CN201660597U - Fine coal pyrolyzing equipment - Google Patents

Fine coal pyrolyzing equipment Download PDF

Info

Publication number
CN201660597U
CN201660597U CN2010201599173U CN201020159917U CN201660597U CN 201660597 U CN201660597 U CN 201660597U CN 2010201599173 U CN2010201599173 U CN 2010201599173U CN 201020159917 U CN201020159917 U CN 201020159917U CN 201660597 U CN201660597 U CN 201660597U
Authority
CN
China
Prior art keywords
tube
fine coal
stainless steel
pipe
tube furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201599173U
Other languages
Chinese (zh)
Inventor
焦红光
刘全润
王灿
赵继芬
李沙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN2010201599173U priority Critical patent/CN201660597U/en
Application granted granted Critical
Publication of CN201660597U publication Critical patent/CN201660597U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides fine coal pyrolyzing equipment. The fine coal pyrolyzing equipment is characterized in that: the fine coal pyrolyzing equipment comprises a first gas inlet pipe and a second gas inlet pipe which are connected in parallel, are respectively provided with mass flow meters and control valves in the middle, and are used for conveying different gases as well as mixed gases thereof into pipe furnaces; the outlet ends of the two gas inlet pipes are connected with the first pipe furnace and the second pipe furnace connected in series through a gas mixing pipe segment and the control valves; a cold trap device and a tar collector are sequentially connected at the outlet end of the second pipe furnace through a pipeline; a pipeline connected with a water supply source is arranged on the gas mixing pipe segment, and a control valve and a metering pump are sequentially arranged in the middle of the pipeline.

