CN201627540U - Accurate sample frame for underground workshop palisades crane beam excavating drilling - Google Patents

Accurate sample frame for underground workshop palisades crane beam excavating drilling Download PDF

Info

Publication number
CN201627540U
CN201627540U CN2010201612623U CN201020161262U CN201627540U CN 201627540 U CN201627540 U CN 201627540U CN 2010201612623 U CN2010201612623 U CN 2010201612623U CN 201020161262 U CN201020161262 U CN 201020161262U CN 201627540 U CN201627540 U CN 201627540U
Authority
CN
China
Prior art keywords
sample frame
guide pipe
drilling
palisades
crane beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201612623U
Other languages
Chinese (zh)
Inventor
程祖刚
李友华
万勇
张红兵
李景元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2010201612623U priority Critical patent/CN201627540U/en
Application granted granted Critical
Publication of CN201627540U publication Critical patent/CN201627540U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides an accurate sample frame for underground workshop palisades crane beam excavating drilling, which relates to a device for the positioning of underground workshop palisades crane beam excavating drilling in water-power engineering, and comprises a sample frame, wherein the sample frame is provided with a guide pipe coincident with the drilling axis, and the rear end of the guide pipe is provided with a limiting rod. The sample frame can accurately locate the position and depth of the drilling by virtue of the guide pipe and a limiting pipe, and avoid the occurrence of bore shifting as well as overexcavation and underexcavation, thus effectively guaranteeing the palisades crane beam excavating construction quality, and reducing the cost for backfilling concrete.

Description

The accurate sample frame of underground power house crag crane girder excavation boring
Technical field
The utility model relates to the device of a kind of hydroelectric project underground power house crag crane girder excavation boring location, the accurate sample frame of particularly a kind of underground power house crag crane girder excavation boring.
Background technology
Crag crane girder tradition excavating device is common sample frame, and drilling rod can not accurately be located, and bore angle and hole depth are difficult to strict control, occur easily wafing the hole and cause super, owe to dig, can't guarantee the excavation Forming Quality of crag crane girder.
Summary of the invention
Technical problem to be solved in the utility model provides the accurate sample frame of a kind of underground power house crag crane girder excavation boring, can guarantee drilling quality, the hole or surpass, owe to dig of avoiding occurring wafing.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: the accurate sample frame of a kind of underground power house crag crane girder excavation boring, comprise the sample frame, and overlap with drilling axis on the sample frame and be provided with guide pipe, the guide pipe rear end is provided with gag lever post.
Described guide pipe is fitted as far as possible near an end and the bedrock surface of bedrock surface.
Described guide pipe length is 0.5~1.2m.
Described guide pipe apart from bedrock surface less than 2cm.
The accurate sample frame of a kind of underground power house crag crane girder excavation boring that the utility model provides, by the guide pipe that is provided with and the position-limiting tube accurately position and the degree of depth of location drilling, avoid occurring wafing hole and surpass, owe to dig, guarantee crag crane girder excavation construction quality effectively, also reduced the fill concrete cost.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples: Fig. 1 is the sample shelf structure front view of vertical drilling in the utility model; Fig. 2 is the sample shelf structure lateral view of vertical drilling in the utility model; Fig. 3 is the sample shelf structure front view of the utility model medium dip boring; Fig. 4 is the sample shelf structure lateral view of the utility model medium dip boring.
The specific embodiment
The accurate sample frame of a kind of underground power house crag crane girder excavation boring comprises sample frame 1, overlaps with drilling axis on the sample frame 1 and is provided with guide pipe 3, and guide pipe 3 rear ends are provided with gag lever post 2.
Described guide pipe 3 is fitted as far as possible near an end and the bedrock surface of bedrock surface.According to the angle of drilling axis and bedrock surface, an end of guide pipe 3 need be cut into the inclined-plane, fitting as far as possible with bedrock surface, thereby guarantees borehole accuracy.
Described guide pipe 3 length are 0.5~1.2m.
Described guide pipe 3 apart from bedrock surface less than 2cm.
Concrete construction sequence: 1, sample frame 1 sets up, select the Ф 40mm high-quality steel pipe of straight nothing distortion for use, set up vertical rod, cross bar and hound respectively according to the some position that measurement is emitted, and establish the vertical anchor rod of Ф 28m L=1.0~1.5m at the hound footing, anchor into basement rock degree of depth 30cm, with the hound firm welding, anchor rod, needling, hound spacing 1.75m, vertical rod, cross bar and cross bar adopt a word card connection, cross bar adopts cross buckle to be connected with vertical rod, and cross bar and hound, vertical rod and hound adopt universal linking to connect.
2, gag lever post 2 is installed, according to survey data, go out the position of gag lever post 2 at every vertical rod subscript with red paint, adopt a word card connection between the gag lever post 2, adopt cross buckle to be connected between gag lever post 2 and the vertical rod, the application level chi is checked whether level of gag lever post 2, checks errorless after, with gag lever post 2 and vertical rod fixation.
3, guide pipe 3 is installed, is adopted total powerstation accurately to emit 3 positions of each guide pipe, use the angle that instruments such as messenger wire and spirit level, protractor are checked guide pipes 3 simultaneously, confirms errorless after, adopt cross buckle that guide pipe 3 and cross bar are connected firmly.Guide pipe 3 length 0.5~1.2m, guide pipe 3 becomes angle according to the angle of inclination in the end-grain cutting near bedrock surface, to be close to bedrock surface as far as possible, bedrock surface can not be close in the part, requires guide pipe 3 to be not more than 2cm (in particular cases being not more than 5cm) apart from the distance of bedrock surface.
4, implement boring, will hand air drill drilling rod insert in the guide pipe 3 and hole, when rig head bottom stops to hole during to gag lever post 2, the drilling depth of this moment finishing is exactly the hole depth of designing requirement.

