CN201560151U - Sewage water circulation processing device - Google Patents

Sewage water circulation processing device Download PDF

Info

Publication number
CN201560151U
CN201560151U CN2009201998715U CN200920199871U CN201560151U CN 201560151 U CN201560151 U CN 201560151U CN 2009201998715 U CN2009201998715 U CN 2009201998715U CN 200920199871 U CN200920199871 U CN 200920199871U CN 201560151 U CN201560151 U CN 201560151U
Authority
CN
China
Prior art keywords
preliminary sedimentation
sewage
sedimentation tank
sludge
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201998715U
Other languages
Chinese (zh)
Inventor
邱风雷
向安乐
张永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongchun Gaoke Pile Industry Co., Ltd.
Original Assignee
NINGBO ZHEDONG BUILDING MATERIAL GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO ZHEDONG BUILDING MATERIAL GROUP CO Ltd filed Critical NINGBO ZHEDONG BUILDING MATERIAL GROUP CO Ltd
Priority to CN2009201998715U priority Critical patent/CN201560151U/en
Application granted granted Critical
Publication of CN201560151U publication Critical patent/CN201560151U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a sewage water circulation processing device capable of processing and circularly utilizing sewage water which is used for cleaning fragmental stones and removing sludge, thereby reducing the pollution and production cost, and saving water consumption, the device comprises an primary deposition pool (1) for collecting sewage water, a sludge pool (2) for further performing the sedimentation processing on the sewage water from the primary deposition pool (1), an original water pool (3) for storing sewage water processed by the sludge pool (2), a clear-water pool (4), and a sewage water processor. The primary deposition pool (1), the sludge pool (2), the sewage water processor and the clear-water pool (4) are communicated in order.

