CN201614726U - Boring device of top plate - Google Patents

Boring device of top plate Download PDF

Info

Publication number
CN201614726U
CN201614726U CN2009202887508U CN200920288750U CN201614726U CN 201614726 U CN201614726 U CN 201614726U CN 2009202887508 U CN2009202887508 U CN 2009202887508U CN 200920288750 U CN200920288750 U CN 200920288750U CN 201614726 U CN201614726 U CN 201614726U
Authority
CN
China
Prior art keywords
rod
quarter butt
hinged
working beam
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202887508U
Other languages
Chinese (zh)
Inventor
胡育华
赵华东
许基
张新志
蔡晓波
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2009202887508U priority Critical patent/CN201614726U/en
Application granted granted Critical
Publication of CN201614726U publication Critical patent/CN201614726U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a construction device used for boring a top plate, in particular to a boring device of the top plate. The boring device is characterized by comprising a parallelogram mechanism, a force-applying rod and an electric hammer; the parallelogram mechanism comprises a supporting rod, a first short rod, a second short rod and a working rod, wherein the right end part of the first short rod is hinged with the upper part of the supporting rod; the left end part of the first short rod is hinged with the lower end part of the working rod; the second short rod is arranged above the first short rod; the right end part of the second short rod is hinged with the upper end part of the supporting rod; the left end part of the second short rod is hinged with the lower part of the working rod; the left part of the force-applying rod is arranged between the first short rod and the second short rod; the left part of the force-applying rod is hinged with the upper part of the supporting rod and the lower part of the working rod respectively; and the electric hammer is fixed on the upper end part of the working rod of the parallelogram mechanism. The boring device has the advantages of simple structure and convenient use.

Description

The top board drilling equipment
Technical field
The utility model relates to a kind of construction equipment to top board boring.
Background technology
At present, hand-held electric hammer of operator or electric drill construction on indoor and outdoor top board boring many employings double ladder or scaffold, the steelframe adopt double ladder construction danger big, adopt scaffold, steelframe construction cost height, move inconvenience.No matter the dust (bits) that adopts the sort of method construction drill to produce all causes great harm to the operator.
Summary of the invention
The purpose of this utility model is to provide a kind of top board drilling equipment simple in structure, easy to use.
To achieve these goals, the technical solution of the utility model is: the top board drilling equipment is characterized in that it comprises parallel-crank mechanism, boosting-rod, electric hammer; Parallel-crank mechanism comprises support bar, first quarter butt, second quarter butt, working beam, the right part of first quarter butt and the upper articulation of support bar, the left part of first quarter butt and the bottom of working beam are hinged, second quarter butt is positioned at the top of first quarter butt, the right part of second quarter butt and the upper end of support bar are hinged, the left part of second quarter butt and the lower hinge of working beam; The left part of boosting-rod between first quarter butt and second quarter butt, the left part of boosting-rod respectively with the top of support bar, the lower hinge of working beam, electric hammer is fixed on the upper end of the working beam of parallel-crank mechanism.
The beneficial effects of the utility model are:
1, parts are few, and are simple in structure.Cost is low, and manufacturing materials flitch, bolt scene are easy to find, and makes according to different height and regulates.
2, easy to use, flexibility is good.Whole device only needs several rods and bolt promptly to can be made into, and in light weight, a people can operate.
3, do not take ground space, safe and reliable.Without double ladder, without scaffold, steelframe, need not hand operation, avoid dust (bits) injury.
4, applied widely.Be applicable to decorate furred ceiling, electric etc. need be at the All Jobs of top boring.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure: 1-support bar, 2-first quarter butt, 3-second quarter butt, 4-working beam, 5-bolt, 6-boosting-rod, 7-electric hammer, the top board that 8-is to be holed, 9-ground.
The specific embodiment
As shown in Figure 1, the top board drilling equipment, it comprises parallel-crank mechanism, boosting-rod 6, electric hammer 7; Parallel-crank mechanism comprises support bar 1, first quarter butt 2, second quarter butt 3, working beam 4, support bar 1, first quarter butt 2, second quarter butt 3, working beam 4, boosting-rod 6 all adopt timber, the upper articulation of the right part of first quarter butt 2 and support bar 1 (the hinged bolt 5 that all adopts is hinged), the bottom of the left part of first quarter butt 2 and working beam 4 is hinged, second quarter butt 3 is positioned at the top of first quarter butt 2, the upper end of the right part of second quarter butt 3 and support bar 1 is hinged, the lower hinge of the left part of second quarter butt 3 and working beam 4; The left part of boosting-rod 6 between first quarter butt 2 and second quarter butt 3, the left part of boosting-rod 6 respectively with the top of support bar 1, the lower hinge of working beam 4, electric hammer 7 fixing (fixing with rope system or bolt etc.) is in upper end of the working beam 4 of parallel-crank mechanism.
The size of parallel-crank mechanism and size can according to electric hammer weight, top board height, drilling depth size, be convenient to the operation determine that specifically boosting-rod can be grown so that laborsaving slightly.The state that the electric hammer switch is in out is reset a switch at the right part of boosting-rod, can a people during operation an independent or people hold up support bar one people to press boosting-rod two people operation.Support bar land (being positioned at ground 9) support whole device, parallel-crank mechanism guarantees that working beam and support bar are in same plane motion, boosting-rod be used to apply power upwards guarantee boring deeply (right part of boosting-rod with hand when pressing down, working beam 4 is being with electric hammer 7 upwards to rise, to top board to be holed 8 borings).