Description

The Bed for Fine Coal pyrolysis plant
Technical field:
The utility model relates to the heat treated technology of coal dust under multiple atmosphere and the mixed atmosphere thereof, relates to a kind of Bed for Fine Coal pyrolysis plant specifically.This device can be realized the heat treated experimental study of coal dust under the high-temperature high-pressure steam, also can be used for fields such as the reinforcement of coal dust magnetic, coal dust coking and coal dust gasification.
Technical background:
Pulverized coal pyrolysis is an important starting stage of coal combustion process, therefore the thermal treatment unit of studying coal dust has crucial meaning for coal dust magnetic reinforcement etc., and the thermal treatment unit of selecting to be fit to can improve the combustion position of coal dust on certain degree.At present, coal dust heat treatment test device is divided into electrically heated, plasma heating, microwave heating etc. by its type of heating, though advantages such as heat-up rate is fast, selectivity heating that the two kinds of type of heating in back have, but owing to apparatus expensive, poor controllability, being difficult to realize suitability for industrialized production, is main mode with electrically heated still at present.Adopt atmospheric fixed bed reactor, quartz tube reactor more in the Electric heating, freely fall bed bioreactor etc., above-mentioned reactor is because reaction compartment is narrow and small, and each sample size is 0.5~3g only, is difficult to satisfy the suitability for industrialized production demand; Simultaneously a lot of testing apparatuss only can be realized coal dust heat treatment test under the single atmosphere of normal pressure, and the coal dust heat treatment test is powerless down for high pressure mixing atmosphere (particularly high-temperature vapor).The Bed for Fine Coal pyrolysis plant of now having seen commonly used is as shown below.
People such as Zhang Guojie adopt the Bed for Fine Coal pyrolysis plant in carrying out high sulphur coal hydropyrolysis desulfurization test research process be atmospheric fixed bed reactor, this installs simplicity of design, easy to operate, but have only an inlet mouth, can not carry out the coal dust heat treatment test under multiple atmosphere and the mixed atmosphere; This device can only carry out synthesis under normal pressure simultaneously, can't carry out coal dust hot high pressure Processing Test; Because its reactor design size is less than normal, this device sample throughput is 3g, granularity is less than 3mm, this device is not owing to add tar well and cooling apparatus etc. simultaneously, can't collect the tar that produces in the coal dust heat treatment process, promptly can not accurately analyze and produce tar content and sulphur content thereof in the coal dust heat treatment process, greatly influence the range of application of this device.People such as Xu Long are quartz tube reactor by changing fixed-bed reactor in research Yanzhou coal pyrolysis pre-desulfurization behavior, two processes of pyrolysis and temperature-programmed pyrolysis have realized being rapidly heated, but because the silica tube internal diameter is 1.4cm, each sample size only is 0.5g, quantity of sample handling is too little, silica tube is frangible simultaneously, shortens this and installs work-ing life.
People such as Sugawara are carrying out adopting the pulverized coal pyrolysis device freely to fall bed bioreactor for normal pressure in the fast pyrogenation desulfurization test research process to bituminous coal, with the bottom of inlet mouth design at device, sample freely falls from the top of installing and enters the high-temperature zone, through falling bottom of device after the heating rapidly.This device is easy to operate, and design cost is low, but only can carry out the normal pressure rapid heating, can not carry out the temperature programming heating, and quantity of sample handling is few simultaneously, and control is had relatively high expectations to air-flow simultaneously, and particle is difficult to control in the reaction times through the high-temperature zone, and controllability is relatively poor.
People such as Gao Meishan separate out at research brown coal pyrolysis characteristics and sulphur under methane atmosphere that its thermal treatment unit has adopted two inlet mouths in the rule, realized coal dust heat test research under the mixed atmosphere, accurately measure and the pilot-gas flow by mass flowmeter and mass rate control display instrument, sample is put into porcelain boat and be pushed into the silica tube middle part, heat by the temperature programming of tube furnace.But this device can only carry out under normal pressure, can not carry out the reaction under high pressure test, and this unit capacity is few simultaneously, is not easy to maximize, and only satisfies the requirement to this test.
People such as Li Bin its thermal treatment unit in carrying out the pre-desulfurization test of high sulphur coal semicoke water vapour partial gasification has added volume pump and steam generator, can carry out coal dust heat treatment test under the steam atmosphere, but only design an inlet mouth, only can charge into a kind of gas in the reaction process, adopt the spinner-type flowmeter can not the better controlled gas flow, this device have setting pressure table and back pressure valve simultaneously, can only carry out the test under the condition of normal pressure, sample throughput is few, influences its range of application.
People such as Feng Yubin pyrolysis and the sulphur of research coal separate out characteristic the time adopt be a kind of be reactor with the fixed bed, be the pyrolysis installation that heats original paper with the carborunbum tube.In process of the test, sample put into porcelain boat and be pushed into the silica tube middle part, heat by carborunbum tube.This unit capacity is less, is generally 0.1g, can only carry out the reaction under normal pressure and the single atmosphere simultaneously.
The common Bed for Fine Coal pyrolysis plant of table 1
Figure GSA00000080855500021
Figure GSA00000080855500031
