CN201634357U - Main lifting winding system - Google Patents
Main lifting winding system Download PDFInfo
- Publication number
- CN201634357U CN201634357U CN 201020022375 CN201020022375U CN201634357U CN 201634357 U CN201634357 U CN 201634357U CN 201020022375 CN201020022375 CN 201020022375 CN 201020022375 U CN201020022375 U CN 201020022375U CN 201634357 U CN201634357 U CN 201634357U
- Authority
- CN
- China
- Prior art keywords
- pulley
- main hook
- steel rope
- jib
- changed course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a main lifting winding system. The system comprises two main hook lifting drum blocks which are arranged in parallel. Both of the two main hook lifting drum blocks are connected with course changing pulleys by steel wire ropes, each course changing pulley is connected with a crane jib middle course changing pulley by a steel wire rope, and both of the two crane jib middle course changing pulleys are connected with a crane jib horizontal course changing pulley block by steel wire ropes. The crane jib horizontal course changing pulley block is connected with two crane jib head course changing pulleys by steel wire ropes, the two crane jib head course changing pulleys are wound into a main hook directional pulley block by steel wire ropes, the main hook directional pulley block is connected with a main hook movable pulley block, the two ends of the main hook directional pulley block are connected with horizontal course changing pulleys by steel wire ropes, a balance force measuring pulley is connected between the two horizontal course changing pulleys by a steel wire rope, a force measuring sensor is arranged on the balance force measuring pulley, and a main hook is suspended below the main hook movable pulley block by a cross beam. The utility model has the advantages of simple structure and little possibility of making the steel wire ropes slip out.
Description
Technical field:
The utility model relates to a kind of later-model crane barge master lifting and winding system that is used for, and is applied to heavy-duty machinery field, harbour, Logistics Equipment, heavy industry field, ocean.
Background technology:
In traditional main lifting and winding system, the main hook steel rope generally all is from main two the reel rope stretchings that hoist, subsequently respectively by Shears changed course assembly pulley, jib middle part changed course assembly pulley, the main hook fixed pulley group that jib head changed course assembly pulley enters the jib head, because when steel rope enters main hook fixed pulley group, two pulley rooms are apart from less, steel rope alters course assembly pulley from jib middle part changed course assembly pulley around to main hook fixed pulley group the time through the jib head, pulley room is bigger apart from changing, therefore the deflection angle of rope in the crane barge main hook pulley system is bigger, and steel rope is easy to jump out from pulley groove.
Summary of the invention:
The purpose of this utility model is in order to overcome above deficiency, a kind of later-model main lifting and winding system is provided, compact conformation, pattern is succinct, drift angle between jib middle part changed course assembly pulley, jib head changed course assembly pulley and the steel rope is reduced, the main lifting and winding system that steel rope is difficult for skidding off.
The purpose of this utility model is achieved through the following technical solutions: a kind of main lifting and winding system, comprise two main hook hoisting drum groups, two main hook hoisting drum groups are placed side by side, two main hook hoisting drum groups all are connected with the changed course pulley by steel rope, be connected with the steel rope that is broken line shape between two changed course pulleys, and each changed course pulley all is connected with jib middle part changed course pulley by steel rope, two jib middle part changed course pulleys all are connected with one group of jib horizontally redirectional assembly pulley jointly by steel rope, jib horizontally redirectional assembly pulley is connected with two jib head changed course pulleys by steel rope, two jib head changed course pulleys move into the directed assembly pulley of a main hook by steel rope and are connected with a main hook running block, the main hook running block places the bottom of the directed assembly pulley of described main hook, the two ends of the directed assembly pulley of main hook all are connected with the horizontally redirectional pulley by steel rope, be connected with balance dynamometry pulley by steel rope between two horizontally redirectional pulleys, balance dynamometry pulley is provided with force transducer, and the below of described main hook running block hangs with main hook by crossbeam.
Further improvement of the utility model is: the placement triangular in shape of jib horizontally redirectional assembly pulley, and be level intersection pulley.
The utility model compared with prior art has the following advantages: be connected with jib horizontally redirectional assembly pulley at two jib middle part changed course assembly pulleys by steel rope, jib horizontally redirectional assembly pulley is connected with jib head changed course assembly pulley by steel rope, drift angle before and after making by jib horizontally redirectional pulley like this between two places changed course roller and the steel rope reduces, and steel rope is difficult for skidding off.
