CN201649122U - Plate type terrace retaining wall for hillock land - Google Patents

Plate type terrace retaining wall for hillock land Download PDF

Info

Publication number
CN201649122U
CN201649122U CN2010200394918U CN201020039491U CN201649122U CN 201649122 U CN201649122 U CN 201649122U CN 2010200394918 U CN2010200394918 U CN 2010200394918U CN 201020039491 U CN201020039491 U CN 201020039491U CN 201649122 U CN201649122 U CN 201649122U
Authority
CN
China
Prior art keywords
retaining wall
plate
breast boards
retaining
terraced fields
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200394918U
Other languages
Chinese (zh)
Inventor
刘文广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010200394918U priority Critical patent/CN201649122U/en
Application granted granted Critical
Publication of CN201649122U publication Critical patent/CN201649122U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a plate type terrace retaining wall for a hillock land, which comprises retaining plate supports, a retaining plate and an inner press plate, wherein the retaining plate supports, the retaining plate and the inner press plate are concrete prefabricated parts; the retaining plate supports comprise a vertical support and a horizontal support, and a cable stayed reinforcing support is arranged between the vertical support and the horizontal support; the retaining plate supports are arranged at intervals, and the retaining plate is built at the inner side of the vertical support, and the inner press plate is pressed at the back end of the horizontal support. The terrace retaining wall can be produced in a standard series mode, and the construction of the plate type terrace retaining wall only has the following five steps of paying off for measurement, leveling a terraced field, transporting the members of the retaining wall, assembling the retaining wall and leveling the planting earth of the terraced field. The plate type terrace retaining wall has small land occupation area, no collapse and low building cost, and an internally installed drainage ditch is omitted.

