- CN108861899A CN108861899A CN201710335789.XA CN201710335789A CN108861899A CN 108861899 A CN108861899 A CN 108861899A CN 201710335789 A CN201710335789 A CN 201710335789A CN 108861899 A CN108861899 A CN 108861899A
- Authority
- CN
- China
- Prior art keywords
- amplitude
- wirerope
- changing drum
- steel wire
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
- B65H75/44—Constructional details
- B65H75/4418—Arrangements for stopping winding or unwinding; Arrangements for releasing the stop means
- B65H75/4428—Arrangements for stopping winding or unwinding; Arrangements for releasing the stop means acting on the reel or on a reel blocking mechanism
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
- B65H75/44—Constructional details
- B65H75/4402—Guiding arrangements to control paying-out and re-storing of the material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
- B65H75/44—Constructional details
- B65H75/4473—Constructional details without arrangements or adaptations for rotating the core or former
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/35—Ropes, lines
Abstract
The invention discloses a kind of crane ship variable-amplitude steel wire rope draw-string methods comprising following step:Step 1, jail that luffing cantilever crane is stopped;Wirerope in step 2, the first amplitude-changing drum of releasing, is correspondingly packed up wirerope with the second amplitude-changing drum, until the wirerope on the first amplitude-changing drum discharges;Step 3 removes wirerope pressure head on the first amplitude-changing drum, fixes head of steel wire rope, and the first amplitude-changing drum is rotated to direction is loosened, and extracts steel wire rope section out, then fixes wirerope pressure head, clip the wirerope of extraction;Step 4 packs up wirerope on the first amplitude-changing drum.Crane ship variable-amplitude steel wire rope draw-string method of the invention avoids the frequent replacement of wirerope, and maintenance and down time is greatly shortened, saves the expense of more change steel rope, eliminates the expense of a large amount of tooling device.
Description
Technical field
The present invention relates to crane ship tackling system, in particular to a kind of crane ship variable-amplitude steel wire rope draw-string method.
Background technique
Crane ship is the very important lifting equipment of shipbuilding industry, its safe and stable operation is directly concerning shipbuilding program
It goes on smoothly.Raising and variable-amplitude steel wire rope are one of most important components in crane ship, and wirerope is if there is problem, crane ship
It will be unable to work.Therefore, how to guarantee the reliable and stable work of wirerope, the number for reducing steel rope replacing, extend steel
The service life of cord, the Maintenance Downtime for shortening crane ship are that put in face of plant engineering technical staff one is great
Project.
The tackling system of 2500t crane ship is divided into changing-breadth system and hoisting system, wherein changing-breadth system totally two groups of four changes
Width reel, every amplitude-changing drum can be rotated independently.2500t crane ship cable drum is using Lebus reel (as schemed
1), rope groove 8 is mainly spliced by two straight lines and two fold line grooves, compared to other smooth reels and oblique line rope groove drum,
Lebus reel have wind submissive, row's rope is close neat, without rope winding jib, Winding Layer it is more (3 layers of common reel hereinafter,
Lebus reel can achieve 10 layers) the advantages that.
What 2500t crane ship wirerope was selected is facial-contracted wire rope, with that contact area is big, rub resistance ability is strong is excellent
Point.But there is also certain problems:Since arrangement is close, Winding Layer is more, its steel wire of internal layer rope is caused to be pressurized very big,
And due to the presence of reel fold line grooves, wirerope has the appearance of the case where point contact compression in broken line, and the face of counteracting connects
Touch the advantage of wirerope, the frictional force that when winding generates is very big, when cantilever crane angle smaller (15 ° to 30 °), wire rope roll around
Often occurs the situation to sparkle when broken line.Therefore, damage of the broken line to wirerope is still quite serious, leads to wirerope
The interrupted abrasion with fixed position is generated, the requirement due to Lebus reel to wirerope diameter precision is very high, broken line steel wire
After rope abrasion to a certain extent, so that wirerope is attenuated, be unable to close-packed arrays, leads to serious disorder cable phenomenon occur when winding, sternly
The service life of wirerope is affected again.Many similar crane ships are all that whole wirerope is caused to be scrapped because of disorder cable, are made
At heavy economic losses.
