CN201567793U - Simple material distributing device for high-rise concrete pouring construction - Google Patents

Simple material distributing device for high-rise concrete pouring construction Download PDF

Info

Publication number
CN201567793U
CN201567793U CN2009202479335U CN200920247933U CN201567793U CN 201567793 U CN201567793 U CN 201567793U CN 2009202479335 U CN2009202479335 U CN 2009202479335U CN 200920247933 U CN200920247933 U CN 200920247933U CN 201567793 U CN201567793 U CN 201567793U
Authority
CN
China
Prior art keywords
pipe
cloth
tube
construction
distributing pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202479335U
Other languages
Chinese (zh)
Inventor
韩春浩
张西祥
刘东涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANGANG REAL ESTATE DEVELOPMENT (GROUP) Co Ltd
Original Assignee
ANGANG REAL ESTATE DEVELOPMENT (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANGANG REAL ESTATE DEVELOPMENT (GROUP) Co Ltd filed Critical ANGANG REAL ESTATE DEVELOPMENT (GROUP) Co Ltd
Priority to CN2009202479335U priority Critical patent/CN201567793U/en
Application granted granted Critical
Publication of CN201567793U publication Critical patent/CN201567793U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to the field of construction facilities in building industry, in particular to a simple material distributing device for high-rise concrete pouring construction. The material distributing device is characterized in that the end part of a movable distributing pipe is connected with a rubber hose; a connecting bent pipe I is arranged between the movable distributing pipe and an oscillating distributing pipe; a connecting bent pipe II is arranged between the oscillating distributing pipe and a fixed distributing pipe; the fixed distributing pipe is connected with a fixture through a bracket; the fixed distributing pipe, the oscillating distributing pipe and the movable distributing pipe can be designed into a plurality of sections according to the actual situation, and the length of each section can be set according to the actual situation on site; and a lifting ring is arranged on the movable distributing pipe. The material distributing device has the benefits of simple assembly, economy and practicality, and good stability in the concrete pouring process; the distributing pipes can be lengthened at will and moved conveniently to meet the construction requirements; and as a crane is used for coordination, construction operations are facilitated for pouring personnel, the construction efficiency is improved, the project construction progress is accelerated, and the concrete pouring quality is guaranteed.