Description

The board-like terraced fields retaining wall that is used for low hillock, mound
Technical field
The utility model relates to terraced fields transformation, especially the terraced fields retaining wall on low hillock, mound.
Background technology
Existing low hilllock, mound farmland improvement engineering all uses the rubble laid dry to keep off the hard wall of native stone.The hard retaining wall body of wall of the terraced fields stone wide 400mm in top, the metope gradient 1: 0.25, the wide gutter land occupation width that adds in bottom are more than 1000mm.
The hard terraced fields retaining wall of this stone body of wall has following shortcoming:
1. after putting the terraced fields shape in order, a large amount of automobiles enters and causes the hard landslide of terraced fields soil; Because quarry rock is marched into the arena and the hard retaining wall progress of building by laying bricks or stones of stone does not catch up with terraced fields earthwork arrangement progress, a large amount of terraced fields soil are firmly because of raining and the nature landslide.
2. large-area landslide needs great amount of manpower, machinery to enter reparation.
3. a large amount of chargings cut loaded vehicle and have damaged terraced fields by pressure, newly repair the roads to be equipped with the loader go-cart work of repairing the roads.
4. the hard retaining wall of terraced fields stone basis earth excavation engineering, basic shoveling 300mm must use manpower to cut the earth.
5. the hard retaining wall of terraced fields stone is built by laying bricks or stones, and it is the maximum the work items of land reclamation project that the hard retaining wall of stone is built the work items by laying bricks or stones.The labour uses many, and construction speed is slow, serious engineering constraint progress.
6. the hard retaining wall of terraced fields stone is built by laying bricks or stones, and the hard retaining wall of dry stone wall easily caves in, and needs a large amount of manpower reparations.
7. need loader to cooperate material loading in building the hard retaining wall engineering of stone by laying bricks or stones, residue building stones and rubble need rehandling.
8. the hard retaining wall reparation of landslide terraced fields stone increases machinery and labour cost.
9. after the hard retaining wall engineering completion of terraced fields stone, must in above-mentioned construction, plant soil layer to the terraced fields soil scarifying of compacting with destroyed.
10. Wan Gong terraced fields engineering, terraced fields are inboard to need the drainage trenching draining.
11. the hard retaining wall land occupation of stone area is big, the 1 meter hard retaining wall land occupation of feldspar area is more than 1 square metre.
Summary of the invention
Construction trouble, land occupation area that the laid dry of existing terraced fields rubble keeps off the hard wall of native stone are big in order to solve, easily landslide, shortcoming that construction cost is high, the utility model proposes the board-like terraced fields retaining wall that is used for low hillock, mound.
For this reason, the technical solution of the utility model is: be used for the board-like terraced fields retaining wall on low hillock, mound, it is characterized in that: be made up of breast boards support, breast boards, clip plate, breast boards support, breast boards, clip plate all are concrete precast elements; The breast boards support is made of vertical support frame, a horizontal stand, is provided with between between vertical support frame, the level and tiltedly draws reinforced support; Breast boards spacer support frame arranged, breast boards is built the medial surface that is contained in vertical support frame, and clip plate is pressed in the rear end of horizontal stand.
Further qualification to technique scheme: the vertical support frame of breast boards support is provided with the reinforcing bar connecting ring, and breast boards is provided with the reinforcing bar connecting ring.Can be in the process of installing by the reinforcing bar connecting ring, temporary fixed breast boards is avoided collapsing.
Beneficial effect: this terraced fields retaining wall can standard serialization production, the construction of plate type retaining wall has only measurement unwrapping wire-terraced fields formation of land-retaining wall member to march into the arena-smooth 5 procedures of retaining wall assembling-terrace cropping soil, the land seizure area is little, can not cave in, construction cost is low, avoids built-in gutter.
Description of drawings
Fig. 1 is the front view that is used for the board-like terraced fields retaining wall on low hillock, mound.
Fig. 2 is the lateral view that is used for the board-like terraced fields retaining wall on low hillock, mound.
Fig. 3 is the user mode figure that is used for the board-like terraced fields retaining wall on low hillock, mound.
The specific embodiment
As shown in Figure 1, 2, be the structure chart that is used for the board-like terraced fields retaining wall on low hillock, mound, it is made up of breast boards support, breast boards 3, clip plate 5, and breast boards support, breast boards 3, clip plate 5 all are concrete precast elements; The breast boards support is made of a vertical support frame 2, horizontal stand 1, is provided with between vertical support frame 2, the horizontal stand 1 and tiltedly draws reinforced support 4; Breast boards spacer support frame arranged, breast boards 3 is built the medial surface that is contained in vertical support frame, and clip plate 5 is pressed in the rear end of horizontal stand.
As shown in Figure 1, tiltedly drawing the angle between reinforced support 4 and the vertical support frame 2 is 35 °.
As shown in Figure 2, vertical support frame 2 is provided with reinforcing bar connecting ring 7, and breast boards 3 is provided with reinforcing bar connecting ring 6.Can be in the process of installing by reinforcing bar connecting ring 6,7, temporary fixed breast boards 3 is avoided collapsing.
Be to be used for the user mode figure of the board-like terraced fields retaining wall on low hillock, mound as shown in Figure 3 in the terraced fields transformation, being used for below the outside of board-like terraced fields retaining wall 8 on low hillock, mound is backfill planting soil district 9, and the inboard that is used for the board-like terraced fields retaining wall 8 on low hillock, mound is backfill planting soil district 10.
Advantage of the present utility model:
Plate type retaining wall only has 5 procedures, and 1, measure unwrapping wire, 2, the terraced fields prepartion of land, 3, Prefabricated slab type retaining wall member marches into the arena, 4, the plate type retaining wall assembling, 5, terrace cropping soil is smooth. Reduce by 7 procedures than the hard terraced fields retaining wall of stone, increase land use area, avoid built-in gutter. Concrete advantage is as follows:
1. recovery project is put in the earthwork of cancellation terraced fields in order.
2. reduce terraced fields materials arrival vehicle. (5 tons of automobiles draw 5 cubic metres of rubbles, build hard retaining wall 8 square meters of stone by laying bricks or stones). 5 tons of automobiles draw and give 40 square metres of 40 assemblings of breast boards processed terraced fields retaining walls.
3. cancel the hard retaining wall basis earth excavation of terraced fields stone and a cleaning landslide cubic metre of earth subdivisional work.
4. reduce terraced fields retaining wall workload: it is 5-6 square metre that a workman builds the hard retaining wall workload of rubble stone by laying bricks or stones an average working day.A workman installs 30 of board-like terraced fields Retaining wall plates the average every workday
5. the cancellation terraced fields stone hard retaining wall reparation the work items of collapsing.
6. the cancellation stone hard retaining wall concrete the work items of bearing down on one.
7. the hard retaining wall construction of cancellation terraced fields stone loader cooperates the material loading the work items.
8. the hard retaining wall of cancellation terraced fields stone is constructed to remain the building stones rehandling and remain rubble and is cleared up the work items
9. the cancellation terraced fields loosen the soil and manually pick up the rubble the work items.
10. manually cut the earth in cancellation terraced fields inboard row ditch.
11. the increase land use area, (the hard retaining wall of stone adds the every 1m land occupation of gutter land occupation more than 1m square) is in plate type retaining wall landed property area 0.2 square meter.
12. board-like terraced fields retaining wall can complete reservation planting soil in work progress.

