CN201722703U - Section steel platform tower crane base - Google Patents

Section steel platform tower crane base Download PDF

Info

Publication number
CN201722703U
CN201722703U CN2010202264158U CN201020226415U CN201722703U CN 201722703 U CN201722703 U CN 201722703U CN 2010202264158 U CN2010202264158 U CN 2010202264158U CN 201020226415 U CN201020226415 U CN 201020226415U CN 201722703 U CN201722703 U CN 201722703U
Authority
CN
China
Prior art keywords
tower crane
iron
cross girder
section steel
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202264158U
Other languages
Chinese (zh)
Inventor
梁克权
周文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO JIANGONG ENGINEERING GROUP CO., LTD.
Original Assignee
NINGBO CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO CONSTRUCTION CO Ltd filed Critical NINGBO CONSTRUCTION CO Ltd
Priority to CN2010202264158U priority Critical patent/CN201722703U/en
Application granted granted Critical
Publication of CN201722703U publication Critical patent/CN201722703U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a section steel platform tower crane base in the field of construction equipment, which is designed to solve the technical problem of poor structural stability of the conventional similar tower crane bases. The design points of the tower crane base lie in that a reinforcing connecting plate is connected to the cross of an I-beam cross girder; supporting plates are connected to the top of a steel latticed column and U-beams, the U-beams are connected with the I-beam cross girder, and the steel latticed column is connected with the I-beam cross girder and the U-beams via a triangular connecting plate; the I-beam cross girder is connected with I-beams connected into a lattice shape, and a reinforcing U-beam is connected between the I-beam cross girder and the I-beams; and bearing plates are connected to upper and lower ends of the cross of the I-beams and the I-beam cross girder and are connected with a tower crane standard joint via nuts and screw rods. With good structural stability and high firmness, the utility model is suitable for making a structural improvement on the conventional similar tower crane bases.

