CN201588305U - Connecting structure between vestibule and double tower buildings - Google Patents

Connecting structure between vestibule and double tower buildings Download PDF

Info

Publication number
CN201588305U
CN201588305U CN2009203511272U CN200920351127U CN201588305U CN 201588305 U CN201588305 U CN 201588305U CN 2009203511272 U CN2009203511272 U CN 2009203511272U CN 200920351127 U CN200920351127 U CN 200920351127U CN 201588305 U CN201588305 U CN 201588305U
Authority
CN
China
Prior art keywords
steel
vestibule
building
double tower
same
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203511272U
Other languages
Chinese (zh)
Inventor
刘丽萍
常建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203511272U priority Critical patent/CN201588305U/en
Application granted granted Critical
Publication of CN201588305U publication Critical patent/CN201588305U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a connecting structure between a vestibule and double tower buildings, a support of the vestibule is composed of two steel trusses and a connection steel beam which are connected with each other, the same ends of the lower chords of the two steel trusses are fixed on the same one tower building, namely, the same ends of the lower chords of the two steel trusses are rigidly connected with the same one tower building, the other ends of the lower chords of the two steel trusses are connected with the other one tower building by a rolling support base; Z-shaped section steel folded plates are connected on two ends of the upper chords of each steel truss, and the two ends of the upper chords of each steel truss are connected with the tower buildings at two ends respectively by the Z-shaped section steel folded plates. The utility model can enable the vestibule to freely displace in the certain range when ensuring the self stability of the vestibule, thereby avoiding the excessive restriction to the vestibule by the structure of double tower buildings, greatly decreasing the inner force of the steel truss components in the vestibule, reducing the steel amounts, so that the applied force mode of the whole structure is reasonable, and the damage of the vestibule caused by large displacements of the double tower buildings can be avoided effectively.

Description

Syndeton between a kind of vestibule and the double tower building
Technical field
The utility model relates to the syndeton between a kind of vestibule and the double tower building, belongs to vestibule link technique field between the high building.
Background technology
In modern architecture, high building structure often occurs with the pattern in double tower building, each architectonical of Double-Tower Structure, simultaneously for the ease of passing through between the double tower building, being everlasting is provided with vestibule and often adopts the steel work pattern with the support that is connected vestibule in double tower building between double tower building structure, and the method that pattern adopts at present that is connected in vestibule support and double tower building is the pattern that is rigidly connected.Adopt this rigidly connected method, though have vestibule and reliable advantage of connecting of double tower building, but, because double tower building structure build is huge, the rigidity of himself is also very big, therefore when adopting this kind to rigidly connect connection, the infinitesimal deflection of double tower building structure brings very big endogenetic process will for the vestibule steel structure support that is attached thereto, what the cross section of each member just must be done in the steel structure support like this is bigger, to guarantee enough resistances, so just certainly will cause the waste of material, in case the while also might damage the steel structure support of vestibule when bigger displacement appears in double tower building structure.Therefore the connected mode between existing vestibule and the double tower building still is not ideal enough.
The utility model content
The purpose of this utility model is: provide a kind of rational in infrastructure, safe and reliable, can reduce the rolled steel dosage of vestibule, can improve the vestibule of vestibule self stability and the syndeton between the double tower building again, thereby overcome the deficiencies in the prior art.
The utility model is to constitute like this: the syndeton between a kind of vestibule of the present utility model and the double tower building comprises high building and be connected with vestibule between two high building, the support of its vestibule by two Pin steel trusss be connected girder steel and interconnect and form, the same end of the lower edge of two Pin steel trusss is fixed on the same high building, and promptly the same end of the lower edge of two Pin steel trusss and same high building adopt and be rigidly connected; The other end of the lower edge of two Pin steel trusss is connected with another high building by roller support; On the position at the two ends of winding up of every Pin steel truss, be connected with Z font steel flap, and the two ends of winding up of every Pin steel truss are all passed through Z font steel flap and are connected with the high building at two ends respectively.
One end of above-mentioned Z font steel flap is connected on the truss vertical support or tie-rod that is connected with winding up of steel truss.
On an end of the above-mentioned Z font steel flap that is connected with high building, be connected with shaped steel, be fixed with the embedded part that can be embedded in the high building on the top of shaped steel.
Owing to adopted technique scheme, the utility model reaches by a kind of new syndeton pattern and has both guaranteed effective the connecting of vestibule with double tower building structure, thereby guarantee the stability of vestibule self, make simultaneously the vestibule within the specific limits can free to deflect again, to avoid of the excessive constraint of double tower building structure to vestibule, so just reduced the internal force of steel truss member in the vestibule greatly, thereby can reduce the size of its member and reduce rolled steel dosage, and make the stressed pattern of total more reasonable; When also having avoided double tower building structure bigger displacement to occur simultaneously effectively to the destruction that steel work caused of vestibule.Therefore, the utility model compared with prior art, the advantage that the rolled steel dosage that the utility model not only has vestibule is few, the vestibule self stability is high, but also have advantages such as the syndeton of vestibule is reasonable, safe and reliable, the life-span is long.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the plan structure schematic diagram of Fig. 1;
Fig. 3 is the local structure for amplifying schematic diagram of the A portion of Fig. 1;
Fig. 4 is the local structure for amplifying schematic diagram of the B portion of Fig. 2;
Fig. 5 is the plan structure schematic diagram of Fig. 4.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but not as to restriction of the present utility model.
Embodiment of the present utility model: shown in Fig. 1-4, when promptly between existing two high buildings 1, connecting vestibule, the support of its vestibule by two Pin steel trusss 2 be connected girder steel 3 and interconnect and form, connect between the lower edge that girder steel 3 flatly is connected two Pin steel trusss 2 and between winding up, the structure of steel truss 2 is a traditional structure, promptly by wind up, lower edge and web member connect to form; The same end of the lower edge of two Pin steel trusss 2 is fixed on the same high building 1 by traditional approach, and the same end and the same high building 1 that are about to the lower edge of two Pin steel trusss 2 are rigidly connected; The other end of the lower edge of two Pin steel trusss 2 is connected with another high building 1 by roller support 4; On the position at the two ends of winding up of every Pin steel truss 2, connect Z font steel flap 5, it is that the thick steel plate of 8~15mm is made that Z font steel flap 5 adopts thickness, each bending angle of its Z font steel flap 5 is generally between 30~45 degree, an end of Z font steel flap 5 can be connected on the truss vertical support or tie-rod 6 that is connected with winding up of steel truss 2; Then Z font steel flap 5 all being passed through at the two ends of winding up of every Pin steel truss 2 is connected with the high building 1 at two ends respectively, convenient and reliable in order to connect, mode by welding on an end of the Z font steel flap 5 that each is connected with high building 1 connects a shaped steel 7, the length of shaped steel 7 can be adjusted according to the distance between steel truss 2 and high building 1 agent structure, then the top of shaped steel 7 is welded on the embedded part 8 that is embedded in high building 1 agent structure.