Description

The simple and easy distribution device of highrise building pouring concrete construction
Technical field
The utility model relates to the builing industry construction and uses the supporting facility field, relates in particular to the simple and easy distribution device of a kind of highrise building pouring concrete construction.
Background technology
In the building engineering construction process, concrete pouring belongs to a very important step, particularly now increasing highrise building, and concreting becomes the emphasis in the engineering construction.More high-rise concreting is adopted the ground pump to cooperate with apparatus for distributing and is constructed, the difficulty or ease of concrete distributing equipment operation, the height of service efficiency, become one of factor of engineering constraint construction speed speed, influence the efficient of concrete construction to a great extent, thereby influenced the integral construction progress of engineering.
The support system of at present commercially available standard concrete cloth tube is too high, the armed lever and the support arm of cloth tube are long, when concreting, the armed lever amplitude is bigger, less stable, the constructor is difficult to operation, and efficiency of construction is low, to the control of Concrete Construction difficult quality, also be unfavorable for the finished product protection of constructor to reinforcing bar; And the template at cloth tube support place is subjected to this frequent vibrations, very easily produces distortion, also influences this position concrete construction quality.
Summary of the invention
The purpose of this utility model provides the simple and easy distribution device of a kind of highrise building pouring concrete construction, is easy to constructor's operation, accelerates the speed of concreting.
For solving the problems of the technologies described above, the technical solution of the utility model is:
The simple and easy distribution device of highrise building pouring concrete construction, it is characterized in that, comprise fixedly cloth tube, the swing cloth tube, the moving cloth pipe, support, rubber hose, bridge piece one, bridge piece two, the moving cloth tube end is connected with rubber hose, between moving cloth pipe and the swing cloth tube bridge piece one is set, swing cloth tube and bridge piece two fixedly is set between the cloth tube, fixedly the effective support of cloth is connected with fixture, described fixedly cloth tube, the swing cloth tube, the moving cloth pipe can be set as some joints according to actual conditions, and every joint length can be decided according to on-site actual situations.
Described bridge piece one comprises elbow, rotatable pipe collar, pipe collar, straight tube one, and straight tube is held one by one successively and is connected with elbow with pipe collar, and the other end is connected with elbow with rotatable pipe collar successively.
Described bridge piece two comprises elbow, rotatable pipe collar, pipe collar, straight tube two, and straight tube 21 ends are connected with elbow with pipe collar successively, and the other end is connected with elbow with rotatable pipe collar successively, and the length of straight tube two is decided according to the on-the-spot height of cast.
Can establish hog frame between described bridge piece two and the fixture.
Described moving cloth pipe is provided with suspension ring.
Compared with prior art, the beneficial effects of the utility model are: assembling is simple, and is economical and practical, good stability during concreting; Cloth tube is spreading arbitrarily, and conveniently moving satisfies construction requirement; Utilize crane to cooperate, conveniently build the personnel operation construction, improved efficiency of construction, accelerated the engineering construction progress, help guaranteeing concrete pouring quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is bridge piece one structural representation;
Fig. 4 is bridge piece two structural representations.
Among the figure: 1-is the rotatable pipe collar 9-elbow 10-pipe collar 11-suspension ring 12-straight tube two 13-bridge pieces one 14-bridge piece two of cloth tube 2-support 3-rubber hose 4-hog frame 5-swing cloth tube 6-moving cloth pipe 7-straight tube one 8-fixedly
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further:
See Fig. 1, Fig. 2, the simple and easy distribution device of highrise building pouring concrete construction, comprise fixedly cloth tube 1, swing cloth tube 5, moving cloth pipe 6, support 2, rubber hose 3, bridge piece 1, bridge piece 2 14, moving cloth pipe 6 ends are connected with rubber hose 3, between moving cloth pipe 6 and the swing cloth tube 5 bridge piece 1 is set, swing cloth tube 5 and bridge piece 2 14 fixedly is set between the cloth tube 1, fixedly cloth tube 1 usefulness support 2 is connected with fixture, fixedly cloth tube 1, swing cloth tube 5, moving cloth pipe 6 can be set as some joints according to actual conditions, and every joint length can be decided according to on-site actual situations.To guarantee that moving cloth pipe 6 ends move freely.Moving cloth pipe 6 is provided with suspension ring 11.
See Fig. 3, bridge piece 1 comprises elbow 9, rotatable pipe collar 8, pipe collar 10, straight tube 1, and straight tube one 7 one ends are connected with elbow 9 with pipe collar 10 successively, and the other end is connected with elbow 9 with rotatable pipe collar 8 successively.
See Fig. 4, bridge piece 2 14 comprises elbow 9, rotatable pipe collar 8, pipe collar 10, straight tube 2 12, straight tube 2 12 1 ends are connected with elbow 9 with pipe collar 10 successively, and the other end is connected with elbow 9 with rotatable pipe collar 8 successively, and the length of straight tube 2 12 is decided according to the on-the-spot height of cast.
Can establish hog frame 4 between bridge piece 2 14 and the fixture.
The utility model is applicable to high building project, when pumping of concrete can't satisfy construction requirement, all can adopt the simple and easy distribution device of this kind to carry out concrete construction.Assembling is simple, and is economical and practical, good stability during concreting; Cloth tube is spreading arbitrarily, and conveniently moving satisfies construction requirement; Utilize crane to cooperate, conveniently build the personnel operation construction, improved efficiency of construction, accelerated the engineering construction progress, help guaranteeing concrete pouring quality.
1, this distribution device must with can be used by towed concrete ground pump.
2, utilize crane to hang moving cloth pipe 6 upper lift rings 11, drive swing cloth tube 5, the rubber hose 3 that manually buttresses pipe end can be carried out concreting.According to the job site requirement, swing cloth tube 5 can increase or remove.
3, fixedly cloth tube 1 usefulness steel pipe and fastener are done support 2, are connected with fixture and play a supporting role.

Claims (5)