Due to cantilever crane inevitably will often in operation when bridge (each cross will lower cantilever crane to 15 °) at 15 °,
It sets clocking requirement wirerope and should just replace after operating as 30 times, and more change steel rope, exists in the prior art
A series of drawback:
1, wirerope buying expenses are high, and the order cycle time is long.By taking 2500t crane ship as an example, variable-amplitude steel wire rope diameter 70mm,
Individual wire rope length 4916m, overall length 4916*2=9832m, Unit Weight:28.49kg/m, gross weight 9832m*28.49kg/m
=280113kg, 17 yuan/kg of unit price, therefore, wirerope buying expenses 280113kg*17 member/ten thousand yuan of kg=476 or so), it orders goods
Period is up to half a year.
2, required tooling device is more:Relevant tooling device includes crane barge, tugboat, truck crane, large-scale hoist engine, rope closing volume
The various ancillary equipments such as cylinder, haulage vehicle.
3, place occupancy is more, difficulty of construction is big:Cantilever crane is transferred to ground, occupies port berth, construction operation place is compared
Greatly, and it is relevant operation and require relatively high.
4, construction personnel is more, and required labour cost is high.
5, long construction period:Only replace variable-amplitude steel wire rope, it is necessary to nearly 25 to 30 days durations.
Further, since more change steel rope personnel are more, construction operation difficulty is big, long in time limit, is easy to cause safety problem, and tight
Ghost image rings the arrangement of shipbuilding program node.
Summary of the invention
The technical problem to be solved by the present invention is in order to overcome, more change steel rope is costly in the prior art, long in time limit is lacked
It falls into, a kind of crane ship variable-amplitude steel wire rope draw-string method is provided.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of crane ship variable-amplitude steel wire rope draw-string method, it is characterized in that comprising following step:
Step 1, jail that luffing cantilever crane is stopped;
Wirerope in step 2, the first amplitude-changing drum of releasing, is correspondingly packed up wirerope with the second amplitude-changing drum, directly
Wirerope on to the first amplitude-changing drum discharges;
Step 3 removes wirerope pressure head on the first amplitude-changing drum, fixes head of steel wire rope, the first amplitude-changing drum to
Loosen direction rotation, extract steel wire rope section out, then fixes wirerope pressure head, clip the wirerope of extraction;
Step 4 packs up wirerope on the first amplitude-changing drum.
Preferably, the brake jail in step 1 include service brake, deadman's brake locking, ratchet lock and
All related electric control circuit shutdowns.This ensure that jail of stopping, prevents from being accidentally unlocked.
Preferably, in step 2 further include operating synchronously first amplitude-changing drum and second amplitude-changing drum first,
So that wirerope is in relaxed state, is then again changed to first amplitude-changing drum and second amplitude-changing drum by linkage pattern
DA SA.The wirerope of the first amplitude-changing drum can be preferably decontroled in this way.
Preferably, the relaxed state is that obviously observing that wirerope has swings silk.Wirerope foot can be determined by swinging Filamentous state
Enough relaxations.
Preferably, in step 2 further including before the wirerope on first amplitude-changing drum discharges, by winch peculiar to vessel
The wirerope of steel wire rope head and first amplitude-changing drum fix.It can guarantee that the wirerope of the first amplitude-changing drum is controllable in this way
Ground slowly discharges.
Preferably, the revolving speed of the revolving speed of first amplitude-changing drum and second amplitude-changing drum is respectively less than in step 2
30rpm, and the revolving speed of the revolving speed of first amplitude-changing drum and second amplitude-changing drum is equal in magnitude, contrary.In this way
It can guarantee that the first amplitude-changing drum and the second amplitude-changing drum are discharged and packed up in an orderly manner.
Preferably, the steel wire rope head of winch peculiar to vessel wirerope plywood is passed through fairlead and institute in step 2
The wirerope above the first amplitude-changing drum is stated to fix.Fairlead enables to winch peculiar to vessel stabilized steel in the proper direction
Cord.
Preferably, wirerope extraction 1/6 to 1/2 is enclosed in step 3.Wirerope can be made to remove the position being prone to wear in this way
It sets, the wirerope having worn out is prevented to be further worn out.
Preferably, first amplitude-changing drum and the second amplitude-changing drum are Lebus reel.
On the basis of common knowledge of the art, above-mentioned each optimum condition, can any combination to get each preferable reality of the present invention
Example.
The positive effect of the present invention is that:Crane ship variable-amplitude steel wire rope draw-string method of the invention avoids wirerope
Frequent replacement, maintenance and down time is greatly shortened, saves the expense of more change steel rope, eliminates a large amount of tooling and sets
Standby expense.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Lebus drum rope groove.
Fig. 2 is the structural schematic diagram of the changing-breadth system of present pre-ferred embodiments.
Fig. 3 is that the first amplitude-changing drum of crane ship of present pre-ferred embodiments and the second amplitude-changing drum draw-string method flow show
It is intended to.