Claims (2)

1. the syndeton between vestibule and the double tower building, comprise high building (1) and between two high buildings (1), be connected with vestibule, it is characterized in that: the support of vestibule by two Pin steel trusss (2) be connected girder steel (3) and interconnect and form, the same end of the lower edge of two Pin steel trusss (2) is fixed on the same high building (1), and promptly the same end of the lower edge of two Pin steel trusss (2) and same high building (1) are rigidly connected; The other end of the lower edge of two Pin steel trusss (2) is connected with another high building (1) by roller support (4); On the position at the two ends of winding up of every Pin steel truss (2), be connected with Z font steel flap (5), and the two ends of winding up of every Pin steel truss (2) are all passed through Z font steel flap (5) and are connected with the high building (1) at two ends respectively.
2. the syndeton between vestibule according to claim 1 and the double tower building is characterized in that: an end of Z font steel flap (5) is connected on the truss vertical support or tie-rod (6) that is connected with winding up of steel truss (2).
CN2009203511272U 2009-12-14 2009-12-14 Connecting structure between vestibule and double tower buildings Expired - Fee Related CN201588305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203511272U CN201588305U (en) 2009-12-14 2009-12-14 Connecting structure between vestibule and double tower buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203511272U CN201588305U (en) 2009-12-14 2009-12-14 Connecting structure between vestibule and double tower buildings

Publications (1)

Publication Number Publication Date
CN201588305U true CN201588305U (en) 2010-09-22

Family

ID=42748078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203511272U Expired - Fee Related CN201588305U (en) 2009-12-14 2009-12-14 Connecting structure between vestibule and double tower buildings

Country Status (1)

Country Link
CN (1) CN201588305U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835369A (en) * 2014-03-05 2014-06-04 江苏南通六建建设集团有限公司 Extensible high-altitude conjoined steel structure
CN113250315A (en) * 2021-06-10 2021-08-13 中铁建工集团有限公司 Energy-consuming type connected structure, connected building system and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835369A (en) * 2014-03-05 2014-06-04 江苏南通六建建设集团有限公司 Extensible high-altitude conjoined steel structure
CN103835369B (en) * 2014-03-05 2015-06-24 江苏南通六建建设集团有限公司 Extensible high-altitude conjoined steel structure
CN113250315A (en) * 2021-06-10 2021-08-13 中铁建工集团有限公司 Energy-consuming type connected structure, connected building system and construction method
CN113250315B (en) * 2021-06-10 2021-09-28 中铁建工集团有限公司 Energy-consuming type connected structure, connected building system and construction method

Similar Documents

Publication Publication Date Title
CN207377121U (en) The formwork erecting structure of concrete floor
CN202248298U (en) Node of steel reinforced concrete framework
CN101748796B (en) Large-span mill construction with super heavy-duty steel structure and design method thereof
CN102094456A (en) Connecting method and structure for corridor and twin towers
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN103015596A (en) Detachable steel structure platform and construction method thereof
CN201588305U (en) Connecting structure between vestibule and double tower buildings
CN207844882U (en) Steel column and crane beam connecting structure
CN207686133U (en) A kind of assembling truss purlin system
CN208137481U (en) A kind of oblique material bracing means of power transmission tower angle steel
CN203452201U (en) Controllable type quantified releasing connecting structure of steel truss
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN219863663U (en) Horizontal variable cross section special-shaped beam of frame structure
CN110143529B (en) Overlong attachment construction method for variable-section truss type tower crane
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN207177086U (en) It is a kind of can quick assembling set up truss
CN207647043U (en) A kind of purlin connecting node of releasable horizontal distortion and adjusting vertical elevation
CN206467892U (en) Steel roof truss
CN203499018U (en) Hinge connection structure for wind-resisting column and roof beam
CN205663282U (en) Light -duty lattice formula steel column of large capacity
CN110469130B (en) Pipe truss girder and pipe truss column flange plate mounting die and mounting method
CN201460022U (en) Cold bending thin-wall welded steel truss purline
CN209260529U (en) A kind of novel combination type trusses
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN203096595U (en) Prestress concrete filled steel tube combined braced girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110601

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110601

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100922

Termination date: 20141214

EXPY Termination of patent right or utility model