CN201568059U - 煤矿井下大面积盘区水仓 - Google Patents
煤矿井下大面积盘区水仓 Download PDFInfo
- Publication number
- CN201568059U CN201568059U CN200920275809XU CN200920275809U CN201568059U CN 201568059 U CN201568059 U CN 201568059U CN 200920275809X U CN200920275809X U CN 200920275809XU CN 200920275809 U CN200920275809 U CN 200920275809U CN 201568059 U CN201568059 U CN 201568059U
- Authority
- CN
- China
- Prior art keywords
- water sump
- tunnel
- sump
- coal mine
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及煤矿井下水仓,具体为一种煤矿井下大面积盘区水仓,解决了现有水仓容积小且清理困难的问题。煤矿井下大面积盘区水仓,包括在煤柱较大的两巷道之间开有巷道,巷道底面设为n个坡面,各坡面底端部设有外挡墙,外挡墙的内侧均设有透水墙,各坡面顶端部设有横川。本实用新型通过开设底面带有坡度的巷道作为水仓,不仅增大了水仓的容积,而且铲车通过横川进入坡面的顶端清理煤泥,有效地解决了水仓煤泥清理苦难的问题,而且采用机掘施工巷道比传统的通过放炮施工方式具有速度快、安全系数高的优点,而且减轻了工人的劳动强度,实现快速机械化清理水仓,保证了井下大面积盘区的排水畅通,为抽放及采掘生产提供了有力的支持。
Description
技术领域
本实用新型涉及煤矿井下水仓,具体为一种煤矿井下大面积盘区水仓。
背景技术
煤矿井下大面积盘区的煤层比普通煤矿井下煤层高,为防止瓦斯突出等恶性事故的发生,同时最大限度保障采掘安全,必须加大抽放力度。而抽放力度的加大导致生产用水的增加,势必加大整个盘区的排水量,而且抽放涌水的特点是含煤屑量大,大量煤泥沉积在水仓中,导致水仓容积的减小,所以,煤矿井下大面积盘区水仓清理必然非常频繁。传统的起底施工水仓是在巷道底板1挖出一个水槽,水槽的底面为用混凝土硬化制成的水仓底板2,使用时存在以下缺点:(1)起底工程量大,工期长;(2)需放炮施工,安全性差;(3)出矸对溜子等运输设备磨损严重;(4)清理水仓困难,需采用人工提升方式,劳动强度较大。传统的砌筑砖墙水仓是在巷道的前后两侧砌有用砂浆抹面制成的砖墙3,相比起底施工水仓工程量和工期大大减少,但仍不能很好的解决水仓清理的问题。
发明内容
本实用新型为了解决现有水仓容积小且清理困难的问题,提供了一种煤矿井下大面积盘区水仓。
本实用新型是采用如下技术方案实现的:煤矿井下大面积盘区水仓,包括在煤柱较大的两巷道之间开有巷道,巷道底面设为n(n为自然数)个坡面,各坡面底端部均设有外挡墙,外挡墙的内侧均设有透水墙,各坡面顶端部均设有横川。具体工作时,涌出水流入水仓,经过透水墙的过滤,将煤泥留在了水仓的巷道底板上,过滤后的水经过外挡墙上的水泵抽出进行处理后,循环利用,为了避免水仓的容积变小,铲车通过横川进入水仓坡面的顶端部清理煤泥,有效地解决了水仓煤泥清理困难的问题,而且减轻了工人的劳动强度。
本实用新型通过开设底面带有坡度的巷道作为水仓,不仅增大了水仓的容积,而且铲车通过横川进入坡面的顶端清理煤泥,有效地解决了水仓煤泥清理苦难的问题,而且采用机掘施工巷道比传统的通过放炮施工方式具有速度快、安全系数高的优点,而且减轻了工人的劳动强度,实现快速机械化清理水仓,保证了井下大面积盘区的排水畅通,为抽放及采掘生产提供了有力的支持。
附图说明
图1为现有起底施工水仓的结构示意图;
图2为现有砌筑砖墙水仓的结构示意图;
图3为本实用新型在煤矿井下大面积盘区中的结构示意图;
图4为本实用新型的侧视示意图。
图中:1-巷道底板,2-水仓底板,3-砖墙,4-横川,5-透水墙,6-外挡墙,7-巷道,8-坡面。
具体实施方式
煤矿井下大面积盘区水仓,包括在煤柱较大的两巷道之间开有巷道7,巷道7底面设为n个坡面8(本实用新型在实施过程中n的数量是2,也就是说巷道7底面设有两个坡面8),各坡面8底端部设有外挡墙6,外挡墙6的内侧均设有透水墙5,各坡面顶端部设有横川4。具体实施过程中,用掘进机在两巷道之间掘出一条巷道7,巷道7的坡面8顶部均掘出横川4,已实现对水仓的清理。
Claims (1)
1.一种煤矿井下大面积盘区水仓,其特征在于:包括在煤柱较大的两巷道之间开有巷道(7),巷道(7)底面设为n个坡面(8),各坡面(8)底端部均设有外挡墙(6),外挡墙(6)的内侧均设有透水墙(5),各坡面顶端部均设有横川(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920275809XU CN201568059U (zh) | 2009-12-20 | 2009-12-20 | 煤矿井下大面积盘区水仓 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920275809XU CN201568059U (zh) | 2009-12-20 | 2009-12-20 | 煤矿井下大面积盘区水仓 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201568059U true CN201568059U (zh) | 2010-09-01 |
