CN201600138U - Device of settling observing point mark - Google Patents

Device of settling observing point mark Download PDF

Info

Publication number
CN201600138U
CN201600138U CN2010201006089U CN201020100608U CN201600138U CN 201600138 U CN201600138 U CN 201600138U CN 2010201006089 U CN2010201006089 U CN 2010201006089U CN 201020100608 U CN201020100608 U CN 201020100608U CN 201600138 U CN201600138 U CN 201600138U
Authority
CN
China
Prior art keywords
box body
wall column
mark
settlement observation
dot mark
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201006089U
Other languages
Chinese (zh)
Inventor
李金林
王燕
汪永权
史晓伟
殷宇锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of building science group Limited by Share Ltd
Original Assignee
CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd filed Critical CHANGZHOU CONSTRUCTION SCIENCE INST Co Ltd
Priority to CN2010201006089U priority Critical patent/CN201600138U/en
Application granted granted Critical
Publication of CN201600138U publication Critical patent/CN201600138U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Or Analysing Materials By Optical Means (AREA)

Abstract

The utility model relates to a device of a settling observing point mark, which comprises a box body and a settling mark point arranged therein, wherein the mark point is pre-embedded in a wall column, the mark point is vertically to the wall column, and the box body is fixedly connected with the wall column. The device has the following advantages that (1) the mark is longer, is easily discovered, so that the device is hardly whitewashed or broken; (2) the device can be still used for a steel-suspended building without influencing the precision thereof; (3) the device can effectively prevent from being impacted by a foreign body and improve the precision thereof through the protection of the box body; (4) the device further reduces the error by pre-embedding the observing point mark; and (5) the device saves more time, is convenient and simple, and is easily found.

Description

The device of settlement observation dot mark
Technical field
The utility model relates to the construction quality checkout equipment, relates in particular to a kind of buildings carries out the boxlike settlement observation dot mark of settlement observation in construction stage and operational phase device.
Background technology
Building subsidence observation at present is particularly important, especially after work progress and final acceptance of construction in a period of time, as Fig. 1, in the prior art, the settlement observation dot mark exposes outside wall column, place baffle plate at the sign upside, the problem that exists is that the observation station sign often suffers artificial destruction in work progress at present, even non-artificial destruction, but whitewashed or the covering of steel extension, causing and can't follow-uply measure, measuring accuracy also reduces greatly.
The utility model content
The technical problems to be solved in the utility model is: the device that a kind of simple, settlement observation dot mark that precision is high is provided.
In order to overcome the defective that exists in the background technology, the technical scheme that its technical matters that solves the utility model adopts is: a kind of device of settlement observation dot mark, comprise box body and be arranged on the interior sedimentation monumented point of box body, this monumented point is embedded in the wall column, this monumented point is vertical with wall column to be provided with, and this box body is fixedlyed connected with wall column.
According to another embodiment of the present utility model, the device of settlement observation dot mark comprises that further described box body fixedlys connected with wall column by bolt.
According to another embodiment of the present utility model, the device of settlement observation dot mark comprises that further the end face of described box body has a cover plate, and this cover plate is connected with the box body locking.
According to another embodiment of the present utility model, the device of settlement observation dot mark comprises that further described box body adopts iron sheet to be made.
According to another embodiment of the present utility model, the device of settlement observation dot mark comprises that further described monumented point adopts stainless steel material to make.
The utility model advantage is as follows: (1) this sign is long, so find easily, can not whitewashed easily or destroy, and (2) hang buildings later for steel still can continue use, and does not influence its precision; (3), can prevent effectively that foreign matter from impacting effectively its precision of raising by the box body protection; (4) by pre-buried observation station sign, further reduce error; (5) relatively save time, convenient and simple, search easily.
Description of drawings
Fig. 1 is the structural representation of the device of this settlement observation dot mark in the prior art;
Fig. 2 is the structural representation of preferred embodiment of the present utility model;
Embodiment
With preferred embodiment the utility model is described in further detail in conjunction with the accompanying drawings now.These accompanying drawings are the synoptic diagram of simplification, basic structure of the present utility model only is described in a schematic way, so it only show the formation relevant with the utility model.
As shown in Figure 2, a kind of device of settlement observation dot mark comprises box body 1 and is arranged on sedimentation monumented point 2 in the box body 1 that this monumented point 2 is embedded in the wall column 3, this monumented point 2 and wall column 3 vertical settings, and this box body 1 is fixedlyed connected with wall column 3.Wherein, described box body 1 can be fixedlyed connected with wall column 3 by bolt, and in addition, end face that also can box body 1 has a cover plate 4, and this cover plate 4 is connected with box body 1 locking.
Because box body 1 is subjected to other object impacts such as steel suspension member easily,, improve its impact resistance so box body 1 adopts iron sheet to be made.
In addition, monumented point 2 adopts stainless steel material to make, so that adapt to various different severe environments.
Use the settlement observation dot mark after improving can effectively reduce the detection error, save time, laborsaving.
With above-mentioned foundation desirable embodiment of the present utility model is enlightenment, and by above-mentioned description, the related work personnel can carry out various change and modification fully in the scope that does not depart from this utility model technological thought.The technical scope of this utility model is not limited to the content on the instructions, must determine its technical scope according to the claim scope.