Description of drawings:
Fig. 1 is a structural representation of the present utility model;
Number in the figure: 1-main hook hoisting drum group, 2-changed course pulley, 3-jib middle part changed course pulley, 4-jib horizontally redirectional assembly pulley, 5-jib head changed course pulley, the directed assembly pulley of 6-main hook, 7-main hook running block, 8-horizontally redirectional pulley, 9-balance dynamometry pulley, 10-force transducer, 11-main hook.
The specific embodiment:
In order to deepen understanding of the present utility model, the utility model is described in further detail below in conjunction with embodiment and accompanying drawing, and this embodiment only is used to explain the utility model, does not constitute the qualification to the utility model protection domain.
Show the embodiment of a kind of main lifting and winding of the utility model system as Fig. 1, described winding system comprises two main hook hoisting drum groups 1, two main hook hoisting drum groups 1 are placed side by side, two main hook hoisting drum groups 1 all are connected with changed course pulley 2 by steel rope, be connected with the steel rope that is broken line shape between two changed course pulleys 2, and each changed course pulley 2 all is connected with jib middle part changed course pulley 3 by steel rope, two jib middle part changed course pulleys 3 all are connected with one group of jib horizontally redirectional assembly pulley 4 jointly by steel rope, jib horizontally redirectional assembly pulley 4 is connected with two jib head changed course pulleys 5 by steel rope, two jib head changed course pulleys 5 move into the directed assembly pulley 6 of a main hook by steel rope and are connected with a main hook running block 7, main hook running block 7 places the bottom of the directed assembly pulley 6 of described main hook, the two ends of the directed assembly pulley 6 of main hook all are connected with horizontally redirectional pulley 8 by steel rope, be connected with balance dynamometry pulley 9 by steel rope between two horizontally redirectional pulleys 8, balance dynamometry pulley 9 is provided with force transducer 10, and the below of main hook running block 7 hangs with main hook 11 by crossbeam.Two main hook hoisting drums of the preferred described winding system of the utility model group 1, also be connected with " people " font steel rope between the two ends of changed course pulley 2,4 placements triangular in shape of jib horizontally redirectional assembly pulley, and be level intersection pulley, two jib middle part changed course assembly pulleys 3 are connected with jib horizontally redirectional assembly pulley 4 by steel rope, jib horizontally redirectional assembly pulley 4 is connected with jib head changed course assembly pulley 5 by steel rope, like this by in crane barge master lifting and winding system, reasonably having arranged one group of jib horizontally redirectional assembly pulley 4, improved large-scale floating crane master hoist rope very effectively in the excessive problem of some positions deflection angle of rope, the level intersection pulley block structure of innovation is succinct, connection and reasonable arrangement, reduced the drift angle of steel rope greatly, avoid crane barge steel rope in the process of hoisting from pulley groove, to jump out caused potential safety hazard, also prolonged the service life of steel rope simultaneously greatly.The utility model can be widely applicable for the main lifting and winding system of various large-tonnage crane barges in addition.
Claims (2)
1. main lifting and winding system, it is characterized in that: described winding system comprises two main hook hoisting drum groups (1), described two main hook hoisting drum groups (1) are placed side by side, described two main hook hoisting drum groups (1) all are connected with changed course pulley (2) by steel rope, be connected with the steel rope that is broken line shape between described two changed course pulleys (2), and described each changed course pulley (2) all is connected with jib middle part changed course pulley (3) by steel rope, described two jibs middle part changed course pulleys (3) all are connected with one group of jib horizontally redirectional assembly pulley (4) jointly by steel rope, described jib horizontally redirectional assembly pulley (4) is connected with two jib head changed course pulleys (5) by steel rope, described two jib heads changed course pulleys (5) move into the directed assembly pulley of a main hook (6) by steel rope and are connected with a main hook running block (7), described main hook running block (7) places the bottom of the directed assembly pulley of described main hook (6), the two ends of the directed assembly pulley of described main hook (6) all are connected with horizontally redirectional pulley (8) by steel rope, be connected with balance dynamometry pulley (9) by steel rope between described two horizontally redirectional pulleys (8), described balance dynamometry pulley (9) is provided with force transducer (10), and the below of described main hook running block (7) hangs with main hook (11) by crossbeam.
