CN201707983U - Cementing equipment of insulating pipe and flange - Google Patents
Cementing equipment of insulating pipe and flange Download PDFInfo
- Publication number
- CN201707983U CN201707983U CN2010202107388U CN201020210738U CN201707983U CN 201707983 U CN201707983 U CN 201707983U CN 2010202107388 U CN2010202107388 U CN 2010202107388U CN 201020210738 U CN201020210738 U CN 201020210738U CN 201707983 U CN201707983 U CN 201707983U
- Authority
- CN
- China
- Prior art keywords
- flange
- groups
- supporting frame
- bracing frame
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to cementing equipment of an insulating pipe and a flange, which comprises two groups of supporting frames, a pressing cylinder, a pedestal and two groups of flange connecting end plates, wherein a transverse guide rail is arranged at the upper end of the pedestal, a first supporting frame is fixedly connected with the left end of the transverse guide rail, a second supporting frame is connected with the right end of the transverse guide rail and can slip leftwards and rightwards along the transverse guide rail, the pressing cylinder is arranged at the right side of the second supporting frame, the piston rod end of the pressing cylinder is connected with the right end of the second supporting frame, and the end surfaces of the opposite sides of the first supporting frame and the second supporting frame are respectively connected with the flange connecting end plates. The utility model has the advantages that: the utility model not only can ensure the parallelism of the end surfaces at both ends of the insulating pipe and the end surface of the flange, but also can ensure the requirements of line displacement tolerances, such as the offset degree of a mounting hole on the end surface of the flange, simultaneously has the functions of simultaneously cementing and simultaneously curing the flanges at both ends and avoids the manufacturing quality defects brought to insulators by single-end cementing repeated adjustment, conveyance and the like.
Description
Technical field
The utility model relates to a kind of processing tool of hollow combined insulator, the mucilage binding frock of particularly a kind of insulated tube and flange.
Background technology
In the prior art, mucilage binding for insulated tube two ends and flange, employing is carried out mucilage binding to the flange at insulated tube two ends successively, need flange is adjusted repeatedly in the mucilage binding process, its mucilage binding process complexity, and be not easy to control the perpendicularity of the outer wall and the end face of flange of insulated tube, the depth of parallelism and the form and position tolerance of the end face of flange of more difficult control insulated tube both sides.
Summary of the invention
The purpose of this utility model is exactly the weak point in the background technology, a kind of end face of flange depth of parallelism and Geometrical Tolerance Principle that can guarantee the insulated tube two ends is provided, possesses the insulated tube of insulated tube two ends and flange while mucilage binding and the mucilage binding frock of flange again.
In order to achieve the above object, the utility model adopts following technical scheme: the mucilage binding frock of insulated tube and flange, described mucilage binding frock comprises two groups of bracing frames, the compacting cylinder, base and two groups of flanged ends plates, the base upper end is provided with cross slide way, first bracing frame is fixedlyed connected with the cross slide way left end, second bracing frame is connected with the cross slide way right-hand member and transversely guide rail left and right sides slippage, the second bracing frame right side is provided with the compacting cylinder, and the tailpiece of the piston rod of compacting cylinder is connected with the second bracing frame right-hand member, and the side end face that first bracing frame is relative with second bracing frame is connected with the flanged ends plate respectively.
For a kind of optimization of the present utility model, be respectively equipped with on the described flanged ends plate with flange on the threaded connection hole of installing hole coupling, corresponding mutually setting of threaded connection hole on two groups of flanged ends plates.
For a kind of optimization of the present utility model, two groups of flanges are connected with the flanged ends plate respectively, and insulated tube connects between two groups of flanges.
The utility model is compared with background technology, have the end face that can guarantee the insulated tube two ends and the depth of parallelism of end face of flange, can guarantee the requirement of the row position tolerances such as drift rate of the installing hole on the end face of flange again, also possesses the two end flanges mucilage binding function of solidifying simultaneously simultaneously simultaneously, the workmanship defective of avoided that single-ended mucilage binding is adjusted repeatedly, carrying etc. bringing to insulator.
Description of drawings
Fig. 1 is the structural representation of the mucilage binding frock of insulated tube and flange.
Embodiment
Embodiment 1: with reference to Fig. 1.The mucilage binding frock of insulated tube and flange, described mucilage binding frock comprises two groups of bracing frames 1 and 7, compacting cylinder 8, base 6 and two groups of flanged ends plates 2, base 6 upper ends are provided with cross slide way 5, first bracing frame 1 is fixedlyed connected with cross slide way 5 left ends, second bracing frame 7 is connected with cross slide way 5 right-hand members and transversely guide rail 5 left and right sides slippages, second bracing frame, 7 right sides are provided with compacting cylinder 8, and the tailpiece of the piston rod of compacting cylinder 8 is connected with second bracing frame, 7 right-hand members, and first bracing frame 1 is connected with flanged ends plate 2 respectively with second bracing frame, 7 relative side end faces.Be respectively equipped with on the described flanged ends plate 2 with flange 3 on the threaded connection hole of installing hole coupling, corresponding mutually setting of threaded connection hole on two groups of flanged ends plates 2.Two groups of flanges 3 are connected with flanged ends plate 2 respectively, and insulated tube 4 connects between two groups of flanges 3.
