CN201713810U - Pile foundation structure applied to Karst region - Google Patents

Pile foundation structure applied to Karst region Download PDF

Info

Publication number
CN201713810U
CN201713810U CN201020133035XU CN201020133035U CN201713810U CN 201713810 U CN201713810 U CN 201713810U CN 201020133035X U CN201020133035X U CN 201020133035XU CN 201020133035 U CN201020133035 U CN 201020133035U CN 201713810 U CN201713810 U CN 201713810U
Authority
CN
China
Prior art keywords
pile foundation
pile
karst region
karst
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020133035XU
Other languages
Chinese (zh)
Inventor
楼晓昱
付宏渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201020133035XU priority Critical patent/CN201713810U/en
Application granted granted Critical
Publication of CN201713810U publication Critical patent/CN201713810U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a pile foundation structure applied to a Karst region, which comprises a pile foundation body (10), a supporting body (13) is arranged in the middle of the pile foundation body (10), and a padding layer (7) is arranged at the lower part of the supporting body (13). The pile foundation structure is applied to construct the pile foundation in the Karst region with better developed pile-end horizontal bedrock and ensures the construction safety.

Description

A kind of piling strtucture that is applicable to the karst region
Technical field
The utility model patent relates to a kind of piling strtucture that is applicable to the karst region, refer in particular in the process of karst region excavation pile foundation, run into that the horizontal karst of an end is extremely grown and during the complete relatively situation of ground top rock, at character expanded hole of construction in the ground preferably, it is carried out arrangement of reinforcement and the bed course with certain thickness and rigidity condition is set under expanded hole, expanded hole place supporting body forms, and makes pile foundation middle part supporting body bring into play bearing capacity by design idea, to guarantee engineering safety.
Background technology
During the pile foundation that constructs a bridge in the karst region, because the solution cavity developmental state is very complicated, boring is difficult to reflect fully virtual condition, builds to engineering and brings many difficulties.Though comparatively typical situation is that boring does not disclose solution cavity, construction finds have folder mud and solution cavity to exist in the stake end certain limit, owing to lack good technical scheme, generally takes at present the pile foundation lengthening, until the way punishment that stake is arranged on the complete basement rock.But adopt this method to handle following problem is still arranged: though 1. pile foundation lengthening back supporting capacity increases, stake top rigidity reduces, and the actual bearer proterties is a friction pile, and stake top displacement is difficult to control; 2. in pile foundation when lengthening,, past more deep excavation be difficult more, constructs dangerous and cost is significantly increased; 3. as the ground deep horizontal when the situation that karst is very grown, it will be very difficult finding suitable bearing stratum in the scope of economical rationality; Even 4. stake is embedded complete basement rock, pile end groundwork following and around the solution cavity situation that contains still be difficult to prediction, can't guarantee fully that bearing capacity of pile tip can bring into play by design load.In fact, vertical karst of growing has the feature that is significantly weakened to the deep by the face of land in the ground, but the karst that level is grown then is subjected to lava position and phreatic the influence and certain buried depth is arranged, the normal interior rock mass engineering project proterties of ground top certain limit of meeting is fair in the engineering, and toward the interior all relatively poor complex situations of foundation condition of the longer scope in deep.If can will allow proterties provide some supporting forces in the rock stratum preferably, the pile foundation that can needn't extend simply reduces unnecessary waste, also can better guarantee engineering safety more.
The utility model content
Technical problem to be solved in the utility model provides the piling strtucture that is applicable to the karst region that a kind of energy adapts to the karst region that the horizontal karst of end an is grown installation and can guarantee engineering safety.
In order to solve the problems of the technologies described above, the piling strtucture that is applicable to the karst region that the utility model provides comprises the pile foundation body, is provided with supporting body at described pile foundation body middle part, is provided with bed course in the bottom of described supporting body.
Adopt the pile base construction method that is applicable to the karst region and the piling strtucture thereof of technique scheme, by pile foundation is retrofited, utilize pile body middle part engineering properties preferably rock mass certain supporting force is provided, carrying out reaming at the better position of rock mass, pile body middle part handles, form the middle part bearing surface, bed course with certain thickness and rigidity requirement is set on this bearing surface face then, after forming pile foundation, the middle part bearing surface can provide certain supporting force, can reach the pile foundation that to extend simply, also can better guarantee the purpose of engineering safety.When pile foundation was born vertical uniform load q, because the initial stiffness of reaming place bed course is less, the side friction of pile foundation is performance earlier, and along with the increase of load, reaming place bed course rigidity increases, and the middle part supporting force is performance fully gradually, the bearing capacity of pile foundation value of reaching capacity.
In sum, the utility model is a kind of energy adaptation karst region that the horizontal karst of end is grown installation pile foundation and the pile base construction method that is applicable to the karst region and the piling strtucture thereof that can guarantee engineering safety.
Description of drawings
Fig. 1 is a pile foundation remodeling processing scheme flow chart;
Fig. 2 is a middle part reaming pile foundation carrying schematic diagram;
Fig. 3 is an A place enlarged drawing among Fig. 2.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, Fig. 2 and Fig. 3, be provided with supporting body 13 at pile foundation body 10 middle parts, be provided with bed course 7 in the bottom of supporting body 13.
Referring to Fig. 1, Fig. 2 and Fig. 3, the karst ground is made up of the solution cavity 3 in last overburden layer 1, rock 2 and the ground, adopt the manually digging hole mode to form a hole 4, because the following karst of stake end is very grown, in the rock 2 on top hole enlargement being carried out in stake hole 4 this moment handles, form expanded hole 5 and form bearing surface 6, construction one deck bed course 7 on bearing surface 6 then, behind the 4 interior install reinforcing cages 8 of stake hole, again in expanded hole 5 places artificial colligation expanded hole reinforcing cage 9, last 4 interior placing of concrete form pile foundation body 10 toward the stake hole, and pile foundation body 10 forms supporting body 13 at expanded hole 5 places.
Referring to Fig. 1, Fig. 2 and Fig. 3, when being subjected to pile top load 11, pile foundation body 10 does the time spent, because bed course 7 initial stiffnesses are less, each pile cutoff frictional resistance 12 of pile foundation body 10 is at first brought into play, when pile top load 11 increased gradually, the rigidity of bed course 7 increased gradually, and the bearing capacity 14 of the bearing surface 6 of the supporting body 13 at expanded hole 5 places is performance fully gradually, this pile foundation body 10 reaches the bearing capacity limiting value, to guarantee engineering safety.

