CN201559797U - Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled - Google Patents

Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled Download PDF

Info

Publication number
CN201559797U
CN201559797U CN2009201703649U CN200920170364U CN201559797U CN 201559797 U CN201559797 U CN 201559797U CN 2009201703649 U CN2009201703649 U CN 2009201703649U CN 200920170364 U CN200920170364 U CN 200920170364U CN 201559797 U CN201559797 U CN 201559797U
Authority
CN
China
Prior art keywords
chinampa
plate
adapter
adapter plates
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201703649U
Other languages
Chinese (zh)
Inventor
谭健苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201703649U priority Critical patent/CN201559797U/en
Application granted granted Critical
Publication of CN201559797U publication Critical patent/CN201559797U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled. The floating island has a structure as follows: screw bolts and screw nuts are fixed at the position of the horizontal pore of the box body fixing block (3) between the two box bodies (1); screw bolts and screw nuts are fixed at the positions of the box cover fixing pore (8) and the vertical pore of the box body fixing block (4) between the box cover (7) and the box bodies (1). The floating island is expanded to the needed scale and shape, and fixed to the sea-bed in the manner of anchoring. The floating island can be used as an exploration and mining platform for petroleum and gas with a part of floating island units disassembled at the center. Oversize floating island can be used as an airport, or as an aircraft carrier in floating island type when dragged by vessels, or having large-power engines mounted on the edge. Affiliated hanging bridges and board houses can be fixed onto the floating island. The loading weight of the floating island is extremely large, the deploying position is not limited, and the function is diversified, so that the actual application range of the floating island is greatly expanded. The hanging bridge and the board houses can be used for the floating island, or be disassembled and used in other places.

Description

Affiliated facility suspension bridge, the board house of marine chinampa and detachable use thereof
One, technical field
The Chinese of present technique is " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, a board house ", and English name is " Floating island on the sea and its affiliated hanging bridgeand board houses which can be disassembled and used in other places ".
In 12 branches of learning and subjects, with regard to the manufacturing and designing of this technology, relate to engineering subject (one-level subject: mechanical engineering), comprise that (suspension bridge is used for being connected between chinampa and the bunding for the chinampa unit member (unit, chinampa is used for the structure on chinampa), suspension bridge member of autonomous Design, the detachable in addition road connection that is used on the gully), board house member (board house is used for personnel's inhabitation, article storage and the obstruction of stormy waves all around on the island, in addition the detachable quick structure that is used in simple buildings such as frontier defense military camp, disaster relief shelter); With regard to the practical application of this technology, relate to Neo-Confucianism (the one-level subject: biology), engineering (one-level subject: architecture, Naval Architecture and Ocean Engineering, Environmental Science and Engineering), economics (the one-level subject: applied economics), military science (the one-level subject: Science of Military Logistics and Military Equipment) subject such as, can be applicable to improvement, coastal city " the marine land " of nearshore waters ecology environment laying, the laying on ocean basin " marine land ", the road on the gully connects and a plurality of engineerings fields such as quick structure of simple building.
This technology mainly comprises in the using value in engineering field: 1, the improvement of nearshore waters ecology environment: have the purposes that dry type artificial floating island prior art is improved the nearshore waters ecology environment, on botanical garden, the island Safari Park on the island as creating in the lake, park.2, the laying of coastal city " marine land ": under the prerequisite that does not account for arable land and other soil, for the coastal city provides laid down cost cheap, lay " marine land " that area and load capacity are not subjected to significant limitation, public welfare or operational place as the coastal city, as living, spend a holiday, leisure, amusement, motion, match, business, the place that sales promotion etc. are movable, for the urban construction and the economic development of coastal city provides useful scheme, as Singapore, Hong Kong, Macao, Shanghai, Tianjin, Guangzhou, Dalian, Hangzhou, Qingdao, the urban construction on ground such as Shenzhen and economic development.3, the laying on ocean basin " marine land ": the significant limitation that is not subjected to conditions such as position, waters, water depth, laying area, load capacity, " the marine land " of low laid down cost, high construction speed is provided for the ocean basin, as the economic activity base or the military activity base of ocean basin (as China's South Sea Nansha waters), weigh as exploration and the production platform of marine economy development zonies such as fishing tourism, sea-bottom oil-gas resource, the sea of serving as islands and reefs sandy beach and building thereof and to guard base, military aviation airport and chinampa formula aircraft carrier etc.4, the application of affiliated facility suspension bridge and board house: suspension bridge is used for being connected between chinampa and the bunding, and the detachable in addition road that is used on the gully connects; Board house is used for personnel's inhabitation, article storage and the obstruction of stormy waves all around on the island, in addition the detachable quick structure that is used in simple buildings such as frontier defense military camp, disaster relief shelter.
In a word, this technology is safeguarded with sovereignty with the economic development of economic development, ocean basin (as China's South Sea Nansha waters) with the urban construction of improvement, coastal city in the improvement of nearshore waters ecology environment, the road on the gully is connected and the fields such as quick structure of simple building, particularly in the controversial issue of Nansha, in China's Science of Military Logistics and Military Equipment technical field, have vast market prospect and great application value.
Two, background technology
" background technology " will set forth following content: the general introduction of (), artificial floating island prior art; (2), the limitation of artificial floating island prior art.
(1), artificial floating island prior art general introduction
According to list of references [1, Ding Zeping: artificial floating island is introduced wetland purification technology---the artificial floating island (AFI) of Japan." view China " net: http://www.landscapecn.com/info/article/detail.asp? id=1216.2, Ma Fengyou, Li Qiang, Deng Fushang: artificial floating island carrier design research.The Chinese countryside water conservancy and hydropower, 2007; (5): 85-87.], the artificial floating island prior art is summarized as follows.
1, artificial floating island brief introduction
Utilize organic material, Composite or other material as carrier, float on the water surface, the plant that is mainly used on it plant forms biocenose, thereby improves the special tectonic thing of local water area ecological environment, is called the chinampa.Original chinampa is by after the sediment of the waters bottom come-up, and the surface biotic formation of deriving forms.Artificial floating island always be with the floating water surface, the material of be difficult for disperseing as carrier, the people is that various types of water environment growing plants kinds that are suitable for of planting form in its surface.
The artificial floating island technology starts from the sixties in 19th century, and its initial purpose is to improve fish egg reproduction environment, increase fisherman's income.In nineteen ninety-five the 6th international lake environment conference, the effect of artificial floating island technology aspect ecology environment just causes people's extensive attention.After this, the artificial floating island technology has worldwide obtained fast speed and has applied, and particularly in Germany, Japan and the U.S., this technology has obtained to apply rapidly.The main purpose of structure artificial floating island is at present, purifies water, beautifies the environment, is that biology is created the habitat, eliminated the impact of stormy waves to the bank.In developed countries such as Britain, the U.S., Germany, the artificial floating island technology is mainly used to beautify the environment, is the biological habitat of creating; In Beijing of China, Shanghai, Ningbo, Shenzhen, Yunnan, Taiwan etc. are local or regional, the artificial floating island technology has also obtained large-area applying, its purpose mainly is the water quality that purifies the lake.
2, the construction process of artificial floating island
2.1 classification
Artificial floating island can be divided into two big classes such as dry type, wet type, on the island under plant and the island water body contactee be wet type, the contactee is not a dry type.
