CN201686383U - Remote monitoring device for mine hoist - Google Patents
Remote monitoring device for mine hoist Download PDFInfo
- Publication number
- CN201686383U CN201686383U CN2010201412773U CN201020141277U CN201686383U CN 201686383 U CN201686383 U CN 201686383U CN 2010201412773 U CN2010201412773 U CN 2010201412773U CN 201020141277 U CN201020141277 U CN 201020141277U CN 201686383 U CN201686383 U CN 201686383U
- Authority
- CN
- China
- Prior art keywords
- controller
- loading
- plc controller
- mine hoist
- data cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Selective Calling Equipment (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The utility model discloses a remote monitoring device for mine hoist, which comprises the following components: a printer, a master controller, a PLC controller, a data memory, an unloading controller and a loading controller. The master controller is connected with the printer through a data cable, and is simultaneously connected with the PLC controller through a communication network line. The PLC controller is connected with the data memory through the data cable. The data memory, the unloading controller and the loading controller are connected through the data cable. The device provided by the utility model performs remote monitoring to the mine elevator through internet and a monitoring system structure, realizes monitoring to the mine elevator at other place or remotely and real-time analysis to the field operation state, and furthermore has the following advantages: remote analysis for failure of mine elevator, reduced number of field failure checking times of personnel, improved convenience and reduced cost.
Description
Technical field
The utility model relates to a kind of mine hoist long-distance monitorng device.
Background technology
Mine hoist is the key equipment that the mine is used to carry ore, equipment, personnel, is a kind of large-scale lifting means, drives cage or skip bucket lifting in pit shaft with steel rope, finishes material and underground work personnel's transportation work.At work, if its hydraulic brake system down be difficult to be judged its fault cause at the scene, and operating personal inconvenience estimate of situation, can not carry out corresponding timely disposal, the safe operation of gig is threatened.
According to above-mentioned situation background, be necessary to provide the remote monitor device of a kind of real-time monitoring gig operation and mode of operation, make the expert engineer just can carry out on-line monitoring and trouble diagnosing by remote monitoring device in long-range or strange land to mine hoist, the diagnosis malfunctioning as brake system instructs field man to carry out quick trouble removal simultaneously.
Summary of the invention
To achieve these goals, the utility model provides a kind of device that mine hoist is carried out remote monitor and control by internet and monitored control system framework, realize that the professional monitors real-time analysis with the field activity situation, the generation that can solve on-the-spot gig brake system fault and other accidents in the strange land to mine hoist.
A kind of mine hoist long-distance monitorng device, comprise chopping machine, main control computer, PLC controller, data storage, off loading control device and load controller, described main control computer connects chopping machine by data cable, connect the PLC controller by communication network simultaneously, described PLC controller connects data storage by data cable, and described data storage, off loading control device and loading controller are connected by data cable.
Described off loading control device and loading controller all comprise a remote I/O and connected transceiver;
Described loading controller can also connect weighting apparatus.
The beneficial effects of the utility model are: (1) is by on-the-spot PLC controller image transmitted, sound and relevant information, understand field conditions, the problem of discovering device operation is implemented remote monitor and control, diagnosis and handling labor, accelerate field man trouble-shooting speed, reduce operating cost; (2) the supervision work personnel whether standardized operation of doing one's duty is finished work such as remote information retrieval and evidence obtaining, simultaneously the running state of real time monitoring gig; (3) equipment is reliable and stable, has satisfied the long-time constantly demand of work.
Description of drawings
Fig. 1 is a structure principle chart of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Be illustrated in figure 1 as structure principle chart of the present utility model, a kind of mine hoist long-distance monitorng device, comprise main control computer 1, chopping machine 2, PLC controller 3, data storage 4, off loading control device 5 and load controller 6, described main control computer 1 connects chopping machine 2 by data cable, main control computer 1 is by communication network wire joint PLC controller 3 simultaneously, described PLC controller 3 connects data storage 4 by data cable, described data storage 4, off loading control device 5 and load controller 6 and be connected by data cable.
Above-mentioned communication network winding thread provides the data basis for realizing long-range on-line monitoring, main control computer 1 is the terminal actuating equipment of data, image, sound and relevant information by 3 reception and registration of PLC controller, through the communication network winding thread, may be displayed on strange land or the main control computer 1 at a distance, can operate or control according to network tool; Described PLC controller 3 according to software program to data handle, the function of monitoring and various logic protection, make each link to move according to rule; Described unloading control device 5 and loading controller 6 all comprise a remote I/O and connected transceiver, finish the collection of various monitor signals and, make signal handle and give PLC controller 3 rational data information transfer at data storage 4 inner analysis to the transmission conveying function of signal; Load controller 6 simultaneously and can also connect weighting apparatus 7, the mineral gathered etc. are weighed, send signal to PLC controller 3 and be presented at main control computer 1 and carry out the real-time tracking analysis.