Description

The effluent cycle treatment unit
Technical field
The utility model relates to technical field of buildings, specifically is a kind of effluent cycle treatment unit.
Background technology
At present manually clean desilt for rubble for building, to guarantee the quality of building body, the large amount of sewage of generation directly discharges by covered drainage ditch or other form, like this, not only greatly pollute surrounding enviroment, and wasted great amount of water resources, increased production cost.
The utility model content
The technical problems to be solved in the utility model is, provides a kind of sewage that rubble can be cleaned behind the desilt to handle and recycle, thus the effluent cycle treatment unit that reduces pollution, water saving, reduces production costs.
The technical solution of the utility model is, the utility model effluent cycle treatment unit, it comprises the preliminary sedimentation tank that is used to collect sewage, the sewage of coming from preliminary sedimentation tank is further carried out the sludge sump of precipitation process, former pond, clean water basin, the apparatus for treating sewage of the sewage of storage after sludge sump is handled, and described preliminary sedimentation tank, sludge sump, former pond, apparatus for treating sewage, clean water basin are communicated with in regular turn.
After adopting said structure, the utility model compared with prior art, have the following advantages: because it comprises the preliminary sedimentation tank that is used to collect sewage, the sewage of coming from preliminary sedimentation tank is further carried out the sludge sump of precipitation process, the former pond of the sewage of storage after sludge sump is handled, clean water basin, apparatus for treating sewage, described preliminary sedimentation tank, sludge sump, former pond, apparatus for treating sewage, clean water basin are communicated with in regular turn, so rubble cleans sewage behind the desilt and can be handled in time and be stored in the clean water basin to take for the workman and wash rubble, the utility model effluent cycle treatment unit is had rubble can be cleaned the sewage behind the desilt to be handled and recycle, pollute thereby reduce, water saving, the advantage that reduces production costs.
As improvement, described apparatus for treating sewage comprises static mixer, integral water purifier, coagulating agent doser, sodium hydroxide doser, and described former pond, integral water purifier, coagulating agent doser, sodium hydroxide doser are connected by pipeline with static mixer respectively; The clear water delivery port of described integral water purifier is connected by pipeline with clean water basin, and the sewage draining exit of described integral water purifier is connected by pipeline with sludge sump; In the described former pond raw water pump is installed, raw water pump is connected by pipeline with static mixer, and described apparatus for treating sewage compact construction, specific aim are strong, cost performance is high, is more conducive to the raising of enforcement of the present utility model and performance.
As further improvement, described preliminary sedimentation tank is two, be designated as a preliminary sedimentation tank and No. two preliminary sedimentation tanks respectively, a described preliminary sedimentation tank and No. two preliminary sedimentation tanks are interconnected, described No. two preliminary sedimentation tanks also are communicated with sludge sump, through experiment, two preliminary sedimentation tanks help accelerating sewage processing speed, alleviate sludge sump and handle burden, thereby more help improving processing power of the present utility model.
As further improvement, it also comprises the sludge pump that is used to collect the plate-and-frame filter press of mud and extracts mud, described sludge pump is installed in the sludge sump, and described sludge pump is connected by pipeline with plate-and-frame filter press, like this, can clear up sludge sump on the one hand, make sludge sump keep certain processing capabilities, on the other hand, the mud of collecting by plate-and-frame filter press can use it for anything else, bring economic benefit, be more conducive to enforcement of the present utility model.
Description of drawings
Accompanying drawing is the structural representation of the utility model effluent cycle treatment unit.
Shown in the figure: 1, preliminary sedimentation tank, 1.1, the slope, 1-1, a preliminary sedimentation tank, 1-2, No. two preliminary sedimentation tanks, 2, sludge sump, 3, former pond, 4, clean water basin, 5, static mixer, 6, integral water purifier, 7, coagulating agent doser, 8, the sodium hydroxide doser, 9, plate-and-frame filter press, 10, sludge pump, 11, backwash pump, 12, the clear water working shaft, 13, raw water pump, 14, wade acroos a river the open drain, 15, wade acroos a river mouth.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
The utility model effluent cycle treatment unit, it comprises the preliminary sedimentation tank 1 that is used to collect sewage, the sewage of coming from preliminary sedimentation tank 1 is further carried out the sludge sump 2 of precipitation process, former pond 3, clean water basin 4, the apparatus for treating sewage of the sewage of storage after sludge sump 2 is handled, and described preliminary sedimentation tank 1, sludge sump 2, former pond 3, apparatus for treating sewage, clean water basin 4 are communicated with in regular turn.
Described apparatus for treating sewage comprises static mixer 5, integral water purifier 6, coagulating agent doser 7, sodium hydroxide doser 8, and described former pond 3, integral water purifier 6, coagulating agent doser 7, sodium hydroxide doser 8 are connected by pipeline with static mixer 5 respectively; The clear water delivery port of described integral water purifier 6 and clean water basin 4 are connected by pipeline, and the sewage draining exit of described integral water purifier 6 and sludge sump 2 are connected by pipeline; In the described former pond 3 raw water pump 13 is installed, raw water pump 13 and static mixer 5 are connected by pipeline.
Described former pond 3, apparatus for treating sewage, clean water basin 4 are communicated with in regular turn and are meant, raw water pump 13 is connected by pipeline so that former pond 3 is communicated with apparatus for treating sewage with static mixer 5, and the clear water delivery port of described integral water purifier 6 is connected by pipeline so that apparatus for treating sewage is communicated with clean water basin 4 with clean water basin 4.
Described preliminary sedimentation tank 1 is two, is designated as a preliminary sedimentation tank 1-1 and No. two preliminary sedimentation tank 1-2 respectively, and a described preliminary sedimentation tank 1-1 and No. two preliminary sedimentation tank 1-2 are interconnected, and described No. two preliminary sedimentation tank 1-2 also are communicated with sludge sump 2.A described preliminary sedimentation tank 1-1 and No. two preliminary sedimentation tank 1-2 are equipped with slope 1.1, to make things convenient for engineering machinery to enter and the throw out among preliminary sedimentation tank 1-1 and No. two preliminary sedimentation tank 1-2 is rooted out.
A described preliminary sedimentation tank 1-1, No. two preliminary sedimentation tank 1-2, sludge sump 2, former ponds 3 by wading acroos a river mouthful 15 connections, wade acroos a river the routine techniques that is set to of mouth 15 in regular turn, do not add and give unnecessary details.
It also comprises plate-and-frame filter press 9 that is used to collect mud and the sludge pump 10 that extracts mud, and described sludge pump 10 is installed in the sludge sump 2, and described sludge pump 10 and plate-and-frame filter press 9 are connected by pipeline.Described plate-and-frame filter press 9 periphery being provided with wade acroos a river open drain 14, wade acroos a river open drain 14 sewage that plate-and-frame filter press 9 press filtrations go out is entered sludge sump 2.The sewage that plate-and-frame filter press 9 press filtrations go out also can use pipeline to collect and enter sludge sump 2.
Backwash pump 11 and clear water working shaft 12 also are installed in the described clean water basin 4, and clear water working shaft 12 is used for extracting the clear water of clean water basin 4 out clean water basin 4.
Said structure sees also accompanying drawing, and is succinctly clear in order to represent, the described pipeline that do not draw in the accompanying drawing connects the pipeline of indication.
The operation workflow of the utility model effluent cycle treatment unit is as follows, sewage at first enters a preliminary sedimentation tank 1-1 and carries out precipitation process, enter No. two preliminary sedimentation tank 1-2 then and carry out precipitation process, then enter sludge sump 2 and carry out precipitation process, it is stand-by to enter former pond 3 again, in the water suction static mixer 5 of raw water pump 13 with former pond 3, static mixer 5 is with water and coagulating agent doser 7, the liquid medicine that sodium hydroxide doser 8 is come is thorough mixing together, mixed water being flowed to integral water purifier 6 handles again, after integral water purifier 6 is handled, promptly obtain clear water, and it is stand-by to flow into clean water basin 4 storages.
Described static mixer 5, integral water purifier 6, coagulating agent doser 7, sodium hydroxide doser 8, plate-and-frame filter press 9, sludge pump 10, backwash pump 11, clear water working shaft 12, raw water pump 13 are commercially available, do not add and give unnecessary details.

