CN201707088U - Device for testing flow of electronic expansion valve - Google Patents

Device for testing flow of electronic expansion valve Download PDF

Info

Publication number
CN201707088U
CN201707088U CN2010202045432U CN201020204543U CN201707088U CN 201707088 U CN201707088 U CN 201707088U CN 2010202045432 U CN2010202045432 U CN 2010202045432U CN 201020204543 U CN201020204543 U CN 201020204543U CN 201707088 U CN201707088 U CN 201707088U
Authority
CN
China
Prior art keywords
expansion valve
anchor clamps
electronic expansion
test
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202045432U
Other languages
Chinese (zh)
Inventor
蔡晋辉
谷小红
姚燕
蒋庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
Original Assignee
China Jiliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jiliang University filed Critical China Jiliang University
Priority to CN2010202045432U priority Critical patent/CN201707088U/en
Application granted granted Critical
Publication of CN201707088U publication Critical patent/CN201707088U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a device for testing flow of an electronic expansion valve, which comprises a vertical test stand, a test tool universal for horizontal tubes and vertical tubes, an integrated clamp for the electronic expansion valve, a self-control unit based on an industrial control computer and a testing method for accurate testing of flow of the electronic expansion valve. The test tool universal for horizontal tubes and vertical tubes can be used for testing straight tube type electronic expansion valves and bent tube type electronic expansion valves due to arrangement of a vertical interface and a horizontal interface, and a hose at the bottom of the test tool can overcome installation deviations. The integrated clamp consists of a gas intake unit and a locking unit with independent courses and integrated structures, and is used for testing different gas intake pressures during clamping and testing of the electronic expansion valve. In the method for accurate testing of flow of the electronic expansion valve, a pressure sensor is respectively arranged on the front part and the rear part of the electronic expansion valve, an automatic pressure-regulating valve is adopted to lock a testing pressure difference between the front part and the rear part of the electronic expansion valve, and three flow sensors with different ranges are arranged at the outlet end of the electronic expansion valve, thereby realizing wide-range and high-precision flow testing, and correction can be carried out through a look-up table.

