CN201671352U - Nodal point installing equipment - Google Patents

Nodal point installing equipment Download PDF

Info

Publication number
CN201671352U
CN201671352U CN2010202188135U CN201020218813U CN201671352U CN 201671352 U CN201671352 U CN 201671352U CN 2010202188135 U CN2010202188135 U CN 2010202188135U CN 201020218813 U CN201020218813 U CN 201020218813U CN 201671352 U CN201671352 U CN 201671352U
Authority
CN
China
Prior art keywords
casket body
vertical
horizontal supporting
platform
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202188135U
Other languages
Chinese (zh)
Inventor
甘秀明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010202188135U priority Critical patent/CN201671352U/en
Application granted granted Critical
Publication of CN201671352U publication Critical patent/CN201671352U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses nodal point installing equipment comprising a base, a platform and a plurality of pairs of installation racks, wherein the base consists of two longitudinal frames and a plurality of transverse frames; the upper surfaces of the two longitudinal frames are provided with first longitudinal beads; the lower surface of the platform is provided with a first sliding rail, and the upper surface thereof is provided with two second longitudinal beads; the installation rack consists of cases; the lower surface of each case is provided with a second sliding rail, and the back surface thereof is provided with a U-shaped groove; the top of the back surface of the case is provided with two first horizontal supporting plates; the bottom of the back surface of the case is provided with a second horizontal supporting plate; the back surface of the case is provided with two pressing plate mechanisms composed of motors and pressing plates; the other end of the pressing plate passes through the back surface of the case; the first horizontal supporting plate is vertical to the pressing plate; the left and right sides of the bottom of the U-shaped groove are provided with third horizontal supporting plates; the interior and back surface of the case are provided with a plurality of air cylinders; the two installation racks of each pair are symmetrically installed on the upper part of the platform; and the distance between the two installation racks is equal to the width of the beam needing to be installed. The nodal point installing equipment has simple structure and high work efficiency, and is convenient and accurate to install the nodal point.