The dry type chinampa does not contact because of water body under plant on the island and the island, thereby can plant large-scale woody, gardening plant, by the woody combination of difference, can build the habitat that is suitable for birds, beautified environment simultaneously yet, improved view, but this chinampa does not have cleansing action to water quality.Large-scale dry type chinampa, its carrier material is generally cement concrete or polystyrene foamed.
The wet type chinampa is divided into again framework, frameless etc. two kinds.The wet type chinampa that framework is arranged, its framework can be made of following material: fiber-reinforced plastic, corrosion-resistant steel add polystyrene foamed, special polystyrene foamed adds special synthetic resin, salinization ethene synthetic resin, cement concrete etc.According to statistics, there is the engineering application percentage on wet type chinampa of framework the highest, accounts for 70%.Frameless wet type chinampa is many to form with the cocoanut fiber braiding, and comparatively soft aspect view, durable wear-resistant is also better, goes back between the available buffer chinampa and the mutual bump between the inside, chinampa.The another kind of engineering application mode on frameless wet type chinampa is, serves as the basal disc of plant with syntheticfibres, again with the whole chinampa that forms of synthetic resin parcel.
2.2 the material of carrier is selected
When selecting the material of chinampa carrier, need to consider the principle of durability, economy, nonstaining property.
Chinampa carrier Material Selection wide range, but consider the principle of durability, economy, nonstaining property, materials such as at present big more options bamboo, wood, foamed plastic, junked tire, PVC, cocoanut fiber, resin material.Wherein, foamed plastic wears out easily, can produce the Environmental Hormone secondary pollution, so do not adopted with the area by developed countries such as Japan, Europe; Advantages such as solid, pollution-free, water-fast erosion that bamboo has, cost is lower, buoyancy effects is good are so be widely used; Cocoanut fiber, resin material be durable in use, cheap and easy to get, polluted-water and help the winding of root system and adhering to of plant not, also is comparatively desirable carrier material.
2.3 scale and shape
Because of the difference of structure purpose, laying environment, the Reasonable Scale of artificial floating island is also inequality, but does not also have mathematical formulae can calculate its Reasonable Scale at present.Studies show that,, except that small-sized pond, generally need 30% chinampa area if be purpose to purify lake water quality; If to beautify the environment, to improve view is purpose, then should in 10 °-20 ° angular field of view, lay the chinampa; If so that the birds habitat to be provided is purpose, then need 1000m at least 2The chinampa area.
The shape of unit, chinampa mostly is oblong, triangle or rhombus, and area mostly is 1m 2-5m 2After splicing and combining, the shape on chinampa mostly is oblong, polygon or annular, and is wherein in the majority with oblong, and this shape is convenient to construct the chinampa, but its landscape effect is more slightly inferior than some other shape.The unit, chinampa of some other shape is not rare yet, unit, chinampa as the production of U.S. Floating Island International company, special shapes such as cake type, arc, crescent are just arranged, it splices and combines shape and usually has bionical characteristics, and the user is mainly used to beautify the environment and improve view.
2.4 performance
During the structure artificial floating island, need to consider the performance of following several respects:
2.41 stability: impacted between displacement and the chinampa and the mutual bump between the unit, chinampa for taking precautions against the chinampa by stormy waves, artificial floating island should possess stability, position and shape when keeping its initial construction.
2.42 durability: when selecting the carrier material, need to consider antiageing, resistant to corrosion principle, be convenient to the maintenance management of artificial floating island like this, also can reduce the supplement consumed of carrier material.
2.43 economy: when design artificial floating island and unit, chinampa, another problem that need consider is, makes great efforts to reduce the cost of investment of construction time, reduces the maintenance cost of used life as possible.
2.44 convenience: the design of artificial floating island unit or member and selection, should consider to be convenient to loading and unloading transports, splices and combines, changes member, mobile chinampa, removes the chinampa, and can be according to user's different requirements, splice and combine or adjust and be varied to different scales, difform artificial floating island.
2.5 cost
Making aspect the cost of island, there are some statistics in Japan, the U.S. in recent years.In Japan, cost is more at the artificial floating island of about 100,000 Yen of every sq ms, but the artificial floating island of cost Control several ten thousand Yen of every sq ms also arranged.In the U.S., use the low-cost artificial floating island of regeneration material, its cost can be controlled in about 10,000 Yen of every sq ms.Because of the difference of costs such as raw MAT'L, labour power, the island cost of making of variety of way, each countries and regions also is not quite similar.
2.6 laying mode
The laying mode of artificial floating island in the lake is more, and for example: the waters near sewage draining exit can be selected in the position, and it is that the multilayer in the center of circle is circular-arc that shape can be selected with the sewage draining exit; Other waters near loke shore also can be selected in the position, and shape can select to be parallel to the checkerboard or the band shape of loke shore.These laying modes help purifying lake water quality, reduce the growing space of making island cost, maintenance management artificial floating island, enlarging the chinampa plant.
Artificial floating island is in the laying of korneforos, and that mode commonly used has is vertical, two kinds of horizontal types etc.Vertical is that the chinampa bearing of trend is parallel with the riverbank, and be applicable to following situation: the river course is narrower, and water (flow) direction is constant; Horizontal type is that the chinampa bearing of trend is vertical with the riverbank, is applicable to following situation: river course broad, water (flow) direction are in a zigzag, and water velocity is little, and certain shelter can be set below the chinampa.
2.7 fixed form
Artificial floating island fixing also is an important design and construction content, can ensure that the chinampa do not impacted displacement by stormy waves after fixing, also can reduce between the chinampa and produces or the mutual bump of water level when acutely changing at wave between the unit, chinampa.Fixed form should be suited measures to local conditions, and mode commonly used has a formula, anchor formula, gravity type boat davit or haves both at the same time.The fixture materials that gravity type boat davit adopted is generally cement concrete, is shaped as the cone about high 20cm.In addition, in order to alleviate, on the chinampa with a small-sized float usually is set between the fixed end under water because of the mutual bump between the chinampa that wave produces or the violent change of water level occurs.
3, the engineering application mode on structure chinampa
The engineering application mode on structure chinampa is existing multiple, mainly contains following several mode at present:
2.1 backguy planting system
Notion: the plant that will build the chinampa is evenly fastened and is distributed in the backguy, and plant is fixed in around the backguy, forms the planting system of group by the staggered growth of sprout tillers.
Suitable plant: be suitable for floating growing plants, as oenanthe stolonifera, Li Shi standing grain, cattail, Scirpus tabernaemontani etc.
Advantage: stretching easy with moulding, auxiliary material requires low, and environmental pollution is little, especially is suitable for the waters of strong eutrophication.
Shortcoming: backguy is easily broken, and stability and capacity of anti-storm are not strong.
Case: the Dian Chi in Yunnan, nebula lake.
2.2 screen frame planting system
Notion: as framework and floating carrier, arrange the double-layer nylon net with materials such as bamboo wood, pvc pipes in the framework, form the planting system on chinampa by the plant of planting.The mesh of nylon wire is about 5cm, and the upper strata nylon wire plays a part fixedly lodging-prevention, and lower floor's nylon wire plays a part to provide the substrate of planting.
Suitable plant: be suitable for multiple emergent aquactic plant, as oenanthe stolonifera, cattail, Scirpus tabernaemontani, hay grass etc.