Description

A kind of flow of electronic expansion valve proving installation
Technical field
The utility model relates to flow rate test equipment, especially relates to a kind of flow of electronic expansion valve proving installation.
Background technology
Throttle mechanism and compressor, condenser, evaporator and be called " the four big parts " of refrigeration system in refrigeration system, it is one of requisite element in the refrigeration system, play a part the throttling step-down, directly controlling the degree of superheat of the flow and the evaporator outlet of evaporator refrigerant.Electric expansion valve is as a kind of throttle mechanism, along with the increased popularity of convertible frequency air-conditioner, uses more and more widely, compares with traditional kapillary, restriction sleeve and heating power expansion valve, and electric expansion valve has advantages such as degree of regulation height, range of adjustment are big.The flow of electric expansion valve under the different opening condition is its key property, and direct relation the quality of refrigeration system, so flow is a whether qualified crucial test index of electric expansion valve.And the technical merit of flow of electronic expansion valve testing apparatus is lower at present, have shortcomings such as automation degree of equipment is low, method of testing is unreasonable, test block is installed difficulty, the replacement frock clamp is time-consuming, cause that test result is inaccurate, consistance is poor, flow rate test becomes the technical bottleneck of electric expansion valve manufacturing enterprise accurately.Therefore designing and developing test result flow of electronic expansion valve testing apparatus accurate, swift to operate and technology, method, satisfy the demand of electric expansion valve manufacturing enterprise, is the effective way that improves the electric expansion valve product quality.
Summary of the invention
Overcome the problem that exists in the background technology for above-mentioned, the purpose of this utility model is to provide a kind of flow of electronic expansion valve proving installation.
The technical scheme that its technical matters that solves the utility model adopts is:
Be provided with left vent fan and right vent fan at vertical operator's console top, the back side is provided with the back door; Front end is the frock table top, and the electric expansion valve test fixture is housed on the frock table top; Frock table top upper panel installation testing gas reduction valve, anchor clamps gas reduction valve, qualified pilot lamp, defective pilot lamp have LCD, boost gauge and illumination daylight lamp; Tooling platform basifacial panel is the operation keypad, installs to start button, reset key, Qianmen; Anchor clamps gas inlet and test gas inlet are equipped with in vertical operator's console side; Vertical operator's console cabinet top is provided with solenoid valve and gas circuit pipe fitting, and the bottom is provided with industrial control computer, and industrial control computer is connected with the electronic expansion valve actuator by serial ports, and the bottom is electrical wiring plate and surge tank.
Described electric expansion valve test fixture: comprise the intake elbow anchor clamps, go out pipe clamp and air inlet straight tube anchor clamps; Intake elbow anchor clamps and go out pipe clamp and be individually fixed on the operating table surface go out the pipe clamp bottom and connect flexible pipe, go out on the operating table surface on pipe clamp right side to be fixed with stand type support, and stand type support top is air inlet straight tube anchor clamps fixedly.
Described intake elbow anchor clamps, to go out pipe clamp identical with air inlet straight tube clamp structure, include anchor clamps housing and test gas housing, anchor clamps enclosure interior end face is provided with upper plug head, upper plug head matches with concentric folder lobe, between upper plug head lower surface and concentric folder lobe spring is set, folder lobe bottom is provided with annular piston with one heart, there is the import of frock gas anchor clamps housing side, the bottom is connected with test gas housing, test gas enclosure interior is equipped with the seal of nylon material, and test gas housing bottom is that the import and export of test gas are connected with test gas turnover pipe.
One termination fixture air inlet of described anchor clamps gas reduction valve, the other end is divided into three the tunnel behind anchor clamps air inlet solenoid valve and anchor clamps exhaust solenoid valve, connect the import of intake elbow clamp fixture gas respectively, go out gas import of pipe clamp frock and the import of air inlet straight tube clamp fixture gas; The air inlet of described test gas reduction valve one termination test, the other end is divided into two-way behind boost gauge, surge tank, test air inlet solenoid valve, test exhaust solenoid valve and air inlet automatic pressure regulator, one the tunnel is connected through bend gas intake hand stop valve, bend gas intake pressure transducer and intake elbow anchor clamps, and another road is connected through straight tube air inlet hand stop valve, straight tube air inlet pressure sensor and air inlet straight tube anchor clamps; The outlet of tested electric expansion valve is parallel after going out pipe clamp and outlet pressure sensor interface to be divided into four the tunnel, connects first exhaust solenoid valve, second exhaust solenoid valve and a small amount of range of flow meter, the 3rd exhaust solenoid valve and middle range flowmeter, the 4th exhaust solenoid valve and wide range flowmeter respectively; Solenoid valve is connected with the electrical wiring plate through electric wire with flow sensor, and the electrical wiring plate is by industrial control board card connection in cable and the industrial control computer, and the coil of tested electric expansion valve is connected with the electronic expansion valve actuator.