Claims (4)

1. the accurate sample frame of underground power house crag crane girder excavation boring comprises sample frame (1), and it is characterized in that: sample frame (1) upward overlaps with drilling axis and is provided with guide pipe (3), and guide pipe (3) rear end is provided with gag lever post (2).
2. the accurate sample frame of a kind of underground power house crag crane girder excavation boring according to claim 1, it is characterized in that: described guide pipe (3) is fitted as far as possible near an end and the bedrock surface of bedrock surface.
3. the accurate sample frame of a kind of underground power house crag crane girder excavation boring according to claim 1, it is characterized in that: described guide pipe (3) length is 0.5~1.2m.
4. the accurate sample frame of a kind of underground power house crag crane girder excavation boring according to claim 1 is characterized in that: described guide pipe (3) apart from bedrock surface less than 2cm.
CN2010201612623U 2010-04-16 2010-04-16 Accurate sample frame for underground workshop palisades crane beam excavating drilling Expired - Fee Related CN201627540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201612623U CN201627540U (en) 2010-04-16 2010-04-16 Accurate sample frame for underground workshop palisades crane beam excavating drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201612623U CN201627540U (en) 2010-04-16 2010-04-16 Accurate sample frame for underground workshop palisades crane beam excavating drilling

Publications (1)

Publication Number Publication Date
CN201627540U true CN201627540U (en) 2010-11-10

Family

ID=43058933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201612623U Expired - Fee Related CN201627540U (en) 2010-04-16 2010-04-16 Accurate sample frame for underground workshop palisades crane beam excavating drilling

Country Status (1)

Country Link
CN (1) CN201627540U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979458A (en) * 2012-12-13 2013-03-20 中国水利水电第十四工程局有限公司 Rock wall beam oblique surface smooth blasting punching guiding and positioning device
CN108590537A (en) * 2018-04-26 2018-09-28 中国水利水电第四工程局有限公司 The quick-fried borehole accuracy of light controls fixed structure
CN109750987A (en) * 2019-02-15 2019-05-14 中国三峡建设管理有限公司 Bottom plate Excavation Blasting control device and application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979458A (en) * 2012-12-13 2013-03-20 中国水利水电第十四工程局有限公司 Rock wall beam oblique surface smooth blasting punching guiding and positioning device
CN108590537A (en) * 2018-04-26 2018-09-28 中国水利水电第四工程局有限公司 The quick-fried borehole accuracy of light controls fixed structure
CN109750987A (en) * 2019-02-15 2019-05-14 中国三峡建设管理有限公司 Bottom plate Excavation Blasting control device and application method

Similar Documents

Publication Publication Date Title
CN103791159A (en) Pipe-jacking construction method for small-diameter pipes
CN103321629A (en) Method for predicting coal mine underground directional drilling trajectory
CN101775988A (en) Method for constructing from inclined shaft to main tunnel in weak surrounding rock
CN201627540U (en) Accurate sample frame for underground workshop palisades crane beam excavating drilling
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
Ningping et al. Status and development of directional drilling technology in coal mine
CN109238161A (en) A kind of observation device and observation method of tunnel surface absolute convergence amount
CN105133624A (en) Double-row pile support structure
CN108150101A (en) A kind of pipeline three-dimensional construction method for crossing
CN101737059A (en) Advancing construction method of long tube shed
CN106968686A (en) A kind of pipe shed construction method
CN113338921B (en) Shale oil horizontal well track control method
JP2009174178A (en) Method of constructing underground structure
CN104453705A (en) Secondary forming method for large-hole-diameter cast-in-place pile rotary drilling rig
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN202659146U (en) Double-drilling combined drill structure suitable for drilling operation of oil well and horizontal well
CN104912093A (en) Deepwater pile foundation positioning and guiding structure and construction method
CN208346822U (en) grouting device
CN108755693B (en) Grouting device and in-hole sectional grouting method for multiple karst caves
CN108755694B (en) Slurry stopper and full-hole grouting method for multiple karst caves
CN114909119B (en) Drilling method for converting original vertical well or inclined well into U-shaped geothermal well with ultra-short radius
CN109989710A (en) High-precision heavy-caliber horizontal resistance force method
CN205049135U (en) Solve inclinometer card gauge head unit
CN108825134A (en) A kind of drill bit guidance system and arc large scale piperoof construction method
CN203429639U (en) Soft soil layer digging pile construction protective structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101110

Termination date: 20180416

CF01 Termination of patent right due to non-payment of annual fee