As can be seen from the above table, it is relatively simple for structure to use the Bed for Fine Coal pyrolysis plant always at present, reaction pressure is designed to normal pressure more, the single inlet mouth of the many employings of intake method, quantity of sample handling is little and granularity had requirement, these thermal treatment units do not relate to as yet for the Collecting and dealing of follow-up tar substantially simultaneously, and these drawbacks will directly influence its range of application.
Summary of the invention:
The purpose of this utility model is just at the weak point that exists in the above-mentioned Bed for Fine Coal pyrolysis plant, and a kind of device that can heat-treat coal dust under multiple atmosphere and mixed atmosphere thereof is provided.Bed for Fine Coal pyrolysis plant of the present utility model not only has the advantage of traditional Bed for Fine Coal pyrolysis plant concurrently, and devices such as interpolation volume pump, bucket and back pressure valve, can realize the pretreated experimental study of pulverized coal pyrolysis under the high-temperature high-pressure steam, have advantages such as easy to operate, that treatment capacity is big, suitability is strong simultaneously.Can be widely used in fields such as the reinforcement of coal dust magnetic, coal dust coking and coal dust gasification.
The purpose of this utility model can realize by following technique measures:
Bed for Fine Coal pyrolysis plant of the present utility model comprises first inlet pipe and second inlet pipe that are used for carrying gas with various and mixed gas thereof in tube furnace that is respectively arranged with mass flowmeter, control valve between two pipelines with the parallel way setting, and the exit end of two inlet pipe is connected with first tube furnace, second tube furnace with the series system setting by gas mixing tube section and control valve; The described second tube furnace exit end is connected with cold-trap device and tar well in turn by pipeline; Described gas mixing tube section is provided with the pipeline that is connected with water-supply source, be disposed with control valve and volume pump at this pipeline enclosure, this structure can feed the water that is used to produce high-temperature vapor in tube furnace in the coal dust heat treatment process, realize the coal dust thermal treatment under many atmosphere and the mixed atmosphere thereof.
Be used to hold the test sample device in second tube furnace described in the utility model and adopt stainless steel tube to be prepared from, the stainless steel tube two-port adopts silica wool as obstruction, and the specification of stainless steel tube can be adjusted according to the test needs; Adopt stainless steel tube not only can increase the treatment capacity of test sample, and compare with the quartz glass tube that generally adopts have non-friable, advantage such as can cool off fast, in process of the test, reduced cooling time, simple to operate; Adopt silica wool as obstruction in addition, this with generally adopt in stainless steel tube the weldable steel expanded metals to compare tool to have great advantage, because coal dust is easy coking and formation tar in heat-processed, long-time use will make tar, coal dust stop up expanded metal lath, will be difficult to cleaning in case stop up.Adopt not only easy to operate, the good air permeability of silica wool, and can use repeatedly, reduce experimentation cost.Tube furnace adopts temperature programming, temperature≤1000 ℃.
Cold-trap described in the utility model mainly cools off tail gas, prevent overheated gas infringement follow-up equipment, cold-trap is designed to removable stainless steel U type pipe, and this compares with traditional U type Glass tubing has non-friable advantage, stainless steel U type pipe easy accessibility is convenient to clean simultaneously; Tar well mainly is to collect the tar that produces in the coal dust heat treatment process, also is simultaneously to prevent the tar pollution follow-up equipment that produces, and be very necessary so add tar well.
In addition, the utility model is provided with tensimeter between the stainless steel connecting tube between cold-trap and the tar well, on the tar well gas emission pipe, back pressure valve is installed, be used for realizing that complete assembly carries out high-potting in process of the test, by the pressure in the tensimeter demonstration reaction unit.
Useful result of the present utility model is as follows:
(1) adopts the air inlet of bidirection air intake pipe, thereby realized coal dust heat treatment test device under many atmosphere and the mixed atmosphere thereof, have a extensive future.
(2) add devices such as bucket, volume pump, tube furnace, back pressure valve, realized in the coal dust heat treatment process, adding high-temperature high-pressure steam, enlarged the range of application of this device.
The stainless steel tube that is used to hold test sample in (3) second tube furnaces can carry out size adjusting according to the test needs, improved quantity of sample handling, simultaneously in the test operation process, reduce cooling time, when stopping up the stainless steel tube air outlet, utilized the not only easy to operate but also reduction experimentation cost of silica wool.
(4) add devices such as cold-trap, tar well and not only can protect follow-up equipment, and increase the range of application of this device, such as carrying out researchs such as pyrolysis of coal characteristic, gasification.
(5) this device is made by stainless steel fully, compares advantage such as have long service life, not fragile with traditional Bed for Fine Coal pyrolysis plant.
Description of drawings:
Fig. 1 is the schematic diagram of prior art.
Sequence number among Fig. 1: 1 ', air container, 2 '. under meter, 3 '. rubber plug, 4 '. high temperature process furnances, 5 '. porcelain boat, 6 '. quartz glass tube.
Fig. 2 is a schematic diagram of the present utility model.
Sequence number among Fig. 2: 1, first inlet pipe, 2, second inlet pipe, 3, be installed in the mass flowmeter between first inlet pipe, 4, be installed in the mass flowmeter between second inlet pipe, 5, first tube furnace, 6, second tube furnace, 7, tensimeter, 8, cold-trap, 9, tar well, 10 back pressure valves, 11, volume pump, 12, water container.
