CN201572658U - Dustproof and temperature-reduction breaking hammer - Google Patents
Dustproof and temperature-reduction breaking hammer Download PDFInfo
- Publication number
- CN201572658U CN201572658U CN2009201802930U CN200920180293U CN201572658U CN 201572658 U CN201572658 U CN 201572658U CN 2009201802930 U CN2009201802930 U CN 2009201802930U CN 200920180293 U CN200920180293 U CN 200920180293U CN 201572658 U CN201572658 U CN 201572658U
- Authority
- CN
- China
- Prior art keywords
- hammer
- core
- sides
- hammer core
- drill steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a dustproof and temperature-reduction breaking hammer which pertains to the technical field of hydraulic breaking equipment of engineering machinery. The key technical point of the breaking hammer is that the breaking hammer comprises a hammer core, a shell and a drill rod, the hammer core (1) is provided with a water channel (11) which is connected and fixed between the two surfaces of the hammer core and the jacket (2) by a bolt (4) from the end surface of one end of an installation drill rod (3) to the inside of the middle part of the hammer core, and the longitudinal section in the middle at one side of the water channel (11) takes on an L shape which is transversed towards the right; a water inlet (12) which is connected with an outside water inlet pipe is fixed at a water channel port in the middle of the middle part of the hammer core; and a water outlet (13) of the water channel is arranged on the surface of one end of the hammer core provided with the drill rod. As the water outlet is arranged on the surface of one end of the hammer core provided with the drill rod, water which is led in from the water inlet of the water channel is directly sprayed on broken articles and the drill rod when the breaking hammer is used for breaking articles, thus being capable of effectively preventing dust pollution of the broken articles and reducing the high temperature generated by the drill rod due to long-time hammering of articles, and prolonging the service life of the drill rod.
Description
Technical field
The utility model relates to a kind of dustproof, cooling quartering hammer, belongs to engineering machinery hydraulic disintegrating apparatus technical field.
Background technology
At present, in mining engineering, architectural engineering, dismounting engineering, hydraulic crushing equipment has obtained using widely.It is power that hydraulic crushing equipment all adopts hydraulic pressure basically, and driven plunger is beaten drill steel, hits to drill steel by piston hammer and transmits energy, and the energy on the drill steel is absorbed by the object that is impacted, and smashes the purpose that is impacted object thereby reach.But because quartering hammer smashes in the process that is impacted object in hammering, tend to produce a large amount of dust, very easily cause pollution surrounding enviroment; Simultaneously, the long hammering object of drill steel is under the high-temperature work environment it, influences the service life of drill steel.
Summary of the invention
The purpose of this utility model is to provide a kind of quartering hammer dustproof, cooling effect that can play in impacting shattering process, reducing its pollution to environment in shattering process, and can prolong the service life of drill steel.
Its technical scheme is: a kind of dustproof, cooling quartering hammer, comprise hammer core, shell and drill steel, it is characterized in that: described hammer core to hammering into shape in the core middle part, is provided with from the end face that drill steel one end is installed in the middle of a side that is connected and fixed by bolt between hammer core and the overcoat both sides, the longitudinal section is
The water channel of shape, the watercourse port in the middle of the hammer core middle part is fixed with the water inlet that is connected with extraneous water inlet pipe, and the delivery port of this water channel is arranged on the hammer core and installs on the end face of drill steel one end.
Its second kind of technical scheme is: a kind of dustproof, cooling quartering hammer, comprise hammer core, shell and drill steel, and it is characterized in that: described hammer core, offers side-looking respectively and is to two outsides of hammering the core middle part into shape from the end face that drill steel one end is installed
With
The groove of shape; In the middle of the side that is connected and fixed by bolt between hammer core and the overcoat both sides, offer the transverse concave groove that is communicated with grooves on two sides, be inlaid with three-way pipe in this transverse concave groove, one end of this three-way pipe is a water inlet, the delivery port on both sides respectively be embedded in transverse concave groove and be connected with water pipe in the grooves on two sides, the delivery port of both sides water pipe places the hammer core to install on the end face of drill steel one end.
Its third technical scheme is: a kind of dustproof, cooling quartering hammer, it comprises hammer core, shell and drill steel, it is characterized in that: described overcoat is installed the middle part inboard of an end of drill steel to the both sides overcoat from hammering core into shape, offers side-looking respectively and is
With
The groove of shape is inlaid with water pipe respectively in the groove; The bolt in centre that is connected and fixed hammer core and overcoat both sides is a hollow tubular, one end of hollow tubular bolt is by stopping up shutoff, the other end is a water inlet, the delivery port that its both sides are connected with the water pipe inlayed in the overcoat both sides respectively, the delivery port of overcoat both sides inner conduit place the hammer core to install on the end face of drill steel one end.
