CN201705375U - Four-column chock-shield large-mining-height mesh-laying hydraulic support - Google Patents

Four-column chock-shield large-mining-height mesh-laying hydraulic support Download PDF

Info

Publication number
CN201705375U
CN201705375U CN201020230078XU CN201020230078U CN201705375U CN 201705375 U CN201705375 U CN 201705375U CN 201020230078X U CN201020230078X U CN 201020230078XU CN 201020230078 U CN201020230078 U CN 201020230078U CN 201705375 U CN201705375 U CN 201705375U
Authority
CN
China
Prior art keywords
shield
support
base
height
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020230078XU
Other languages
Chinese (zh)
Inventor
张守祥
刘国柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN201020230078XU priority Critical patent/CN201705375U/en
Application granted granted Critical
Publication of CN201705375U publication Critical patent/CN201705375U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a four-column chock-shield large-mining-height mesh-laying hydraulic support which comprises a base, a top beam and a shield beam. Two stand columns are arranged between the top beam and the base. The supporting height of the support is more than or equal to 3.8m. A mesh laying mechanism is arranged at the rear part of the support and comprises a tail beam which is hinged at the rear end of the shied beam and at least one mesh roll which is arranged at the rear part of the base. A tail beam jack is arranged between the shield beam and the tail beam. An inserting plate and an inserting plate jack are arranged in the tail beam. Since the large mining height technology is organically combined with the mesh laying technology, the mesh laying space at the rear part is increased. Thereby, the utility model has the advantages that the requirements on the output can be satisfied, the mining efficiency is improved and the coal recovery rate is improved.

Description

The four post support shield type large mining height lapping hydraulic bracket
Technical field
The utility model relates to a kind of hydraulic support, relates in particular to a kind of four post support shield type large mining height lapping hydraulic bracket.
Background technology
Hydraulic support is the indispensable suspension device in the coal mining, and lapping exploitation and top coal caving are two kinds of production practices commonly used of the prior art.
Because top coal caving work efficiency height, cost of winning are low, be widely used in the prior art.But the caving coal recovery is low, the coal seam is inflammable.
And lapping exploitation work efficiency is low, cost is high, thus big not as good as caving coal promoted extension, but higher to the rate of recovery of coal.3.5 meters of the general height of support with mesh-layingdevice of the prior art use highly about 3 ~ 3.3 meters.
There is following shortcoming at least in above-mentioned prior art:
Production efficiency and coal recovery rate can not be taken into account.
The utility model content
The purpose of this utility model provides a kind of production efficiency height, four post support shield type large mining height lapping hydraulic bracket that coal recovery rate is high.
The purpose of this utility model is achieved through the following technical solutions:
Four post support shield type large mining height lapping hydraulic bracket of the present utility model comprises base, back timber, caving shield, is provided with two root posts between back timber and the base, and the supporting height of this support is more than or equal to 3.8m, and the rear portion of this support is provided with net laying mechanism.
The technical scheme that provides by above-mentioned the utility model as can be seen, four post support shield type large mining height lapping hydraulic bracket described in the utility model because the supporting height of this support is more than or equal to 3.8m, the rear portion of this support is provided with net laying mechanism.Big mining height technology and lapping technology are organically combined, lapping space, rear portion is strengthened.Both can satisfy the output requirement, improve production efficiency, and can improve coal recovery rate again.
Description of drawings
Fig. 1 is the structural representation of the utility model four post support shield type large mining height lapping hydraulic bracket.
The specific embodiment
Four post support shield type large mining height lapping hydraulic bracket of the present utility model, its preferable specific embodiment as shown in Figure 1, comprise base 1, back timber 2, caving shield 3, be provided with 4 root posts 4 between back timber 2 and the base 1, the supporting height of this support is more than or equal to 3.8m, and the rear portion of this support is provided with net laying mechanism.
Net laying mechanism can comprise tail boom 5 that is articulated in caving shield 3 rear ends and at least one net volume 6 of being located at base 1 rear portion, is provided with tail boom jack 7 between caving shield 3 and the tail boom 5, forms retaining cash mechanism.The last pivot angle degree of tail boom 5 is 10~15 °, and bottom angle is 40~45 °.Can also be provided with plate 8 and plate jack 9 in the tail boom 5.
Push unit can be equipped with in the centre of base 1, and the front end of push unit is connected with the front scrapping plate conveyer.
Standard code belongs to big mining height hydraulic support greater than 3.8 meters, the utility model organically combines (support height reaches 7.5m) with big mining height technology and lapping technology, high seam is carried out separate zone production, and do not adopt top coal caving, can satisfy output and require (as more than 300,500 1,000 ten thousand tons), improve mine economic profit; Adopt the separate zone production technology, improve coal recovery rate again.Improve working surface production efficient and resource recovery, satisfied demand safe, efficient, high yield.
In the utility model, the big more original support with mesh-layingdevice of mining height back space, lapping space, rear portion is bigger, for the rear portion provides bigger operating space, is easy to networking.Support height can be applied in supporting height more than 3.8 meters, adapt to thick coal-layer mining needs, improved working surface production efficient and resource recovery, satisfy safety, efficiently, the demand of high yield.
The above; it only is the preferable specific embodiment of the utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.