Embodiment:
The utility model is further detailed below with reference to embodiment (accompanying drawing):
As shown in Figure 2, Bed for Fine Coal pyrolysis plant of the present utility model comprises that the exit end that is used for carrying first inlet pipe 1 of gas with various and mixed gas thereof and 2, two inlet pipe of second inlet pipe in tube furnace that is respectively arranged with mass flowmeter 3,4 and control valve between two pipelines with the parallel way setting is connected with first tube furnace 5, second tube furnace 6 with the series system setting by gas mixing tube section and control valve; Described second tube furnace, 6 exit end are connected with cold-trap device 8 and tar well 9 in turn by pipeline; Described gas mixing tube section is provided with the pipeline that is connected with water-supply source (water container 12), be disposed with control valve and volume pump 11 at this pipeline enclosure, this structure can feed the water that is used to produce high-temperature vapor in tube furnace in the coal dust heat treatment process, realize the coal dust thermal treatment under many atmosphere and the mixed atmosphere thereof.
Be used to hold the test sample device in second tube furnace 6 described in the utility model and adopt stainless steel tube to be prepared from, the stainless steel tube two-port adopts silica wool as obstruction, and the specification of stainless steel tube can be adjusted according to the test needs; Adopt stainless steel tube not only can increase the treatment capacity of test sample, and compare with the quartz glass tube that generally adopts have non-friable, advantage such as can cool off fast, in process of the test, reduced cooling time, simple to operate; Adopt silica wool as obstruction in addition, this with generally adopt in stainless steel tube the weldable steel expanded metals to compare tool to have great advantage, because coal dust is easy coking and formation tar in heat-processed, long-time use will make tar, coal dust stop up expanded metal lath, will be difficult to cleaning in case stop up.Adopt not only easy to operate, the good air permeability of silica wool, and can use repeatedly, reduce experimentation cost.Tube furnace adopts temperature programming, temperature≤1000 ℃.
Cold-trap 8 described in the utility model mainly cools off tail gas, prevent overheated gas infringement follow-up equipment, cold-trap is designed to removable stainless steel U type pipe, and this compares with traditional U type Glass tubing has non-friable advantage, stainless steel U type pipe easy accessibility is convenient to clean simultaneously; Tar well 9 mainly is to collect the tar that produces in the coal dust heat treatment process, also is simultaneously to prevent the tar pollution follow-up equipment that produces, and be very necessary so add tar well.
In addition, the utility model is provided with tensimeter 7 between the stainless steel connecting tube between cold-trap 8 and the tar well 9, back pressure valve 10 is installed on the tar well gas emission pipe, be used for realizing that complete assembly carries out high-potting in process of the test, by the pressure in the tensimeter demonstration reaction unit.
Principle of work of the present utility model is as follows:
Different gas enters two inlet pipe respectively by the valve that is arranged on first inlet pipe 1 and second inlet pipe, 2 inlet mouth ends, and pass through mass flowmeter 3,4 pilot-gas flows via what be separately positioned on its pipeline enclosure, behind the gas with various process gas mixing tube section thorough mixing, control by valve enters first tube furnace 5, second tube furnace 6 successively, tail gas cools off by cold-trap device 8 after reacting, cooled gas is collected the tar that produces through tar well 9, and last tail gas is discharged through back pressure valve 10.If test conditions needs high-temperature vapor, can be by the water in the volume pump 11 extraction water containers 12, water is fed into first tube furnace 5 by water pipe, generate high-temperature vapor through first tube furnace, 5 heat, and by carrier gas high-temperature vapor is sent into second tube furnace 6 and react.Can pass through the pressure of tensimeter 7, back pressure valve 10 adjustment reaction atmospheres in the reaction process.
The testing apparatus operation steps is specific as follows:
(1) takes off stainless steel tube in second tube furnace 6, silica wool is filled in an end of stainless steel tube air outlet, then load weighted sample is put into the tube furnace middle part, tight a bolt.
(2) open mass flowmeter, make a call to the valve of first inlet pipe 1 and second inlet pipe, 2 inlet mouth ends respectively according to the test needs, and the valve of connection first tube furnace 5 of the intersegmental setting of gas mixing tube (the high-temperature vapor reaction conditions then should be opened the volume pump switch and adjust strapping table if desired, open the water pipe valve simultaneously), by mass flowmeter pilot-gas flow.
(3) open first tube furnace, the second tube furnace switch, the temperature of reaction that set to need heats then, checks tensimeter simultaneously and adjusts back pressure valve and determine reaction pressure.
(4) reaction should at first be closed the tube furnace switch after finishing, slowly open back pressure valve, when tensimeter is shown as normal pressure, the stainless steel tube taking-up is cooled to room temperature, close the valve of first inlet pipe 1 and second inlet pipe, 2 inlet mouth ends simultaneously, close mass flowmeter switch (as closing volume pump and respective valves in that the high-temperature vapor reaction conditions is next) then.
(5) stainless steel tube that will be cooled to room temperature takes out, and then sample is poured out from stainless steel tube inlet mouth one end, collects sample (test as need to collect tar, tail gas can carry out in the lump).
(6) sample after will collecting is weighed and is preserved the washing test device with sample sack.

