CN201610628U - Stone laying leveling device - Google Patents
Stone laying leveling device Download PDFInfo
- Publication number
- CN201610628U CN201610628U CN2009202103172U CN200920210317U CN201610628U CN 201610628 U CN201610628 U CN 201610628U CN 2009202103172 U CN2009202103172 U CN 2009202103172U CN 200920210317 U CN200920210317 U CN 200920210317U CN 201610628 U CN201610628 U CN 201610628U
- Authority
- CN
- China
- Prior art keywords
- plastic
- stone
- base
- belt body
- plastic tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/0092—Separate provisional spacers used between adjacent floor or wall tiles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The utility model relates to the field of building material pavement, in particular to a stone laying leveling device comprising a plastic strip and a plastic base, wherein the plastic tape consists of a strip body and a base at the bottom of the strip body; the strip body upwards passes out from a gap between two adjacent leveling stones and is clamped from two sides by the two leveling stones; the base is left below the stones; the bottom surface of the plastic base is a plane; a middle shaft of the plastic base is provided with a through hole vertical to the bottom surface; the strip body of the plastic strip upwards passes out from the through hole; the strip body is clamped by a forceps holder and pulled to lead the strip body to be frapped on the upper surface of the base to be clung to the lower surfaces of the two leveling stones, simultaneously, the plastic base is tightly pressed on the upper surface of the stones; and after two adjacent stones are firmly connected, the plastic strip is pulled cut by the forceps holder and the plastic base is removed. The device has simple structure, easy manufacturing and low cost, can be widely applied to the laying of all types of stones, improve laying efficiency and save working hours, only needs one-time laying, and avoids unnecessary pollution, and construction trace does not exist after finishing the laying.
Description
Technical field
The utility model relates to the building materials field of mating formation, and is a kind of stone laying leveling unit, is particularly useful for the good artificial stone of thickness evenness and lays.
Background technology
Along with people to the improving constantly of environmental requirement in the residence, room, stone material is owing to itself have elegant and poised makings, and long-lived characteristics, has become the common used material in the architectural decoration.Nowadays, artificial stone's application is extensive further, not only because its price has a clear superiority in than lithotome, and because it adopts the processing mode of Artificial Control composition, aberration is little, thickness evenness good, be fit to large tracts of land lays, and makes it be applied to flow of personnel places with dense such as hall, hotel, auditorium conference room, office space more and more.
The whole process of tradition stone laying generally includes following steps:
On the ground of level, use the half-dried and soft cement mortar of mixture layer overlay of cement and sand earlier, again stone material is placed on it, adjust height, then stone material is taken off, on cement mortar, spill one deck again and be used for bonding cement flour, make cement flour keep moistening, spread stone material once more, beat with hand-held tools such as rubber hammers, make stone material fully with cement mortar fits tightly and while level of corrections degree.If there is one or more stone material not to be in same level, then need it is taken off, adjust level once more, whole levelling pavement process is very loaded down with trivial details, wastes time and energy, and is badly in need of the leveling unit assistance easily of a kind of novelty and mats formation.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of leveling unit that can lay stone material quickly and effectively, lays efficient to improve, and reduces the cost of production of leveling unit.
The utility model solves the problems of the technologies described above the technical scheme of being taked: a kind of stone laying leveling unit, comprise plastic tape and plastic seat, wherein, described plastic tape is made of the base of belt body and belt body bottom, belt body upwards passes from the slit of adjacent two blocks of levelling stone materials, and clamped from both sides by two blocks of levelling stone materials, base is stayed the below of stone material; The bottom surface of described plastic seat is the plane, is provided with a through hole vertical with the bottom surface at the middle shaft part of plastic seat, and the plastic tape belt body upwards passes from this through hole; Live belt body and lift its soffit that is tightened to base upper surface and two blocks of levelling stone materials is fitted with clamp, simultaneously plastic seat is pressed on the stone material upper surface, after adjacent two blocks of stone materials were connected firmly, clamping clip was removed plastic seat after breaking plastic tape.
Stone material leveling unit of the present utility model provides a kind of brand-new stone material pattern of mating formation:
On the ground of level, use the half-dried and soft cement mortar of mixture layer overlay of cement and sand earlier, again cement mortar is evenly spread upon the stone material back side, directly lay, base from the side of stone material with plastic tape inserts, make the upper surface of base be close to the bottom surface of stone material, be close to the side of stone material with seasonal belt body; One side that second block of stone material and first block of stone material have been placed plastic tape splicing of aliging makes the side of second block of stone material also be close to belt body, guarantees the spacing of stone material; Again with plastic seat cover on the belt body of plastic tape, and the bottom surface of plastic seat is close on the stone material; Clamp belt body with clamping clip, upwards lift and tighten up, make the bottom surface of plastic seat and the base of plastic tape clamp middle stone material from both sides, realize levelling; Treat the cement mortar drying, after stone material is connected and fixed, belt body is broken, take off plastic seat and finish laying with clamping clip.
Compare traditional laying method, use after this leveling unit, the working time shortens greatly, and constructor's degree of fatigue greatly reduces, and obviously plays the effect of raising labour productivity, and tangible practicality and economic advantages are arranged.
On the basis of such scheme, plastic tape has certain intensity, in order to guarantee when twisting into two parts belt body, not have in the slit that the part belt body remains in two blocks of stone materials, expose outside the slit even, described plastic tape forms the strength weak point of plastic tape at the tie point place of belt body and base, after removing belt body and plastic seat, guarantee the aesthetics of stone material seam crossing thus.
In addition, when being applied to the artificial stone, because artificial stone's thickness is less, plastic tape belt body part height can reduce, because the artificial stone is light than lithotome, can reduce the thickness of plastic tape again, required pulling force when helping reducing to break plastic tape, play the minimizing material usage simultaneously, save the effect of cost.
On the basis of such scheme, for guarantee plastic seat cover on the plastic tape belt body back both can in conjunction with, the inboard of described plastic seat through hole is provided with the metal tongue, the belt body of this metal tongue and plastic tape fastens firm.
On the basis of such scheme, after described plastic seat and plastic tape tightened up, the upper surface of the bottom surface of plastic seat and plastic tape base was two parallel surfaces, with in the middle of two blocks of levelling stone materials are clamped in, and the planarization of the stone material that further guarantees to mat formation.
On the basis of such scheme, the utility model adopts special tool clamping clip clamping belt body, and described clamping clip comprises two pincers sheets that are pivoted and connect, be provided with spring between the two pincers sheets, wherein, the front end of following pincers sheet is provided with a horizontal plane, and this horizontal plane is pressed on plastic seat on the stone material downwards; The front end of upper pliers plate is provided with outer retaining part, also be pivoted with a rotatable screw die on the upper pliers plate, the front end of screw die forms the inner retaining part corresponding with outer retaining part, the inboard of screw die is provided with a reed that inside and outside clamping part is drawn close mutually, when clamping clip is not worked, the bottom of screw die is replaced with the horizontal plane that clamps sheet down, reed is in tensioning state, when clamping clip is worked, the bottom of screw die and the horizontal plane disengaging of pincers sheet down, reed extrapolation screw die, inside and outside clamping part will clamp from the plastic tape belt body that passes therebetween.
On the basis of such scheme, be easier to clamp belt body in order to make clamping clip, described inner retaining part is provided with most teeth, and enough friction grip power is provided.
Advantage of the present utility model is:
1, a whole set of leveling unit of the present utility model is saved material, and is simple in structure, and convenient processing and manufacture also can be processed in enormous quantities, and is with low cost;
2, adopt the levelling principle of physics levelling, practical, can be widely used in various stone laying;
3, easy to use, realize once-paving, save with the artificial levelling of rubber hammer stone material, improved operating efficiency greatly, save man-hour, alleviated construction workman's degree of fatigue, reduced cost of labor, the hommization more of whole pavement process;
Only need once-paving when 4, laying, avoided unnecessary pollution fully, lay and finish the back without any the vestige of constructing.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of the utility model plastic tape.
Fig. 2 is the side-looking structural representation of the utility model plastic tape.
Fig. 3 is the plan structure schematic diagram of the utility model plastic tape.
Fig. 4 is the main TV structure schematic diagram of the utility model plastic seat.
Fig. 5 is the A-A sectional view of Fig. 4.
Fig. 6 is the exploded view of the utility model clamping clip pincers sheet.
Fig. 7 is the assembling drawing of the utility model clamping clip off working state.
Fig. 8 is the B portion enlarged drawing of Fig. 7.
Fig. 9 is the assembling drawing of the utility model clamping clip duty.
Figure 10 is the C portion enlarged drawing of Fig. 9.
Figure 11 is the package assembly schematic diagram in the utility model leveling system pavement process.
Figure 12 lays structural representation after finishing for the utility model leveling system.
1-plastic tape 11-belt body 12-base
The A-tie point
2-plastic seat 21-through hole 22-metal tongue
3,3 '-levelling stone material 4-cement mortar 5-concrete base layer
The 6-clamping clip
61-is pincers sheet 611-horizontal plane 612-lower spring cup down
62-upper pliers plate 621-outer retaining part 622-upper spring seat
623-is salient point fixedly
The 63-stage clip
64-screw die 641-inner retaining part
The 65-reed
The rotating shaft of 66-screw die
The specific embodiment
See also the main TV structure schematic diagram of Fig. 1 the utility model plastic tape, the side-looking structural representation of Fig. 2 the utility model plastic tape, the plan structure schematic diagram of Fig. 3 the utility model plastic tape, the main TV structure schematic diagram of Fig. 4 the utility model plastic seat, Fig. 5 is that A-A sectional view and Figure 11 of Fig. 4 is the package assembly schematic diagram in the utility model leveling system pavement process, a kind of stone laying leveling installation system comprises plastic tape 1, plastic seat 2 and clamping clip 6, wherein:
Described plastic tape 1 usefulness modification of nylon (GXNL) is processed into, the base 12 of flat belt body 11 of reason and belt body bottom constitutes, belt body 11 is from adjacent two blocks of levelling stone materials 3, upwards pass in 3 ' the slit, and by two blocks of levelling stone materials 3,3 ' from the both sides clamping, and base 12 is stayed the below of stone material, at the strength weak point of belt body 11 with the tie point A place formation plastic tape 1 of base 12;
The bottom surface of described plastic seat 2 is the plane, place two blocks of levelling stone materials 3,3 ' top, middle shaft part at plastic seat 2 is provided with a through hole 21 vertical with the bottom surface, the inboard of through hole 21 is provided with metal tongue 22, plastic tape belt body 11 upwards passes from this through hole 21, and this metal tongue 22 fastens firmly with the belt body 11 of plastic tape;
See also the exploded view of Fig. 6 for the utility model clamping clip pincers sheet, Fig. 7 is the assembling drawing of the utility model clamping clip off working state, Fig. 8 is the B portion enlarged drawing of Fig. 7, Fig. 9 is that assembling drawing and Figure 10 of the utility model clamping clip duty is shown in the C portion enlarged drawing of Fig. 9, described clamping clip 6 comprises two following pincers sheets 61 that are pivoted and connect, upper pliers plate 62, under clamp sheet 61 and be provided with lower spring cup 612, upper pliers plate 62 is provided with upper spring seat 622, stage clip 63 is inserted in respectively on lower spring cup 612 and the upper spring seat 622, the front end that clamps sheet 61 down is provided with a horizontal plane 611, this horizontal plane 611 is pressed on stone material 3 downwards with plastic seat 2, on 3 '; After clamping, provide restoring force by this stage clip 63, wherein,
The front end of upper pliers plate 62 is provided with outer retaining part 621, on upper pliers plate 62, also be pivoted with the screw die 64 of winding board tooth rotating shaft 66 rotations, the front end of screw die 64 forms the inner retaining part 641 corresponding with outer retaining part, reed 65 winding board tooth rotating shafts 66 bendings, reed 65 is replaced with the fixedly salient point 623 that is located on the upper pliers plate 62 on one side, the another side of reed 65 and screw die 64 are replaced, and make inner retaining part 641 and outer retaining part 621 be tending towards mutually drawing close; When clamping clip 6 is not worked, the bottom of screw die 64 is replaced with the horizontal plane 611 that clamps sheet 61 down, reed 65 is in tensioning state, when clamping clip is worked, the bottom of screw die 64 and horizontal plane 611 disengagings of pincers sheet 61 down, reed 65 stretches extrapolation screw die 64, and inside and outside clamping part 641,621 will be clamped from the belt body 11 that passes therebetween.
On described inner retaining part 641, be provided with most teeth, be difficult for getting loose after being held with the protection belt body.
See also Figure 12 and lay structural representation after finishing for the utility model leveling system, clamping clip 6 is clamped the plastic tape belt body 11 that upwards passes from plastic seat through hole 21 tightens up it, and simultaneously plastic seat 2 is pressed on the stone material 3, after adjacent two blocks of stone materials 3 are connected firmly, lift disconnected plastic tape 1 back on the clamping clip 6 and remove plastic seat 2.
Claims (6)
1. stone laying leveling unit, comprise plastic tape and plastic seat, it is characterized in that: described plastic tape is made of the base of belt body and belt body bottom, and belt body upwards passes from the slit of adjacent two blocks of levelling stone materials, and clamped from both sides by two blocks of levelling stone materials, base is stayed the below of stone material; The bottom surface of described plastic seat is the plane, is provided with a through hole vertical with the bottom surface at the middle shaft part of plastic seat, and the plastic tape belt body upwards passes from this through hole.