Advantage: stability and capacity of anti-storm are stronger, and environmental pollution is little, is suitable for the higher waters of eutrophication degree.
Shortcoming: crystallized ability is relatively poor, plant lodges easily, and the depth of planting is big, plant survival rate is affected easily.
Case: east wind dam, Dian Chi.
2.3 biological floating island planting system
Notion: be compiled into the chinampa carrier with organic materials such as deadwood, balloonflower roots, carrier floats on the water surface, plants plant at carrier surface and forms the planting system on chinampa.Carrier thickness should be decided according to vegetation type, should adopt thin carrier as small-sized plant, and large-scale emergent aquactic plant then should be adopted thicker carrier.
Advantage: it is easy to draw materials, and the chinampa moulding is very fast, and the chinampa after the moulding is comparatively complete, and plant is higher because of the more survivor's rate of the matrix of planting, and carrier also can provide nutritional labeling after rotting.
Shortcoming: have contaminative to a certain degree after carrier rots, therefore can only in the higher waters of eutrophication degree, use.
2.4 cystosepiment planting system
Notion: as floating carrier, plant the planting system of planting plant in the hole and forming the chinampa at cystosepiment with cystosepiment.
Advantage: easy construction, moulding is quick, and is with low cost.
Shortcoming: plant is influenced at interval by foam and can't form holistic community, and cystosepiment is damaged easily, and damaged back produces white secondary pollution.
2.5 other planting system
Other planting system mainly contains the enterprise product planting system, comprises the patented product of multiple style.For example:
2.51 Feitian plate, flower flying saucer are two kinds of patented products on structure chinampa, have that assembly unit is easy, moulding characteristics efficiently, but it is higher to make the island cost, and can not form complete chinampa group.
2.52 a kind of chinampa carrier of Yunnan modern industry ecological construction group development adopts the PVC material to produce, moulding is rapid, and survival rate of plant is higher, and plant root parcel carrier can form complete chinampa group, has reduced the pollution of plastic material to water environment.
2.53 two kinds of chinampa carriers of Korea S refined gloomy (ASSUM) Co., Ltd. development, the polyethylene material that adopts diffustivity polystyrene material, bridge formation combination is as carrier, can in a certain size whole lake, construct artificial floating island, for the purification of water quality and ecological improvement the in whole lake, has effect preferably.With the polyethylene of plate bridge formation combination be, the cocoanut fiber mat be placed on above the carrier that whole with the high-density polyethylene material parcel again, the plant of planting on it forms the chinampa as the characteristics of the artificial floating island of carrier.
(2), the limitation of artificial floating island prior art
Scan the artificial floating island prior art, generally be used for the improvement of nearshore waters ecology environment, these technology load capacities are less, installation position limits to, the chinampa function singleness, have tangible limitation in many aspects, therefore can't be applied to following engineering field: 1, the laying on coastal city " marine land ": the urban construction of coastal city and economic development; 2, the laying on ocean basin " marine land ": the economic development of ocean basin and sovereignty are safeguarded.Load capacity is very big, installation position is not limit, the artificial floating island of chinampa diverse in function and make up, be applied to engineering fields such as above-mentioned " laying on coastal city ' marine land ' ", " laying on ocean basin ' marine land ' ", have crucial economic implications and military significance.
Be example now, its economic implications and military significance are described with China's South Sea Nansha waters and the Nansha Islands.
The sovereignty on the Nansha Islands belong to China since ancient times, China finds the earliest, name the earliest, the earliest exercise the administration sovereignty, develop activity the earliest and constantly, on some bigger island, now still have China fisherman and build the temple of building, the movable old sites such as well of excavation.After France's invasion in 1933, just begin to cause the sovereignty dispute.Since 20th century sixties, the particularly seventies, the Nansha Islands and Nansha waters are are progressively occupied with the area by surrounding countries and are carved up, and marine resources such as oil, natural fuels suffer to rob without restraint.The present situation characteristics of Nansha controversial issue comprise following some: 1, control islands and reefs quantitative aspects, 29 in Vietnam, 8 in Philippine, 7 in Malaysia, 2 in Indonesia, 1 of Brunei, 12 of China's Mainlands, 2 of TaiWan, Chinas, 6 states, 7 sides form the face-off situation in the controversial issue of Nansha.2, aspect the declaring of islands and reefs sovereignty, three partss such as China's Mainland, TaiWan, China, Vietnam declare to have the sovereignty of whole islands and reefs, two countries such as Philippine, Malaysia declare to have the sovereignty of part islands and reefs, and two countries such as Indonesia, Brunei declare to have the sovereignty in part marine site, comprised the sovereignty of part islands and reefs indirectly.3, aspect the exploitation of marine economy, China does nothing in Nansha waters at present, and other state-run illegal mining oil well reaches more than 1000 mouthful, produces 50000000 tons of submarine oils per year.4, aspect the ordering of infringement and threat, Vietnam is unique proposition has challenge China of whole sovereignty to the Nansha Islands (and even Xisha Islands) country, in the country of Nansha controversial issue (and even South Sea controversial issue) challenge China, it is maximum to occupy islands and reefs, it is the widest to cover the marine site, military power is the strongest, directly threatens maximum.
In recent years, some global or zonal politics, economical, military power is (as the U.S., India), in multiple non-friendly mode, frequent activities is in China Nanhai area, as hydrocarbon resources at the bottom of the associating other country exploitation Nansha Sea, constantly send naval vessels and the opportunity of combat turnover Nanhai area, gather South Sea hydrologic data and China's military intelligence by force, repeatedly give and sell the advanced weaponry equipment to surrounding countries and area, the frequent stage war games in combined with peripheral countries and regions, even collide to crash and directly threaten and provoke China in the right-safeguarding activity at the South Sea etc., in politics, economical, many-sides such as military affairs are supported surrounding countries and area in public or in secret, recover the Nansha Islands to China and have increased huge resistance.
Militarily, except surrounding countries and area capture and rush to the rescue, the support and external factor such as support of some big countries to surrounding countries and area, the military internal factor of China then comprises, powerless and beyond one's ability to help at the Nansha regional military power, particularly in the complete vacancy of Nansha Regional Air Navigation mother ship carrier or air base.External cause adds internal cause, the present situation that has caused China to quite feel passive in the military affairs in the controversial issue of Nansha, do nothing economically.
In view of above situation, in Nansha waters such as the lagoon waters of U.S.'s Ji reef rim reef and other reef surrounding waters of China's control, make up particularly large-scale, the super-huge artificial floating island of artificial floating island, and even be used for activities such as fishing, tourism, resource exploitation, sea power guard, the construction of airport construction aircraft carrier, in Nansha regional development economy and maintenance sovereignty, have crucial economic implications and military significance for China.And artificial floating island prior art load capacity is less, installation position limits to, the chinampa function singleness, can not be used for making up particularly large-scale, the super-huge artificial floating island of artificial floating island in China's Nansha waters, limited economic development and the sovereignty that the artificial floating island prior art is used for China's Nansha waters and safeguarded that this is that the artificial floating island prior art is in one of very outstanding limitation performance of China economic military field application facet.
In a general sense, have circumscribed artificial floating island prior aries such as load capacity is less, installation position limitation, chinampa function singleness, the application in following engineering field awaits remedying: 1, the laying on coastal city " marine land ": the urban construction of coastal city and economic development; 2, the laying on ocean basin " marine land ": the economic development of ocean basin (as China's South Sea Nansha waters) and sovereignty are safeguarded.