Its beneficial effect is: quartering hammer is in impacting the process of broken object, be arranged on the delivery port on the hammer core installation drill steel one end end face, to inject directly on by the water that the water channel water inlet is introduced and be impacted on the broken object and drill steel, can effectively prevent to be impacted the dust pollution of broken object and reduce the high temperature that the long-time hammering object of drill steel is produced, prolong the service life of drill steel.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is another structural representation of the present utility model;
Fig. 3 is an another kind of structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of dustproof, cooling quartering hammer comprises hammer core, shell and drill steel.Hammer core 1 to hammering into shape in the core middle part, is provided with from the end face that drill steel 3 one ends are installed in the middle of a side that is connected and fixed by bolt 4 between hammer core and overcoat 2 both sides, the longitudinal section is
The water channel 11 of shape, the watercourse port in the middle of the hammer core middle part is fixed with the water inlet 12 that is connected with external water inlet pipe, and the delivery port 13 of this water channel is arranged on the hammer core and installs on the end face of drill steel one end.
For preventing to impact in the process of broken object at quartering hammer, be injected in by the water channel delivery port and impacted broken object and the water splash on the drill steel, be provided with bulge loop 31 at drill steel 3 near the ends of hammer cores.
Shown in Figure 2 is that another is dustproof, the cooling quartering hammer.It comprises hammer core, shell and drill steel.Hammer core 1 is installed the end face of drill steel 3 one ends certainly to two outsides of hammering the core middle part into shape, offers side-looking respectively and is
With
The groove of shape.In the middle of the side that is connected and fixed by bolt 4 between hammer core and overcoat 2 both sides, offer the transverse concave groove that is communicated with grooves on two sides, be inlaid with three-way pipe 6 in this transverse concave groove, one end of this three-way pipe is a water inlet, the delivery port on both sides respectively be embedded in transverse concave groove and be connected with water pipe 7 in the grooves on two sides, the delivery port 73 of both sides water pipe places the hammer core to install on the end face of drill steel one end.Drill steel 3 is provided with bulge loop 31 near the end of hammer core.
Shown in Figure 3 is that another is dustproof, the cooling quartering hammer.It comprises hammer core, shell and drill steel.Overcoat 2 is installed the middle part inboard of an end of drill steel 3 to the both sides overcoat from hammering core 1 into shape, offers side-looking respectively and is
With
The groove of shape is inlaid with water pipe 7 respectively in the groove.The bolt in centre 4 that is connected and fixed hammer core and overcoat both sides is hollow tubular, one end of hollow tubular bolt is by stopping up shutoff, the other end is a water inlet 41, the delivery port that its both sides are connected with the water pipe inlayed in the overcoat both sides respectively, the delivery port 73 of overcoat both sides inner conduit place the hammer core to install on the end face of drill steel one end.Drill steel 3 is provided with bulge loop 31 near the end of hammer core.
Claims (4)
1. dustproof, cooling quartering hammer, comprise hammer core, shell and drill steel, it is characterized in that: the end face that described hammer core (1) is installed drill steel (3) one ends certainly is to hammering into shape in the core middle part, is provided with in the middle of a side that is connected and fixed by bolt (4) between hammer core and overcoat (2) both sides, the longitudinal section is
The water channel of shape (11), the watercourse port in the middle of the hammer core middle part is fixed with the water inlet (12) that is connected with extraneous water inlet pipe, and the delivery port of this water channel (13) is arranged on the hammer core and installs on the end face of drill steel one end.
2. dustproof, cooling quartering hammer according to claim 1, it is characterized in that: described drill steel (3) is provided with bulge loop (31) near the end of hammer core (1).
3. dustproof, a cooling quartering hammer comprises hammer core, shell and drill steel, it is characterized in that: described hammer core (1) is installed the end face of drill steel (3) one ends certainly to two outsides of hammering the core middle part into shape, offers side-looking respectively and is
With
The groove of shape; In the middle of the side that is connected and fixed by bolt (4) between hammer core and overcoat (2) both sides, offer the transverse concave groove that is communicated with grooves on two sides, be inlaid with three-way pipe (6) in this transverse concave groove, one end of this three-way pipe is a water inlet, the delivery port on both sides respectively be embedded in transverse concave groove and be connected with water pipe (7) in the grooves on two sides, the delivery port of both sides water pipe (73) places the hammer core to install on the end face of drill steel one end.