Method of testing of the present utility model:
Utilize the tested electric expansion valve intake pressure of air inlet automatic Regulation valve regulation, pressure reduction is realized flow rate test before and after the locking electric expansion valve: operation preceding type selecting bend gas intake hand stop valve or straight tube air inlet hand stop valve according to tested electric expansion valve draft tube, during operation under the control of industrial control computer, open the fixing tested electric expansion valve of anchor clamps air inlet solenoid valve earlier, the delayed start-up test air inlet solenoid valve and first exhaust solenoid valve, and send pulse by the electronic expansion valve actuator and open tested electric expansion valve to assigned address, industrial control computer detects bend pipe, straight tube air inlet pressure sensor and outlet pressure sensor, calculate pressure reduction, transfer in the gas automatic pressure regulator, make the turnover draught head in specified scope, after selecting the test pipeline of suitable range, start-stop respective electrical magnet valve, carry out the pressure reduction fine tuning by the air inlet automatic pressure regulator once more, obtain flow value, close test air inlet solenoid valve after the end of test (EOT), open the test exhaust solenoid valve, time-delay closing anchor clamps air inlet solenoid valve is opened the anchor clamps exhaust solenoid valve.
The test pipeline of the suitable range of described selection, need read the flow count value during test, industrial control computer is opened the 4th exhaust solenoid valve earlier, then air inlet automatic pressure regulator fine tuning turnover draught head is arrived specified scope, read wide range flowmeter registration, if numerical value is greater than the range of middle range flowmeter, then wide range flowmeter registration is exported exactly, otherwise close the 4th exhaust solenoid valve, open the 3rd exhaust solenoid valve, fine tuning air inlet automatic pressure regulator makes the turnover draught head to specified scope, range flowmeter registration in reading, if numerical value is greater than the range of a small amount of range of flow meter, then middle range flowmeter registration is exported exactly, otherwise closes the 3rd exhaust solenoid valve, opens second exhaust solenoid valve, fine tuning air inlet automatic pressure regulator makes the turnover draught head to specified scope, reads a small amount of range of flow meter registration as test result.After industrial control computer reads the flow measurement test result, utilizing the inner test traffic and the normal flow table of comparisons, is input value with current test traffic, obtains the traffic alignment value by look-up table.
The utility model is compared the beneficial effect that has with background technology:
1. the utility model adopts vertical operator's console structure, and operation, maintenance and improvement adopt industrial computer to realize that the Automatic Control of test process, realization pressure reduction lock, and the built-in algorithm of tabling look-up are realized the numerical value calibration easily.
2, the electric expansion valve test fixture can satisfy the test request of bent-tube boiler electric expansion valve and straight pipe type electric expansion valve, has that electric expansion valve is easy for installation, frock is replaced characteristics efficiently.The integrated clamp that adopts is integrated in one air inlet and clamping function, volume is little, safe and reliable, and test gas and frock are clamped gas adopt fully independently two passages, electric expansion valve does not have damage when guaranteeing under the high pressure test traffic, can be airtight during test traffic under the low pressure.
3, be furnished with pressure transducer before and after the electric expansion valve, adopt the pressure reduction feedback control algorithm, the air inlet automatic pressure regulator carries out a coarse adjustment, and pressure reduction was constant before and after repeatedly fine tuning realized electric expansion valve, and the resistance of ducting is to the influence of system under the minimizing heavy traffic condition.The flowmeter of a plurality of different ranges is arranged in parallel, and selects only flowmeter according to the flow size, with the assurance precision, and further adopts look-up table correction measuring accuracy.
The utlity model has easy to install, measuring accuracy advantages of higher in a word, can better solve flow of electronic expansion valve and be difficult to survey accurate technical barrier.
Description of drawings
Fig. 1 is the side schematic view of vertical test board in the utility model flow of electronic expansion valve testing apparatus.
Fig. 2 is the front schematic view of vertical test board in the utility model flow of electronic expansion valve testing apparatus.
Fig. 3 is the structural representation of the utility model electric expansion valve test fixture.
Fig. 4 is the structural representation of the utility model electric expansion valve integrated clamp.
Fig. 5 is the utility model flow of electronic expansion valve test technology process flow diagram.
Fig. 6 is the utility model flow of electronic expansion valve test process block diagram.