[one of bibliography: the Nansha Islands and Nansha waters brief introduction]
Being dispersed throughout the Nansha Islands of Nansha waters, being positioned at the southernmost end of China South Sinkiang, is maximum, the widest oval coral reef group of distribution limit of islands and reefs quantity in all islands of southern China sea.Its geographic position is, 3 ° 40 of north latitude ' to 11 ° 55 ', 109 ° 33 of east longitude ' to 117 ° 50 ', North gets the Xiong Nan beach, reach the Zengmu Reef in the south, to the east of a nautical mile Ma Tan, the west is to Wan Antan, and more than 500 nautical miles long from south to north, thing is wide more than 400 nautical miles, about 820,000 square kilometres of water surface area accounts for 2/5ths of southern China sea tradition oceanic area.In the west, south, east to, adjoin countries and regions such as Vietnam, Indonesia, Malaysia, Brunei, Philippine, TaiWan, China successively.The Nansha Islands are made up of more than 550 islands, continent, reef, sand, beach, and that exposes the sea accounts for 1/5th.
In the Nansha Islands, about 3000 square kilometres of the reefs area of water surface reef atoll, this has status, accurate land in United Nations Convention on the Law of the Sea.According to the Archiplagic Baselines criterion, tens thousand of square kilometres zone, territory (land+water surface reef atoll+lagoon) can be marked in the Nansha Islands, can advocate the exclusive economic zone in up to ten thousand square kilometres territorial waters, hundreds of thousands of square kilometre in view of the above.
The strategic position of the Nansha Islands and Nansha waters is very important, she is between the two big naval bases such as Vietnam Jinlanwan Gulf, Philippine's Subic Bay, hold the marine traffic communications centre of the Pacific Ocean to the Indian Ocean, for East Asia lead to South Asia, the Middle East, Africa, Europe must through international important navigation channel, also be the important channel of China's opening and the important barrier of South Sinkiang safety.Lead in 39 external course lines in China, 21 course lines are arranged by Nansha waters, 60% the transportation for foreign trade is passed through from Nansha waters.
The Nansha Islands and Nansha waters belong to tropical maritime monsoon climate, and monthly mean temperature is between 25 to 29 degrees centigrade, and rainfall is abundant.The Nansha Islands or Nansha waters shrub are in great numbers, and seabird troops, and amphibious organisms is abundant, and aquatic products is of a great variety, abounds with birds droppings, and 155 kinds of floating algae plants are arranged, and zooplankton is kind more than 200, and 66 kinds in shell is the tropical fishing ground of China's marine fishery maximum.Nansha waters is being contained a large amount of mining depositses, there are oil, natural fuels, iron, copper, manganese, phosphorus etc. multiple, wherein hydrocarbon resources is particularly abundant, at least contain 367.8 hundred million tons of oil are arranged, 7.5 the tcm natural fuels have the title in " second Persian Gulf ", mainly is distributed in tens basins such as Zengmu Reef, Wan Anxi, northern happy beach, about 410,000 square kilometres of the gross area, only the oil-gas geology reserves in basin, Zengmu Reef just have 126 to 13,700,000,000 tons.
The island of the long-term exposure of Nansha waters, reef, shoal and on the low tide highland of low water time exposure reef platform, reef totally 54, wherein water surface reef atoll is 44,8 of water surface table reefs, 2 of water surface pinnacle reefs.Because of water surface reef atoll often is made of a plurality of independent reefs again, thereby, totally 86 of the geographical monomers of exposure throughout the year and low water time exposure, 23 of wherein grey sand islands, 11 on the reef of exposure throughout the year, 52 of the drying rock of low water time exposure reef platform, reef.According to United Nations Convention on the Law of the Sea, the reef of grey sand island and exposure throughout the year can be enjoyed 12 nautical miles territorial waters, 12 nautical miles contiguous zone marine sites.
[two of bibliography: U.S. Ji reef brief introduction]
U.S. Ji reef (Mischief Reef), be positioned at 9 ° 55 of north latitude ', 115 ° 32 of east longitude '.U.S. Ji reef is a reef atoll, and thing is about 9 kilometers, and north and south is wide about 5.2 kilometers, about 46 square kilometres of the gross area.Reef surfaces 6 feet on the ebb the time all around, locates the depth of water and can reach more than 1000 meters for about 1 kilometer beyond the reef dish.The lagoon area is about 36 square kilometres in the reef atoll, 20 meters to 30 meters of the depth of waters.Have 3 inlets can enter lagoon, 3 inlets are positioned in the south and southwestern face, and large vessel can enter the mouth in the south by maximum at the incoming tide and enter lagoon.92 meters of southwest face entrance widths, 414 meters of length, 23.8 meters of the depth of waters, watercourse port is distributed with point reef, deaden the way.Inlet in the south is distributed with point reef, makes water channel be divided into east, west two parts, 18 meters of host's width, 1.8 meters of the depth of waters, and 37 meters of western road width, 275 meters of length, the depth of water are more than 18 meters.During the water channel neap, flow velocity 1.3 joints.The reef atoll northeast is more shallow, is distributed with the reef head of 1.8 meters of the depth of waters.
One of geology geographic entity of U.S. Ji reef is, she is a reef atoll, and the seawater that reef atoll surrounded has constituted a lagoon.This lagoon has 3 lagoon mouths, during high tide, replenishes seawater by the lagoon mouth in lagoon; Seawater at ebb tide, the seawater in the lagoon is closed again.Seawater in the lagoon concentrates under the effect of exposure in sunshine gradually, and the inspissation of tanning by the sun through 1,100 has deposited a large amount of salts substances in the lagoon.
In the Nansha Islands, the feature of U.S. Ji reef is near the Diego Garcia island, and other more than 200 islands and reefs do not possess or not exclusively possess the characteristics of U.S. Ji reef.In more than 200 islands and reefs, although the island that the area that has some to surface is bigger, peaceful island (0.43 square kilometre), first island as China's Taiwan control, industry island (0.33 square kilometre) in the second largest island of Philippine's control, the Spratly Island, the third-largest island (0.15 square kilometre) of Vietnam's control etc., but these island do not have reef atoll.Even the islands and reefs of reef atoll are arranged, also not as U.S. Ji reef, perhaps the area of lagoon is too little in the growth of its reef atoll, and perhaps the degree of depth of lagoon is too shallow, does not perhaps have the gangway, and perhaps the degree of depth of gangway is too shallow.And the uniqueness of U.S. Ji reef is that area, the degree of depth of lagoon are bigger, has three gangways, and wherein the gangway of southwestern face is not only wide but also dark, can pass through naval vessel, gross ton position.In December, 1994, when China for the first time carried out scientific investigation to U.S.'s Ji reef, 4000 tons " facing south red No. 14 " boats and ships of weighing had entered lagoon by the gangway of southwestern face.Apart from the outer 1 kilometer place of reef atoll, sea water advanced dropping to rapidly below 1000 meters, reef is the spitting image of the crater on the moon so U.S. helps, and the top exposure in part crater is on the sea level.The degree of depth of U.S. Ji velu reaches about 25 meters, and bigger than the degree of depth of Diego Garcia island central authorities lagoon, lagoon internal ratio lagoon is calmer outward, therefore is more suitable for the large ship that berths.Recall according to the team member of the scientific investigation first time, the calm also waviness in sea around the U.S. Ji reef, more than 20 meter of the Gao Shida of wave, and the wave in the lagoon has only 1 meter high, seems very quite still in the lagoon.