What need understand is: though present embodiment is to the utility model detailed explanation of contrasting; but these explanations; just to simple declaration of the present utility model; rather than to restriction of the present utility model; any innovation and creation that do not exceed in the utility model connotation all fall in the protection range of the present utility model.
Claims (3)
1. the mucilage binding frock of insulated tube and flange, it is characterized in that: described mucilage binding frock comprises two groups of bracing frames (1) and (7), compacting cylinder (8), base (6) and two groups of flanged ends plates (2), base (6) upper end is provided with cross slide way (5), first bracing frame (1) is fixedlyed connected with cross slide way (5) left end, second bracing frame (7) is connected with cross slide way (5) right-hand member, second bracing frame (7) right side is provided with compacting cylinder (8), and the tailpiece of the piston rod of compacting cylinder (8) is connected with second bracing frame (7) right-hand member, and the side end face that first bracing frame (1) is relative with second bracing frame (7) is connected with flanged ends plate (2) respectively.
2. the mucilage binding frock of insulated tube according to claim 1 and flange, it is characterized in that: be respectively equipped with the threaded connection hole of going up the installing hole coupling with flange (3) on the described flanged ends plate (2), the threaded connection hole on two groups of flanged ends plates (2) is corresponding mutually to be provided with.
3. the mucilage binding frock of insulated tube according to claim 1 and flange is characterized in that: two groups of flanges (3) are connected with flanged ends plate (2) respectively, and insulated tube (4) connection is positioned between two groups of flanges (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202107388U CN201707983U (en) | 2010-05-31 | 2010-05-31 | Cementing equipment of insulating pipe and flange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202107388U CN201707983U (en) | 2010-05-31 | 2010-05-31 | Cementing equipment of insulating pipe and flange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201707983U true CN201707983U (en) | 2011-01-12 |
Family
ID=43445138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202107388U Expired - Fee Related CN201707983U (en) | 2010-05-31 | 2010-05-31 | Cementing equipment of insulating pipe and flange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201707983U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104575882A (en) * | 2013-10-25 | 2015-04-29 | 山东彼岸电力科技有限公司 | Flange-cementing heating platform |
CN109046871A (en) * | 2018-09-30 | 2018-12-21 | 江苏祥源电气设备有限公司 | A kind of hollow composite insulator flange disk assembly glue-injection machine |
CN110619981A (en) * | 2019-10-25 | 2019-12-27 | 江苏祥源电气设备有限公司 | Hollow composite insulator flange assembly quality |
CN114360822A (en) * | 2021-12-10 | 2022-04-15 | 江苏神马电力股份有限公司 | Horizontal cementing machine |
-
2010
- 2010-05-31 CN CN2010202107388U patent/CN201707983U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104575882A (en) * | 2013-10-25 | 2015-04-29 | 山东彼岸电力科技有限公司 | Flange-cementing heating platform |
CN104575882B (en) * | 2013-10-25 | 2016-08-17 | 山东彼岸电力科技有限公司 | A kind of flange mucilage binding heating platform |
CN109046871A (en) * | 2018-09-30 | 2018-12-21 | 江苏祥源电气设备有限公司 | A kind of hollow composite insulator flange disk assembly glue-injection machine |
CN110619981A (en) * | 2019-10-25 | 2019-12-27 | 江苏祥源电气设备有限公司 | Hollow composite insulator flange assembly quality |
CN110619981B (en) * | 2019-10-25 | 2021-02-05 | 江苏祥源电气设备有限公司 | Hollow composite insulator flange assembly quality |
CN114360822A (en) * | 2021-12-10 | 2022-04-15 | 江苏神马电力股份有限公司 | Horizontal cementing machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201707983U (en) | Cementing equipment of insulating pipe and flange | |
CN202639892U (en) | Fastening device for steel pipe end face processing | |
CN203508657U (en) | Square tube correction device | |
CN103521986A (en) | Vehicle frame assembling table | |
CN103522221A (en) | Device for bidirectionally positioning and clamping wafer | |
CN101648342B (en) | Method for installing machine tool guideway | |
CN203640311U (en) | Inverted rail slide system | |
CN203514803U (en) | Clamping device for building wall templates | |
CN103206083B (en) | Double-wall crack formwork support | |
CN204144732U (en) | Distribution switchgear cabinet presetting system base | |
CN204230172U (en) | A kind of insulated tension pole press-fitting tool | |
CN203850090U (en) | General standardized mounting base for mutual inductors | |
CN204036249U (en) | Ceramic ferrule fixture | |
CN203426986U (en) | Multifunctional electric installation work bench | |
CN203402634U (en) | Steel tube transportation device | |
CN208376258U (en) | A kind of printing machine Destaticizing device | |
CN202914985U (en) | Connecting and fixing device for box bodies and support frame of display screen | |
CN104319192A (en) | Insulation pull rod press-fitting tool and method | |
CN205033575U (en) | Antenna house presss from both sides tightly fixes a position frock | |
CN212094237U (en) | Large-scale piston high accuracy psammitolite fast assembly structure | |
CN201129362Y (en) | Adjusting device fixed by improved bearing support | |
CN203522012U (en) | Tubular busbar adjusting tool | |
CN104677247A (en) | Equipment wire clamp hole distance rapid measurement device | |
CN204657356U (en) | Steel Reinforcing Bar Material chassis | |
CN204524667U (en) | Semitrailer main longitudinal grider tailor-welding tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110112 Termination date: 20140531 |