Claims (4)

1. Bed for Fine Coal pyrolysis plant, it is characterized in that: described device comprises first inlet pipe and second inlet pipe that are used for carrying gas with various and mixed gas thereof in tube furnace that is respectively arranged with mass flowmeter, control valve between two pipelines with the parallel way setting, and the exit end of two inlet pipe is connected with first tube furnace, second tube furnace with the series system setting by gas mixing tube section and control valve; The described second tube furnace exit end is connected with cold-trap device and tar well in turn by pipeline; Described gas mixing tube section is provided with the pipeline that is connected with water-supply source, is disposed with control valve and volume pump at this pipeline enclosure.
2. Bed for Fine Coal pyrolysis plant according to claim 1 is characterized in that: be used to hold the test sample device in described second tube furnace and adopt stainless steel tube to be prepared from, the stainless steel tube two-port adopts silica wool as obstruction.
3. Bed for Fine Coal pyrolysis plant according to claim 1 is characterized in that: described cold-trap master is the stainless steel U type pipe of removable structure.
4. Bed for Fine Coal pyrolysis plant according to claim 1 is characterized in that: be provided with tensimeter between the stainless steel connecting tube between cold-trap and the tar well, on the tar well gas emission pipe back pressure valve be installed.
CN2010201599173U 2010-04-15 2010-04-15 Fine coal pyrolyzing equipment Expired - Fee Related CN201660597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201599173U CN201660597U (en) 2010-04-15 2010-04-15 Fine coal pyrolyzing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201599173U CN201660597U (en) 2010-04-15 2010-04-15 Fine coal pyrolyzing equipment

Publications (1)

Publication Number Publication Date
CN201660597U true CN201660597U (en) 2010-12-01

Family

ID=43231012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201599173U Expired - Fee Related CN201660597U (en) 2010-04-15 2010-04-15 Fine coal pyrolyzing equipment

Country Status (1)