Claims (1)

1. the top board drilling equipment is characterized in that it comprises parallel-crank mechanism, boosting-rod (6), electric hammer (7); Parallel-crank mechanism comprises support bar (1), first quarter butt (2), second quarter butt (3), working beam (4), the upper articulation of the right part of first quarter butt (2) and support bar (1), the bottom of the left part of first quarter butt (2) and working beam (4) is hinged, second quarter butt (3) is positioned at the top of first quarter butt (2), the upper end of the right part of second quarter butt (3) and support bar (1) is hinged, the lower hinge of the left part of second quarter butt (3) and working beam (4); The left part of boosting-rod (6) is positioned between first quarter butt (2) and second quarter butt (3), the left part of boosting-rod (6) respectively with the top of support bar (1), the lower hinge of working beam (4), electric hammer (7) is fixed on the upper end of the working beam (4) of parallel-crank mechanism.
CN2009202887508U 2009-12-04 2009-12-04 Boring device of top plate Expired - Fee Related CN201614726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202887508U CN201614726U (en) 2009-12-04 2009-12-04 Boring device of top plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202887508U CN201614726U (en) 2009-12-04 2009-12-04 Boring device of top plate

Publications (1)

Publication Number Publication Date
CN201614726U true CN201614726U (en) 2010-10-27

Family

ID=43001097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202887508U Expired - Fee Related CN201614726U (en) 2009-12-04 2009-12-04 Boring device of top plate

Country Status (1)

Country Link
CN (1) CN201614726U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051975A (en) * 2010-11-22 2011-05-11 中建三局建设工程股份有限公司 Lever type high-altitude borer
CN102296932A (en) * 2011-05-18 2011-12-28 常熟市金龙装饰有限责任公司 Floor type indoor ceiling concrete slab bottom drilling mechanism
CN111155748A (en) * 2020-01-04 2020-05-15 李爱莲 Quick jacking device for mounting building gypsum boards
CN111195739A (en) * 2018-11-20 2020-05-26 中建材创新科技研究院有限公司 Supplementary high altitude drilling mechanism
CN112476794A (en) * 2020-11-19 2021-03-12 中铁建工集团山东有限公司 High-altitude top plate drilling device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051975A (en) * 2010-11-22 2011-05-11 中建三局建设工程股份有限公司 Lever type high-altitude borer
CN102296932A (en) * 2011-05-18 2011-12-28 常熟市金龙装饰有限责任公司 Floor type indoor ceiling concrete slab bottom drilling mechanism
CN102296932B (en) * 2011-05-18 2012-11-07 常熟市金龙装饰有限责任公司 Floor type indoor ceiling concrete slab bottom drilling mechanism
CN111195739A (en) * 2018-11-20 2020-05-26 中建材创新科技研究院有限公司 Supplementary high altitude drilling mechanism
CN111155748A (en) * 2020-01-04 2020-05-15 李爱莲 Quick jacking device for mounting building gypsum boards
CN111155748B (en) * 2020-01-04 2021-06-15 嘉兴德基机械设计有限公司 Quick jacking device for mounting building gypsum boards
CN112476794A (en) * 2020-11-19 2021-03-12 中铁建工集团山东有限公司 High-altitude top plate drilling device

Similar Documents

Publication Publication Date Title
CN201614726U (en) Boring device of top plate
CN201664775U (en) Long-distance drilling device of top plate
CN103611967B (en) A kind of elevation type percussion drill auxiliary support apparatus
CN109940706A (en) A kind of wood furniture factory lumber drilling device
CN204736279U (en) Plank flattens, drilling equipment
CN202578536U (en) Adjustable support for perforating floor
CN204152417U (en) A kind of removable hanging ladder
CN110893606B (en) Hydraulic wrench lifting device
CN204843050U (en) High altitude drilling equipment
CN216913730U (en) Support device for upward vertical hole forming of electric drill
CN213827159U (en) Simple punching device for top plate hanging hole
CN201940984U (en) Support frame of electric hammer
CN211803983U (en) Simple and easy drilling tool for raising and planting bars
CN214920682U (en) High-efficient perforating device suitable for furniture board
CN201943589U (en) Top plate drilling mould
CN203526628U (en) Lifting-type auxiliary support device of percussion drill
CN205057125U (en) Indoor roof bar planting drilling tool
CN203412518U (en) Indoor ceiling drilling device capable of freely adjusting drilling height
CN203583897U (en) Rebar-planting portable support
CN203863076U (en) Roof drilling device for suspended ceiling for lifting roofs
CN202125060U (en) Simple punching frame
CN203248090U (en) Adjustable supporting frame used for top drilling
CN204800006U (en) Ceiling drilling appurtenance
CN105252041A (en) Portable assistance supporting frame suitable for overhead operation
CN204621989U (en) Concrete roof electric hammer support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101027

Termination date: 20171204