If U.S. Ji reef is controlled fully, is built well, little it, Wu Fangjiao, kindheartedness reef, good faith reef, celestial pretty young woman's reef, the first quarter moon reef controlled by China around will leading; Big it, small piece of land surrounded by water Bi Jiao, the south that leads Nansha waters the north by China control is smoked reef, Chi Guajiao, east gate (cultivating south) reef, heat reef, Hua Yangjiao forever, becoming with U.S.'s Ji reef is the Nansha waters strategic point group of center of gravity, the islands and reefs group that north deterrence Philippine occupies, the southwest face is looked the islands and reefs group that Vietnam occupies with convetous eyes, and its strategic importance is self-evident.
[three of bibliography :] about applying the suggestion of this technology
1, registration state-holding enterprise Shenzhen 3A makes the island Co., Ltd, to 6,000,000,000 yuan of (estimation foundations: unit, chinampa length of side 100CM of defense-related science, technology and industry office application funds, high 200CM, thick 0.5CM, the thick 1CM in deck, corrosion-resistant steel proportion 7.8,24000 yuan/ton of prices, the long 1000M in chinampa, wide 500M, amount to more than 50 hundred million yuan), being used for company establishes, equipment purchasing, sample making, Mold Making, materials procurement, batch manufacturing, South China Sea Fleet's transportation and convoy, the chinampa makes up and other essential expense, in the lagoon of the U.S. Ji of Nansha waters reef rim reef, make up formula air-sea associating base, chinampa (the chinampa scheme with fill out the sea and make island scheme advantage relatively: calm in the lagoon, be suitable for making up the chinampa; The wave is high for the lagoon exogenous wind, and seawater rises and falls big, and it is big to fill out the extra large degree of depth, quantities, cost, time span.Chinampa scheme and aircraft carrier scheme advantage relatively: the cost of unit area is less than 1/100 of aircraft carrier, floor space is much larger than aircraft carrier, and total cost is much smaller than aircraft carrier, and the construction time was less than 1 year, need not carrier-borne aircraft), and can consider that making up formula sea, chinampa power in other marine site of China's control guards the base.(about the Nansha controversial issue: Nansha surrounding countries to China's Countermeasures are, military occupation islands and reefs, the company of not shelving with China's sovereignty dispute, bid developed country develop jointly.Take all factors into consideration factors such as national interests, geopolitics, production technique, the further countermeasure that China can take is, make up air-sea associating base at Mei Jijiao, the company of exploitation or bid developed country develops the Nansha resource jointly separately)
2, be sample project with above-mentioned beautiful Ji Jiao chinampa engineering, in Hong Kong, coastal city such as Macao, Shanghai, Tianjin, Guangzhou, Dalian, Hangzhou, Qingdao, Shenzhen applies this technology, making the island Co., Ltd by Shenzhen 3A makes up and manages low-cost chinampa and (reduce the height and the thickness of unit, chinampa, adopt plastic flagstone to lay the deck), comprise the operation of house for rent, retail shop's taxi, square taxi, fishing gear taxi, physical culture and body-building apparatus taxi, the operation of juvenile's recreation facility, seagoing taxi operation and other project.As not relating to national interests, consider that the coastal city makes up and manage low-cost chinampa abroad.Strive that Shenzhen 3A makes the island Co., Ltd and grows up fast, and the listing national capital market, realize the significantly increment of state-owned assets.
Three, summary of the invention
" summary of the invention " will set forth following content: (one), mentality of designing; (2), the feature of chinampa, suspension bridge, board house; The characteristic of (three), patent retrieval situation, present technique and novelty, practicality and beneficial effect.
(1), mentality of designing
Load capacity is very big, installation position is not limit in order to reach, the purpose of chinampa diverse in function (being applied to fields such as economics, military science), and the spy does the design of following several respects.
1, the design casing that volume is big, buoyancy is big is as one of main unit, chinampa support element, leak-tight joint between the member, water resistance are good, rely on the huge marine chinampa (hereinafter to be referred as the chinampa) of numerous members one-tenth area capable of being combined, the bottom is fixed in anchor formula mode in this chinampa.
2, member or structures such as design binding bolt, the nested hole of facility as " taking root " part, are fixed various facilities on the chinampa, as are used for the board house etc. of personnel's inhabitation, article storage and the obstruction of stormy waves all around.Board house is the detachable quick structure that is used in simple buildings such as frontier defense military camp, disaster relief shelter in addition.
3, the sea in city makes up the chinampa by the sea, lays passage with the unit, chinampa, relies on passage to be connected chinampa and bunding with suspension bridge, increases some indispensable facilities, can be used as " the marine land " of coastal city.The detachable in addition road that is used on the gully of suspension bridge connects.
4, at the central part on large-scale chinampa, remove unit, part chinampa, form well sample hole, fixedly oil-gas exploration and production facility around the hole, the chinampa can be reconstructed and is the exploration of sea-bottom oil-gas resource and production platform.
5, make up super-huge chinampa, increase some indispensable facilities, the chinampa can be used as military or the civil aviation base; After receiving anchor, by towing chinampa, naval vessel or at the edge, chinampa serial high-output engine is installed, the chinampa can be used as chinampa formula aircraft carrier.
(2), the feature of chinampa, suspension bridge, board house
Referring to accompanying drawing, the feature of chinampa, suspension bridge, board house is respectively:
1, the feature on chinampa: between two tanks (1), bolt (5) and nut (6) are located to fix at casing fixed block lateral aperture (3); Between case lid (7) and casing (1), bolt (5) and nut (6) are located to fix at case lid fixed orifice (8) and casing fixed block upright opening (4); The chinampa extends to required scale and shape; In chinampa edge, bolt (5) and anchor (10) that the upper and lower end of numerous anchor chains (9) difference connect box fixed block lateral aperture (3) is located, the seabed is fixed in anchor formula mode in the chinampa; Fixedly affiliated facility suspension bridge, board house on the chinampa.
2, the feature of suspension bridge: suspension bridge coupling link (33) interconnects, and bunding (31) and passage (36) are fixed in two ends, fixing bridge plate (34) on it; The structure of suspension bridge coupling link (33) contains the cube (23) of suspension bridge coupling link, the vertical square hole (24) of suspension bridge coupling link, the horizontal square hole (25) of suspension bridge coupling link, the bolt (26) of suspension bridge coupling link, the tractive hook (27) of suspension bridge coupling link.