The utility model PLC controller 3 can also connect brake system detector, Voltage detector, current detecting instrument and various sensors etc. by data cable, can monitor at each link of gig, reaches the early warning purpose; This plant network host-host protocol is open simultaneously, satisfy the demand of system extension, can realize interconnected with other system, the node system of front end also is open on the other hand, the Communication Control agreement can exchange, support the equipment of most of manufacturers, can make the image of on-the-spot mine hoist like this, monitor messages such as sound are transferred on the main control computer 1 of strange land monitoring by the communication network winding thread, realize that the professional carries out analyzing and diagnosing to information transmitted, trouble-shooting, thereby the scheme that proposes to solve is given on-the-spot operating personal, has so just saved the professional and has directly arrived the number of times of site inspection.
This device also is provided with safety monitoring system, and the guarantee information transmittance process is osed top, safety, takes precautions against information leakage, by with the information sharing of above-mentioned various monitors, set up corresponding early warning mechanism, grasp the abnormal condition of equipment, be convenient in time take emergency measures.
Claims (3)
1. mine hoist long-distance monitorng device, comprise chopping machine, main control computer, PLC controller, data storage, off loading control device and load controller, it is characterized in that described main control computer connects chopping machine by data cable, simultaneously by communication network wire joint PLC controller, described PLC controller connects data storage by data cable, and described data storage, off loading control device and loading controller are connected by data cable.
2. mine hoist long-distance monitorng device as claimed in claim 1 is characterized in that, described off loading control device and loading controller all comprise a remote I/O and connected transceiver.
3. mine hoist long-distance monitorng device as claimed in claim 1 is characterized in that, described loading controller can also connect weighting apparatus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201412773U CN201686383U (en) | 2010-03-25 | 2010-03-25 | Remote monitoring device for mine hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201412773U CN201686383U (en) | 2010-03-25 | 2010-03-25 | Remote monitoring device for mine hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201686383U true CN201686383U (en) | 2010-12-29 |
Family
ID=43374669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201412773U Expired - Lifetime CN201686383U (en) | 2010-03-25 | 2010-03-25 | Remote monitoring device for mine hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201686383U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103456154A (en) * | 2013-09-10 | 2013-12-18 | 昆山奥德鲁自动化技术有限公司 | Control system based on industrial rotating frequency |
CN114706345A (en) * | 2022-04-11 | 2022-07-05 | 临沂矿业集团菏泽煤电有限公司彭庄煤矿 | Human-computer interaction remote sensing control system |
CN116861218A (en) * | 2023-07-25 | 2023-10-10 | 上海华菱电站成套设备股份有限公司 | Mine winder key equipment state monitoring early warning system |
-
2010
- 2010-03-25 CN CN2010201412773U patent/CN201686383U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103456154A (en) * | 2013-09-10 | 2013-12-18 | 昆山奥德鲁自动化技术有限公司 | Control system based on industrial rotating frequency |
CN114706345A (en) * | 2022-04-11 | 2022-07-05 | 临沂矿业集团菏泽煤电有限公司彭庄煤矿 | Human-computer interaction remote sensing control system |
CN116861218A (en) * | 2023-07-25 | 2023-10-10 | 上海华菱电站成套设备股份有限公司 | Mine winder key equipment state monitoring early warning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102566503B (en) | Remote monitoring and fault diagnosis system for numerical control machine tool | |
CN103950837B (en) | A kind of safety monitoring system of elevator machinery and method | |
CN101224854A (en) | Crane integrated observation system and method | |
CN202609720U (en) | Mine hoist steel wire rope tension-monitoring device | |
CN204897229U (en) | Traveling state real -time monitoring system | |
CN101723249B (en) | Real-time networking monitoring and pre-warning system for operating data of hoisting machinery | |
CN209118121U (en) | Motor and connecting transmission mechanism running state monitoring device | |
CN102826437A (en) | Device for recording and monitoring running of staircase | |
CN201686383U (en) | Remote monitoring device for mine hoist | |
CN104760887A (en) | Harbor lifting machinery operation safety machine-mounted early warning system | |
CN103910288A (en) | Safety-brake PLC (Programmable Logic Controller) control system with self recognition and control method thereof | |
CN203237942U (en) | Crane running state monitoring and information management system | |
CN205397913U (en) | Metallurgy crane safety monitoring system | |
CN102842155A (en) | Safety monitoring system for large-size hoisting machinery | |
CN202808204U (en) | Safety monitoring system for large hoisting machinery | |
CN104444812A (en) | Novel crane monitoring system | |
CN211786721U (en) | Tower crane fault diagnosis system | |
CN106081834A (en) | A kind of mine vertical shaft elevator unmanned control system and control method thereof | |
CN116022673A (en) | Tower crane driving assisting system based on cloud edge cooperative technology | |
CN202322062U (en) | Intelligentized tower crane control system | |
CN110668312A (en) | Safety monitoring and structural health information management system for hoisting machinery | |
CN206033001U (en) | Mine vertical shaft hoisting machine unmanned on duty control system | |
CN204737634U (en) | Crane monitoring system | |
CN206278845U (en) | A kind of bridge crane fault diagnosis system | |
CN218725320U (en) | Monitoring device for variable-amplitude motor reduction gearbox of stacker-reclaimer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200083 Shanghai water circuit No. 120, west side, four floor Patentee after: Shanghai Hualing power station equipment Limited by Share Ltd Address before: 200083 Shanghai water circuit No. 120, west side, four floor Patentee before: Shanghai Hualing Power Station Complete Equipment Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20101229 |
|
CX01 | Expiry of patent term |