Description

Shaped steel platform tower crane pedestal
Technical field
The utility model relates to the construction implement field, is a kind of shaped steel platform tower crane pedestal.
Background technology
In the building operations, the vertical transport of various constructional materialss is finished by tower crane, the safety of the construction that the stability of tower crane and firmness directly have influence on and progress.Especially the construction of modern high-rise building and deep layer basement, tower crane often is arranged in the middle of the basement, in the basement construction stage, below the seat platform of basis is unsettled, therefore quite high to the requirement of tower crane, in case the tower crane structure goes wrong, its consequence that causes is with hardly imaginable.Influencing constitutionally stable one of them principal element of tower crane whole is exactly tower crane pedestal, and all load-bearing are all transmitted by tower crane pedestal; In addition, tower crane pedestal also need bear extra natural wind, so, tower crane pedestal stable and be extremely important firmly.For guaranteeing the firm and stable of tower crane pedestal, patent No. ZL200510013280.0 as the Chinese patent literature publication, denomination of invention is " tower crane foundation with stiffened steel structure ", the patent No. 200620095063.0 of Chinese patent literature publication and for example, the utility model name is called " tower crane type crane cross steel work basis ", above-mentioned two kinds of patents all disclose a kind of tower crane holder structure, have improved the stable and firm of tower crane pedestal to a certain extent, and have reduced cost.But through scrutinizing, above-mentioned two kinds of tower crane pedestals are when super dark basement construction, and its stability of structure is still waiting to improve.
Summary of the invention
For overcoming above-mentioned deficiency, the purpose of this utility model is to provide a kind of shaped steel platform tower crane pedestal to this area, makes it solve existing similar tower crane pedestal not good enough technical problem of structural stability when super dark basement construction.Its objective is and be achieved through the following technical solutions.
A kind of shaped steel platform tower crane pedestal, this seat bottom, basis is laced of battened compression member and bored pile, the roof attachment type steel platform base seat of described tower crane pedestal, this shaped steel platform base seat comprises i iron cross girder, i iron, channel-section steel.Its main points are: right-angled intersection place of described i iron cross girder connects reinforced company's fishplate bar, and its connected mode is a full weld.Described laced of battened compression member top connects supporting plate, and supporting plate links to each other with channel-section steel, and channel-section steel links to each other with i iron cross girder, and described laced of battened compression member links to each other with i iron cross girder, channel-section steel by the triangle junction plate.Described i iron cross girder connects and is the i iron that " well " font connects, and is connected the reinforcement channel-section steel between i iron cross girder and the i iron.Described i iron is connected backing plate with the two ends up and down of i iron cross girder intersection location, and backing plate connects the tower crane standard knot by nut, screw rod.Said structure is the shaped steel platform structure at tower crane pedestal top, and this structure is not only comparatively firm, and connected mode is comparatively simple, is convenient to dismounting, can reuse.
Described screw rod is provided with at least eight, and per two screw rods are made as one group, and every screw rod passes by i iron cross girder and i iron intersection location and formed a angle in the angle, plays spacing and stressed uniform purpose.
Described two screw rods that are made as a group pass respectively by i iron cross girder and i iron intersection location and are formed two symmetrical in angle angles.
The utility model mainly is that the top structure of existing tower crane pedestal has been done improvement, and it is comparatively reliable that its structure is connected, and stability and firmness improve, thereby makes that tower crane basis stability when super dark basement construction is preferable.Be suitable as the architecture advances of existing similar tower crane basis seat.
Description of drawings
Fig. 1 is the utility model top surface structure schematic diagram, has done K portion among the figure and has confined with A-A and analyse and observe.
Fig. 2 is the K portion structural representation of Fig. 1, has made B-B among the figure and has analysed and observe.
Fig. 3 is the B-B sectional structure schematic diagram of Fig. 2, has made C-C among the figure and has analysed and observe.
Fig. 4 is the C-C sectional structure schematic diagram of Fig. 2.
Fig. 5 is the A-A sectional view of Fig. 1, has done T portion among the figure and has confined, and D-D analyses and observe with E-E and analyses and observe.
Fig. 6 is the T portion structural representation of Fig. 5.
Fig. 7 is the D-D sectional view of Fig. 5.
Fig. 8 is the E-E sectional view of Fig. 5.
Specific embodiment
Now in conjunction with the accompanying drawings the utility model is further described, the name of sequence number is called among Fig. 1~Fig. 8: i iron cross girder 1, channel-section steel 2, i iron 3, triangle junction plate 4, supporting plate 5, backing plate 6, screw rod 7, reinforced company's fishplate bar 8 is strengthened channel-section steel 9, tower crane standard knot 10, steel plate for sealing water 11, bored pile 12, reinforced concrete foundation 13.
Embodiment in conjunction with Fig. 1~Fig. 5: according to routine, this shaped steel platform tower crane pedestal bottom is provided with four bored piles of the array that is square, spacing between each bored pile is set to 2~4 meters, connect a laced of battened compression member on four bored piles respectively, connect vertically to cut the support mode by the bar shaped channel-section steel between the adjacent laced of battened compression member, the centre of four laced of battened compression member is by bar shaped channel-section steel cross support to be connected.Connect a supporting plate 5 respectively at the top of four laced of battened compression member, supporting plate connects i iron cross girder 1 and channel-section steel 2, the crossover location welding reinforced company fishplate bar of i iron cross girder.Laced of battened compression member also connects i iron cross girder and channel-section steel by triangle junction plate 4, further improves bonding strength.Shown in Fig. 4~7, the shaped steel platform structure of this shaped steel platform tower crane pedestal comprises i iron cross girder, i iron, channel-section steel, i iron cross Main Girder Welding is the i iron that " well " font connects, be connected between the angle of i iron and i iron cross girder intersection location and strengthen channel-section steel 9, play further firm effect.Channel-section steel is divided into interior channel-section steel and the outer channel-section steel that is square frame shape, and two groups of channel-section steels place same plane, same center, and are provided with spacing each other, and this spacing is calculated by the technician.The upper end of channel-section steel connects i iron cross girder, and the lower end connects supporting plate.Said structure is shaped steel platform base seat of the present utility model.This shaped steel platform base seat is connected backing plate 6 at i iron cross girder with the two ends up and down of i iron intersection location, by nut, screw rod 7 tower crane standard knot 10 is fixedlyed connected with backing plate again, promptly finishes being connected of tower crane standard knot and shaped steel platform base seat.
The foregoing description is intended to illustrate technological means of the present utility model, and unrestricted technical scope of the present utility model.

Claims (2)

1. shaped steel platform tower crane pedestal, this seat bottom, basis is laced of battened compression member and bored pile (12), the roof attachment type steel platform base seat of described tower crane pedestal, this shaped steel platform base seat comprises i iron cross girder (1), i iron (3), channel-section steel (2); It is characterized in that:
Right-angled intersection place of described i iron cross girder (1) connects reinforced company's fishplate bar (8);
Described laced of battened compression member top connects supporting plate (5), and supporting plate links to each other with channel-section steel (2), and channel-section steel links to each other with i iron cross girder (1), and described laced of battened compression member links to each other with i iron cross girder, channel-section steel by triangle junction plate (4);
Described i iron cross girder (1) connects and to be the i iron (3) that " well " font connects, and is connected reinforcement channel-section steel (9) between i iron cross girder and the i iron;
Described i iron (3) is connected backing plate (6) with the two ends up and down of i iron cross girder (1) intersection location, and backing plate connects tower crane standard knot (10) by nut, screw rod (7).
2. according to the described shaped steel platform of claim 1 tower crane pedestal, it is characterized in that described screw rod (7) is provided with at least eight, per two screw rods are made as one group, and every screw rod passes by i iron cross girder (1) and i iron (3) intersection location and formed a angle in the angle.
CN2010202264158U 2010-06-13 2010-06-13 Section steel platform tower crane base Expired - Lifetime CN201722703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202264158U CN201722703U (en) 2010-06-13 2010-06-13 Section steel platform tower crane base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202264158U CN201722703U (en) 2010-06-13 2010-06-13 Section steel platform tower crane base