Description of symbols:
First amplitude-changing drum 1
Second amplitude-changing drum 2
Third amplitude-changing drum 3
4th amplitude-changing drum 4
Luffing cantilever crane 5
Wirerope plywood 6
Fairlead 7
Rope groove 8
Specific embodiment
The present invention is further illustrated below by the mode of embodiment, but does not therefore limit the present invention to the reality
It applies among a range.
As shown in Fig. 2, changing-breadth system of the invention includes luffing cantilever crane 5, wirerope and several luffing rollers.
The crane ship variable-amplitude steel wire rope draw-string method of the present embodiment to first as shown in figure 3, successively become in the present embodiment
Width reel 1 and the second amplitude-changing drum 2 carry out draw-string operation.
As shown in figure 3, the operation of the draw-string of the first amplitude-changing drum 1 and the second amplitude-changing drum 2 includes the following steps:
Luffing cantilever crane 5 is raised to respect to the horizontal plane 52 degree or more and jail of stopping by step 101, and the third of second side group is become
Width reel 3 and the 4th amplitude-changing drum 4 are stopped jail, and jail of stopping includes service brake, deadman's brake locking, ratchet lock and all
The shutdown of related electric control circuit.
Step 102, the first amplitude-changing drum 1 of the first side group and the second amplitude-changing drum 2 operate synchronously and loosen wirerope, make
The wirerope of one amplitude-changing drum 1 and the second amplitude-changing drum 2 is in relaxed state, and relaxed state is obviously to observe that wirerope has to swing
Silk.First amplitude-changing drum 1 and the second amplitude-changing drum 2 are changed to DA SA by linkage pattern.First amplitude-changing drum 1 continues to release
Wirerope, while the corresponding income wirerope of the second amplitude-changing drum 2, until the wirerope residue at least 3 on the first amplitude-changing drum 1 is enclosed
When stop, the revolving speed of the first amplitude-changing drum 1 and the second amplitude-changing drum 2 is less than 30rpm, and the two speed is equal, contrary.By ship
With the steel wire rope head wirerope plywood 6 of winch, the wirerope by 1 top of fairlead 7 and the first amplitude-changing drum is solid
It is fixed, prevent wirerope from deviating from from the first amplitude-changing drum 1 when giving out light.In the present embodiment, it can be fixed using chain block
Head of steel wire rope.First amplitude-changing drum 1 continues to loosen wirerope, while winch peculiar to vessel synchronizes and loosens wirerope, until first becomes
Wirerope on width reel 1 discharges.
Step 103 removes wirerope pressure head on the first amplitude-changing drum 1, fixes head of steel wire rope, the first amplitude-changing drum
1, to 1/6 to 1/2 circle of direction rotation is loosened, makes 1/6 to 1/2 circle of wirerope extraction, then fixes wirerope pressure head.
Step 104, the wirerope for clipping extraction, then the first amplitude-changing drum 1 tightens at a slow speed wirerope, meanwhile, strand peculiar to vessel
The synchronous tightening wirerope of machine, the second amplitude-changing drum 2 loosen wirerope, until also surplus at least 3 circle of wirerope on the first amplitude-changing drum 1
When stop, and remove winch steel wire rope head peculiar to vessel.Third amplitude-changing drum 3 and the 4th amplitude-changing drum 4 remain stationary, the first luffing volume
Cylinder 1 tightens wirerope, until the steel wire tensioning on the first amplitude-changing drum 1 and the second amplitude-changing drum 2,3 He of third amplitude-changing drum
The steel wire rope looseness of 4th amplitude-changing drum 4.Second amplitude-changing drum 2 discontinuously loosens wirerope, while the first amplitude-changing drum 1 is continuously received
Tight wirerope is always maintained at the wirerope on the first amplitude-changing drum 1 and the second amplitude-changing drum 2 and swings silk, until the first luffing is rolled up
Cylinder 1 is identical with the steel wire rope loop number on the second amplitude-changing drum 2.