2. according to the described a kind of main lifting and winding of claim 1 system, it is characterized in that: described jib horizontally redirectional assembly pulley (4) placement triangular in shape, and be that level is intersected pulley.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020022375 CN201634357U (en) | 2010-01-22 | 2010-01-22 | Main lifting winding system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020022375 CN201634357U (en) | 2010-01-22 | 2010-01-22 | Main lifting winding system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201634357U true CN201634357U (en) | 2010-11-17 |
Family
ID=43078843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201020022375 Expired - Fee Related CN201634357U (en) | 2010-01-22 | 2010-01-22 | Main lifting winding system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201634357U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103318751A (en) * | 2013-07-18 | 2013-09-25 | 徐州重型机械有限公司 | Lifting hook and crane |
CN103613020A (en) * | 2013-11-29 | 2014-03-05 | 中联重科股份有限公司 | Combined-type pulley block and crane |
CN105417417A (en) * | 2015-12-16 | 2016-03-23 | 四川电力建设三公司 | Winch lifting system of die lifting device |
CN108861899A (en) * | 2017-05-12 | 2018-11-23 | 上海船厂船舶有限公司 | Crane ship variable-amplitude steel wire rope draw-string method |
CN108946537A (en) * | 2018-08-16 | 2018-12-07 | 江苏紫石机械制造有限公司 | A kind of electronic loop wheel machine take-up and pay-off device of ship |
CN110240071A (en) * | 2019-06-06 | 2019-09-17 | 徐工集团工程机械股份有限公司建设机械分公司 | A kind of large pitching angle degree derricking rope wind and winding method |
-
2010
- 2010-01-22 CN CN 201020022375 patent/CN201634357U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103318751A (en) * | 2013-07-18 | 2013-09-25 | 徐州重型机械有限公司 | Lifting hook and crane |
CN103613020A (en) * | 2013-11-29 | 2014-03-05 | 中联重科股份有限公司 | Combined-type pulley block and crane |
CN103613020B (en) * | 2013-11-29 | 2015-10-14 | 中联重科股份有限公司 | Combination type pulley group and hoisting crane |
CN105417417A (en) * | 2015-12-16 | 2016-03-23 | 四川电力建设三公司 | Winch lifting system of die lifting device |
CN108861899A (en) * | 2017-05-12 | 2018-11-23 | 上海船厂船舶有限公司 | Crane ship variable-amplitude steel wire rope draw-string method |
CN108946537A (en) * | 2018-08-16 | 2018-12-07 | 江苏紫石机械制造有限公司 | A kind of electronic loop wheel machine take-up and pay-off device of ship |
CN108946537B (en) * | 2018-08-16 | 2020-02-11 | 江苏紫石机械制造有限公司 | Electric crane wire take-up and pay-off device for ship |
CN110240071A (en) * | 2019-06-06 | 2019-09-17 | 徐工集团工程机械股份有限公司建设机械分公司 | A kind of large pitching angle degree derricking rope wind and winding method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201634357U (en) | Main lifting winding system | |
CN201614242U (en) | Deck crane hoisting mechanism with emergency luffing function | |
CN102530757A (en) | Wire-rope/pulley component and crane | |
CN101100267A (en) | Hoisting device for loop wheel machine | |
CN202542765U (en) | Steel wire rope pulley assembly and crane | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN202369310U (en) | Safety detection and control device for amplitude variation of swing arm of crane | |
CN202807040U (en) | Suspension device for ship bull facade | |
CN205170251U (en) | Slack rope protection monitoring alarm device | |
CN203865920U (en) | Steel wire rope winding structure for large-tonnage crane hoisting mechanism | |
CN104649120A (en) | Balance hoisting equipment | |
CN204752004U (en) | Novel become width of cloth formula bridge floor hoist | |
WO2009003332A1 (en) | Wire rope space anti-interference arrangement for crane with multiple hoisting points | |
CN201722053U (en) | Hoisting mechanism used for upright column hoisting | |
CN101428742A (en) | Overweight electric block | |
CN203653125U (en) | Hoister for tower crane hoisting | |
CN203033669U (en) | Lifting mounting device of bridge crane | |
CN207061730U (en) | Possesses the hoist engine of suspension hook supervising device | |
CN204454368U (en) | A kind of hanging device | |
CN107840240B (en) | Hanging beam | |
CN201447316U (en) | Electromagnetic crane | |
CN201099586Y (en) | Crane lifting device | |
CN103663206A (en) | Universal hydraulic crane | |
CN205275132U (en) | Forklift lifting tool | |
CN103640971B (en) | Rope guiding device for marine crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101117 Termination date: 20150122 |
|
EXPY | Termination of patent right or utility model |