3, the feature of board house: an adapter plate (52), No. two adapter plates (50), No. three adapter plates (54) be as footing, a plastic flagstone (90) to No. seven plastic flagstones (96) as wallboard, floor, top board or nested door and window, the top board tractive adds and is fixed in the chinampa; The structure of an adapter plate (52) contains the fixed orifice (67) of the diaphragm plate of the fixed orifice (66) of the horizontal plate of the diaphragm plate (65) of the horizontal plate (64) of an adapter plate, an adapter plate, an adapter plate, an adapter plate, the groove (68) of an adapter plate; The structure of No. two adapter plates (50) contains the fixed orifice (72) of the diaphragm plate of the fixed orifice (71) of the horizontal plate of the diaphragm plate (70) of the horizontal plate (69) of No. two adapter plates, No. two adapter plates, No. two adapter plates, No. two adapter plates, the groove (73) of No. two adapter plates; The structure of No. three adapter plates (54) contains the groove (79) of the exterior wall adapter plate (78) of the exterior wall fixed orifice (77) of the interior wall fixed orifice (76) of the diaphragm plate (75) of the horizontal plate (74) of No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates; A plastic flagstone (90) contains 4 square holes, is inserted in the groove (68) of two adapter plates, can be used as wallboard on the edge of case lid (7), and the correspondence position that is tiled in the room can be used as the floor; No. two plastic flagstones (91) contain 4 square holes, be inserted in the groove (68) of the groove (73) of No. two adapter plates and an adjacent adapter plate thereof, can be used as wallboard on the edge of case lid (7); No. three plastic flagstones (92) contain 4 square holes, are tiled in the room and can be used as the floor near the position of No. two adapter plates (50) or No. three adapter plates (54); The length of No. four plastic flagstones (93), width, basic structure are identical with No. two plastic flagstones (91), but contain segmental defect in upper and lower two bights, be inserted in the groove (68) of the groove (79) of No. three adapter plates and an adjacent adapter plate thereof, on the edge of case lid (7), can be used as the wallboard of interior wall corner; The length of No. five plastic flagstones (94), width are identical with a plastic flagstone (90), contain the screw hole (84) of 4 square holes and a plurality of door and window wallboards, are used for the door and window housing (85) of nested door and substitute a plastic flagstone (90); The length of No. six plastic flagstones (95), width are identical with a plastic flagstone (90), contain the screw hole (84) of 4 square holes and a plurality of door and window wallboards, are used for the door and window housing (85) of nested window and substitute a plastic flagstone (90); No. seven plastic flagstones (96) are as top board, and respectively there are 2 square holes both sides, in board house over against the door and window both sides two holes, the outside of an adapter plate (52) or No. two adapter plates (50); The structure of top board drawing plate (97) contains base plate, nested hole, stayed pole, with top board tractive hook (98), the top board tractive added is fixed in the chinampa platform.
The characteristic of (three), patent retrieval situation, present technique and novelty, practicality and beneficial effect
1, patent retrieval situation: on " State Intellectual Property Office of the People's Republic of China " website (http://www.sipo.gov.cn/sipo2008/wxfw/), be search terms with " title ", be keyword with " chinampa ", retrieve all kinds of patent documentations, seize patent of invention, utility model patent, design patent 50 remainders altogether; Be search terms with " title ", be keyword, retrieve all kinds of patent documentations, seize patent of invention, utility model patent, design patent and amount to 40 remainders with " suspension bridge "; Be search terms with " title ", be keyword, retrieve all kinds of patent documentations, seize patent of invention, utility model patent, design patent and amount to 40 remainders with " board house ".In above-mentioned Patent project, do not see structure and " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house " identical patented technology.
2, the characteristic of present technique and novelty: (1), in configuration aspects, chinampa in " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house ", component composition by autonomous Design forms, these members are convenient to loading and unloading and are transported, splice and combine, change member, mobile chinampa, remove the chinampa, are convenient to assembling combination or adjust scale and the shape that changes the chinampa.(2), in function aspects, chinampa in " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house ", load capacity is very big, installation position is not limit, the chinampa diverse in function, remedied that artificial floating island prior art load capacity is less, the limitation of installation position limitation, chinampa function singleness, thereby greatly expanded the practical application area on chinampa.(3) suspension bridge, the board house in " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house ", component composition by autonomous Design forms, these members are convenient to loading and unloading and are transported, splice and combine, change member, remove facility, suspension bridge, board house both can be used for the chinampa, detachable again other occasion that is used in.
3, the practicality of present technique and beneficial effect: the improvement of (1), nearshore waters ecology environment: have the purposes that dry type artificial floating island prior art is improved the nearshore waters ecology environment, on botanical garden, the island Safari Park on the island as creating in the lake, park.(2), the laying of coastal city " marine land ": under the prerequisite that does not account for arable land and other soil, for the coastal city provides laid down cost cheap, lay " marine land " that area and load capacity are not subjected to significant limitation, public welfare or operational place as the coastal city, as living, spend a holiday, leisure, amusement, motion, match, business, the place that sales promotion etc. are movable, for the urban construction and the economic development of coastal city provides useful scheme, as Singapore, Hong Kong, Macao, Shanghai, Tianjin, Guangzhou, Dalian, Hangzhou, Qingdao, the urban construction on ground such as Shenzhen and economic development.(3), the laying on ocean basin " marine land ": the significant limitation that is not subjected to conditions such as position, waters, water depth, laying area, load capacity, " the marine land " of low laid down cost, high construction speed is provided for the ocean basin, as the economic activity base or the military activity base of ocean basin (as China's South Sea Nansha waters), weigh as exploration and the production platform of marine economy development zonies such as fishing tourism, sea-bottom oil-gas resource, the sea of serving as islands and reefs sandy beach and building thereof and to guard base, military aviation airport and chinampa formula aircraft carrier etc.(4), the application of affiliated facility suspension bridge and board house: suspension bridge is used for being connected between chinampa and the bunding, and the detachable in addition road that is used on the gully connects; Board house is used for personnel's inhabitation, article storage and the obstruction of stormy waves all around on the island, in addition the detachable quick structure that is used in simple buildings such as frontier defense military camp, disaster relief shelter.In a word, this technology is safeguarded with sovereignty with the economic development of economic development, ocean basin (as China's South Sea Nansha waters) with the urban construction of improvement, coastal city in the improvement of nearshore waters ecology environment, the road on the gully is connected and the fields such as quick structure of simple building, particularly in the controversial issue of Nansha, in China's Science of Military Logistics and Military Equipment technical field, have vast market prospect and great application value.
Four, description of drawings
The numbering and the title of each accompanying drawing are respectively:
Fig. 1: chinampa general structure scheme drawing.
Fig. 2: chinampa basic building block structural representation.
Fig. 3: suspension bridge structural representation.
Fig. 4: chinampa, coastal city layout reference scheme scheme drawing.
Fig. 5: board house adapter plate schematic layout pattern.
Fig. 6: board house adapter plate structural representation.
Fig. 7: board house top board schematic layout pattern.
Fig. 8: board house door and window structure scheme drawing.
Fig. 9: board house plastic flagstone overview scheme drawing.
Figure 10: board house top board tractive member and other element structure scheme drawing.
" specific embodiment " asked for an interview in specifying of each accompanying drawing.
Five, the specific embodiment
" specific embodiment " comprises following content:
(1), Fig. 1 (chinampa general structure scheme drawing) explanation;
(2), Fig. 2 (chinampa basic building block structural representation) explanation;
(3), Fig. 3 (suspension bridge structural representation) explanation;
(4), Fig. 4 (chinampa, coastal city layout reference scheme scheme drawing) explanation;
(5), Fig. 5 (board house adapter plate schematic layout pattern) explanation;
(6), Fig. 6 (board house adapter plate structural representation) explanation;
(7), Fig. 7 (board house top board schematic layout pattern) explanation;
(8), Fig. 8 (board house door and window structure scheme drawing) explanation;
(9), Fig. 9 (board house plastic flagstone overview scheme drawing) explanation;
(10), Figure 10 (board house top board tractive member and other element structure scheme drawing) explanation;
(11), chinampa member, apparatus and uses thereof overview;
(12), suspension bridge member, apparatus and uses thereof overview;
(13), board house member, apparatus and uses thereof overview;
The step method on (14), structure chinampa;
The step method of (15), structure suspension bridge;
The step method of (16), structure board house;
(17), safeguard the step method on chinampa;
The step method on (18), mobile chinampa;
(19), the step method of removing chinampa, suspension bridge, board house.
