CN201606572U - 一种电缆桥架支撑装置 - Google Patents
一种电缆桥架支撑装置 Download PDFInfo
- Publication number
- CN201606572U CN201606572U CN2010200565127U CN201020056512U CN201606572U CN 201606572 U CN201606572 U CN 201606572U CN 2010200565127 U CN2010200565127 U CN 2010200565127U CN 201020056512 U CN201020056512 U CN 201020056512U CN 201606572 U CN201606572 U CN 201606572U
- Authority
- CN
- China
- Prior art keywords
- platform
- cable
- support device
- testing bridge
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000725 suspension Substances 0.000 claims description 21
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 239000000463 material Substances 0.000 description 10
- 238000010276 construction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 241000272165 Charadriidae Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200565127U CN201606572U (zh) | 2010-01-11 | 2010-01-11 | 一种电缆桥架支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010200565127U CN201606572U (zh) | 2010-01-11 | 2010-01-11 | 一种电缆桥架支撑装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201606572U true CN201606572U (zh) | 2010-10-13 |
Family
ID=42951279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010200565127U Expired - Lifetime CN201606572U (zh) | 2010-01-11 | 2010-01-11 | 一种电缆桥架支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201606572U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105655040A (zh) * | 2014-12-01 | 2016-06-08 | 鞍钢股份有限公司 | 一种防止单芯动力电缆发热的方法 |
CN107093876A (zh) * | 2017-06-15 | 2017-08-25 | 国网山东省电力公司龙口市供电公司 | 一种用于电缆桥架的支撑固定装置 |
CN110985758A (zh) * | 2019-11-25 | 2020-04-10 | 浙江宁围环境服务有限公司 | 一种保护市政管线的构造及施工方法 |
-
2010
- 2010-01-11 CN CN2010200565127U patent/CN201606572U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105655040A (zh) * | 2014-12-01 | 2016-06-08 | 鞍钢股份有限公司 | 一种防止单芯动力电缆发热的方法 |
CN107093876A (zh) * | 2017-06-15 | 2017-08-25 | 国网山东省电力公司龙口市供电公司 | 一种用于电缆桥架的支撑固定装置 |
CN107093876B (zh) * | 2017-06-15 | 2018-10-16 | 国网山东省电力公司龙口市供电公司 | 一种用于电缆桥架的支撑固定装置 |
CN110985758A (zh) * | 2019-11-25 | 2020-04-10 | 浙江宁围环境服务有限公司 | 一种保护市政管线的构造及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410670B (zh) | 桁架式风力发电机塔架及具有该塔架的风力发电机组 | |
CN103993728B (zh) | 一种装配式型钢悬挑防护棚 | |
CN204125899U (zh) | 一种高桩码头超大排架现浇墩台底模支撑系统 | |
CN101761031B (zh) | 大节段桥面梁连续垂直提升装置 | |
CN201606572U (zh) | 一种电缆桥架支撑装置 | |
CN203639095U (zh) | 内边柱倒装法提升装置 | |
CN203891441U (zh) | 一种装配式型钢悬挑防护棚 | |
CN103967263B (zh) | 液压自动爬升卸料平台 | |
CN202658590U (zh) | 整体装配式钻孔平台 | |
CN205077880U (zh) | 一种钢柱翻身用辅助装置 | |
CN204385629U (zh) | 一种用于悬索桥主塔上横梁施工的支架 | |
CN202131798U (zh) | 移动式快装基站 | |
CN111485483B (zh) | 一种斜拉桥支承体系及斜拉桥 | |
CN103601078A (zh) | 悬挂式吊装设备 | |
CN203947758U (zh) | 新型液压自动爬升卸料平台 | |
CN206742822U (zh) | 一种用于隧道疏散平台及电力电缆的一体式支架 | |
CN203312626U (zh) | 变电站框架结构以及10kV变电站框架结构 | |
CN101139813A (zh) | 一种下承式桥的钢桁架 | |
CN201411926Y (zh) | 弧形梁起重结构 | |
CN212507295U (zh) | 悬挑钢平台 | |
CN202482779U (zh) | 箱梁提升系统 | |
CN201052950Y (zh) | 吊机 | |
CN203373661U (zh) | 一种钢结构桥梁挑臂下部活动作业平台装置 | |
CN201448518U (zh) | 组合式门型电缆桥架支架系统 | |
CN206616843U (zh) | 一种悬挑脚手架的支撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170608 Address after: 518119 Beek Industrial Zone, Kwai Chung street, Dapeng New District, Guangdong, Shenzhen Patentee after: SHENZHEN BAK POWER BATTERY Co.,Ltd. Address before: Kwai Chung street Beek Industrial Park in Longgang District of Shenzhen City, Guangdong province 518119 Co-patentee before: BAK INTERNATIONAL (TIANJIN) Ltd. Patentee before: SHENZHEN BAK BATTERY Co.,Ltd. |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20191022 Granted publication date: 20101013 |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20101013 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20200111 Granted publication date: 20101013 |