Fig. 7 is a flux modification block diagram in the utility model flow of electronic expansion valve test process.
Among the figure: 1. vertical operator's console, 2. back door, 3. left vent fan, 4. right vent fan, 5. illumination daylight lamp, 6. LCD, 7. boost gauge, 8. anchor clamps gas reduction valve, 9. test the gas reduction valve, 10. qualified pilot lamp, 11. defective pilot lamp, 12. frock table tops, 13. electric expansion valve test fixture, 14. the startup button, 15. reset keys, 16. industrial control computers, 17. electronic expansion valve actuator, 18. surge tank, 19. electrical wiring plates, 20. Qianmens, 21. anchor clamps gas inlet, 22. test gas inlet, 23. intake elbow anchor clamps, 24. go out pipe clamp, 25. air inlet straight tube anchor clamps, 26. stand type support, 27. first set bolts, 28. second set bolts, 29. operation keypad, 30. anchor clamps air inlet solenoid valve, 31. anchor clamps exhaust solenoid valves, 32. test air inlet solenoid valves, 33. test exhaust solenoid valve, 34. the air inlet automatic pressure regulator, 35. bend gas intake hand stop valves, 36. straight tube air inlet hand stop valves, 37. bend gas intake pressure transducer, 38. the straight tube air inlet pressure sensor, 39. tested electric expansion valves, 40. outlet pressure sensors, 41. first exhaust solenoid valve, 42. second exhaust solenoid valve, 43. a small amount of range of flow meters, 44. the 3rd exhaust solenoid valves, 45. middle range flowmeter, 46. the 4th exhaust solenoid valve, 47. wide range flowmeters, 48. flexible pipes, 50. the 3rd grip nut, 51. the 4th grip nut, 52. first grip nuts, 53. second grip nuts, 54. the 5th grip nut, 55. the 6th grip nut, 56. mounting grooves, 57. springs, 58. press from both sides lobe with one heart, 59. the 3rd O type circle, 60. the 4th O type circles, 61. the one O type circles, 62. the 2nd O type circle, 63. the import of frock gas, 65. test gas housings, 66. seals, 67. the 5th O type circle, 68. the 6th O type circle, 69. the 7th O type circles, 70. annular pistons, 71. anchor clamps housing, 72. upper plug head, 73. test gas are imported and exported 74. external threads.
Embodiment
Below in conjunction with drawings and embodiments the utility model is further described.
As shown in Figure 1 and Figure 2, the utility model is provided with left vent fan 3 and right vent fan 4 at vertical operator's console 1 top, and the back side is provided with back door 2; Front end is a frock table top 12, and electric expansion valve test fixture 13 is housed on the frock table top 12; Frock table top 12 upper panel installation testing gas reduction valve 9, anchor clamps gas reduction valve 8, qualified pilot lamp 10, defective pilot lamp 11 have LCD 6, boost gauge 7 and illumination daylight lamp 5; Frock table top 12 lower panel are operation keypads 29, install to start button 14, reset key 15, Qianmen 20; Anchor clamps gas inlet 21 and test gas inlet 22 are equipped with in vertical operator's console 1 side; Vertical operator's console 1 cabinet top is provided with solenoid valve and gas circuit pipe fitting, and the bottom is provided with industrial control computer 16, and industrial control computer 16 is connected with electronic expansion valve actuator 17 by serial ports, and the bottom is electrical wiring plate 19 and surge tank 18.
As shown in Figure 3, described electric expansion valve test fixture 13 comprises intake elbow anchor clamps 23, goes out pipe clamp 24 and air inlet straight tube anchor clamps 25.Intake elbow anchor clamps 23 are fixing by first grip nut 52, second grip nut 53 and operating table surface 12, its left side is furnished with out pipe clamp 24, fixing by the 3rd grip nut 50, the 4th grip nut 51 and operating table surface 12, going out the pipe clamp bottom is flexible pipe 48, operating table surface 12 right sides are fixed with stand type support 26 by first set bolt 27 and second set bolt 28, microscler mounting groove 56 is dug on stand type support 26 tops, and fixedly air inlet straight tube anchor clamps 25 of the 5th grip nut 54, the 6th grip nut 55 are housed on the mounting groove 56.
As shown in Figure 4, described intake elbow anchor clamps 23, it is identical with air inlet straight tube anchor clamps 25 structures to go out pipe clamp 24, include anchor clamps housing 71 and test gas housing 65, anchor clamps housing 71 inside top surface are provided with upper plug head 72, upper plug head 72 matches with concentric folder lobe 58, upper plug head 72 lower surfaces are provided with spring 57 with 58 of concentric folder lobes, folder lobe 58 bottoms are provided with annular piston 70 with one heart, an O type circle 61 and the 2nd O type circle 62 are equipped with in annular piston 70 inside, the 3rd O type circle 59 and the 4th O type circle 60 are equipped with in the outside, there is frock gas import 63 anchor clamps housing 71 sides, bottom and test gas housing 65 are threaded, the seal 66 of nylon material is equipped with in test gas housing 65 inside, the 5th O type circle 67 and the 6th O type circle 68 are equipped with in seal 66 inside, and the bottom is the 7th O type circle 69, and test inside, gas housing 65 bottom has test gas to import and export 73, rely on internal thread to be connected with test gas turnover pipe, the outside has external thread 74 to be connected with grip nut.Folder lobe 58 is made up of three independent folder lobes with one heart.Be conical through-hole in the upper plug head 72, the top is a mounting hole, and the outside is a retaining thread, and the below then is a spring groove.Test gas housing 65 bottoms are that test gas import and export 73 are connected with test gas turnover pipe.