Claims (5)

1. the device of a settlement observation dot mark is characterized in that: comprise box body and be arranged on sedimentation monumented point in the box body, this monumented point is embedded in the wall column, and this monumented point is vertical with wall column to be provided with, and this box body is fixedlyed connected with wall column.
2. the device of settlement observation dot mark as claimed in claim 1 is characterized in that: described box body is fixedlyed connected with wall column by bolt.
3. the device of settlement observation dot mark as claimed in claim 1 is characterized in that: the end face of described box body has a cover plate, and this cover plate is connected with the box body locking.
4. the device of settlement observation dot mark as claimed in claim 1 is characterized in that: described box body adopts iron sheet to be made.
5. the device of settlement observation dot mark as claimed in claim 1 is characterized in that: described monumented point adopts stainless steel material to make.
CN2010201006089U 2010-01-25 2010-01-25 Device of settling observing point mark Expired - Fee Related CN201600138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201006089U CN201600138U (en) 2010-01-25 2010-01-25 Device of settling observing point mark

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201006089U CN201600138U (en) 2010-01-25 2010-01-25 Device of settling observing point mark

Publications (1)

Publication Number Publication Date
CN201600138U true CN201600138U (en) 2010-10-06

Family

ID=42811199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201006089U Expired - Fee Related CN201600138U (en) 2010-01-25 2010-01-25 Device of settling observing point mark

Country Status (1)

Country Link
CN (1) CN201600138U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494678A (en) * 2011-12-30 2012-06-13 山东大学 Pavement settlement point arrangement apparatus in monitor measurement and burying method
CN104482926A (en) * 2014-12-09 2015-04-01 常州市安贞建设工程检测有限公司 Device for protecting hidden-bolt sedimentation observation point

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494678A (en) * 2011-12-30 2012-06-13 山东大学 Pavement settlement point arrangement apparatus in monitor measurement and burying method
CN102494678B (en) * 2011-12-30 2013-08-28 山东大学 Pavement settlement point arrangement apparatus in monitor measurement and burying method
CN104482926A (en) * 2014-12-09 2015-04-01 常州市安贞建设工程检测有限公司 Device for protecting hidden-bolt sedimentation observation point

Similar Documents

Publication Publication Date Title
CN102590215B (en) Portable multifunctional tunnel defect information collector
CN202562406U (en) Mining fissure monitoring device
CN202547579U (en) Grouting construction raising deformation observation device
CN203604918U (en) Device for correcting horizontal position of large-sized apparatus
CN201600138U (en) Device of settling observing point mark
CN109208657A (en) A kind of low strain dynamic quality testing measuring tool and its test method
CN104567641A (en) Middle and small span bridge deflection measuring device
CN102587374A (en) Perpendicularity control process for single-tubular-pile foundation of offshore intertidal wind farm
CN207779385U (en) A kind of bridge holder settlement monitoring device
CN208187393U (en) A kind of magnetic foot pin and measuring device for urban surface settlement deformation survey
CN201443549U (en) Protector for hydraulic cylinder position sensor
CN203177925U (en) Measure device of molten steel jar headroom and slag blanket thickness
CN202351160U (en) Inner surface defect expansion inspection tool for steel pipe
CN206635834U (en) A kind of new take-off bar
CN208736403U (en) A kind of sedimentation plate for roadbed monitoring
CN201081672Y (en) Protective cover type settlement observation control point
CN106979439A (en) A kind of high accuracy movable pedestal of automatic survey station
CN202793945U (en) Penetration resisting test device for rubber warning protection plate
CN102590486A (en) Cement paste water cement ratio meter and use method thereof
CN201093991Y (en) Rolling mill housing window verticality and parallelism measuring device
CN204575051U (en) For the novel observation pier of retainer instrument
CN207502276U (en) A kind of reisilometer
CN204456238U (en) A kind of foundation pit deformation monitoring mark
CN104213542A (en) Reinforced full-blocking-eave bollard
CN211824386U (en) Foundation settlement measuring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE CO., LT

Free format text: FORMER OWNER: CHANGZHOU CONSTRUCTION SCIENCE INST. CO., LTD.

Effective date: 20110914

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110914

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Architectural Research Institute Co., Ltd.

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Construction Science Inst. Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Changzhou Institute of building science group Limited by Share Ltd

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Changzhou Architectural Research Institute Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20180125

CF01 Termination of patent right due to non-payment of annual fee