Claims (1)

1. a piling strtucture that is applicable to the karst region comprises pile foundation body (10), it is characterized in that: be provided with supporting body (13) at described pile foundation body (10) middle part, be provided with bed course (7) in the bottom of described supporting body (13).
CN201020133035XU 2010-03-17 2010-03-17 Pile foundation structure applied to Karst region Expired - Fee Related CN201713810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020133035XU CN201713810U (en) 2010-03-17 2010-03-17 Pile foundation structure applied to Karst region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020133035XU CN201713810U (en) 2010-03-17 2010-03-17 Pile foundation structure applied to Karst region

Publications (1)

Publication Number Publication Date
CN201713810U true CN201713810U (en) 2011-01-19

Family

ID=43459809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020133035XU Expired - Fee Related CN201713810U (en) 2010-03-17 2010-03-17 Pile foundation structure applied to Karst region

Country Status (1)

Country Link
CN (1) CN201713810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899832A (en) * 2010-03-17 2010-12-01 长沙理工大学 Pile foundation construction method suitable for karstregion and pile foundation structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899832A (en) * 2010-03-17 2010-12-01 长沙理工大学 Pile foundation construction method suitable for karstregion and pile foundation structure

Similar Documents

Publication Publication Date Title
CN201031391Y (en) Umbrella-shape weigh anchor
CN201809779U (en) Open caisson foundation of power transmission line iron tower
CN202595731U (en) High-bearing-capacity multistage enlarged bore pile convenient to construct
CN203403404U (en) High-efficiency cast-in-place pile device
CN201835276U (en) Prefabricated reaming pile
CN104695433A (en) Construction method of bituminous coating pile in sandy foundation
CN101899832A (en) Pile foundation construction method suitable for karstregion and pile foundation structure
CN105113976B (en) Wire brush bit convolution rig and solve burying, fall bore, the method for bit freezing
CN201713810U (en) Pile foundation structure applied to Karst region
CN205530231U (en) Can reinforcement type drilling bored concrete pile structure
CN205399503U (en) Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN204827213U (en) Double dynamical head digs rig soon
CN203977433U (en) Soft Deep Foundation Pit engineering composite supporting construction
CN101024958A (en) Drilling poured-pile hole-bottom slurry-injection pile-forming method
CN201502065U (en) Anchor rod joint excavation compound basis
CN201232180Y (en) Novel sheet-pile wall
CN204238209U (en) A kind of back-up sand bamboo joint pile
CN208472717U (en) A kind of depth back filled region bored concrete pile steel pile casting retaining wall
CN203049570U (en) Deep-buried round thin-wall hollow anti-slide pile
CN201713811U (en) Stepped cone-shaped pile foundation applicable to karst regions
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN202610808U (en) Press-anchor-restrict method foundation pit retaining structure
CN206053401U (en) A kind of thin stake reinforcement discharges rectification joint reinforcement structure
CN205399410U (en) Dig first slip casting club -footed pile of drilling soon
CN101812847A (en) Stepped conical pile foundation suitable for karst area and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119

Termination date: 20110317