Claims (4)

1. effluent cycle treatment unit, it is characterized in that, it comprises the preliminary sedimentation tank (1) that is used to collect sewage, the sewage of coming from preliminary sedimentation tank (1) is further carried out the sludge sump (2) of precipitation process, former pond (3), clean water basin (4), the apparatus for treating sewage of the sewage of storage after sludge sump (2) is handled, and described preliminary sedimentation tank (1), sludge sump (2), former pond (3), apparatus for treating sewage, clean water basin (4) are communicated with in regular turn.
2. effluent cycle treatment unit according to claim 1, it is characterized in that: described apparatus for treating sewage comprises static mixer (5), integral water purifier (6), coagulating agent doser (7), sodium hydroxide doser (8), and described former pond (3), integral water purifier (6), coagulating agent doser (7), sodium hydroxide doser (8) are connected by pipeline with static mixer (5) respectively; The clear water delivery port of described integral water purifier (6) is connected by pipeline with clean water basin (4), and the sewage draining exit of described integral water purifier (6) is connected by pipeline with sludge sump (2); Raw water pump (13) is installed in the described former pond (3), and raw water pump (13) is connected by pipeline with static mixer (5).
3. effluent cycle treatment unit according to claim 1, it is characterized in that: described preliminary sedimentation tank (1) is two, be designated as a preliminary sedimentation tank (1-1) and No. two preliminary sedimentation tanks (1-2) respectively, a described preliminary sedimentation tank (1-1) and No. two preliminary sedimentation tanks (1-2) are interconnected, and described No. two preliminary sedimentation tanks (1-2) also are communicated with sludge sump (2).
4. effluent cycle treatment unit according to claim 1, it is characterized in that: it also comprises plate-and-frame filter press (9) that is used to collect mud and the sludge pump (10) that extracts mud, described sludge pump (10) is installed in the sludge sump (2), and described sludge pump (10) is connected by pipeline with plate-and-frame filter press (9).
CN2009201998715U 2009-11-19 2009-11-19 Sewage water circulation processing device Expired - Fee Related CN201560151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201998715U CN201560151U (en) 2009-11-19 2009-11-19 Sewage water circulation processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201998715U CN201560151U (en) 2009-11-19 2009-11-19 Sewage water circulation processing device

Publications (1)

Publication Number Publication Date
CN201560151U true CN201560151U (en) 2010-08-25

Family

ID=42625298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201998715U Expired - Fee Related CN201560151U (en) 2009-11-19 2009-11-19 Sewage water circulation processing device

Country Status (1)

Country Link
CN (1) CN201560151U (en)

Similar Documents

Publication Publication Date Title
CN103771605B (en) Onboard micro-filtration algae removal system and algae removal method
CN104591359A (en) Sewage treatment device
CN203270698U (en) Domestic water recycling device
CN201686571U (en) Double-core water-saving reverse osmosis water purifier
CN203724881U (en) Scum processing system
CN203855482U (en) Combined air flotation device
CN110368740A (en) A kind of construction site waste water filtering recycling device
CN201560151U (en) Sewage water circulation processing device
CN205500984U (en) Novel sewage purification processing device
RU195504U1 (en) SOIL WATER AND SOIL CLEANER
CN207498160U (en) A kind of circulating equipment for processing industrial sewage
CN202081471U (en) Household water recycling device
CN206408056U (en) A kind of sanitary wastewater recycling equipment
CN204974585U (en) Pond device of cyclic utilization cleaner
CN204588882U (en) A kind of waste water reclamation utilizes device
CN211712650U (en) Paper-plastic wastewater filtering system
CN203620366U (en) Ceramic filter washing water recycling system
CN204185343U (en) A kind of waste disposal plant
CN203971478U (en) A kind of wastewater recycling system
CN203568891U (en) Waste water treatment device for glass edging machine
CN102936064B (en) Device for purifying roof rainwater rapidly
CN201678552U (en) Water-saving and environment-friendly vehicle cleaning sewage treatment device
CN203447831U (en) Structure of rapid settling overflow tower
CN205275410U (en) Sewage treatment equipment of recycling
CN201596565U (en) Crushed stone screen wash classification and sewage circulation treatment system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhejiang Zhongchun New Material Co.,Ltd.

Assignor: Ningbo Zhedong Building Material Group Co., Ltd.

Contract record no.: 2012330000290

Denomination of utility model: Small-sized waste water circular processing device

Granted publication date: 20100825

License type: Exclusive License

Record date: 20120522

ASS Succession or assignment of patent right

Owner name: ZHONGCHUN GAOKE PILE INDUSTRY CO., LTD.

Free format text: FORMER OWNER: NINGBO ZDOON BUILDING MATERIAL GROUP CO., LTD.

Effective date: 20131012

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315101 NINGBO, ZHEJIANG PROVINCE TO: 315145 NINGBO, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131012

Address after: 315145 Zhejiang Ningbo Yinzhou District Binhai Pioneering Center sailing South Road

Patentee after: Zhongchun Gaoke Pile Industry Co., Ltd.

Address before: 315101 No. 42 Mo Road, Qiu Tong, Ningbo, Zhejiang

Patentee before: Ningbo Zhedong Building Material Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100825

Termination date: 20141119

EXPY Termination of patent right or utility model