Particular content sees for details following.
(1), Fig. 1 (chinampa general structure scheme drawing) explanation
1, casing (1): the square section is square, and smooth surface is smooth, not yielding, be difficult for getting rusty, thereby can reach the purpose that waterproof enters with adjacent member tight connecting.
2, casing fixed block (2): be positioned at the end face four corners position of casing (1), the square section is 7 fonts.
3, casing fixed block lateral aperture (3): fore-and-aft direction, left and right directions respectively have one, penetrate casing (1) and casing fixed block (2), and the square section is square.
4, casing fixed block upright opening (4): penetrate casing fixed block (2) up and down, the square section of top, middle and lower part is rounded, square respectively.Referring to the middle and lower part square hole (14) of the casing fixed block upright opening among Fig. 2, the top circular hole (15) of casing fixed block upright opening.
5, bolt (5): be used for fastening associated components.Comprise a bolt (11), No. two bolts (12), No. three bolts (13), referring to Fig. 2.
6, nut (6): be cylindric, peripheric surface is coarse, be convenient to the rotation of pliers clamp, is used for binding bolt (5).Groove (22) referring to the nut among Fig. 2.
7, case lid (7): the square section is square, and the cross-sectional area of area and casing (1) etc. are big, can coincide with casing (1) contraposition.
8, case lid fixed orifice (8): bolt (5) and nut (6) are anchored on case lid (7) on the casing (1) at the position of case lid fixed orifice (8).Referring to the bottom small sircle hole (16) of the case lid fixed orifice among Fig. 2, the top big hole (17) of case lid fixed orifice.
9, anchor chain (9): the chain link on top is nested on the bolt (5) at edge, chinampa, and the chain link of bottom connects the anchor (10) that is used to cast anchor.
10, anchor (10): the edge, chinampa connects numerous anchor chain (9) and anchor (10).Cast anchor (10) in the bottom, can prevent the excessive drift on chinampa.
(2), Fig. 2 (chinampa basic building block structural representation) explanation
11, a bolt (11): be used for case lid (7) is anchored on the casing (1), the wallboard of board house is anchored on adapter plate; Therefore, the length of a bolt (11) middle part cuboid (square section is square) is near the length of the middle and lower part square hole (14) of casing fixed block upright opening.Screw thread is contained in the top and the bottom of a bolt (11), the height+case lid (7) of the top circular hole (15) of the length of each threaded portion=casing fixed block upright opening or the height of case lid fixed orifice (8).
12, No. two bolts (12): be used for substituting a bolt (11) and the fixing top board of facility, fastening board house and the top board tractive added be fixed in the chinampa platform on the island.The middle and lower part of No. two bolts (12) is identical with a bolt (11), but top threaded portion is longer, so that facility is thereon fastening with nested hole of facility (20) and nut (6) mode on the island.
13, No. three bolts (13): be used for fastening contraposition splicing two casings (1), sealing edge, chinampa casing fixed block lateral aperture (3) and fix the facility at this place; Therefore, the length of No. three bolts (13) middle parts cuboid (square section is square) is near 2 times of casing fixed block lateral aperture (3) length.The upper and lower threaded portion of No. three bolts (13) is identical with a bolt (11).
14, the middle and lower part square hole (14) of casing fixed block upright opening: the height and the square section length of side are slightly larger than the middle part cuboid of a bolt (11), are convenient to the nested of the two and coincide.
15, the top circular hole (15) of casing fixed block upright opening: height and slightly larger in diameter are convenient to the nested of the two and are coincide in nut (6).
16, the bottom small sircle hole (16) of case lid fixed orifice: highly be half of case lid (7), slightly larger in diameter is convenient to the nested of the two and is coincide in the threaded portion of a bolt (11).
17, the top big hole (17) of case lid fixed orifice: highly be half of case lid (7), slightly larger in diameter is convenient to the nested of the two and is coincide in nut (6).
18, square hole rubber band (18): be nested between the rectangular body and nut (6) of bolt (5), regulate thickness and elasticity.
19, circular hole rubber band (19): be nested between the threaded portion and nut (6) of bolt (5), regulate thickness and elasticity.
20, the nested hole of facility (20): one, two or four nested holes of adjacent facility (20) are nested on one, two or four adjacent No. two bolts (12), and nut (6) is fastening, the facility of independently selecting can be fixed on the chinampa.Two nested holes of adjacent facility (20) are referring to the nested hole of the top board drawing plate (97) among Figure 10, and four nested holes of adjacent facility (20) are referring to the fixed orifice (71) of the horizontal plate of the fixed orifice (66) of the horizontal plate of an adapter plate among Fig. 6, No. two adapter plates.
21, nut driver (21): be used for fastening or the nut that gets loose (6).The side of nut driver (21) is seen and is the ancient cooking vessel shape, and the bottom of bipod is thinner, can be nested among the groove (22) of nut; The above broad in the bottom of bipod helps handing and reinforcing indeformable.
22, the groove of nut (22): the groove of nut (22) is the nested position of nut driver (21) two foot bottoms, and the two nested rear nut bottle opener (21) can the fastening or nut that gets loose (6).Nut (6) tightens together adjacent member by a rotation nested bolt (11), No. two bolts (12), No. three bolts (13).
(3), Fig. 3 (suspension bridge structural representation) explanation
23, the cube of suspension bridge coupling link (23): be cubic.
24, the vertical square hole (24) of suspension bridge coupling link: the hole of vertical direction, square section are square, penetrate the cube (23) of suspension bridge coupling link.
25, the horizontal square hole (25) of suspension bridge coupling link: the hole of horizontal direction, the square section is identical with the vertical square hole (24) of suspension bridge coupling link, penetrates the cube (23) of suspension bridge coupling link.
26, the bolt of suspension bridge coupling link (26): the tractive hook (27) that act as sealing suspension bridge coupling link.
27, the tractive hook (27) of suspension bridge coupling link: suspension bridge coupling link (33) connecting portion between any two.
28, Fig. 3 omits line (28): illustrate that mapping is omitted between two dotted lines.
29, the panel of bridge plate (29): lay the suspension bridge platform.
30, the square hole of bridge plate (30): can splice with vertical square hole (24) contraposition of suspension bridge coupling link, No. three bolts (13) and nut (6) are penetrable fastening.
31, bunding (31): near passage (36) part, become the dike shape with mixed earth finishing seashore, width is greater than whole suspension bridge.
32, bunding fixture (32): the suspension bridge coupling link (33) that is used for fixing bunding (31) one sides.
33, suspension bridge coupling link (33): front and back come across the two-end part of bridge plate (34) in pairs, about mutually tractive connect, two ends are individually fixed in No. two bolts (35) on bunding fixture (32), the passage, nut (6) is fastening.Under the influence of water level or stormy waves, suspension bridge has certain mobility because of the constructional feature of suspension bridge coupling link (33) in vertical direction and horizontal direction.