Country Link
CN (1) CN201660597U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304374A (en) * 2011-08-04 2012-01-04 太原理工大学 Leakage-free recovery device and recovery method of coal carbonization gas
CN102580625A (en) * 2012-03-23 2012-07-18 天津市先权工贸发展有限公司 High-temperature pyrolysis reactor
CN103205268A (en) * 2013-04-25 2013-07-17 新疆大学 Low-order coal pyrolysis tar device and pyrolysis method of low-order coal pyrolysis tar
CN107099313A (en) * 2017-05-18 2017-08-29 华南理工大学 A kind of microwave-heating apparatus and method with carrier gas Hybrid Heating and oil collecting function

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304374A (en) * 2011-08-04 2012-01-04 太原理工大学 Leakage-free recovery device and recovery method of coal carbonization gas
CN102304374B (en) * 2011-08-04 2013-06-26 太原理工大学 Leakage-free recovery device and recovery method of coal carbonization gas
CN102580625A (en) * 2012-03-23 2012-07-18 天津市先权工贸发展有限公司 High-temperature pyrolysis reactor
CN102580625B (en) * 2012-03-23 2014-06-18 天津市先权工贸发展有限公司 High-temperature pyrolysis reactor
CN103205268A (en) * 2013-04-25 2013-07-17 新疆大学 Low-order coal pyrolysis tar device and pyrolysis method of low-order coal pyrolysis tar
CN103205268B (en) * 2013-04-25 2014-11-26 新疆大学 Low-order coal pyrolysis tar device and pyrolysis method of low-order coal pyrolysis tar
CN107099313A (en) * 2017-05-18 2017-08-29 华南理工大学 A kind of microwave-heating apparatus and method with carrier gas Hybrid Heating and oil collecting function

Similar Documents

Publication Publication Date Title
CN101824345A (en) Coal powder heat treatment device
CN201660597U (en) Fine coal pyrolyzing equipment
CN101724467B (en) Method for preparing combustible gas and gas-solid reaction device specially used therefor
CN104946281A (en) Device and method for intensifying tar cracking in biomass gasification pyrolysis process
CN103113904A (en) Experimental device for coal and biomass pyrolysis experiment
CN204198661U (en) Test pyrolysis installation
CN102878822A (en) Device and method for purifying and recycling furnace gas of hermetic ore smelting furnace
CN204824722U (en) Reinforce cracked device of tar in biomass gasification pyrolytic process
CN103743772A (en) System and method for rapidly analyzing pyrolysis characteristics of solid organic matter
CN115106038A (en) Utilize infrared rapid heating's broken coal pyrolysis experiment platform
CN105255520A (en) Device and system for gasification/thermolysis combined test of high-temperature entrained-flow bed
CN205133526U (en) High temperature entrained flow gasifica tion pyrolysis combined test device and system
CN201626940U (en) Gas-solid reaction device for preparing flammable gas
CN105861064B (en) Coal slurry preheating device and the gasification system and method for using the device
CN104650930A (en) Dry quenching air introduction control method
CN201331085Y (en) Independent adjusting device of gas and combustion-supporting air for burner nozzle of annular sleeve kiln
CN102585907A (en) Step oxygen supply dry slag removal pressure gasification testing system
CN103074111A (en) Equipment and technology for producing synthesis gas through cooperating outer cylinder air gasification with inner cylinder steam gasification
CN102410744A (en) Waste heat comprehensive utilization system in aluminum profile production line
US9862890B2 (en) Apparatus and method for pyrolyzing coal with wide particle size distribution
CN211645120U (en) Low-rank coal segmented upgrading and hot flue gas gradient utilization system
CN203123979U (en) Catalyst reduction device
CN203018063U (en) Pulverized coal thermal transition multifunctional fundamental research device
CN102517061A (en) Equipment for treating non-sticky coal and coking method for treating non-sticky coal
CN203463157U (en) Clean synthetic gas preheating system for improving performance of IGCC (integrated gasification combined cycle) power generation facilities

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101201

Termination date: 20130415