CN201661062U - Convenient quick-installation scaffold for overhead operation - Google Patents

Convenient quick-installation scaffold for overhead operation Download PDF

Info

Publication number
CN201661062U
CN201661062U CN2009202544758U CN200920254475U CN201661062U CN 201661062 U CN201661062 U CN 201661062U CN 2009202544758 U CN2009202544758 U CN 2009202544758U CN 200920254475 U CN200920254475 U CN 200920254475U CN 201661062 U CN201661062 U CN 201661062U
Authority
CN
China
Prior art keywords
scaffold
platform
footboards
pedal
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202544758U
Other languages
Chinese (zh)
Inventor
刘长庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202544758U priority Critical patent/CN201661062U/en
Application granted granted Critical
Publication of CN201661062U publication Critical patent/CN201661062U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a convenient quick-installation scaffold for overhead operation, which comprises scaffold poles, fixed connectors and platform footboards, wherein the fixed connectors are connected between the scaffold poles, the platform footboards are arranged on the scaffold poles, and one platform footboard is arranged on the scaffold poles from bottom to top at intervals of 0.5 to 2.0 meters. By using the utility model, rush-repair or construction personnel climbs onto the platform footboard at the top of the scaffold upwards layer by layer after connection footboards arranged on the platform footboards at intervals of 0.5 to 2.0 meters are upwards turned; and after the rush-repair or construction personnel treads on the platform footboards of each layer, the footboards can be flatly placed on fixed racks, which is convenient to operate. The utility model does not need to additionally lap a ladder, which not only saves the rush-repair time greatly but also is also convenient to disassemble and install.

Description

A kind of ascend operation is with convenient fast-assembling scaffold
Technical field
The utility model relates to a kind of ascend operation with convenient fast-assembling scaffold.
Background technology
At present in industries such as traffic, electric power, communication and buildings, in order to construct or the convenience of maintenance of equipment, the normal scaffold that adopts manual interim overlap joint, the patent No. is 200620024131.4, name is called " a kind of quick mounting type scaffold " and discloses a kind of scaffold that can on-the-spot build.But this scaffold " when working depth is arrived in winding; the platform pedal can be set; also can staircase be set; about the constructor " in the scaffold both sides, be that it need be provided with staircase in the scaffold both sides, building with dismounting of scaffold not only wasted time and energy like this, and because lapping time is long, the normal repairing work fast of influence.
The utility model content
But technical problem to be solved in the utility model provides a kind of Fast Installation, easy disassembly, safe and reliable ascend operation with convenient fast-assembling scaffold.
The utility model adopts following technical scheme:
The utility model comprises scaffolding pole, be connected the fixed connector between the scaffolding pole and be arranged on platform pedal on the scaffolding pole, it is characterized in that on scaffolding pole, every 0.5-2.0 rice a platform pedal being set from bottom to top, described platform pedal is made of the fixed mount of two or more pedals and connection pedal, pedal and fixed mount connect by the hinge strand, and pedal can be by hinge around upwards upset of fixed mount.
The beneficial effects of the utility model:
Use the utility model when the maintenance of construction of industries such as traffic, electric power, communication, building or equipment, repairing or constructor are by will be every the connection pedal that is provided with on the 0.5-2.0 rice platform pedal upwards after the upset, successively upwards climb on the platform pedal on frame top, after setting foot on the platform pedal of each layer, pedal can be set level on fixed mount, be convenient to operation like this.The utility model need not overlap staircase more in addition, so not only saves the repairing time greatly, and dismounting is also convenient, and the utility model can make the overlap joint of scaffold more steadily firm every 0.5-2.0 rice overlap joint platform pedal like this.
Description of drawings
Accompanying drawing is the utility model structural representation.
In the accompanying drawings: 1 scaffolding pole, 2 fixed connectors, 3 platform pedals, 4 pedals, 5 fixed mounts, 6 hinges.
The specific embodiment
As shown in drawings, the utility model can be in advance or the scene utilize fixed connector 2 and scaffolding pole 1 to form single-store frame, then at the scene as required winding become the scaffold of certain altitude, the scaffold bottom can install and fix the chassis, also universal wheel can be installed, use diagonal member to be connected with the connection-peg that blocks surely with lock, the utility model scaffold winding as required becomes different in width, the scaffold of shape and height, on scaffolding pole 1, every 0.5-2.0 rice a platform pedal 3 is set from bottom to top, described platform pedal 3 is made of the fixed mount 5 of two or more pedals 4 and connection pedal 4, one of them pedal 4 and fixed mount 5 connect by hinge 6 strands, and pedal 4 can be by hinge 6 around upwards upset of fixed mount 5.Like this when the maintenance of construction of industries such as traffic, electric power, communication, building or equipment, repairing or constructor will be by after will upwards overturning every the connection pedal 4 of setting on the 0.5-2.0 rice platform pedal 3, successively upwards climb on the platform pedal 3 on frame top, after setting foot on the platform pedal 3 of each layer, pedal 4 can be set level on fixed mount 5, be convenient to operation like this.The utility model need not overlap staircase more in addition, so not only saves the repairing time greatly, and dismounting is also convenient, and the utility model can make the overlap joint of scaffold more steadily firm every 0.5-2.0 rice overlap joint platform pedal 3 like this.