As shown in Figure 5, one termination fixture air inlet of described anchor clamps gas reduction valve 8, the other end is divided into three the tunnel behind anchor clamps air inlet solenoid valve 30 and anchor clamps exhaust solenoid valve 31, connect the 23 frock gas imports of intake elbow anchor clamps respectively, go out pipe clamp 24 frock gas imports and the 25 frock gas imports of air inlet straight tube anchor clamps; Described test gas reduction valve 9 one termination test air inlets, the other end is divided into two-way behind boost gauge 7, surge tank 18, test air inlet solenoid valve 32, test exhaust solenoid valve 33 and air inlet automatic pressure regulator 34, one the tunnel is connected through bend gas intake hand stop valve 35, bend gas intake pressure transducer 37 and intake elbow anchor clamps 23, and another road is connected through straight tube air inlet hand stop valve 36, straight tube air inlet pressure sensor 38 and air inlet straight tube anchor clamps 25; The outlet of tested electric expansion valve 39 is parallel after going out pipe clamp 24 and outlet pressure sensor 40 interfaces to be divided into four the tunnel, connects first exhaust solenoid valve 41, second exhaust solenoid valve 42 and a small amount of range of flow meter 43, the 3rd exhaust solenoid valve 44 and middle range flowmeter 45, the 4th exhaust solenoid valve 46 and wide range flowmeter 47 respectively; Solenoid valve is connected with electrical wiring plate 19 through electric wire with flow sensor, and electrical wiring plate 19 is by industrial control board card connection in cable and the industrial control computer 16, and the coil of tested electric expansion valve 39 is connected with electronic expansion valve actuator 17.
Automatic Regulation valve regulation intake pressure, realize flow rate test method before and after the locking electric expansion valve under the pressure reduction condition: operation is preceding according to tested electric expansion valve 39 air inlet type of switch bend gas intake hand stop valves 35, straight tube air inlet hand stop valve 36, during operation under the control of industrial control computer 16, open anchor clamps air inlet solenoid valve 30 fixing tested electric expansion valves 39 earlier, the delayed start-up test air inlet solenoid valve 32 and first exhaust solenoid valve 41, and send pulses by electronic expansion valve actuator 17 and open tested electric expansion valve 39 to assigned address, detect air inlet pressure sensor 37,38 and outlet pressure sensor 40, calculate pressure reduction, coarse adjustment air inlet automatic pressure regulator 34, make the turnover draught head in specified scope, select the test pipeline of suitable range, start-stop respective electrical magnet valve, carry out the pressure reduction fine tuning by air inlet automatic pressure regulator 34 once more, obtain flow value, close test air inlet solenoid valve 32 after the end of test (EOT), open test exhaust solenoid valve 33, time-delay closing anchor clamps air inlet solenoid valve 30 is opened anchor clamps exhaust solenoid valve 31.
Multistage flowmeter is parallel to be arranged, open step by step, the data software correction of tabling look-up: in the test, when reading the flow count value, open the 4th exhaust solenoid valve 46 earlier, air inlet automatic pressure regulator 34 fine tunings turnover draught head is to specified scope then, read wide range flowmeter 47 registrations, if numerical value is greater than the range of middle range flowmeter 45, then wide range flowmeter 47 registrations are exported exactly, otherwise close the 4th exhaust solenoid valve 46, open the 3rd exhaust solenoid valve 44, fine tuning air inlet automatic pressure regulator 34 makes the turnover draught head to specified scope, range flowmeter 45 registrations in reading, if numerical value is greater than the range of a small amount of range of flow meter 43, then middle range flowmeter 45 registrations are exported exactly, otherwise close the 3rd exhaust solenoid valve 44, open second exhaust solenoid valve 42, fine tuning air inlet automatic pressure regulator 34 makes the turnover draught head to specified scope, reads a small amount of range of flow meter 43 registrations as test result.After industrial control computer 16 reads the flow measurement test result, utilizing the inner test traffic and the normal flow table of comparisons, is input value with current test traffic, obtains the traffic alignment value by look-up table.
Normal stream value-measured discharge value correction chart utilization knows out that the standard valve of valve pulse and normal flow relation determines in advance, standard valve is installed on this test board as test block, then under industrial control computer 16 controls, open the valve pulse by what electronic expansion valve actuator 17 increased standard valve one by one, after the pressure differential of air inlet automatic pressure regulator 34 lock-up valves front and back, current measured discharge value, and set up normal stream value-measured discharge value correction chart under the stated pressure differential by industrial control computer 16.In the test to product, to identical value, read flowmeter and obtain the present flow rate value afterwards, call normal stream value-measured discharge value correction chart then and carry out interpolation calculation, obtain revising the back flow value by pressure differential before and after automatic pressure regulator 34 lock-up valves.
Fig. 5 is the utility model flow of electronic expansion valve test technology process flow diagram.Fig. 6 is the utility model flow of electronic expansion valve test process block diagram.