Claims (5)

1. a four post support shield type large mining height lapping hydraulic bracket comprises base, back timber, caving shield, is provided with 4 root posts between back timber and the base, it is characterized in that, the supporting height of this support is more than or equal to 3.8m, and the rear portion of this support is provided with net laying mechanism.
2. four post support shield type large mining height lapping hydraulic bracket according to claim 1, it is characterized in that, described net laying mechanism comprises the tail boom that is articulated in described caving shield rear end and is located at least one net volume at described base rear portion, is provided with the tail boom jack between described caving shield and the tail boom.
3. four post support shield type large mining height lapping hydraulic bracket according to claim 2 is characterized in that, the last pivot angle degree of described tail boom is 10~15 °, and bottom angle is 40~45 °.
4. four post support shield type large mining height lapping hydraulic bracket according to claim 3 is characterized in that, is provided with plate and plate jack in the described tail boom.
5. according to each described four post support shield type large mining height lapping hydraulic bracket of claim 1 to 4, it is characterized in that push unit is equipped with in the centre of described base, the front end of described push unit is connected with the front scrapping plate conveyer.
CN201020230078XU 2010-06-10 2010-06-10 Four-column chock-shield large-mining-height mesh-laying hydraulic support Expired - Lifetime CN201705375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020230078XU CN201705375U (en) 2010-06-10 2010-06-10 Four-column chock-shield large-mining-height mesh-laying hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020230078XU CN201705375U (en) 2010-06-10 2010-06-10 Four-column chock-shield large-mining-height mesh-laying hydraulic support

Publications (1)

Publication Number Publication Date
CN201705375U true CN201705375U (en) 2011-01-12

Family

ID=43442529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020230078XU Expired - Lifetime CN201705375U (en) 2010-06-10 2010-06-10 Four-column chock-shield large-mining-height mesh-laying hydraulic support

Country Status (1)

Country Link
CN (1) CN201705375U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871355A (en) * 2010-06-10 2010-10-27 中煤北京煤矿机械有限责任公司 Four post support shield type large mining height mesh-placement hydraulic support
CN106351679A (en) * 2016-11-09 2017-01-25 安徽理工大学 Soil similar coal working face fully sealed shield support device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871355A (en) * 2010-06-10 2010-10-27 中煤北京煤矿机械有限责任公司 Four post support shield type large mining height mesh-placement hydraulic support
CN101871355B (en) * 2010-06-10 2013-02-13 中煤北京煤矿机械有限责任公司 Four post support shield type large mining height mesh-placement hydraulic support
CN106351679A (en) * 2016-11-09 2017-01-25 安徽理工大学 Soil similar coal working face fully sealed shield support device

Similar Documents

Publication Publication Date Title
CN101871355B (en) Four post support shield type large mining height mesh-placement hydraulic support
CN101592035A (en) Big mining height shield type low caving coal hydraulic support
CN201687497U (en) Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
AU2015251283A1 (en) Design process and optimisation method for hydraulic support for solid filling coal mining
CN101906982B (en) Two-stage side guard transition bracket for large height mining face
CN101975072B (en) Recovery method of common combined mining working face hydraulic support
CN201705375U (en) Four-column chock-shield large-mining-height mesh-laying hydraulic support
CN101886547B (en) Two-pier shielding type large mining height lapping hydraulic bracket
CN201232562Y (en) Double-fork hyperstatic hydraulic support
CN202788899U (en) Large-swing beam structured top coal caving hydraulic support
CN201013399Y (en) Rotary type two-stage side-protection device
CN201705374U (en) Two-leg shield type mesh laying hydraulic support with large mining height
CN206233944U (en) Underground coal mine removes the cover frame of hydraulic support
CN202467883U (en) Light-duty hydraulic support for bistable reverse four-link mechanism
CN1087807C (en) Hydraulic prop frame for low position blasting down the roof coal
CN201363155Y (en) Mine single oscillating bar breaking coal hydraulic support
CN101333930B (en) Double-fork type hyperstatic hydraulic support
CN202325609U (en) Light hydraulic bracket of short wall working surface
CN103195459B (en) Low caving coal hydraulic support
CN204371398U (en) A kind of novel precise protection fully-mechanized mining working
CN201902220U (en) Light end bracket
CN201502390U (en) Mechanical coal mining top plate crushing work surface hydraulic support
CN2921287Y (en) Hydraulic support four linkage rod device
CN201747391U (en) Two-stage lateral protection transition bracket of large mining height working surface
CN206928968U (en) A kind of rigid backbone scraper loader guard rail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110112

Effective date of abandoning: 20130306

RGAV Abandon patent right to avoid regrant