Description

Node installation equipment
Technical field
The utility model relates to a kind of construction and installation equipment, refers to a kind of node installation equipment especially.
Background technology
Node in the building is installed mainly by manually mullion and crossbeam being welded together at present, node after welding is good is transported to building operations ground again, because the node volume ratio after welding is good is bigger, at every turn can only entrucking one or two, this kind mode efficient is too low and the Stress Transfer of node structure welding is poor, be difficult to discharge and cause stress to concentrate easily, and local failure is big.
The applicant is in the patent application document " semi-butterfly type connection clip and construction steel frame node structure " of application in 2008, as shown in Figure 1, comprise mullion 1 ', four I shape crossbeams 2 ' that are right-angled intersection, eight semi-butterfly type connection clips 3 ' and four friction shear resisting boards 4 ', friction shear resisting board 4 ' is the friction plate 41 ' of V-type and the shear resisting board 42 ' formation that is connected with friction plate 41 ' two middle side parts by cross section, the friction plate 41 ' of four friction shear resisting boards 4 ' evenly fits in the external surface of 1 ' four jiaos of mullions, friction shear resisting board 4 ' is arranged between mullion 1 ' and the Connection Card 3 ', the web of the crossbeam 2 ' between the shear resisting board 42 ' of each adjacent friction shear resisting board 4 ' and this two shear resisting boards 42 ' tightens together mutually with bolt, per two Connection Cards 3 ' partner, every pair of Connection Card 3 ' lays respectively on the two relative side of mullion 1 ', per two pairs of Connection Cards 3 ' are formed one group of two crossbeam 2 ' that are fixed on the same straight line, wherein a pair of in one group of Connection Card 3 ' be arranged at vertical two crossbeam 2 ' upper flanges in four crossbeams that are right-angled intersection above, a pair of in addition Connection Card 3 ' be arranged at these vertical two crossbeam 2 ' lower wing plates below, and the upper flange of the self-locking mounting plate 31 ' that will organize Connection Card 3 ' by bolt and vertical two crossbeams 2 ' and lower wing plate are spirally connected and are fixed together, other one group of Connection Card 3 ' fixedly is horizontal two crossbeams 2 ' in four crossbeams of right-angled intersection, a pair of Connection Card 3 ' in this group Connection Card be arranged at horizontal two crossbeam 2 ' upper flanges below, a pair of in addition Connection Card 3 ' be arranged at these horizontal two crossbeam 2 ' lower wing plates above, and the upper flange of the self-locking mounting plate 31 ' of the Connection Card in will organizing by bolt and these horizontal two crossbeams 2 ' and lower wing plate are spirally connected and are fixed together, the pretension plate 32 ' of the Connection Card 3 ' in this group is spirally connected with the web of these horizontal two crossbeams 2 ' and is fixed together, pretension plate 32 ' facing each other being bolted together of every pair of Connection Card 3 ', aforesaid operations is by manual operations, because the bolt connecting portion is by manual operations and will satisfy the pretightning force requirement of node connecting portion, therefore each bolt is installed all relatively wastes time and energy, and the big efficient of labor strength is low.
The utility model content
The purpose of this utility model is to provide a kind of node installation equipment, its simple in structure and convenient accurate high efficiency of installation node.
To achieve these goals, technical solution of the present utility model is: a kind of node installation equipment, comprising base, platform and some to installing rack, described base is connected and composed by two parallel vertical framves and several crossbearers, described two vertical frame upper surfaces are provided with first parallel vertical fin, be provided with first slide rail that is slidingly connected with described first vertical fin below the described platform, be provided with two second vertical fins parallel above the described platform with described first vertical fin, described installing rack is uncovered casket body by top and front and constitutes, described each casket body soffit is equipped with second slide rail that is slidingly connected with described second vertical fin, a U-lag is offered on the top of described casket body back, the top, the back side of described casket body is arranged with two first horizontal supporting plates backward, the bottom, the back side of described casket body is provided with second horizontal supporting plate backward, be positioned at the inboard and casket body back side that be positioned at the U-lag outside top of described first horizontal supporting plate and be arranged with two press plate mechanisms, described press plate mechanism is connected to form by motor and L shaped pressing plate one end, the described pressing plate other end passes the back of casket body, the vertical pressing plate of described first horizontal supporting plate, the left and right sides that is positioned at described U-lag bottom is respectively equipped with the 3rd horizontal supporting plate backward, in the described casket body and the casket body back side be respectively equipped with several cylinders by control section control, two installing rack symmetries of described every pair are installed in distance between platform top and two installing racks and equal the crossbeam width that will install.
The utility model node installation equipment, wherein said vertical frame by two channel-section steels or cast steel longitudinally face be welded, described crossbearer is a channel-section steel, described vertical frame and crossbearer welding.
The utility model node installation equipment, wherein said platform two parallel vertical plates below level board and described level board are welded, described two vertical plates are positioned at the inboard of described two vertical framves, the described level board upper surface left and right sides is respectively equipped with second vertical fin that the cross section is a circular arc, be provided with first slide rail that is slidingly connected with described first vertical fin below the described level board, described level board middle part is provided with through hole.
The utility model node installation equipment, wherein said each each internodal center to center distance that the centre distance between the installing rack is equaled to install.
The utility model node installation equipment, the two ends, the left and right sides of wherein said casket intracoelomic cavity are respectively equipped with several first cylinders of laterally placing, and the left and right sides at the described casket body back side is respectively equipped with several second cylinders of vertically placing.
The utility model node installation equipment, wherein said first cylinder are arranged at respectively on the left and right sidewall of casket intracoelomic cavity, described second cylinder be arranged at respectively the following of first horizontal supporting plate and second horizontal supporting plate above.