Family
ID=42660346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920275809XU Expired - Lifetime CN201568059U (zh) | 2009-12-20 | 2009-12-20 | 煤矿井下大面积盘区水仓 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201568059U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383858A (zh) * | 2011-10-06 | 2012-03-21 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
CN112546700A (zh) * | 2020-12-29 | 2021-03-26 | 山西三元煤业股份有限公司 | 一种井下用水仓施工方法 |
CN113336346A (zh) * | 2021-05-24 | 2021-09-03 | 国电建投内蒙古能源有限公司 | 一种联络巷式井下中转污水处理系统及其构筑方法 |
-
2009
- 2009-12-20 CN CN200920275809XU patent/CN201568059U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383858A (zh) * | 2011-10-06 | 2012-03-21 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
CN102383858B (zh) * | 2011-10-06 | 2014-02-26 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
CN112546700A (zh) * | 2020-12-29 | 2021-03-26 | 山西三元煤业股份有限公司 | 一种井下用水仓施工方法 |
CN113336346A (zh) * | 2021-05-24 | 2021-09-03 | 国电建投内蒙古能源有限公司 | 一种联络巷式井下中转污水处理系统及其构筑方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103615285B (zh) | 一种利于充填接顶的采场进路布置方式及方法 | |
CN102852550B (zh) | 一种无煤柱半原位沿空留巷方法 | |
CN102168579A (zh) | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 | |
CN103147792B (zh) | 进路式采煤充填法 | |
CN104775817A (zh) | 全负压连采连充分步置换“三下”采煤法 | |
CN107893658A (zh) | 强地压环境下极厚大矿体阶段空场嗣后充填采矿方法 | |
CN101270672A (zh) | 一种人工矿柱的构筑方法 | |
CN102704873A (zh) | 自带泥浆池及泥浆分离装置钻/冲孔灌注桩的施工设备 | |
CN111058458A (zh) | 基于绞吸式地连墙局部替代排桩支护的施工方法及结构 | |
CN103206215A (zh) | 一种预控顶上向进路充填采矿法 | |
CN104088662A (zh) | 一种固体充填采煤沿空留巷支护墙体的施工方法 | |
CN109629561A (zh) | 一种清洁环保的高栈桥施工平台反循环成桩系统 | |
CN201568059U (zh) | 煤矿井下大面积盘区水仓 | |
CN210948688U (zh) | 一种人工假巷 | |
CN106089207A (zh) | 特厚煤层工作面沿空掘巷窄煤柱留设方法 | |
CN103982186A (zh) | 无底柱后退式竖向倾斜分条分段崩落采矿法 | |
CN100485161C (zh) | 上向间隔进路充填采矿方法 | |
CN103061767A (zh) | 下向水平分层干式充填采矿法 | |
WO2016155657A1 (zh) | 移动式围堰明挖法 | |
CN102322068B (zh) | 减压降水辅助成槽施工工艺 | |
CN107701231A (zh) | 一种集约化整体结构井下水仓系统及其施工方法 | |
CN209483247U (zh) | 用于高栈桥施工平台反循环成桩系统的钻渣沉淀过滤箱 | |
CN210977592U (zh) | 一种煤矿井下新型盘区小型水仓 | |
CN209483248U (zh) | 用于高栈桥施工平台反循环成桩系统的钻渣储蓄箱 | |
CN110500132A (zh) | 一种上行式空场嗣后废石胶结充填方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20100901 |
|