CN201634321U - 一种钢结构吊车梁的锚定连接装置 - Google Patents

一种钢结构吊车梁的锚定连接装置 Download PDF

Info

Publication number
CN201634321U
CN201634321U CN2010201622625U CN201020162262U CN201634321U CN 201634321 U CN201634321 U CN 201634321U CN 2010201622625 U CN2010201622625 U CN 2010201622625U CN 201020162262 U CN201020162262 U CN 201020162262U CN 201634321 U CN201634321 U CN 201634321U
Authority
CN
China
Prior art keywords
crane
steel
crane beam
grappling
end support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201622625U
Other languages
English (en)
Inventor
于俭海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lino (dalian) Import & Export Trading Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010201622625U priority Critical patent/CN201634321U/zh
Application granted granted Critical
Publication of CN201634321U publication Critical patent/CN201634321U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

一种钢结构吊车梁的锚定连接装置,属于钢结构吊车梁的锚定连接技术领域。这种钢结构吊车梁的锚定连接装置采用二个与吊车梁固定连接的吊车梁端支架,二个与厂房立柱固定连接的立柱端支架,并采用连接板把吊车梁端支架和立柱端支架连接在一起。吊车梁端支架和立柱端支架与连接板的连接采用关节轴承。这种连接结构解决了因连接板损坏而要停工维修的问题,延长了吊车梁、起重机、轨道及轨道固定件的使用寿命,提高了整个作业系统的安全性。

Description

一种钢结构吊车梁的锚定连接装置
技术领域
本实用新型涉及一种钢结构吊车梁的锚定连接装置,属于钢结构吊车梁的锚定连接技术领域。
背景技术
在吊车负载运行过程中,由于起重机的运行和作业,会产生震动力、冲击力等,吊车梁在这些力的作用下会发生偏移、弯曲,翻转等现象;造成轨道吊车梁变形,轨道磨损,轨道固定件损坏,并影响起重机的正常运行。吊车梁本身无法承受这些力。在设计上,需要将吊车梁和钢结构厂房的立柱连起来,以锚定连接吊车梁。
目前,我国大部分工厂采用一块钢板,用焊接将吊车梁与厂房立柱连接起来。由于吊车梁同时会受到拉力、压力、弯曲冲击和扭转,导致连接钢板很快损坏。
发明内容
为了解决单纯钢板连接带来的易损坏、维护成本高等问题,本实用新型提供一种钢结构吊车梁的锚定连接装置。该锚定连接装置应结构简单,稳定性好,能可靠地将起重机运行产生的震动,冲击,扭转等力传到厂房力柱上,具有足够的强度和刚度,寿命长,并免于维护。
本实用新型采用的技术方案:一种钢结构吊车梁的锚定连接装置主要包括一个固定安装在吊车梁上的吊车轨道;它还包括一些吊车梁的锚定连接装置,每个锚定连接装置采用二个与吊车梁固定连接的吊车梁端支架,二个与厂房立柱固定连接的立柱端支架,并采用连接板把吊车梁端支架和立柱端支架连接在一起。
所述吊车梁端支架和立柱端支架与连接板的连接采用关节轴承。
所述吊车梁端支架与吊车梁的连接采用螺栓连接或焊接。
所述立柱端支架与厂房立柱的连接采用螺栓连接或焊接。
采用上述技术方案的指导思想是:改善吊车梁与立柱连接板的受力状况,无论是冲、弯、震、扭等力,通过关节轴承的作用,可以顺应力的方向,传递给吊车梁。不会在连接板处产生过大的力。当轨道吊车梁将作用力传递给吊车梁时,锚定连接装置的连接板是铰链活动的,能将复杂的冲、弯、震、扭等力可靠地传到柱上。同时,连接板不会产生过负载的力。而老式的一块钢板的连接,由于钢板不能活动,当冲、弯、震、扭等力传递到立柱时,连接板会过载。这种超负荷的力造成了连接板的损坏。
本实用新型的有益效果是:这种钢结构吊车梁的锚定连接装置采用二个与吊车梁固定连接的吊车梁端支架,二个与厂房立柱固定连接的立柱端支架,并采用连接板把吊车梁端支架和立柱端支架连接在一起。吊车梁端支架和立柱端支架与连接板的连接采用关节轴承。这种连接结构解决了因连接板损坏而要停工维修的问题,延长了吊车梁、起重机、轨道及轨道固定件的使用寿命,提高了整个作业系统的安全性。
附图说明
图1是一种钢结构吊车梁的锚定连接装置的结构正视图。
图2是一种钢结构吊车梁的锚定连接装置的结构俯视图。
图中:1、吊车梁,2、吊车梁端支架,3、关节轴承,4、连接板,5、立柱端支架,5a、立板,5b、面板,6、厂房立柱,7、吊车轨道。
具体实施方式
图1、2示出了一种钢结构吊车梁的锚定连接装置的结构图。图中,吊车梁1和厂房立柱6都采用工字钢结构,吊车轨道7固定安装在吊车梁1的上面板上。在吊车梁1与厂房立柱6之间设置了锚定连接装置,锚定连接装置主要包括吊车梁端支架2、立柱端支架5和连接板4。每个吊车梁端支架2采用二块板,把吊车梁1的上面板夹在中间,并采用二组螺栓固定连接。二个立柱端支架5采用二组螺栓把立柱端支架5的立板5a与厂房立柱6的侧面板固定连接在一起。每个连接板4的一端夹在吊车梁端支架2的板中间,采用关节轴承3连接;另一端夹在立柱端支架5的面板5b中间也采用关节轴承3连接。
上述的吊车梁端支架2与吊车梁1之间的连接以及立柱端支架5与厂房立柱6之间的连接除采用螺栓连接外,还可采用焊接连接。