After adopting such scheme, the utility model node installation equipment is installed on first pair of Connection Card of node structure on the installing rack earlier, again first pair of friction shear resisting board is positioned on first pair of Connection Card, again mullion is installed on first pair of friction shear resisting board, then second pair of friction shear resisting board is installed on mullion top, again second pair of Connection Card is installed on second pair of friction shear resisting board, be installed on other two pairs of Connection Cards on the mullion again and be positioned at the front and back end of two installing racks, pressing plate rotation with press plate mechanism at last is pressed on the node structure, the starting control section, make each cylinder operation by control section, utilize cylinder to mullion, each connecting portion of Connection Card and friction shear resisting board is implemented precompressed and is satisfied the required precompression of each connecting portion, get final product by the manual bolt of screwing on again, node structure taken off from this equipment put into the job site and vertically erect, crossbeam being placed into the bolt of screwing on this node structure has just finished again, save the workman and transferred the time of twisting pretension bolt one by one, and because required extruding force all is therefore implementing accurately of setting in advance, this structure only is made up of three parts, simple in structure, implement convenience and installation accurately, save workman's labour hour greatly, improved workman's operating efficiency.
Description of drawings
Fig. 1 is the perspective view of existing construction steel frame node structure;
Fig. 2 is the front view of the utility model node installation equipment;
Fig. 3 is the structural representation of the utility model node installation equipment;
Fig. 4 is the scheme of installation of the utility model node installation equipment;
Fig. 5 is the enforcement illustration of the utility model node installation equipment.
Below in conjunction with accompanying drawing, the utility model is described further by embodiment;
The specific embodiment
See also Fig. 2 and shown in Figure 3, the utility model node installation equipment comprises base 1, platform 2 and some to installing rack 3;
Base 1 is made of two parallel vertical framves 11 and several crossbearers 12 welding, vertical frame 11 by two channel-section steels or cast steel longitudinally face be welded, crossbearer 12 be a channel-section steel, two indulge frame 11 upper surfaces is provided with first parallel vertical fin 111,
Platform 2 is welded with level board 21 following two parallel vertical plates 22 by level board 21, two vertical plates 22 are positioned at the inboard of two vertical framves 11, the level board 21 upper surface left and right sides are respectively equipped with second vertical fin 212 that the cross section is a circular arc, second vertical fin 212 is parallel with first vertical fin 111, be provided with first slide rail 211 that is slidingly connected with first vertical fin 111 below the level board 21, first slide rail 211 can slide on first vertical fin 111 so that adjust the position of every pair of installing rack 3 on base 1, and level board 21 middle parts are provided with through hole 213;
Installing rack 3 is uncovered casket body 31 by top and front and constitutes, each casket body 31 soffit is equipped with second slide rail 311 that is slidingly connected with second vertical fin 212, second slide rail 311 can slide on second vertical fin 212 so that adjust distance between two installing racks 3 of every pair, a U-lag 312 is offered on the top of casket body 31 back, the top, the back side of casket body 31 is arranged with two first horizontal supporting plates 313 backward, the bottom, the back side of casket body 31 is provided with second horizontal supporting plate 314 backward, be positioned at inboard and casket body 31 back sides that be positioned at U-lag 312 outside top of first horizontal supporting plate 313 and be arranged with two press plate mechanisms 315, press plate mechanism 315 is connected to form by motor 3151 and L shaped pressing plate 3,152 one ends, pressing plate 3152 other ends pass the back of casket body 31, first horizontal supporting plate, 313 vertical pressing plates 3152, the left and right sides that is positioned at U-lag 312 bottoms is respectively equipped with the 3rd horizontal supporting plate 316 backward, two ends, the left and right sides in the casket body 31 are respectively equipped with several first cylinders of laterally placing 41 by control section control, the left and right sides at casket body 31 back sides is respectively equipped with several second cylinders of vertically placing 42 by control section control, two installing rack 3 symmetries of every pair are installed in platform 2 tops, and the distance between two installing racks 3 equals the crossbeam width that will install.Each internodal center to center distance that each equals to install to the centre distance between the installing rack 3.
When node is installed, consult Fig. 4 and shown in Figure 5, earlier first pair of Connection Card 5 is positioned over respectively on the 3rd horizontal supporting plate 316 on two installing racks 3, then first pair of friction shear resisting board 6 is positioned over first pair of Connection Card 5 above, mullion 7 is arranged at above first pair of friction shear resisting board 6 again, mullion 7 passes U-lag 312, then second pair of friction shear resisting board 6 is positioned over above the mullion 7, second pair of friction shear resisting board 6 and first pair of friction shear resisting board 6 symmetry are placed, then second pair of Connection Card 5 is positioned over second pair of friction shear resisting board 6 above, again with the 3rd, four pairs of Connection Cards 5 are installed on respectively on the mullion 7, and lay respectively at the front and back end of two installing racks 3, pressing plate 3152 rotations that drive press plate mechanisms 315 by motor 3151 at last are pressed on the node structure and get final product, the start-up control part, make control section drive first cylinder 41 and 42 work of second cylinder, piston rod by first cylinder 41 and second cylinder 42 is to mullion 7, Connection Card 5 and friction shear resisting board 6 each connecting portion are implemented precompressed and are satisfied the required precompression of each connecting portion, get final product by the manual bolt of screwing on again, node structure taken off from this equipment put into the job site and vertically erect, crossbeam being placed into the bolt of screwing on this node structure has just finished again, save the workman and transferred the time of twisting pretension bolt one by one, and because required extruding force all is therefore implementing accurately of setting in advance, this structure only is made up of three parts, simple in structure, implement convenience and installation accurately, save workman's labour hour greatly, improved workman's operating efficiency.
The above embodiment is described preferred implementation of the present utility model; be not that scope of the present utility model is limited; under the prerequisite that does not break away from the utility model design spirit; various distortion and improvement that the common engineers and technicians in this area make the technical solution of the utility model all should fall in the definite protection domain of claims of the present utility model.