Claims (2)

1. be used for the board-like terraced fields retaining wall on low hillock, mound, it is characterized in that: be made up of breast boards support, breast boards, clip plate, breast boards support, breast boards, clip plate all are concrete precast elements; The breast boards support is made of vertical support frame, a horizontal stand, is provided with between between vertical support frame, the level and tiltedly draws reinforced support; Breast boards spacer support frame arranged, breast boards is built the medial surface that is contained in vertical support frame, and clip plate is pressed in the rear end of horizontal stand.
2. the board-like terraced fields retaining wall that is used for low hillock, mound according to claim 1, it is characterized in that: the vertical support frame of breast boards support is provided with the reinforcing bar connecting ring, and breast boards is provided with the reinforcing bar connecting ring.
CN2010200394918U 2010-01-13 2010-01-13 Plate type terrace retaining wall for hillock land Expired - Fee Related CN201649122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200394918U CN201649122U (en) 2010-01-13 2010-01-13 Plate type terrace retaining wall for hillock land

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200394918U CN201649122U (en) 2010-01-13 2010-01-13 Plate type terrace retaining wall for hillock land

Publications (1)

Publication Number Publication Date
CN201649122U true CN201649122U (en) 2010-11-24

Family

ID=43114350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200394918U Expired - Fee Related CN201649122U (en) 2010-01-13 2010-01-13 Plate type terrace retaining wall for hillock land

Country Status (1)

Country Link
CN (1) CN201649122U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669395A (en) * 2012-09-13 2014-03-26 上海老港废弃物处置有限公司 Cofferdam device for controlling landfill garbage working plane
CN105951875A (en) * 2016-06-27 2016-09-21 长沙学院 Adjustable assembly retaining wall with pressure reduction plate structures
CN106193106A (en) * 2015-05-07 2016-12-07 青岛天力建筑加固工程有限公司 Skeleton oblique pull barricade

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669395A (en) * 2012-09-13 2014-03-26 上海老港废弃物处置有限公司 Cofferdam device for controlling landfill garbage working plane
CN103669395B (en) * 2012-09-13 2015-12-16 上海老港废弃物处置有限公司 Control the cofferdam device of the landfill yard rubbish scope of operation
CN106193106A (en) * 2015-05-07 2016-12-07 青岛天力建筑加固工程有限公司 Skeleton oblique pull barricade
CN105951875A (en) * 2016-06-27 2016-09-21 长沙学院 Adjustable assembly retaining wall with pressure reduction plate structures
CN105951875B (en) * 2016-06-27 2019-05-21 长沙学院 A kind of adjustable Retaining Wall with pressure reductor structure

Similar Documents

Publication Publication Date Title
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN100585094C (en) Construction method of circular deep foundation pit support
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN102061923B (en) Tunnel construction method capable of protecting existing building
CN102691300A (en) Construction method of foundation pit earthwork
CN104196049B (en) A kind of construction method of the fetal membrane of foundation platform and grade beam
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN104264680B (en) The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN101781896A (en) Construction method for manufacturing open caisson on concrete cushion
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN102817372A (en) Construction method of underground deep foundation concrete by reverse formworks
CN101597888B (en) Construction method of municipal drainage culvert sinking trough
CN102182866B (en) Backfilling process for large ultra-deep circulating water pipe
CN106837341B (en) A kind of Metro construction construction method of shaft wall
CN105256854A (en) Excavator bucket suitable for construction of trapezoid channel and construction method
CN201649122U (en) Plate type terrace retaining wall for hillock land
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN101949226A (en) Cross construction method for large pool body
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN103726508A (en) Prefabricated reinforced concrete board molding bed and construction method
CN111622234B (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN102852160B (en) Composite-structured retaining wall for artistic wall painting and construction method thereof
KR200413303Y1 (en) Stone stacked wall structure using steel beam
CN205975653U (en) Independent bearing platform structure of soil child mould construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20120113