Claims (4)

1. flow of electronic expansion valve proving installation, it is characterized in that: be provided with left vent fan (3) and right vent fan (4) at vertical operator's console (1) top, the back side is provided with back door (2); Front end is frock table top (12), and electric expansion valve test fixture (13) is housed on the frock table top (12); Frock table top (12) upper panel installation testing gas reduction valve (9), anchor clamps gas reduction valve (8), qualified pilot lamp (10), defective pilot lamp (11) have LCD (6), boost gauge (7) and illumination daylight lamp (5); Frock table top (12) lower panel is an operation keypad (29), installs to start button (14), reset key (15), Qianmen (20); Anchor clamps gas inlet (21) and test gas inlet (22) are equipped with in vertical operator's console (1) side; Vertical operator's console (1) cabinet top is provided with solenoid valve and gas circuit pipe fitting, the bottom is provided with industrial control computer (16), industrial control computer (16) is connected with electronic expansion valve actuator (17) by serial ports, and the bottom is electrical wiring plate (19) and surge tank (18).
2. a kind of flow of electronic expansion valve proving installation according to claim 1 is characterized in that: described electric expansion valve test fixture (13) comprises intake elbow anchor clamps (23), goes out pipe clamp (24) and air inlet straight tube anchor clamps (25); Intake elbow anchor clamps (23) and go out pipe clamp (24) and be individually fixed on the operating table surface (12), go out pipe clamp (24) bottom and connect flexible pipe (48), go out on the operating table surface (12) on pipe clamp (24) right side to be fixed with stand type support (26), stand type support (26) top is air inlet straight tube anchor clamps (25) fixedly.
3. a kind of flow of electronic expansion valve proving installation according to claim 2, it is characterized in that: described intake elbow anchor clamps (23), it is identical with air inlet straight tube anchor clamps (25) structure to go out pipe clamp (24), include anchor clamps housing (71) and test gas housing (65), anchor clamps housing (71) inside top surface is provided with upper plug head (72), upper plug head (72) matches with concentric folder lobe (58), between upper plug head (72) lower surface and concentric folder lobe (58) spring (57) is set, folder lobe (58) bottom is provided with annular piston (70) with one heart, there is frock gas import (63) anchor clamps housing (71) side, the bottom is connected with test gas housing (65), the seal (66) of nylon material is equipped with in test gas housing (65) inside, and test gas housing (65) bottom is that test gas import and export (73) are connected with test gas turnover pipe.
4. a kind of flow of electronic expansion valve proving installation according to claim 1, it is characterized in that: a termination fixture air inlet of described anchor clamps gas reduction valve (8), the other end is divided into three the tunnel behind anchor clamps air inlet solenoid valve (30) and anchor clamps exhaust solenoid valve (31), connect the import of intake elbow anchor clamps (23) frock gas respectively, go out pipe clamp (24) frock gas import and the import of air inlet straight tube anchor clamps (25) frock gas; The air inlet of described test gas reduction valve (9) one termination test, the other end is divided into two-way behind boost gauge (7), surge tank (18), test air inlet solenoid valve (32), test exhaust solenoid valve (33) and air inlet automatic pressure regulator (34), one the tunnel is connected through bend gas intake hand stop valve (35), bend gas intake pressure transducer (37) and intake elbow anchor clamps (23), and another road is connected through straight tube air inlet hand stop valve (36), straight tube air inlet pressure sensor (38) and air inlet straight tube anchor clamps (25); The outlet of tested electric expansion valve (39) is parallel after going out pipe clamp (24) and outlet pressure sensor (40) interface to be divided into four the tunnel, connects first exhaust solenoid valve (41), second exhaust solenoid valve (42) and a small amount of range of flow meter (43), the 3rd exhaust solenoid valve (44) and middle range flowmeter (45), the 4th exhaust solenoid valve (46) and wide range flowmeter (47) respectively; Solenoid valve is connected with electrical wiring plate (19) through electric wire with flow sensor, electrical wiring plate (19) is by cable and the interior industrial control board card connection of industrial control computer (16), and the coil of tested electric expansion valve (39) is connected with electronic expansion valve actuator (17).
CN2010202045432U 2010-05-27 2010-05-27 Device for testing flow of electronic expansion valve Expired - Fee Related CN201707088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202045432U CN201707088U (en) 2010-05-27 2010-05-27 Device for testing flow of electronic expansion valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202045432U CN201707088U (en) 2010-05-27 2010-05-27 Device for testing flow of electronic expansion valve