Claims (6)

1. node installation equipment, it is characterized in that: comprise base (1), platform (2) and some to installing rack (3), described base (1) is connected and composed by two parallel vertical framves (11) and several crossbearers (12), described two vertical frame (11) upper surfaces are provided with first parallel vertical fin (111), be provided with first slide rail (211) that is slidingly connected with described first vertical fin (111) below the described platform (2), be provided with two second vertical fins (212) parallel above the described platform (2) with described first vertical fin (111), described installing rack (3) is uncovered casket body (31) by top and front and constitutes, described each casket body (31) soffit is equipped with second slide rail (311) that is slidingly connected with described second vertical fin (212), a U-lag (312) is offered on the top of described casket body (31) back, the top, the back side of described casket body (31) is arranged with two first horizontal supporting plates (313) backward, the bottom, the back side of described casket body (31) is provided with second horizontal supporting plate (314) backward, be positioned at inboard and casket body (31) back side that be positioned at U-lag (312) outside top of described first horizontal supporting plate (313) and be arranged with two press plate mechanisms (315), described press plate mechanism (315) is connected to form by motor (3151) and L shaped pressing plate (3152) one ends, described pressing plate (3152) other end passes the back of casket body (31), the vertical pressing plate (3152) of described first horizontal supporting plate (313), the left and right sides that is positioned at described U-lag (312) bottom is respectively equipped with the 3rd horizontal supporting plate (316) backward, in the described casket body (31) and casket body (31) back side be respectively equipped with several cylinders (4) by control section control, two installing racks (3) symmetry of described every pair is installed in distance between platform (2) top and two installing racks (3) and equals the crossbeam width that will install.
2. node installation equipment as claimed in claim 1 is characterized in that: described vertical frame (11) by two channel-section steels or cast steel longitudinally face be welded, described crossbearer (12) is a channel-section steel, described vertical frame (11) and crossbearer (12) welding.
3. node installation equipment as claimed in claim 2, it is characterized in that: described platform (2) is welded with following two the parallel vertical plates of described level board (21) (22) by level board (21), described two vertical plates (22) are positioned at the inboard of described two vertical framves (11), described level board (21) the upper surface left and right sides is respectively equipped with second vertical fin (212) that the cross section is a circular arc, be provided with first slide rail (211) that is slidingly connected with described first vertical fin (111) below the described level board (21), described level board (21) middle part is provided with through hole (213).
4. node installation equipment as claimed in claim 3 is characterized in that: described each each internodal center to center distance that the centre distance between the installing rack (3) is equaled to install.
5. node installation equipment as claimed in claim 4, it is characterized in that: the two ends, the left and right sides of described casket body (31) inner chamber are respectively equipped with several first cylinders of laterally placing (41), and the left and right sides at described casket body (31) back side is respectively equipped with several second cylinders of vertically placing (42).
6. node installation equipment as claimed in claim 5, it is characterized in that: described first cylinder (41) is arranged at respectively on the left and right sidewall of casket body (31) inner chamber, described second cylinder (42) be arranged at respectively the following of first horizontal supporting plate (313) and second horizontal supporting plate (314) above.
CN2010202188135U 2010-06-08 2010-06-08 Nodal point installing equipment Expired - Lifetime CN201671352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202188135U CN201671352U (en) 2010-06-08 2010-06-08 Nodal point installing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202188135U CN201671352U (en) 2010-06-08 2010-06-08 Nodal point installing equipment

