A (en) * 2010-04-24 2011-11-09 徐州建机工程机械有限公司 Human walking platform for #-shaped frame of crane
CN102424332A (en) * 2011-11-30 2012-04-25 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN103213910A (en) * 2013-04-28 2013-07-24 广州建筑股份有限公司 Hoisting frame for attachment of inner climbing type tower crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102234073A (en) * 2010-04-24 2011-11-09 徐州建机工程机械有限公司 Human walking platform for #-shaped frame of crane
CN102424332A (en) * 2011-11-30 2012-04-25 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN102424332B (en) * 2011-11-30 2014-09-17 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN103213910A (en) * 2013-04-28 2013-07-24 广州建筑股份有限公司 Hoisting frame for attachment of inner climbing type tower crane
CN103213910B (en) * 2013-04-28 2014-12-31 广州建筑股份有限公司 Hoisting frame for attachment of inner climbing type tower crane

Similar Documents

Publication Publication Date Title
CN201546435U (en) Bolted stayed cantilever scaffold
CN201729605U (en) Tower crane grillage frame pedestrian platform
KR101007728B1 (en) Guardrail
CN102234073A (en) Human walking platform for #-shaped frame of crane
CN201176637Y (en) Assembled car parking roof
KR100909486B1 (en) Fabricated inspecting support of bridge
CN202000268U (en) Foldable front outrigger for bridge girder erection machine
CN206503082U (en) A kind of overhead bridge construction climbing device
CN201801812U (en) Multi-functional highway-railway overhead working truck for bridge inspection
CN204038917U (en) Detachable external hanging type operating platform
CN201306117Y (en) Foldable operating platform
CN202644626U (en) Novel foldable pedal plate
CN207829789U (en) A kind of novel tower wagon of vcehicular tunnel
CN208884948U (en) A kind of operating platform
CN206753006U (en) A kind of construction scaffold
CN205242981U (en) Concrete construction operation platform
CN111648620A (en) Mounting structure of piece and a supporting beam encorbelments
CN205439948U (en) Installation protective structure of power battery group
CN111908334A (en) Method for assembling and disassembling portal crane and auxiliary support structure
CN202243211U (en) Walking board of engineering machinery and engineering machinery with walking board
CN206636165U (en) Simple scaffold capable of being folded integrally
CN218176397U (en) Steel structure stair for power plant building
CN203022614U (en) Folding rear step ladder device for concrete mixers
CN218346833U (en) Independent beam formwork support bearing bracket
CN219138960U (en) Step ladder for evacuation platform and evacuation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Jianjun

Inventor after: Wang Houzhen

Inventor after: Li Shiping

Inventor after: Zhou Shengyu

Inventor after: Zhang Lianwen

Inventor after: Wang Feng

Inventor after: Shi Xiangang

Inventor before: Wang Jianjun

Inventor before: Zhang Lianwen

Inventor before: Wang Feng

Inventor before: Xie Pingguang

Inventor before: Zhou Shengyu

Inventor before: Chang Tieshan

Inventor before: Shi Xiangang

Inventor before: Wang Houzhen

Inventor before: Wang Tiezhu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG JIANJUN ZHANG LIANWEN WANG FENG XIE PINGGUANG ZHOU SHENGYU CHANG TIESHAN SHI XIANGANG WANG HOUZHEN WANG TIEZHU TO: WANG JIANJUN WANG HOUZHEN LI SHIPING ZHOU SHENGYU ZHANG LIANWEN WANG FENG SHI XIANGANG

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20170424

CF01 Termination of patent right due to non-payment of annual fee