Claims (4)

1.一种钢结构吊车梁的锚定连接装置,它主要包括一个固定安装在吊车梁(1)上的吊车轨道(7);其特征在于:它还包括一些吊车梁(1)的锚定连接装置,每个锚定连接装置采用二个与吊车梁(1)固定连接的吊车梁端支架(2),二个与厂房立柱(6)固定连接的立柱端支架(5),并采用连接板(4)把吊车梁端支架(2)和立柱端支架(5)连接在一起。
2.根据权利要求1所述的一种钢结构吊车梁的锚定连接装置,其特征在于:所述吊车梁端支架(2)和立柱端支架(5)与连接板(4)的连接采用关节轴承(3)。
3.根据权利要求1所述的一种钢结构吊车梁的锚定连接装置,其特征在于:所述吊车梁端支架(2)与吊车梁(1)的连接采用螺栓连接或焊接。
4.根据权利要求1所述的一种钢结构吊车梁的锚定连接装置,其特征在于:所述立柱端支架(5)与厂房立柱(6)的连接采用螺栓连接或焊接。
CN2010201622625U 2010-04-13 2010-04-13 一种钢结构吊车梁的锚定连接装置 Expired - Fee Related CN201634321U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201622625U CN201634321U (zh) 2010-04-13 2010-04-13 一种钢结构吊车梁的锚定连接装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201622625U CN201634321U (zh) 2010-04-13 2010-04-13 一种钢结构吊车梁的锚定连接装置

Publications (1)

Publication Number Publication Date
CN201634321U true CN201634321U (zh) 2010-11-17

Family

ID=43078807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201622625U Expired - Fee Related CN201634321U (zh) 2010-04-13 2010-04-13 一种钢结构吊车梁的锚定连接装置

Country Status (1)

Country Link
CN (1) CN201634321U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103395690A (zh) * 2013-08-19 2013-11-20 谢合清 轻量化实腹式工字形钢吊车梁

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103395690A (zh) * 2013-08-19 2013-11-20 谢合清 轻量化实腹式工字形钢吊车梁

Similar Documents

Publication Publication Date Title
CN103492642A (zh) 脚手架附接装置
CN203173749U (zh) 液压复式起重机塔架组装整体式竖向自顶升装置
CN105035112A (zh) 一种用于重型设备的吊挂结构
CN201634321U (zh) 一种钢结构吊车梁的锚定连接装置
CN102261043A (zh) 拼装式钢管立柱系统
CN201506692U (zh) 屋面钢结构简易提升装置及其安装结构
CN201258459Y (zh) 一种模数式桥梁伸缩装置
CN202689665U (zh) 一种三柱式抢修塔
CN209941512U (zh) 一种斜拉桥斜塔下横梁支撑剪力件
CN201873474U (zh) 一种对称设置的行车吊钩滑轮组钢丝绳防脱装置
CN210887601U (zh) 一种钢架结构支座
CN202323727U (zh) 钢箱梁水平位置调整装置
CN201678344U (zh) 一种电梯上曳引机的布置结构
CN205277707U (zh) 风力发电机组内的升降机支撑结构及风力发电机组的塔架
CN202785365U (zh) 桥式过轨起重机
CN202144051U (zh) 密集钢排架安装胎架
CN102418676B (zh) 一种风力发电机组焊接后机架
CN101648679A (zh) 组合式电动单梁起重机
CN204535833U (zh) 一种带接头箱的单节分体汽车衡
CN111456236B (zh) 轻型钢梁和钢柱之间的连接方法
CN215052156U (zh) 一种斜拉桥梁下0号托架支撑剪力件
CN205223842U (zh) 斜拉桥结构体系防止主梁出现负反力构造
CN202729660U (zh) 塔吊附着框支撑加固装置
CN203583774U (zh) 斜坡屋顶的组合钢筋骨架
CN221398654U (zh) 滑移支架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ELINORE (DALIAN) IMPORT AND EXPORT TRADING CO., LT

Free format text: FORMER OWNER: YU JIANHAI

Effective date: 20110119

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110119

Address after: Room 1206, rainbow building, No. 23 Renmin Road, Zhongshan District, Liaoning, Dalian, 116001

Patentee after: Lino (Dalian) Import & Export Trading Co., Ltd.

Address before: Room 1206, rainbow building, No. 23 Renmin Road, Zhongshan District, Liaoning, Dalian, 116001

Patentee before: Yu Jianhai

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20170413