CN201600018U - Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system - Google Patents
Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system Download PDFInfo
- Publication number
- CN201600018U CN201600018U CN2009201443711U CN200920144371U CN201600018U CN 201600018 U CN201600018 U CN 201600018U CN 2009201443711 U CN2009201443711 U CN 2009201443711U CN 200920144371 U CN200920144371 U CN 200920144371U CN 201600018 U CN201600018 U CN 201600018U
- Authority
- CN
- China
- Prior art keywords
- energy
- tunnel cave
- tunnel kiln
- arc
- tracks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/60—Production of ceramic materials or ceramic elements, e.g. substitution of clay or shale by alternative raw materials, e.g. ashes
Landscapes
- Tunnel Furnaces (AREA)
Abstract
An energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system comprises tracks, a movable tunnel kiln and a green brick drying system. The two tracks are sequentially provided with the arc-shaped tunnel kiln, a closable awning and an outer awning, and the arc-shaped tunnel kiln consists of a pre-heating section and a roasting section. In the energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system, green brick manufacturing equipment is not arranged between the tracks of the kiln body, and a green brick workshop section is moved to another occasion, thereby being capable of saving portions of investment, reducing occupied area, and decreasing perimeter of the tracks by one-fifth.
Description
Technical field
The utility model relates to a kind of fired brick production system, is specially a kind of system that adopts mobile tunnel cave to produce fired brick.
Background technology
Existing mobile tunnel cave is produced fired brick, generally be that order is provided with arc tunnel cave, dry rain-proof shelter, humidity discharging rain-proof shelter, defeated base and blank separating machine, base platform and adobe production equipment, piles up adobe at the bottom of the kiln between two tracks in orbit, the finished bricks after firing is moved very soon.This production system is called the semi-stiff extrusion process system, and this semi-stiff extrusion process system is suitable for the long and sufficient production system of investment once of orbit circumference.Because limit in the brickmaking place, it is inadequate perhaps once to inject capital into, and all can't adopt the semi-stiff extrusion process system, for this reason, makes base workshop section in addition outside track, can address the above problem at present.
Summary of the invention
The purpose of this utility model promptly proposes a kind of quadratic code that base workshop section is shifted out circuit orbit and burns system, to adapt to the situation of the less or place restriction of investment.
A kind of energy-conservation turnover arc tunnel cave quadratic code of the present utility model burns system, comprise track, mobile tunnel cave and brick bat drying system, wherein be sequentially set with the arc tunnel cave on two tracks, can seal rain-proof shelter, outer rain-proof shelter, described arc tunnel cave is made up of preheating section and furnace zone.
Described a kind of energy-conservation turnover arc tunnel cave quadratic code burns system, wherein is provided with two block walls vertically in the interlayer between kiln body top Nei Ding and the outer top, is respectively air channel, Kazakhstan and the total road of humidity discharging outside described two partition walls, is heat-delivering general channel between two partition walls.
Described a kind of energy-conservation turnover arc tunnel cave quadratic code burns system, and heat-delivering general channel wherein links to each other with preheating section.
A kind of energy-conservation turnover arc tunnel cave quadratic code of the present utility model burns system, does not make base equipment between the kiln track body, and base workshop section is moved on to other place, can save part investment, also can reduce floor space, and orbit circumference can reduce 1/5th.
Description of drawings
Fig. 1 is that quadratic code burns the system architecture schematic diagram
Among the figure at the bottom of the 1-moisture-eliminating blower 2-arc tunnel cave 3-furnace zone 4-finished bricks 5-track 6-kiln 7-base 8-that waits to bake bricks can seal the outer rain-proof shelter 10-moulding adobe of rain-proof shelter 9-
The specific embodiment
With reference to accompanying drawing 1, there are the tracks 5 of two different radiis that are provided with one heart in a kind of energy-conservation turnover arc tunnel cave quadratic code burning of the present utility model system, on track 5, be sequentially set with arc tunnel cave 2, can seal rain-proof shelter 8, outer rain-proof shelter 9, be placed with the moulding adobe 10 and the base 7 of waiting to bake bricks respectively on 6 at the bottom of the kiln in two rain-proof shelters.Wherein moulding adobe 10 is to be come by the outer base place carrying of track.Through dry a period of time of slow draining, part moisture is discharged from the adobe in canopy in these adobes.Enter then in the closed rain-proof shelter 8, this canopy is opening, only just seals when blowing and raining, at this moment for treating the burning stage that the moisture in the adobe is further discharged, enters the preheating section of kiln body then.Heated-air drying in kiln, the big portion of moisture is discharged from the adobe.Dry adobe is after furnace zone 3 roastings, and finished bricks 4 is moved away from the bottom of the kiln with the mobile disengaging kiln body of kiln body.Moisture-eliminating blower 1 is used for the damp vapour of preheating section is discharged.