Step 105, the first amplitude-changing drum 1 of the first side group and the second amplitude-changing drum 2 operate synchronously and loosen wirerope, make
The wirerope of one amplitude-changing drum 1 and the second amplitude-changing drum 2 is in relaxed state, and relaxed state is obviously to observe that wirerope has to swing
Silk.First amplitude-changing drum 1 and the second amplitude-changing drum 2 are changed to DA SA by linkage pattern.Second amplitude-changing drum 2 continues to release
Wirerope, while the corresponding income wirerope of the first amplitude-changing drum 1, until the wirerope residue at least 3 on the second amplitude-changing drum 2 is enclosed
When stop, the revolving speed of the first amplitude-changing drum 1 and the second amplitude-changing drum 2 is less than 30rpm, and the two speed is equal, contrary.By ship
With the steel wire rope head wirerope plywood 6 of winch, the wirerope by 2 top of fairlead 7 and the second amplitude-changing drum is solid
It is fixed, prevent wirerope from deviating from from the second amplitude-changing drum 2 when giving out light.In the present embodiment, it can be fixed using chain block
Head of steel wire rope.Second amplitude-changing drum 2 continues to loosen wirerope, while winch peculiar to vessel synchronizes and loosens wirerope, until second becomes
Wirerope on width reel 2 discharges.
Step 106 removes wirerope pressure head on the second amplitude-changing drum 2, fixes head of steel wire rope, the second amplitude-changing drum
2, to 1/6 to 1/2 circle of direction rotation is loosened, make 1/6 to 1/2 circle of wirerope extraction, then fix wirerope pressure head.
Step 107, the wirerope for clipping extraction, then the second amplitude-changing drum 2 tightens at a slow speed wirerope, meanwhile, strand peculiar to vessel
The synchronous tightening wirerope of machine, the first amplitude-changing drum 1 loosen wirerope, until also surplus at least 3 circle of wirerope on the second amplitude-changing drum 2
When stop, and remove winch steel wire rope head peculiar to vessel.Third amplitude-changing drum 3 and the 4th amplitude-changing drum 4 remain stationary, the second luffing volume
Cylinder 2 tightens wirerope, until the steel wire tensioning on the first amplitude-changing drum 1 and the second amplitude-changing drum 2,3 He of third amplitude-changing drum
The steel wire rope looseness of 4th amplitude-changing drum 4.First amplitude-changing drum 1 discontinuously loosens wirerope, while the second amplitude-changing drum 2 is continuously received
Tight wirerope is always maintained at the wirerope on the first amplitude-changing drum 1 and the second amplitude-changing drum 2 and swings silk, until the first luffing is rolled up
Cylinder 1 is identical with the steel wire rope loop number on the second amplitude-changing drum 2.
The draw-string step of third amplitude-changing drum 3 and the 4th amplitude-changing drum 4 and the first amplitude-changing drum 1 and the second amplitude-changing drum 2
Draw-string step it is corresponding.
In the present embodiment, the first amplitude-changing drum 1, the second amplitude-changing drum 2, third amplitude-changing drum 3 and the 4th amplitude-changing drum 4
It is Lebus reel.
The crane ship variable-amplitude steel wire rope draw-string method of the present embodiment avoids the frequent replacement of wirerope, and dimension is greatly shortened
It repairs and down time, saves the expense of more change steel rope, eliminate the expense of a large amount of tooling device.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that this is only
For example, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from
Under the premise of the principle and substance of the present invention, many changes and modifications may be made, but these change and
Modification each falls within protection scope of the present invention.
Claims (9)
1. a kind of crane ship variable-amplitude steel wire rope draw-string method, which is characterized in that it includes the following steps:
Step 1, jail that luffing cantilever crane is stopped;
Wirerope in step 2, the first amplitude-changing drum of releasing, is correspondingly packed up wirerope with the second amplitude-changing drum, until the
Wirerope on one amplitude-changing drum discharges;
Step 3 removes wirerope pressure head on the first amplitude-changing drum, fixes head of steel wire rope, and the first amplitude-changing drum is to loosening
Direction rotation, extracts steel wire rope section out, then fixes wirerope pressure head, clips the wirerope of extraction;
Step 4 packs up wirerope on the first amplitude-changing drum.
2. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that the brake in step 1
Jail includes service brake, deadman's brake locking, ratchet lock and the shutdown of all related electric control circuits.
3. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that in step 2 further include head
First amplitude-changing drum and second amplitude-changing drum are first operated synchronously, wirerope is made to be in relaxed state, then again by institute
It states the first amplitude-changing drum and second amplitude-changing drum and DA SA is changed to by linkage pattern.
4. crane ship variable-amplitude steel wire rope draw-string method as claimed in claim 3, which is characterized in that the relaxed state is obvious
It observes that wirerope has and swings silk.
5. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that further include in step 2
Before wirerope on first amplitude-changing drum discharges, by the steel of the steel wire rope head of winch peculiar to vessel and first amplitude-changing drum
Cord is fixed.
6. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that in step 2 described first
The revolving speed of the revolving speed of amplitude-changing drum and second amplitude-changing drum is respectively less than 30rpm, and the revolving speed of first amplitude-changing drum and
The revolving speed of second amplitude-changing drum is equal in magnitude, contrary.
7. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that in step 2 by strand peculiar to vessel
The steel wire rope head of machine wirerope plywood is fixed by fairlead and the wirerope above first amplitude-changing drum.
8. crane ship variable-amplitude steel wire rope draw-string method as described in claim 1, which is characterized in that wirerope is taken out in step 3
1/6 to 1/2 circle out.
9. the crane ship variable-amplitude steel wire rope draw-string method as described in claim 1 to 8 any one, which is characterized in that described
One amplitude-changing drum and the second amplitude-changing drum are Lebus reel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710335789.XA CN108861899B (en) | 2017-05-12 | 2017-05-12 | Crane vessel amplitude-variable steel wire rope drawing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710335789.XA CN108861899B (en) | 2017-05-12 | 2017-05-12 | Crane vessel amplitude-variable steel wire rope drawing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108861899A true CN108861899A (en) | 2018-11-23 |
CN108861899B CN108861899B (en) | 2021-03-12 |
Family
ID=64320028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710335789.XA Active CN108861899B (en) | 2017-05-12 | 2017-05-12 | Crane vessel amplitude-variable steel wire rope drawing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108861899B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201010456Y (en) * | 2007-03-14 | 2008-01-23 | 山东华夏集团有限公司 | Euphroe of tower crane luffing winch |
CN101858067A (en) * | 2010-06-21 | 2010-10-13 | 中交一航局第二工程有限公司 | Process for vertically prefabricating, turning, centering and installing semi-circle body on water |
CN201634357U (en) * | 2010-01-22 | 2010-11-17 | 惠生(南通)重工有限公司 | Main lifting winding system |
CN102009917A (en) * | 2010-10-26 | 2011-04-13 | 北京首钢建设集团有限公司 | Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously |
-
2017
- 2017-05-12 CN CN201710335789.XA patent/CN108861899B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201010456Y (en) * | 2007-03-14 | 2008-01-23 | 山东华夏集团有限公司 | Euphroe of tower crane luffing winch |
CN201634357U (en) * | 2010-01-22 | 2010-11-17 | 惠生(南通)重工有限公司 | Main lifting winding system |
CN101858067A (en) * | 2010-06-21 | 2010-10-13 | 中交一航局第二工程有限公司 | Process for vertically prefabricating, turning, centering and installing semi-circle body on water |
CN102009917A (en) * | 2010-10-26 | 2011-04-13 | 北京首钢建设集团有限公司 | Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously |
Also Published As
Publication number | Publication date |
---|---|
CN108861899B (en) | 2021-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101357736B (en) | Method for hoisting and turning over large articles using frame crane | |
CN201647085U (en) | Quick boat recovery and release installation | |
CN205314061U (en) | Buffer of intelligence absorption formula large -tonnage ship alongside | |
US10787327B2 (en) | Multi-bar linkage mechanism based conveyor | |
CN202415021U (en) | Irrotational foldable variable-amplitude large-scale crane ship | |
CN102556869A (en) | Mechanism for lifting two rotary drums | |
CN201614242U (en) | Deck crane hoisting mechanism with emergency luffing function | |
CN111559473B (en) | Hoisting method for bow main section of bulk carrier | |
CN105108708B (en) | Crane disassembling process | |
CN206033063U (en) | Electronic change width of cloth loop wheel machine | |
CN108861899A (en) | Crane ship variable-amplitude steel wire rope draw-string method | |
CN213036993U (en) | Offshore wind power pile foundation roll-on-roll-off shipment system | |
CN216269827U (en) | Offshore single point mooring replacement maintenance equipment | |
CN201634357U (en) | Main lifting winding system | |
CN109775582A (en) | Crane ship hoist rope draw-string method | |
CN107600310B (en) | Dismounting process of the FPSO aft main deck in harbour | |
CN100519947C (en) | Intelligent fast release hook | |
CN202169997U (en) | Heavy lift vessel with door-shaped trusses | |
CN204265369U (en) | Permanent pulling force mooring winch | |
CN104279525B (en) | A kind of reversible aft anchor lamp socket | |
CN202415043U (en) | Double-winding-drum hoisting mechanism | |
Gao et al. | Study on the safety guarantee of ship mooring from frequent cable accidents | |
CN204659966U (en) | A kind of ship cable fender guard | |
CN202022652U (en) | Device capable of fast lifting oil tanks in group | |
CN104340864A (en) | Crane and hoisting mechanism thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |