CN201609621U - Spray tower for gas dry dedusting - Google Patents

Spray tower for gas dry dedusting Download PDF

Info

Publication number
CN201609621U
CN201609621U CN2010201017717U CN201020101771U CN201609621U CN 201609621 U CN201609621 U CN 201609621U CN 2010201017717 U CN2010201017717 U CN 2010201017717U CN 201020101771 U CN201020101771 U CN 201020101771U CN 201609621 U CN201609621 U CN 201609621U
Authority
CN
China
Prior art keywords
tower body
spray
gas
water
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201017717U
Other languages
Chinese (zh)
Inventor
俞樟勇
敖爱国
张焕荣
杨建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN2010201017717U priority Critical patent/CN201609621U/en
Application granted granted Critical
Publication of CN201609621U publication Critical patent/CN201609621U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

煤气干法除尘的喷淋塔,其包括,塔体,其一侧面设有接煤气管道的煤气入口,塔体顶部设煤气出口;塔体内上部设至少两层填料层,塔体内下部设排水斗;至少三层喷水结构,每层喷水结构包括环形水管、设置于环形水管上的若干喷枪;环形水管环设于塔体外侧,喷枪喷水端穿过塔体对应塔体内;各环形水管分别连接给水管道;给水管道上设置了流量计及控制阀门;排水密封罐,设置于塔体的排水侧,通过管道连接塔体内下部的排水斗。本实用新型解决了煤气干法除尘工艺弊端对净煤气管道及后续煤气用户设备的不良影响。

Figure 201020101771

A spray tower for gas dry dedusting, which includes a tower body, a gas inlet connected to a gas pipeline on one side, a gas outlet on the top of the tower body; at least two layers of packing layers are arranged on the upper part of the tower body, and a drainage bucket is arranged on the lower part of the tower body ; at least three layers of water spray structure, each layer of water spray structure includes an annular water pipe, a number of spray guns arranged on the annular water pipe; the annular water pipe ring is set outside the tower body, and the water spray end of the spray gun passes through the corresponding tower body of the tower body; each annular water pipe The water supply pipes are respectively connected; the water supply pipes are provided with flowmeters and control valves; the drainage sealing tank is arranged on the drainage side of the tower body, and is connected to the drainage bucket at the lower part of the tower body through pipes. The utility model solves the bad influence of the disadvantages of the gas dry dedusting process on the clean gas pipeline and subsequent gas user equipment.

Figure 201020101771

Description

煤气干法除尘的喷淋塔 Spray tower for gas dry dedusting

技术领域technical field

本实用新型涉及煤气净化设备,特别涉及适用于特大型高炉煤气干法除尘的喷淋塔。The utility model relates to gas purification equipment, in particular to a spray tower suitable for dry dust removal of extra-large blast furnace gas.

背景技术Background technique

高炉煤气是高炉炼铁生产的重要副产品,可作为钢铁联合企业中其他流程的廉价高效的燃料。高炉煤气从炉顶上升管经下降管进入重力除尘器,粗煤气中约40%的大颗粒灰尘留在重力除尘器中通过排灰机排出。经过最初处理的荒煤气进入后续煤气净化工艺设备中进行处理,要求处理完的净煤气含尘量小于5mg/NM3Blast furnace gas is an important by-product of blast furnace ironmaking and serves as an inexpensive and efficient fuel for other processes in iron and steel complexes. Blast furnace gas enters the gravity dust collector from the furnace top ascending pipe through the downcomer, and about 40% of the large particle dust in the crude gas remains in the gravity dust collector and is discharged through the ash discharger. The initially treated raw gas enters the subsequent gas purification process equipment for treatment, and the dust content of the treated clean gas is required to be less than 5mg/NM 3 .

现有的煤气净化工艺设备分为2大类,一类是煤气湿法清洗工艺,比较典型的是双文洗涤塔,还有目前使用较多的环缝洗涤工艺。另一类是煤气干法除尘工艺,最常用的是布袋除尘。The existing gas purification process equipment is divided into two categories, one is the gas wet cleaning process, the typical one is the Shuangwen scrubber, and the ring seam scrubbing process is currently used more. The other is the gas dry dedusting process, the most commonly used is bag dedusting.

煤气湿法清洗和煤气干法除尘工艺各有优缺点:Gas wet cleaning and gas dry dedusting processes have their own advantages and disadvantages:

煤气湿法清洗系统,设备维修费用比较低,维修工作量小,但整个煤气湿法洗涤系统占地面积大,运行需要多台大功率水泵不停的供水,消耗工业新水多,而且洗涤煤气的水处理比较困难,污泥输送管道容易磨损堵塞,运行费用较高,高温煤气经过清洗后显热明显下降,降低了余压发电系统的发电能力。而且湿法清洗后的煤气中机械水和灰尘的含量比干法除尘高许多,不利于煤气用户的使用。The gas wet cleaning system has relatively low equipment maintenance costs and a small maintenance workload, but the entire gas wet cleaning system occupies a large area and requires multiple high-power water pumps to supply water continuously, consuming a lot of industrial fresh water, and cleaning the gas. Water treatment is difficult, the sludge conveying pipeline is easy to wear and block, and the operating cost is high. After the high-temperature gas is cleaned, the sensible heat decreases significantly, which reduces the power generation capacity of the residual pressure power generation system. Moreover, the content of mechanical water and dust in the gas after wet cleaning is much higher than that of dry dust removal, which is not conducive to the use of gas users.

煤气干法除尘系统,总体来说占地面积较小,消耗工业新水少,除尘后的煤气含尘量低,煤气温度高,余压发电系统的发电能力高。缺点是后期设备维修费用较高,尤其致命的是经过除尘的煤气中有害离子如氯离子、硫酸根离子仍然残留在煤气中,在低温煤气管段会因为煤气冷凝水析出而形成酸性腐蚀性介质,对煤气管道和煤气用户设备造成损害。The coal gas dry dust removal system generally occupies a small area, consumes less industrial fresh water, the dust content of the gas after dust removal is low, the gas temperature is high, and the power generation capacity of the residual pressure power generation system is high. The disadvantage is that the equipment maintenance cost is higher in the later period, especially fatal is that harmful ions such as chloride ions and sulfate ions in the gas after dedusting still remain in the gas, and acidic corrosive media will be formed due to the precipitation of gas condensate in the low-temperature gas pipeline section. Damage to gas pipelines and gas user equipment.

从节能环保角度考虑,煤气干法除尘工艺正日渐成为大型高炉煤气净化的首选工艺,其本身的工艺缺陷也不断地凸显出来。From the perspective of energy saving and environmental protection, the gas dry dedusting process is gradually becoming the preferred process for large-scale blast furnace gas purification, and its own process defects are also constantly highlighted.

发明内容Contents of the invention

本实用新型的目的在于设计一种煤气干法除尘的喷淋塔,解决煤气干法除尘工艺弊端对净煤气管道及后续煤气用户设备的不良影响。The purpose of this utility model is to design a spray tower for gas dry dedusting, so as to solve the adverse effects of the drawbacks of the gas dry dedusting process on the clean gas pipeline and subsequent gas user equipment.

为达到上述目的,本实用新型的技术方案:In order to achieve the above object, the technical scheme of the utility model:

煤气干法除尘的喷淋塔,其包括,塔体,其一侧面设有接煤气管道的煤气入口,塔体顶部设煤气出口;塔体内上部设至少两层填料层,塔体内下部设排水斗;至少三层喷水结构,每层喷水结构包括环形水管、设置于环形水管上的若干喷枪;环形水管环设于塔体外侧,喷枪喷水端穿过塔体对应塔体内;各环形水管分别连接给水管道;给水管道上设置了流量计及控制阀门;排水密封罐,设置于塔体的排水侧,通过管道连接塔体内下部的排水斗。A spray tower for gas dry dust removal, which includes a tower body, a gas inlet connected to a gas pipeline on one side, a gas outlet on the top of the tower body; at least two layers of packing layers are arranged on the upper part of the tower body, and a drainage bucket is arranged on the lower part of the tower body ; at least three layers of water spray structure, each layer of water spray structure includes an annular water pipe, a number of spray guns arranged on the annular water pipe; the annular water pipe ring is set outside the tower body, and the water spray end of the spray gun passes through the corresponding tower body of the tower body; each annular water pipe The water supply pipes are respectively connected; the water supply pipes are provided with flowmeters and control valves; the drainage sealing tank is arranged on the drainage side of the tower body, and is connected to the drainage bucket at the lower part of the tower body through pipes.

进一步,所述的塔体的内径是煤气管道内径的3倍。Further, the inner diameter of the tower body is three times the inner diameter of the gas pipeline.

又,所述的喷枪通过法兰与喷淋塔塔体连接。Also, the spray gun is connected to the spray tower body through a flange.

所述的环形水管上分别设置控制阀门。The annular water pipes are respectively provided with control valves.

所述的给水管道上设置了U型水封管。A U-shaped water seal pipe is arranged on the water supply pipeline.

所述的塔体设计有可稳定地安装在基础上的自支撑结构,。The tower is designed with a self-supporting structure that can be stably installed on the foundation.

另外,本实用新型所述的塔体上还设置了便于对内部进行检查和更换填料作业的检修人孔。In addition, the tower body described in the utility model is also provided with a maintenance manhole for inspection of the interior and replacement of fillers.

所述的给水管道接一水池,水池设置电子水位计及水泵。The water supply pipeline is connected to a pool, and the pool is provided with an electronic water level gauge and a water pump.

在本实用新型的喷淋塔中,In the spray tower of the present utility model,

给水管道上设置了流量计,可根据运行效果通过手动阀门调节给水量,在确保净煤气成分合格的基础上以最经济的方式运行。A flow meter is installed on the water supply pipeline, and the water supply can be adjusted through the manual valve according to the operation effect, and the most economical operation is performed on the basis of ensuring that the clean gas composition is qualified.

喷淋塔的排水侧设置了排水密封罐,满足低压煤气的密封和排水要求。The drainage side of the spray tower is equipped with a drainage sealing tank to meet the sealing and drainage requirements of low-pressure gas.

喷淋塔的水池设置了电子水位计,水池边设置三台水泵,可根据水位的设定控制水泵的启停,使整个系统处于自动运行状态。The pool of the spray tower is equipped with an electronic water level gauge, and three water pumps are installed beside the pool, which can control the start and stop of the water pump according to the setting of the water level, so that the whole system is in an automatic operation state.

塔体的内径是煤气管道内径的3倍,确保了煤气流速较低,能与喷淋雾化水充分混合。The inner diameter of the tower body is three times the inner diameter of the gas pipeline, which ensures that the gas flow rate is low and can be fully mixed with the spray atomized water.

喷淋塔设置了三层喷枪,每层的喷枪数量和长度不同,喷出的雾状水可以覆盖整个喷淋塔内表面,防止煤气流短路而影响洗涤效果。The spray tower is equipped with three layers of spray guns. The number and length of the spray guns in each layer are different. The sprayed mist water can cover the entire inner surface of the spray tower to prevent the short circuit of the gas flow from affecting the washing effect.

喷枪通过法兰与喷淋塔塔体连接,既保证不泄漏煤气,又可以在检修时方便更换。The spray gun is connected to the spray tower body through the flange, which not only ensures no gas leakage, but also facilitates replacement during maintenance.

三层喷淋管分别设置了手动阀门,可根据工艺需求调整入口阀门开度即调整喷淋总水量,也可分别关闭某层的喷嘴,调节方便可靠。The three-layer spray pipes are respectively equipped with manual valves. The opening of the inlet valves can be adjusted according to the process requirements, that is, the total spray water volume can be adjusted, and the nozzles of a certain layer can also be closed separately. The adjustment is convenient and reliable.

喷淋塔给水侧设置了U型水封管,即使供水断流也可保证喷淋塔内的煤气不外逸。A U-shaped water seal pipe is installed on the water supply side of the spray tower to ensure that the gas in the spray tower does not escape even if the water supply is cut off.

喷淋塔设置了两层填料层,用于脱去煤气清洗过程带入的机械水,保证送往煤气管网的煤气含水量符合工艺要求。The spray tower is equipped with two packing layers, which are used to remove the mechanical water brought in by the gas cleaning process, so as to ensure that the water content of the gas sent to the gas pipeline network meets the process requirements.

喷淋塔塔体设计成自支撑结构,可以稳定地安装在基础上,不用外界钢结构支撑。The spray tower body is designed as a self-supporting structure, which can be stably installed on the foundation without external steel structure support.

喷淋塔合适的位置设置了检修人孔,便于对内部进行检查和更换填料作业。The maintenance manhole is set at the appropriate position of the spray tower, which is convenient for internal inspection and filler replacement.

本实用新型的优点在于:The utility model has the advantages of:

煤气喷淋降温塔使用的水是原有煤气湿法除尘系统提供的污循环水,对于高炉煤气清洗干湿法并用煤气清洗系统,在处于干法除尘状态时,原有煤气清洗污循环水泵的水量可以适当调小,确保原有双文洗涤塔水位处于安全水位的基础上,多余的水可用于煤气喷淋洗涤,洗涤完的水回流到水池,再由返送泵将水送回水处理厂加药调整PH值等指标,喷淋塔的水可以循环利用,基本不用补充新水。The water used in the gas spray cooling tower is the sewage circulating water provided by the original gas wet dedusting system. For blast furnace gas cleaning with dry and wet method and gas cleaning system, when it is in the dry dedusting state, the original gas cleaning sewage circulating water pump The water volume can be appropriately adjusted down to ensure that the water level of the original Shuangwen washing tower is at a safe water level. The excess water can be used for gas spray washing, and the washed water returns to the pool, and then the water is sent back to the water treatment plant by the return pump. Dosing to adjust the PH value and other indicators, the water in the spray tower can be recycled, and there is basically no need to add new water.

不仅很好的适应了不同工况条件对煤气清洗系统的要求,还解决了因煤气干法除尘净煤气中酸根离子和氯离子含量高对管道的腐蚀问题。煤气冷凝水的PH值由洗涤前的1.5提高到洗涤后的5.8,氯离子含量由1400ppm降低到156ppm,取得了良好的综合效益。Not only is it well adapted to the requirements of different working conditions for the gas cleaning system, but it also solves the corrosion problem of the pipeline due to the high content of acid ions and chloride ions in the clean gas by dry dust removal. The PH value of the gas condensate was increased from 1.5 before washing to 5.8 after washing, and the chloride ion content was reduced from 1400ppm to 156ppm, achieving good comprehensive benefits.

附图说明Description of drawings

图1为本实用新型一实施例的示意图;Fig. 1 is the schematic diagram of an embodiment of the utility model;

图2为本实用新型实施例喷淋塔的示意图;Fig. 2 is the schematic diagram of the utility model embodiment spray tower;

图3为本实用新型实施例的剖视图。Fig. 3 is a cross-sectional view of an embodiment of the present invention.

具体实施方式Detailed ways

参见图1~图3,本实用新型煤气干法除尘的喷淋塔,其包括,塔体1,其一侧面设有接煤气管道9的煤气入口101,塔体顶部设煤气出口102;塔体内上部设两层填料层2、2’,塔体1内下部设排水斗3;三层喷水结构,每层喷水结构包括环形水管4、设置于环形水管4上的若干喷枪5、5’;环形水管4环设于塔体1外侧,喷枪5、5’喷水端穿过塔体1对应塔体内;各环形水管4分别连接给水管道6;给水管道6上设置了流量计及控制阀门;排水密封罐11,设置于塔体1的排水侧,通过排水管道10连接塔体1内下部的排水斗3。Referring to Fig. 1~Fig. 3, the spray tower of the utility model gas dry dedusting, it comprises, tower body 1, its one side is provided with the gas inlet 101 that connects gas pipeline 9, and the gas outlet 102 is provided at the tower body top; There are two layers of packing layers 2, 2' in the upper part, and a drainage bucket 3 in the lower part of the tower body 1; three layers of water spraying structure, each layer of water spraying structure includes an annular water pipe 4, and several spray guns 5, 5' arranged on the annular water pipe 4 The 4 rings of the annular water pipes are arranged on the outside of the tower body 1, and the water spray ends of the spray guns 5 and 5' pass through the tower body 1 corresponding to the tower body; Drainage sealing tank 11 is arranged on the drain side of the tower body 1, and is connected to the drain bucket 3 in the lower part of the tower body 1 through the drain pipe 10.

