CN201634357U CN 201020022375 CN201020022375U CN201634357U CN 201634357 U CN201634357 U CN 201634357U CN 201020022375 CN201020022375 CN 201020022375 CN 201020022375 U CN201020022375 U CN 201020022375U CN 201634357 U CN201634357 U CN 201634357U
Authority
CN
China
Prior art keywords
pulley
main hook
steel rope
jib
changed course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020022375
Other languages
Chinese (zh)
Inventor
王艳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wison Nantong Heavy Industry Co Ltd
Original Assignee
Wison Nantong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wison Nantong Heavy Industry Co Ltd filed Critical Wison Nantong Heavy Industry Co Ltd
Priority to CN 201020022375 priority Critical patent/CN201634357U/en
Application granted granted Critical
Publication of CN201634357U publication Critical patent/CN201634357U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a main lifting winding system. The system comprises two main hook lifting drum blocks which are arranged in parallel. Both of the two main hook lifting drum blocks are connected with course changing pulleys by steel wire ropes, each course changing pulley is connected with a crane jib middle course changing pulley by a steel wire rope, and both of the two crane jib middle course changing pulleys are connected with a crane jib horizontal course changing pulley block by steel wire ropes. The crane jib horizontal course changing pulley block is connected with two crane jib head course changing pulleys by steel wire ropes, the two crane jib head course changing pulleys are wound into a main hook directional pulley block by steel wire ropes, the main hook directional pulley block is connected with a main hook movable pulley block, the two ends of the main hook directional pulley block are connected with horizontal course changing pulleys by steel wire ropes, a balance force measuring pulley is connected between the two horizontal course changing pulleys by a steel wire rope, a force measuring sensor is arranged on the balance force measuring pulley, and a main hook is suspended below the main hook movable pulley block by a cross beam. The utility model has the advantages of simple structure and little possibility of making the steel wire ropes slip out.

Description

Main lifting and winding system
Technical field:
The utility model relates to a kind of later-model crane barge master lifting and winding system that is used for, and is applied to heavy-duty machinery field, harbour, Logistics Equipment, heavy industry field, ocean.
Background technology:
In traditional main lifting and winding system, the main hook steel rope generally all is from main two the reel rope stretchings that hoist, subsequently respectively by Shears changed course assembly pulley, jib middle part changed course assembly pulley, the main hook fixed pulley group that jib head changed course assembly pulley enters the jib head, because when steel rope enters main hook fixed pulley group, two pulley rooms are apart from less, steel rope alters course assembly pulley from jib middle part changed course assembly pulley around to main hook fixed pulley group the time through the jib head, pulley room is bigger apart from changing, therefore the deflection angle of rope in the crane barge main hook pulley system is bigger, and steel rope is easy to jump out from pulley groove.
Summary of the invention:
The purpose of this utility model is in order to overcome above deficiency, a kind of later-model main lifting and winding system is provided, compact conformation, pattern is succinct, drift angle between jib middle part changed course assembly pulley, jib head changed course assembly pulley and the steel rope is reduced, the main lifting and winding system that steel rope is difficult for skidding off.
The purpose of this utility model is achieved through the following technical solutions: a kind of main lifting and winding system, comprise two main hook hoisting drum groups, two main hook hoisting drum groups are placed side by side, two main hook hoisting drum groups all are connected with the changed course pulley by steel rope, be connected with the steel rope that is broken line shape between two changed course pulleys, and each changed course pulley all is connected with jib middle part changed course pulley by steel rope, two jib middle part changed course pulleys all are connected with one group of jib horizontally redirectional assembly pulley jointly by steel rope, jib horizontally redirectional assembly pulley is connected with two jib head changed course pulleys by steel rope, two jib head changed course pulleys move into the directed assembly pulley of a main hook by steel rope and are connected with a main hook running block, the main hook running block places the bottom of the directed assembly pulley of described main hook, the two ends of the directed assembly pulley of main hook all are connected with the horizontally redirectional pulley by steel rope, be connected with balance dynamometry pulley by steel rope between two horizontally redirectional pulleys, balance dynamometry pulley is provided with force transducer, and the below of described main hook running block hangs with main hook by crossbeam.
Further improvement of the utility model is: the placement triangular in shape of jib horizontally redirectional assembly pulley, and be level intersection pulley.
The utility model compared with prior art has the following advantages: be connected with jib horizontally redirectional assembly pulley at two jib middle part changed course assembly pulleys by steel rope, jib horizontally redirectional assembly pulley is connected with jib head changed course assembly pulley by steel rope, drift angle before and after making by jib horizontally redirectional pulley like this between two places changed course roller and the steel rope reduces, and steel rope is difficult for skidding off.
Description of drawings:
Fig. 1 is a structural representation of the present utility model;
Number in the figure: 1-main hook hoisting drum group, 2-changed course pulley, 3-jib middle part changed course pulley, 4-jib horizontally redirectional assembly pulley, 5-jib head changed course pulley, the directed assembly pulley of 6-main hook, 7-main hook running block, 8-horizontally redirectional pulley, 9-balance dynamometry pulley, 10-force transducer, 11-main hook.
The specific embodiment:
In order to deepen understanding of the present utility model, the utility model is described in further detail below in conjunction with embodiment and accompanying drawing, and this embodiment only is used to explain the utility model, does not constitute the qualification to the utility model protection domain.
Show the embodiment of a kind of main lifting and winding of the utility model system as Fig. 1, described winding system comprises two main hook hoisting drum groups 1, two main hook hoisting drum groups 1 are placed side by side, two main hook hoisting drum groups 1 all are connected with changed course pulley 2 by steel rope, be connected with the steel rope that is broken line shape between two changed course pulleys 2, and each changed course pulley 2 all is connected with jib middle part changed course pulley 3 by steel rope, two jib middle part changed course pulleys 3 all are connected with one group of jib horizontally redirectional assembly pulley 4 jointly by steel rope, jib horizontally redirectional assembly pulley 4 is connected with two jib head changed course pulleys 5 by steel rope, two jib head changed course pulleys 5 move into the directed assembly pulley 6 of a main hook by steel rope and are connected with a main hook running block 7, main hook running block 7 places the bottom of the directed assembly pulley 6 of described main hook, the two ends of the directed assembly pulley 6 of main hook all are connected with horizontally redirectional pulley 8 by steel rope, be connected with balance dynamometry pulley 9 by steel rope between two horizontally redirectional pulleys 8, balance dynamometry pulley 9 is provided with force transducer 10, and the below of main hook running block 7 hangs with main hook 11 by crossbeam.Two main hook hoisting drums of the preferred described winding system of the utility model group 1, also be connected with " people " font steel rope between the two ends of changed course pulley 2,4 placements triangular in shape of jib horizontally redirectional assembly pulley, and be level intersection pulley, two jib middle part changed course assembly pulleys 3 are connected with jib horizontally redirectional assembly pulley 4 by steel rope, jib horizontally redirectional assembly pulley 4 is connected with jib head changed course assembly pulley 5 by steel rope, like this by in crane barge master lifting and winding system, reasonably having arranged one group of jib horizontally redirectional assembly pulley 4, improved large-scale floating crane master hoist rope very effectively in the excessive problem of some positions deflection angle of rope, the level intersection pulley block structure of innovation is succinct, connection and reasonable arrangement, reduced the drift angle of steel rope greatly, avoid crane barge steel rope in the process of hoisting from pulley groove, to jump out caused potential safety hazard, also prolonged the service life of steel rope simultaneously greatly.The utility model can be widely applicable for the main lifting and winding system of various large-tonnage crane barges in addition.

Claims (2)

1. main lifting and winding system, it is characterized in that: described winding system comprises two main hook hoisting drum groups (1), described two main hook hoisting drum groups (1) are placed side by side, described two main hook hoisting drum groups (1) all are connected with changed course pulley (2) by steel rope, be connected with the steel rope that is broken line shape between described two changed course pulleys (2), and described each changed course pulley (2) all is connected with jib middle part changed course pulley (3) by steel rope, described two jibs middle part changed course pulleys (3) all are connected with one group of jib horizontally redirectional assembly pulley (4) jointly by steel rope, described jib horizontally redirectional assembly pulley (4) is connected with two jib head changed course pulleys (5) by steel rope, described two jib heads changed course pulleys (5) move into the directed assembly pulley of a main hook (6) by steel rope and are connected with a main hook running block (7), described main hook running block (7) places the bottom of the directed assembly pulley of described main hook (6), the two ends of the directed assembly pulley of described main hook (6) all are connected with horizontally redirectional pulley (8) by steel rope, be connected with balance dynamometry pulley (9) by steel rope between described two horizontally redirectional pulleys (8), described balance dynamometry pulley (9) is provided with force transducer (10), and the below of described main hook running block (7) hangs with main hook (11) by crossbeam.
2. according to the described a kind of main lifting and winding of claim 1 system, it is characterized in that: described jib horizontally redirectional assembly pulley (4) placement triangular in shape, and be that level is intersected pulley.
CN 201020022375 2010-01-22 2010-01-22 Main lifting winding system Expired - Fee Related CN201634357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020022375 CN201634357U (en) 2010-01-22 2010-01-22 Main lifting winding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020022375 CN201634357U (en) 2010-01-22 2010-01-22 Main lifting winding system