Claims (1)

1. an ascend operation is with convenient fast-assembling scaffold, it comprises scaffolding pole (1), be connected the fixed connector (2) between the scaffolding pole (1) and be arranged on platform pedal (3) on the scaffolding pole (1), it is characterized in that on scaffolding pole (1), every 0.5-2.0 rice a platform pedal (3) being set from bottom to top, described platform pedal (3) is made of the fixed mount (5) of two or more pedals (4) and connection pedal (4), pedal (4) and fixed mount (5) connect by hinge (6) strand, and pedal (4) can pass through hinge (6) around upwards upset of fixed mount (5).
CN2009202544758U 2009-11-17 2009-11-17 Convenient quick-installation scaffold for overhead operation Expired - Lifetime CN201661062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202544758U CN201661062U (en) 2009-11-17 2009-11-17 Convenient quick-installation scaffold for overhead operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202544758U CN201661062U (en) 2009-11-17 2009-11-17 Convenient quick-installation scaffold for overhead operation

Publications (1)

Publication Number Publication Date
CN201661062U true CN201661062U (en) 2010-12-01

Family

ID=43231479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202544758U Expired - Lifetime CN201661062U (en) 2009-11-17 2009-11-17 Convenient quick-installation scaffold for overhead operation

Country Status (1)

Country Link
CN (1) CN201661062U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677886A (en) * 2012-05-28 2012-09-19 开平市优赢金属制品有限公司 Safety device for scaffold
CN105591306A (en) * 2015-12-25 2016-05-18 南京南瑞继保电气有限公司 Inspection gallery
CN106869471A (en) * 2017-03-21 2017-06-20 无锡市龙海杰机械制造有限公司 Indoor individual layer scaffold
CN106996187A (en) * 2017-05-23 2017-08-01 佛山维可斯脚手架有限公司 A kind of scaffold work platform and its process equipment
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN107965134A (en) * 2018-01-10 2018-04-27 北京龙建集团有限公司 Welding hanging basket
CN114562097A (en) * 2022-02-21 2022-05-31 中冶天工集团有限公司 Operation platform for slope construction and use method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677886A (en) * 2012-05-28 2012-09-19 开平市优赢金属制品有限公司 Safety device for scaffold
CN105591306A (en) * 2015-12-25 2016-05-18 南京南瑞继保电气有限公司 Inspection gallery
CN106869471A (en) * 2017-03-21 2017-06-20 无锡市龙海杰机械制造有限公司 Indoor individual layer scaffold
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN106996187A (en) * 2017-05-23 2017-08-01 佛山维可斯脚手架有限公司 A kind of scaffold work platform and its process equipment
CN106996187B (en) * 2017-05-23 2023-10-24 佛山维可斯脚手架有限公司 Scaffold work platform and processing equipment thereof
CN107965134A (en) * 2018-01-10 2018-04-27 北京龙建集团有限公司 Welding hanging basket
CN114562097A (en) * 2022-02-21 2022-05-31 中冶天工集团有限公司 Operation platform for slope construction and use method

Similar Documents

Publication Publication Date Title
CN201661062U (en) Convenient quick-installation scaffold for overhead operation
CN108708546B (en) It is attached to the construction elevator wall-attached frame mounting platform and method of steel platform mould bases
CN112942790A (en) Cantilever climbing device and construction method of cantilever structure
CN205151456U (en) Split type track intelligence elevator of riding instead of walk
CN207846427U (en) A kind of upper and lower walkway of assembled foundation pit
CN201546434U (en) Multifunctional scaffold convenient and rapid to mount
CN214169883U (en) Construction elevator adheres to frame
CN215407312U (en) Overhanging climbing device
CN206126783U (en) Detachable work platform
CN204038917U (en) Dismountable external hanging service platform
CN201924532U (en) Standard stair guard rail capable of being repeatedly used
EP2140082A1 (en) Scaffold with handrail frames provided with post sections
CN103741939B (en) The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method
CN203607723U (en) Overhead operation platform of isolation switch in electrical network
CN206110555U (en) Stone composite board outer wall
CN204175176U (en) A kind of wire pole climbing climbing frame of the weather that congeals for ice and snow
CN204357090U (en) A kind of horizontal support framework of attached lift scaffold
CN215803136U (en) Portable scaffold ladder
CN105178602A (en) Building construction system
CN203545530U (en) Bridge for tower crane
CN216380492U (en) Scaffold frame for building engineering of easy dismounting
CN213869090U (en) Electric power construction safety climbing device
CN211421658U (en) Prefabricated stair tread convenient to guarantee joint strength
CN214090858U (en) Scaffold for building engineering
CN217326391U (en) Building engineering climbs a connector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101201

CX01 Expiry of patent term