2. stone laying leveling unit according to claim 1 is characterized in that: described plastic tape forms the strength weak point of plastic tape at the tie point place of belt body and base.
3. stone laying leveling unit according to claim 1 is characterized in that: be provided with the metal tongue in the inboard of described plastic seat through hole, the belt body of this metal tongue and plastic tape fastens firmly.
4. according to claim 1 or 3 described stone laying leveling units, it is characterized in that: after described plastic seat and plastic tape tightened up, the upper surface of the bottom surface of plastic seat and plastic tape base was two parallel surfaces, in the middle of two blocks of levelling stone materials are clamped in.
5. stone laying leveling unit according to claim 1, it is characterized in that: described clamping clip comprises two pincers sheets that are pivoted and connect, and is provided with spring between the two pincers sheets, wherein, the front end that clamps sheet down is provided with a horizontal plane, and this horizontal plane is pressed on plastic seat on the stone material downwards; The front end of upper pliers plate is provided with outer retaining part, also is pivoted with a rotatable screw die on the upper pliers plate, and the front end of screw die forms the inner retaining part corresponding with outer retaining part, and the inboard of screw die is provided with a reed that inside and outside clamping part is drawn close mutually.
6. stone laying leveling unit according to claim 5 is characterized in that: described inner retaining part is provided with most teeth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202103172U CN201610628U (en) | 2009-09-28 | 2009-09-28 | Stone laying leveling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202103172U CN201610628U (en) | 2009-09-28 | 2009-09-28 | Stone laying leveling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201610628U true CN201610628U (en) | 2010-10-20 |
Family
ID=42961260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202103172U Expired - Fee Related CN201610628U (en) | 2009-09-28 | 2009-09-28 | Stone laying leveling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201610628U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775602A (en) * | 2015-04-16 | 2015-07-15 | 新中源建材有限公司 | Brick paving method and special brick paving clamp |
CN105822051A (en) * | 2016-05-10 | 2016-08-03 | 佛山市东鹏陶瓷有限公司 | Ceramic tile leveling adjustment block and ceramic tile pavement system and method employing same |
-
2009
- 2009-09-28 CN CN2009202103172U patent/CN201610628U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775602A (en) * | 2015-04-16 | 2015-07-15 | 新中源建材有限公司 | Brick paving method and special brick paving clamp |
CN105822051A (en) * | 2016-05-10 | 2016-08-03 | 佛山市东鹏陶瓷有限公司 | Ceramic tile leveling adjustment block and ceramic tile pavement system and method employing same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209261127U (en) | Stone moulds stone composite floor | |
CN204001325U (en) | Artificial flat-plate stone and curtain wall thereof easy for installation | |
CN201610628U (en) | Stone laying leveling device | |
CN112110301A (en) | Method for laying composite geomembrane for building construction | |
CN201614727U (en) | Stone paving leveling device | |
CN202380694U (en) | Plastering board dedicated to splits | |
CN110835996A (en) | A buckle device for timber apron installation | |
CN101696600A (en) | Stone laying and leveling installation system and laying method | |
CN203867143U (en) | Ground tile and connecting structure thereof | |
CN113431099B (en) | Clamp for laying waterproof coiled material and construction method of waterproof coiled material at brick bed die position | |
CN203867134U (en) | Structure of indoor tile floor | |
CN210421798U (en) | Assembling autoclaved aerated concrete heat preservation heating plate | |
CN105239751B (en) | A kind of combined type floor tile of easily draining | |
CN209603456U (en) | Ceramic tile smoothing pad and its auxiliary tool | |
CN202787708U (en) | Simulated thatch roof | |
CN219315442U (en) | Building concrete slab dividing strip | |
CN107386578B (en) | A kind of method for paving floor boards | |
CN207332209U (en) | A kind of Integral floor system | |
CN110318522A (en) | A kind of quick paving structure of compound ceramic tile | |
CN204238108U (en) | A kind of concrete surface plucking trowel | |
CN213464663U (en) | Carpet fixation clamp structure | |
CN213952775U (en) | Aluminium honeycomb decorative board and wallboard | |
CN204386090U (en) | Wall hanging connector for fastening boards | |
CN210508294U (en) | Supplementary component that levels of floor tile | |
CN209924495U (en) | Civil engineering construction support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101020 Termination date: 20150928 |
|
EXPY | Termination of patent right or utility model |