所述的塔体1的内径是煤气管道9内径的3倍。所述的喷枪通过法兰与喷淋塔塔体连接。所述的三层环形水管4上分别设置控制阀门。给水管道6上设置了U型水封管7。所述的塔体1设计有可稳定地安装在基础上的自支撑结构8。The inner diameter of the tower body 1 is 3 times of the inner diameter of the gas pipeline 9 . The spray gun is connected with the spray tower body through the flange. Control valves are respectively set on the three-layer annular water pipes 4 . A U-shaped water seal pipe 7 is arranged on the water supply pipeline 6 . The tower body 1 is designed with a self-supporting structure 8 that can be stably installed on the foundation.

喷淋塔的水池12设置了电子水位计,水池边设置三台水泵13,可根据水位的设定控制水泵的启停,使整个系统处于自动运行状态。The pool 12 of the spray tower is provided with an electronic water level gauge, and three water pumps 13 are arranged on the side of the pool, which can control the start and stop of the water pump according to the setting of the water level, so that the whole system is in an automatic operation state.

另外,本实用新型所述的塔体1上还设置了便于对内部进行检查和更换填料作业的检修人孔。In addition, the tower body 1 described in the utility model is also provided with a maintenance manhole for inspection of the interior and replacement of fillers.

Claims (8)

1.煤气干法除尘的喷淋塔,其特征是,包括,1. The spray tower for gas dry dedusting is characterized in that it comprises, 塔体,其一侧面设有接煤气管道的煤气入口,塔体顶部设煤气出口;塔体内上部设至少两层填料层,塔体内下部设排水斗;The tower body has a gas inlet connected to the gas pipeline on one side, and a gas outlet on the top of the tower body; at least two layers of packing layers are arranged on the upper part of the tower body, and a drainage bucket is arranged on the lower part of the tower body; 至少三层喷水结构,每层喷水结构包括环形水管、设置于环形水管上的若干喷枪;环形水管环设于塔体外侧,喷枪喷水端穿过塔体对应塔体内;各环形水管分别连接给水管道;给水管道上设置了流量计及控制阀门;At least three layers of water spray structure, each layer of water spray structure includes an annular water pipe, a number of spray guns arranged on the annular water pipe; the annular water pipe ring is set outside the tower body, and the water spray end of the spray gun passes through the corresponding tower body of the tower body; each annular water pipe is respectively Connect the water supply pipeline; flow meters and control valves are installed on the water supply pipeline; 排水密封罐,设置于塔体的排水侧,通过管道连接塔体内下部的排水斗。The drainage sealing tank is arranged on the drainage side of the tower body, and is connected to the drainage bucket at the lower part of the tower body through a pipe. 2.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的塔体的内径是煤气管道内径的3倍。2. The spray tower for gas dry dedusting as claimed in claim 1, wherein the inner diameter of the tower body is 3 times of the inner diameter of the gas pipeline. 3.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的喷枪通过法兰与喷淋塔塔体连接。3. The spray tower for gas dry dedusting according to claim 1, wherein the spray gun is connected to the spray tower body through a flange. 4.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的环形水管上分别设置控制阀门。4. The spray tower for gas dry dedusting as claimed in claim 1, characterized in that control valves are respectively set on the said annular water pipes. 5.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的给水管道上设置了U型水封管。5. The spray tower for gas dry dedusting as claimed in claim 1, characterized in that a U-shaped water seal pipe is arranged on the water supply pipeline. 6.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的塔体设计有可稳定地安装在基础上的自支撑结构。6. The spray tower for gas dry dust removal according to claim 1, characterized in that, the tower body is designed with a self-supporting structure that can be stably installed on the foundation. 7.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的塔体上还设置了便于对内部进行检查和更换填料作业的检修人孔。7. The spray tower for gas dry dedusting as claimed in claim 1, characterized in that, the tower body is also provided with maintenance manholes for inspection of the interior and replacement of fillers. 8.如权利要求1所述的煤气干法除尘的喷淋塔,其特征是,所述的给水管道接一水池,水池设置电子水位计及水泵。8. The spray tower for gas dry dedusting as claimed in claim 1, wherein the water supply pipeline is connected to a pool, and the pool is provided with an electronic water level gauge and a water pump.
CN2010201017717U 2010-01-26 2010-01-26 Spray tower for gas dry dedusting Expired - Fee Related CN201609621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201017717U CN201609621U (en) 2010-01-26 2010-01-26 Spray tower for gas dry dedusting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201017717U CN201609621U (en) 2010-01-26 2010-01-26 Spray tower for gas dry dedusting