Arc tunnel cave top is double-deck top, Nei Ding with push up outward between an interlayer is arranged, in this interlayer, be provided with two walls vertically, be respectively air channel, Kazakhstan and the total road of humidity discharging in the outside of two walls.It between two partition walls heat-delivering general channel.This heat-delivering general channel links to each other with preheating section, and the waste heat of extracting out in heat energy that the pinkeye pipe is distributed by heat-delivering general channel and the soaking zone is sent to preheating section, uses for dry brick.
Claims (3)
1. an energy-conservation turnover arc tunnel cave quadratic code burns system, comprise track, mobile tunnel cave and brick bat drying system, it is characterized in that being sequentially set with arc tunnel cave (2) on described two tracks (5), can seal rain-proof shelter (8), outer rain-proof shelter (9), described arc tunnel cave (2) is made up of preheating section and furnace zone (3).
2. a kind of energy-conservation turnover arc tunnel cave quadratic code according to claim 1 burns system, it is characterized in that being provided with two block walls vertically in the interlayer between kiln body top Nei Ding and the outer top, the described two partition walls outside is respectively breathes out air channel and the total road of humidity discharging, is heat-delivering general channel between two partition walls.
3. a kind of energy-conservation turnover arc tunnel cave quadratic code according to claim 2 burns system, it is characterized in that described heat-delivering general channel links to each other with preheating section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201443711U CN201600018U (en) | 2009-12-05 | 2009-12-05 | Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201443711U CN201600018U (en) | 2009-12-05 | 2009-12-05 | Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201600018U true CN201600018U (en) | 2010-10-06 |
Family
ID=42811079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201443711U Expired - Fee Related CN201600018U (en) | 2009-12-05 | 2009-12-05 | Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201600018U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102032775A (en) * | 2010-11-26 | 2011-04-27 | 王宏伟 | High-yield efficient tunnel kiln |
-
2009
- 2009-12-05 CN CN2009201443711U patent/CN201600018U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102032775A (en) * | 2010-11-26 | 2011-04-27 | 王宏伟 | High-yield efficient tunnel kiln |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107560401A (en) | Circulation tunnel type rapid draing room and drying means in a kind of | |
CN103836890B (en) | Multi-layer roller way type ceramic drying kiln | |
CN201600018U (en) | Energy-saving circulation arc-shaped tunnel kiln secondary palletizing and burning system | |
CN104457228B (en) | Tenon type composite flat-top tunnel kiln | |
CN102748926A (en) | Building ceramic single-layer rapid dryer equipment | |
CN105973007B (en) | A kind of furnace equipment and the method using its making fired brick | |
CN201203349Y (en) | Multichannel energy-saving kiln | |
CN205228143U (en) | System for adobe stoving sintering | |
CN210180150U (en) | Environment-friendly tunnel cave | |
CN201021872Y (en) | A tile stove | |
CN107062898A (en) | Column type brick and tile sintering kiln | |
CN207299776U (en) | A kind of drying equipment of novel refractory | |
CN208805047U (en) | Multiple duct semi-stiff extrusion process opening annular kiln | |
CN206959571U (en) | A kind of ring-like adobe Mobile brick tile kiln | |
CN203964646U (en) | A kind of flat-top brick and tile tunnel cave | |
CN201697460U (en) | Self-firing high-efficiency energy-saving annular kiln | |
CN101439974B (en) | Brick making and brick delivering apparatus of ring kiln chamber and ring shaped energy-saving environmental-protecting ring kiln thereof | |
CN205262172U (en) | Energy -conserving flat top tunnel cave | |
CN213067051U (en) | Kiln for self-combustion type rapid brick making of green bricks | |
CN101000213A (en) | Five-channel combined one-setting-firing circular kiln | |
CN203464693U (en) | Revolving kiln with air distribution system arranged at kiln bottom | |
CN103740384B (en) | The vertical coke discharging system of pit kiln | |
CN212253608U (en) | Three-air-duct energy-saving tunnel kiln | |
CN204346088U (en) | The Underground-Ditch-Pattern rotary kiln of end air-supply, side exhaust structure | |
CN201104101Y (en) | Two-ventiduct side-wall ventilation dispersion wind mouth one-time palletizing and burning annular kiln |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101006 Termination date: 20101205 |