4. dustproof, cooling quartering hammer, it is characterized in that: described overcoat (2) is hammered core (1) certainly into shape the middle part inboard of an end of drill steel (3) to the both sides overcoat is installed, and offers side-looking respectively and is
With
The groove of shape is inlaid with water pipe (7) respectively in the groove; The bolt in centre (4) that is connected and fixed hammer core and overcoat both sides is a hollow tubular, one end of hollow tubular bolt is by stopping up shutoff, the other end is water inlet (41), the delivery port that its both sides are connected with the water pipe inlayed in the overcoat both sides respectively, the delivery port (73) of overcoat both sides inner conduit place the hammer core to install on the end face of drill steel one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201802930U CN201572658U (en) | 2009-11-04 | 2009-11-04 | Dustproof and temperature-reduction breaking hammer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201802930U CN201572658U (en) | 2009-11-04 | 2009-11-04 | Dustproof and temperature-reduction breaking hammer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201572658U true CN201572658U (en) | 2010-09-08 |
Family
ID=42692538
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201802930U Expired - Fee Related CN201572658U (en) | 2009-11-04 | 2009-11-04 | Dustproof and temperature-reduction breaking hammer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201572658U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103348207A (en) * | 2010-11-03 | 2013-10-09 | 布鲁克有限公司 | Demolition arrangement for remote- controlled working machine equipped with manoeuvrable arm, and use of such for refurbishment of metallurgical vessels |
CN106077398A (en) * | 2016-08-01 | 2016-11-09 | 宜兴市鑫锤锻压设备有限公司 | A kind of pneumatic hammer improving hammering efficiency |
CN108915018A (en) * | 2018-07-10 | 2018-11-30 | 高恒萍 | A kind of self-priming filling liquid hammer with two-sided cooling function |
CN110159182A (en) * | 2017-12-29 | 2019-08-23 | 郑州赫恩电子信息技术有限公司 | A kind of horizontal rock drilling device |
-
2009
- 2009-11-04 CN CN2009201802930U patent/CN201572658U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103348207A (en) * | 2010-11-03 | 2013-10-09 | 布鲁克有限公司 | Demolition arrangement for remote- controlled working machine equipped with manoeuvrable arm, and use of such for refurbishment of metallurgical vessels |
CN103348207B (en) * | 2010-11-03 | 2016-01-20 | 布鲁克有限公司 | For being equipped with the dismounting hammer device of the remote control work machine of motor-driven arm |
CN106077398A (en) * | 2016-08-01 | 2016-11-09 | 宜兴市鑫锤锻压设备有限公司 | A kind of pneumatic hammer improving hammering efficiency |
CN110159182A (en) * | 2017-12-29 | 2019-08-23 | 郑州赫恩电子信息技术有限公司 | A kind of horizontal rock drilling device |
CN108915018A (en) * | 2018-07-10 | 2018-11-30 | 高恒萍 | A kind of self-priming filling liquid hammer with two-sided cooling function |
CN108915018B (en) * | 2018-07-10 | 2021-02-26 | 安徽英泰科技有限公司 | Self-filling hydraulic hammer with double-side cooling function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201572658U (en) | Dustproof and temperature-reduction breaking hammer | |
CN208167854U (en) | A kind of environment-friendly type hydraulic breaking hammer | |
CN202248006U (en) | Novel hydraulic crushing hammer | |
CN104234109B (en) | Hydraulic breaking hammer | |
CN204080903U (en) | A kind of hydraulic breaking hammer | |
CN203638446U (en) | Hydraulic arch breaker | |
CN203097721U (en) | High-energy percussion rock-breaking PDC (polycrystalline diamond compact) drill bit | |
CN202248004U (en) | Connecting structure of hydraulic breaking hammer cylinder body | |
CN103410439B (en) | The hammer drill of rubber corselet shoulder type six side drill steel can be cooled | |
CN210315736U (en) | Hydraulic breaker | |
CN214836229U (en) | Mechanical jar | |
CN212104296U (en) | Compact spraying anti-brittle-fracture hydraulic breaking hammer | |
CN211285764U (en) | Pneumatic breaking hammer | |
CN210066876U (en) | Breaking hammer supercharger | |
CN201384964Y (en) | Hydraulic cylinder used for breaking hammer | |
CN202989180U (en) | Linear plate fixing device of steel slag pyrolytic device | |
CN204352933U (en) | A kind of catalase hammer hammer axle fastener | |
CN104074907B (en) | A kind of vibration absorber of impact type ridge buster | |
CN202811529U (en) | Novel slurry pump overflowing device | |
CN202753100U (en) | Auxiliary device for mounting and dismounting of roller drill pressuring chain | |
CN206519189U (en) | A kind of engineering construction crushes rifle with assault type high pressure | |
CN202622296U (en) | Mechanical coupling detachment mechanism | |
CN215029505U (en) | Hydraulic operating device for replacing hammer head of large hammer crusher | |
CN202628137U (en) | Anchor bolt with pressure releasing device | |
CN203002445U (en) | Combination sectional type anvil of vertical shaft crusher |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100908 Termination date: 20111104 |