Publications (1)

Publication Number Publication Date
CN201609621U true CN201609621U (en) 2010-10-20

Family

ID=42960252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201017717U Expired - Fee Related CN201609621U (en) 2010-01-26 2010-01-26 Spray tower for gas dry dedusting

Country Status (1)

Country Link
CN (1) CN201609621U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103272451A (en) * 2013-05-13 2013-09-04 茅兴娟 Exhaust gas scrubbing tower
CN104001394A (en) * 2014-06-25 2014-08-27 昆明中天达玻璃钢开发有限公司 Scrubbing tower
CN104399337A (en) * 2014-11-25 2015-03-11 广西农垦糖业集团红河制糖有限公司 Boiler chimney dust collection system and dust collection method
CN105642046A (en) * 2016-01-11 2016-06-08 陈胜民 Measure for filtering, cleaning and rinsing chimney smoke dust by water mist
CN107036119A (en) * 2017-04-21 2017-08-11 昆明理工大学 A water-saving chimney dust removal device
CN111704938A (en) * 2020-06-29 2020-09-25 马鞍山钢铁股份有限公司 A gas cleaning tower with integrated safety water seal

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103272451A (en) * 2013-05-13 2013-09-04 茅兴娟 Exhaust gas scrubbing tower
CN104001394A (en) * 2014-06-25 2014-08-27 昆明中天达玻璃钢开发有限公司 Scrubbing tower
CN104001394B (en) * 2014-06-25 2016-08-17 昆明中天达玻璃钢开发有限公司 A kind of scrubbing tower
CN104399337A (en) * 2014-11-25 2015-03-11 广西农垦糖业集团红河制糖有限公司 Boiler chimney dust collection system and dust collection method
CN105642046A (en) * 2016-01-11 2016-06-08 陈胜民 Measure for filtering, cleaning and rinsing chimney smoke dust by water mist
CN107036119A (en) * 2017-04-21 2017-08-11 昆明理工大学 A water-saving chimney dust removal device
CN111704938A (en) * 2020-06-29 2020-09-25 马鞍山钢铁股份有限公司 A gas cleaning tower with integrated safety water seal

Similar Documents

Publication Publication Date Title
CN201609621U (en) Spray tower for gas dry dedusting
CN203971658U (en) Flue-gas treater
CN205402665U (en) Ultra -low temperature economizer
CN103866058B (en) Blast furnace rotary drum method using exhaust heat of slag flushing water utilizes combined supply system
CN201952442U (en) Gas purification tower
CN210595957U (en) Spray gun mounting structure and blast furnace gas deacidification device
CN204254648U (en) A kind of desulfurizing tower body device for boiler dusting
CN207567257U (en) A kind of Power Generation by BF Gas purifier
CN207567263U (en) A kind of blast furnace gas processing system
CN205199259U (en) Regeneration gas low temperature conveying system
CN207091454U (en) The overhead blowdown tank of anti-incrustation
CN205269376U (en) Treatment device for sludge incineration flue gas
CN201864738U (en) Blast furnace gas spray alkali dechlorination device
CN210699444U (en) Modularization blast furnace gas dechlorination device
CN209210740U (en) Blast furnace gas atomization depickling dechlorination device
CN203768382U (en) Combined cooling, heating and power system for blast furnace rotary drum process slag flushing water waste heat utilization
CN204986430U (en) Bury ground coal gas drainer
CN203591640U (en) Filtering device capable of cleaning online at inlet of desulfurizing slurry circulating pump
CN203295535U (en) Corrosion prevention device of gas pipe network
CN209237592U (en) Lime slaking machine soot processing device
CN209714393U (en) A flue gas condensate recovery device
CN209188489U (en) Elution device for hydrogenated tail gas emptying
CN201924036U (en) Wet dust removal device for converter
CN208678681U (en) A kind of flue gas condensing and dust removal integrated plant
CN105885960B (en) Vertical coal gas desalting and dewatering integral system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101020

Termination date: 20160126

EXPY Termination of patent right or utility model