Publications (1)

Publication Number Publication Date
CN201671352U true CN201671352U (en) 2010-12-15

Family

ID=43328764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202188135U Expired - Lifetime CN201671352U (en) 2010-06-08 2010-06-08 Nodal point installing equipment

Country Status (1)

Country Link
CN (1) CN201671352U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839022A (en) * 2010-06-08 2010-09-22 甘秀明 Node installation equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839022A (en) * 2010-06-08 2010-09-22 甘秀明 Node installation equipment
CN101839022B (en) * 2010-06-08 2012-07-11 甘秀明 Node installation equipment

Similar Documents

Publication Publication Date Title
CN212613183U (en) Assembled steel sheet compound shear wall structure
CN101839022B (en) Node installation equipment
CN203145258U (en) Three-dimensional adjustable adaptor device for curtain walls
CN201671352U (en) Nodal point installing equipment
CN109317911A (en) A kind of cross column welding production line
CN211622593U (en) Modular floor formwork device
CN205324557U (en) Full -automatic mechanism of bending of plane steel bar truss
CN204876539U (en) Template is used in civil engineering construction
CN204414302U (en) A kind of T plate mould
CN210064276U (en) Novel supporting leg for belt conveyor
CN210594291U (en) Asymmetric stacking fixture
CN202627486U (en) Connection type building template
CN106368410A (en) Raised floor structure
CN102417017A (en) Ship building molding bed combination method and ship building combined molding bed
CN101864834B (en) Construction method of wall wood formers adopting steel pipes as back edges
CN206279623U (en) A kind of tier building steel structure frame
CN2820993Y (en) Grooved movable house
CN208762876U (en) A kind of flat anchorage that can stablize clamping
CN212498239U (en) Fixed convenient prefabricated wallboard mould
CN212153747U (en) Connecting node structure of box type support and box type cross beam
CN212153748U (en) Connecting node structure of box type support and H-shaped cross beam
CN213773968U (en) Environment-friendly assembled finger joint board log cabin wall body
CN216239739U (en) Mould device for pressing windowsill top
CN207048061U (en) A kind of prefabricated board for being easy to positioning and girder steel bindiny mechanism
CN203834755U (en) Curtain wall assembly and curtain wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20101215

Effective date of abandoning: 20120711