Publications (1)

Publication Number Publication Date
CN201707088U true CN201707088U (en) 2011-01-12

Family

ID=43444251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202045432U Expired - Fee Related CN201707088U (en) 2010-05-27 2010-05-27 Device for testing flow of electronic expansion valve

Country Status (1)

Country Link
CN (1) CN201707088U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101846536A (en) * 2010-05-27 2010-09-29 中国计量学院 Device and method for measuring flow of electronic expansion valve
CN102126404A (en) * 2011-01-26 2011-07-20 中国计量学院 Anti-explosion air valve exhaust pressure testing and regulating equipment
CN108982083A (en) * 2018-07-16 2018-12-11 珠海格力电器股份有限公司 A kind of system and method for automatic detection electric expansion valve
CN109187000A (en) * 2018-09-13 2019-01-11 格力电器(武汉)有限公司 Electric expansion valve maximum actuation pressure difference test device
CN109946633A (en) * 2018-12-18 2019-06-28 北京航天计量测试技术研究所 A kind of solenoid valve multifunctional tester calibration system
CN116399578A (en) * 2023-06-07 2023-07-07 宁波瑞丰汽车零部件有限公司 Flow detection device of shock absorber piston main body

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101846536A (en) * 2010-05-27 2010-09-29 中国计量学院 Device and method for measuring flow of electronic expansion valve
CN101846536B (en) * 2010-05-27 2011-08-24 中国计量学院 Device and method for measuring flow of electronic expansion valve
CN102126404A (en) * 2011-01-26 2011-07-20 中国计量学院 Anti-explosion air valve exhaust pressure testing and regulating equipment
CN108982083A (en) * 2018-07-16 2018-12-11 珠海格力电器股份有限公司 A kind of system and method for automatic detection electric expansion valve
CN109187000A (en) * 2018-09-13 2019-01-11 格力电器(武汉)有限公司 Electric expansion valve maximum actuation pressure difference test device
CN109946633A (en) * 2018-12-18 2019-06-28 北京航天计量测试技术研究所 A kind of solenoid valve multifunctional tester calibration system
CN116399578A (en) * 2023-06-07 2023-07-07 宁波瑞丰汽车零部件有限公司 Flow detection device of shock absorber piston main body
CN116399578B (en) * 2023-06-07 2023-08-25 宁波瑞丰汽车零部件有限公司 Flow detection device of shock absorber piston main body

Similar Documents

Publication Publication Date Title
CN101846536B (en) Device and method for measuring flow of electronic expansion valve
CN201707088U (en) Device for testing flow of electronic expansion valve
CN102661859B (en) Performance testing equipment of pressure regulator of bottled liquefied petroleum gas and application method thereof
CN103837214A (en) Combined container type gas flow detection device by pVTt method
CN103411766B (en) Heating power expansion valve flow testing device and method of testing
CN102537486B (en) Intelligent valve positioning device
CN101718628B (en) Air intake management and test system for internal combustion engine
US5384709A (en) Miniature fluorescent lamp processing apparatus
CN106153161B (en) Instrument detection device
CN201599899U (en) Refrigerant addition control system of air conditioner,
CN104748809A (en) Intelligent metering instrument based on pressure regulator and metering method
CN202648050U (en) Debugging device matched with air conditioning system
CN214010770U (en) Performance simulation test system for ejector of water chilling unit
CN108506279B (en) A kind of high-pressure pneumatic servo valve mass flow characteristic detecting apparatus and method
CN2218927Y (en) Testing table for gas pressure part
CN202693298U (en) Performance detection test stand of airplane environment control accessory
CN109269796A (en) Zero-pressure valve test device and test method
CN212180747U (en) Gas divider
CN204514409U (en) Based on the intelligent meter of pressure regulator
CN208833501U (en) A kind of zero-pressure valve test device
CN104019842B (en) Calibration tool and calibration steps
CN111473829A (en) Multi-channel variable-range flowmeter
CN108955839B (en) Automatic flow calibrating device for electronic soap film
CN217560938U (en) Portable calibration equipment of idle call pressure switch
CN220525321U (en) Diaphragm valve test fixture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110112

Termination date: 20120527