Publications (1)

Publication Number Publication Date
CN201634357U true CN201634357U (en) 2010-11-17

Family

ID=43078843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020022375 Expired - Fee Related CN201634357U (en) 2010-01-22 2010-01-22 Main lifting winding system

Country Status (1)

Country Link
CN (1) CN201634357U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318751A (en) * 2013-07-18 2013-09-25 徐州重型机械有限公司 Lifting hook and crane
CN103613020A (en) * 2013-11-29 2014-03-05 中联重科股份有限公司 Combined-type pulley block and crane
CN105417417A (en) * 2015-12-16 2016-03-23 四川电力建设三公司 Winch lifting system of die lifting device
CN108861899A (en) * 2017-05-12 2018-11-23 上海船厂船舶有限公司 Crane ship variable-amplitude steel wire rope draw-string method
CN108946537A (en) * 2018-08-16 2018-12-07 江苏紫石机械制造有限公司 A kind of electronic loop wheel machine take-up and pay-off device of ship
CN110240071A (en) * 2019-06-06 2019-09-17 徐工集团工程机械股份有限公司建设机械分公司 A kind of large pitching angle degree derricking rope wind and winding method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318751A (en) * 2013-07-18 2013-09-25 徐州重型机械有限公司 Lifting hook and crane
CN103613020A (en) * 2013-11-29 2014-03-05 中联重科股份有限公司 Combined-type pulley block and crane
CN103613020B (en) * 2013-11-29 2015-10-14 中联重科股份有限公司 Combination type pulley group and hoisting crane
CN105417417A (en) * 2015-12-16 2016-03-23 四川电力建设三公司 Winch lifting system of die lifting device
CN108861899A (en) * 2017-05-12 2018-11-23 上海船厂船舶有限公司 Crane ship variable-amplitude steel wire rope draw-string method
CN108946537A (en) * 2018-08-16 2018-12-07 江苏紫石机械制造有限公司 A kind of electronic loop wheel machine take-up and pay-off device of ship
CN108946537B (en) * 2018-08-16 2020-02-11 江苏紫石机械制造有限公司 Electric crane wire take-up and pay-off device for ship
CN110240071A (en) * 2019-06-06 2019-09-17 徐工集团工程机械股份有限公司建设机械分公司 A kind of large pitching angle degree derricking rope wind and winding method

Similar Documents

Publication Publication Date Title
CN201634357U (en) Main lifting winding system
CN201614242U (en) Deck crane hoisting mechanism with emergency luffing function
CN102530757A (en) Wire-rope/pulley component and crane
CN101100267A (en) Hoisting device for loop wheel machine
CN202542765U (en) Steel wire rope pulley assembly and crane
CN202390116U (en) High-intensity small-tonnage hoist
CN202369310U (en) Safety detection and control device for amplitude variation of swing arm of crane
CN202807040U (en) Suspension device for ship bull facade
CN205170251U (en) Slack rope protection monitoring alarm device
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN104649120A (en) Balance hoisting equipment
CN204752004U (en) Novel become width of cloth formula bridge floor hoist
WO2009003332A1 (en) Wire rope space anti-interference arrangement for crane with multiple hoisting points
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN101428742A (en) Overweight electric block
CN203653125U (en) Hoister for tower crane hoisting
CN203033669U (en) Lifting mounting device of bridge crane
CN207061730U (en) Possesses the hoist engine of suspension hook supervising device
CN204454368U (en) A kind of hanging device
CN107840240B (en) Hanging beam
CN201447316U (en) Electromagnetic crane
CN201099586Y (en) Crane lifting device
CN103663206A (en) Universal hydraulic crane
CN205275132U (en) Forklift lifting tool
CN103640971B (en) Rope guiding device for marine crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20150122

EXPY Termination of patent right or utility model