Publications (1)

Publication Number Publication Date
CN201722703U true CN201722703U (en) 2011-01-26

Family

ID=43491018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202264158U Expired - Lifetime CN201722703U (en) 2010-06-13 2010-06-13 Section steel platform tower crane base

Country Status (1)

Country Link
CN (1) CN201722703U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102127976A (en) * 2011-04-21 2011-07-20 中国建筑第八工程局有限公司 H-shaped steel tower crane bearing platform
CN102677675A (en) * 2011-03-11 2012-09-19 中国建筑第四工程局有限公司 Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN103790241A (en) * 2014-01-21 2014-05-14 浙江大学 Angle steel connecting method of H-type solid-web type beam and lattice type steel column
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
WO2014131332A1 (en) * 2013-03-01 2014-09-04 Li Wenze Mobile crane base
CN108019057A (en) * 2017-12-20 2018-05-11 江苏沪宁钢机股份有限公司 The column foot steel construction and its installation method of a kind of transfer component load
CN108383016A (en) * 2018-03-26 2018-08-10 宁波建工工程集团有限公司 Assembling steel construction tower crane platform and its construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677675A (en) * 2011-03-11 2012-09-19 中国建筑第四工程局有限公司 Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN102677675B (en) * 2011-03-11 2015-03-04 中国建筑第四工程局有限公司 Tower crane foundation in building basement and manufacturing method of tower crane foundation
CN102127976A (en) * 2011-04-21 2011-07-20 中国建筑第八工程局有限公司 H-shaped steel tower crane bearing platform
WO2014131332A1 (en) * 2013-03-01 2014-09-04 Li Wenze Mobile crane base
CN103790241A (en) * 2014-01-21 2014-05-14 浙江大学 Angle steel connecting method of H-type solid-web type beam and lattice type steel column
CN103790241B (en) * 2014-01-21 2015-10-07 浙江大学 A kind of Bolted angle connection method of H type steel flanged beam beam and laced of battened compression member
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
CN108019057A (en) * 2017-12-20 2018-05-11 江苏沪宁钢机股份有限公司 The column foot steel construction and its installation method of a kind of transfer component load
CN108019057B (en) * 2017-12-20 2020-08-14 江苏沪宁钢机股份有限公司 Tower footing steel structure for transferring component load and installation method thereof
CN108383016A (en) * 2018-03-26 2018-08-10 宁波建工工程集团有限公司 Assembling steel construction tower crane platform and its construction method

Similar Documents

Publication Publication Date Title
CN201722703U (en) Section steel platform tower crane base
CN104595126A (en) Tower Construction and a Method for Erecting the Tower Construction
CN211447708U (en) Super high-rise building construction elevator feeding platform support system that encorbelments
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN105625186A (en) Method for constructing large-section concrete Y-shaped column
CN113684929A (en) Seismic isolation support upper buttress node type steel stiff column overhead fixing structure and construction method
CN203808094U (en) Adjustable tower crane steel platform foundation
CN106193101B (en) Tower crane steel platform pile foundation and its construction method
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN106592821A (en) Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN208310001U (en) A kind of built-in lattice stem concrete-filled steel square tubular column
CN110725402A (en) Multi-cavity combined shear wall and H-shaped steel beam assembled node and construction method thereof
CN106894544A (en) Embedded individual layer steel plate concrete combined shear wall and its construction method
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN115839102A (en) Wind power tower prestress stiffening type steel concrete high-rise pile cap foundation
CN102041785B (en) Pier steel-concrete composite structure column beam
CN204898508U (en) Circular steel tube pier of bucking power consumption structure is prevented in root setting
CN211143826U (en) Node connecting device for newly adding beam on existing reinforced concrete column beam
CN106567454A (en) Installation method of inclined steel reinforced concrete composite structure
CN207974239U (en) A kind of petrochemical industry crosses over steel truss
CN206599882U (en) Embedded individual layer steel plate concrete combined shear wall
CN217268057U (en) Reinforced supporting building structure of reinforced concrete flat slab
CN221072298U (en) Integral binding jig frame for bent cap framework
CN211172368U (en) Assembled steel bar processing shed
CN218264949U (en) Concrete cantilever member support system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170116

Address after: Jiangdong District 315040 Zhejiang city of Ningbo Province Ning Chuan Road No. 538

Patentee after: NINGBO JIANGONG ENGINEERING GROUP CO., LTD.

Address before: 315040 Xingning Road, Zhejiang, Ningbo No. 46 Ningbo construction Limited by Share Ltd

Patentee before: Ningbo Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110126