1. the simple and easy distribution device of highrise building pouring concrete construction, it is characterized in that, comprise fixedly cloth tube, the swing cloth tube, the moving cloth pipe, support, rubber hose, bridge piece one, bridge piece two, the moving cloth tube end is connected with rubber hose, between moving cloth pipe and the swing cloth tube bridge piece one is set, swing cloth tube and bridge piece two fixedly is set between the cloth tube, fixedly the effective support of cloth is connected with fixture, described fixedly cloth tube, the swing cloth tube, the moving cloth pipe can be set as some joints according to actual conditions, and every joint length can be decided according to on-site actual situations.
2. the simple and easy distribution device of highrise building pouring concrete construction according to claim 1, it is characterized in that, described bridge piece one comprises elbow, rotatable pipe collar, pipe collar, straight tube one, straight tube is held one by one successively and is connected with elbow with pipe collar, and the other end is connected with elbow with rotatable pipe collar successively.
3. the simple and easy distribution device of highrise building pouring concrete construction according to claim 1, it is characterized in that, described bridge piece two comprises elbow, rotatable pipe collar, pipe collar, straight tube two, straight tube 21 ends are connected with elbow with pipe collar successively, the other end is connected with elbow with rotatable pipe collar successively, and the length of straight tube two is decided according to the on-the-spot height of cast.
4. the simple and easy distribution device of highrise building pouring concrete construction according to claim 3 is characterized in that, can establish hog frame between described bridge piece two and the fixture.
5. the simple and easy distribution device of highrise building pouring concrete construction according to claim 1 is characterized in that described moving cloth pipe is provided with suspension ring.
CN2009202479335U 2009-11-10 2009-11-10 Simple material distributing device for high-rise concrete pouring construction Expired - Fee Related CN201567793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202479335U CN201567793U (en) 2009-11-10 2009-11-10 Simple material distributing device for high-rise concrete pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202479335U CN201567793U (en) 2009-11-10 2009-11-10 Simple material distributing device for high-rise concrete pouring construction

Publications (1)

Publication Number Publication Date
CN201567793U true CN201567793U (en) 2010-09-01

Family

ID=42660080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202479335U Expired - Fee Related CN201567793U (en) 2009-11-10 2009-11-10 Simple material distributing device for high-rise concrete pouring construction

Country Status (1)

Country Link
CN (1) CN201567793U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938900A (en) * 2014-04-29 2014-07-23 中联重科股份有限公司 Construction method of cooling tower and tower crane
CN108086686A (en) * 2017-11-24 2018-05-29 上海建工集团股份有限公司 Single oil cylinder all standing distribution device and its construction method
CN111971440A (en) * 2018-03-22 2020-11-20 普茨迈斯特工程有限责任公司 End hose support for a distribution rod of a concrete pump, concrete pump having an end hose support, and method for assembling an end hose support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938900A (en) * 2014-04-29 2014-07-23 中联重科股份有限公司 Construction method of cooling tower and tower crane
CN103938900B (en) * 2014-04-29 2015-11-18 中联重科股份有限公司 A kind of construction method of cooling tower and tower machine
CN108086686A (en) * 2017-11-24 2018-05-29 上海建工集团股份有限公司 Single oil cylinder all standing distribution device and its construction method
CN111971440A (en) * 2018-03-22 2020-11-20 普茨迈斯特工程有限责任公司 End hose support for a distribution rod of a concrete pump, concrete pump having an end hose support, and method for assembling an end hose support

Similar Documents

Publication Publication Date Title
CN105484514A (en) Method for strengthening circular reinforced concrete pier column
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN201567793U (en) Simple material distributing device for high-rise concrete pouring construction
CN108131012A (en) A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method
CN201401005Y (en) Template sliding and lifting device
CN203187333U (en) Light carrying device for building block installment
CN104895329B (en) Silo sliding formwork storehouse wall concrete with liter conveying, pour device
CN205046854U (en) Drum formula concrete spreader
CN205205683U (en) High mound construction formwork device of concrete
CN207144456U (en) Builder's jack I-steel built-in fitting
CN207957611U (en) A kind of small members are mobile and install equipment
CN201873949U (en) Bride prestress stretch-draw trolley
CN213951977U (en) Health preserving equipment suitable for long-span prestressing force continuous rigid frame section concrete
CN205822014U (en) A kind of Hollow High Pier pier top entity section template rigid frame
CN204770348U (en) Major diameter steel reinforcement cage strengthening rib processing equipment
CN207582934U (en) A kind of pre-buried hook for being used to fix builder's jack I-steel
CN205933040U (en) Portal frame hoisting accessory
CN204265249U (en) A kind of transfer crane and portal frame thereof
CN206035506U (en) Tunnel pressure steel pipe bottom concrete construction device
CN212027140U (en) Steel column bottom grouting device
CN205222519U (en) Simple and easy rotatory bull ladle device
CN204977023U (en) T girder iron muscle standard festival production ligature device
CN207645611U (en) A kind of prefabricated small box girder, T beam reinforcement cages suspenders
CN204418681U (en) The overall advance and retreat mold mechanism of a kind of band inner corner trim wall form
CN212979183U (en) Pipe production line deviation prevention system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100901

Termination date: 20131110