34, bridge plate (34): length is slightly less than the length of side of case lid (7), and width is slightly less than the length of suspension bridge coupling link (33), and is movable to adapt to suspension bridge appropriateness in the horizontal direction.The at both ends position, the square hole of bridge plate (30) splices with vertical square hole (24) contraposition of suspension bridge coupling link, and No. three bolts (13) and nut (6) penetrate fastening.
35, No. two bolts (35) on the passage: i.e. No. two bolts (12) on the case lid fixed orifice (8) are used for fixing the suspension bridge coupling link (33) of passage (36) one sides.
36, passage (36): by the chinampa cell formation, be the extendible portion on chinampa, near bunding (31).The width of passage (36) depends on the number of unit, chinampa on the square section, and the number and the width of suspension bridge also are complementary with it.Passage (36) and suspension bridge play a part to lay passage waterborne between chinampa and bunding (31).
(4), Fig. 4 (chinampa, coastal city layout reference scheme scheme drawing) explanation
37, integrated service portion (37): be positioned on the bunding (31),, comprise and having dinner, hire out board house (key), fishing gear, sports equipment, body-building apparatus etc., sell and do not have the obvious articles for daily use of polluting etc. for last island personnel provide integrated service.The integrated service portion (37) of last island personnel on bunding (31) has dinner, and can take precautions against the pollution of local environment.
38, integrated management office (38): be convenient to manage island personnel's turnover with movable.
39, (39) between bathing: be positioned on the bunding (31), scrub for last island personnel provide, bathing, the place that goes to toilet.Other looks the chinampa size, and some of pay toilet Che Yizhi are set on the chinampa.
40, passage junction (40): interface channel (36), passage (36) connect the integrated management office (38) on chinampa and the bunding (31) with suspension bridge.
41, health-care facilities district (41): be mainly the elderly health-care facilities and space for activities are provided.
42, recreation facility district (42): be mainly children recreation facility and space for activities are provided.
43, sports equipment district (43): be mainly teenager and adult sports equipment and space for activities are provided.
44, meta retail shop hires out district (44): for business personnel on the island provide retail shop.
45, the meta board house is hired out district (45): for business personnel on the island, all kinds of personnel such as personnel, fishing fan's (stretching fishing bar fisherman from window), city person that do not have the room or residents who do not have their own living quarters that spend a holiday provide low-rent housing temporarily.
46, position, angle board house is hired out district (46): the bilateral symmetry layout, hire out district (45) referring to the meta board house.
47, position, limit retail shop hires out district (47): the bilateral symmetry layout, hire out district (44) referring to meta retail shop.
48, position, limit board house is hired out district (48): the bilateral symmetry layout, hire out district (45) referring to the meta board house.
49, fishing behaviour area (49): be positioned at the boundary position on chinampa, the fan provides the behaviour area for fishing.The fishing fan also can rent the board house that the meta board house is hired out district (45), position, limit board house taxi district (48), stretches out the fishing bar from window and carries out the fishing activity.
(5), Fig. 5 (board house adapter plate schematic layout pattern) explanation
50, No. two adapter plates (50): be positioned at the position at exterior wall turning, the corner location of a promptly whole board house.Referring to the horizontal plate (69) of No. two adapter plates among Fig. 6 groove (73) to No. two adapter plates.
51, No. one No. two adapter plate break joints (51): the slit between an adapter plate (52), No. two adapter plates (50).
52, an adapter plate (52): the position that is positioned at exterior wall, the non-turning of interior wall.Referring to the horizontal plate (64) of an adapter plate among Fig. 6 groove (68) to an adapter plate.
53, an adapter plate break joint (53): the slit between two adapter plates (52).
54, No. three adapter plates (54): the position that is positioned at the interior wall turning.Referring to the horizontal plate (74) of No. three adapter plates among Fig. 6 groove (79) to No. three adapter plates.
55, No. three adapter plates and exterior wall break joint (55): the slit between the adapter plate of No. three adapter plates (54) and exterior wall (52).
56, No. three adapter plates and interior wall break joint (56): the slit between the adapter plate of No. three adapter plates (54) and interior wall (52).
57, Fig. 5 omits line (57): illustrate that mapping is omitted between two dotted lines.
58, case lid bight (58): in the bight of four case lids (7) splicing, contain four case lid fixed orifices (8), this position is installed or is replaced by four No. two bolts (12), can be used to a fastening adapter plate (52), No. two adapter plates (50).
59, wallboard length (59): a plastic flagstone (90) is to the length or the height of No. six plastic flagstones (95) among Fig. 9.Wherein, a plastic flagstone (90), No. two plastic flagstones (91), No. four plastic flagstones (93), No. five plastic flagstones (94), the upright back of No. six plastic flagstones (95) are as wallboard, and a plastic flagstone (90), No. three plastic flagstones (92) are used as the floor again after being tiled in the relevant position, room.
60, a plastic flagstone width (60): the width of a plastic flagstone (90) position among Fig. 9 equals the length of side of case lid (7).
61, No. two plastic flagstone width (61): the width of No. two plastic flagstones (91) position among Fig. 9.Be subjected to the influence at exterior wall among Fig. 5 or interior wall turning, this width is slightly less than the length of side or a plastic flagstone width (60) of case lid (7).
62, No. three plastic flagstone width (62): the width that is tiled in No. three plastic flagstones (92) in the room among Fig. 9.Be subjected to go up most among Fig. 5, adapter plate (52) of below (the two sides exterior wall that does not promptly contain door and window) and the influence of No. two adapter plates (50), this width is less than No. two plastic flagstone width (61).
63, four jiaos of square bar positions (63): at the corner location (corner location of a promptly whole board house) of No. two adapter plates (50), after inserting No. two plastic flagstones (91) among two Fig. 9, stay foursquare little space, this space fills up substantial with four jiaos of square bars that highly equal wallboard.
(6), Fig. 6 (board house adapter plate structural representation) explanation
64, the horizontal plate of an adapter plate (64): the edge that places case lid (7).
65, the diaphragm plate of an adapter plate (65): two, parallel to each other.
66, the fixed orifice of the horizontal plate of an adapter plate (66): four, circular hole is anchored on four adjacent No. two bolts (12) on four adjacent case lid fixed orifices (8).
67, the fixed orifice of the diaphragm plate of an adapter plate (67): two pairs, square hole, the penetrable fastening upright wallboard of a bolt (11) and nut (6).Referring to the plastic flagstone (90) among Fig. 9, No. two plastic flagstones (91), No. five plastic flagstones (94), No. six plastic flagstones (95).
68, the groove of an adapter plate (68): being positioned at the top at case lid (7) edge, is that the boundary inserts two blocks of upright wallboards with the middle vertical plane, and a bolt (11) and nut (6) penetrate fastening.
69, the horizontal plate of No. two adapter plates (69): the angle position that places case lid (7).
70, the diaphragm plate of No. two adapter plates (70): two, parallel to each other, every square section is 7 fonts.
71, the fixed orifice of the horizontal plate of No. two adapter plates (71): referring to the fixed orifice (66) of the horizontal plate of an adapter plate.
72, the fixed orifice of the diaphragm plate of No. two adapter plates (72): two pairs, square hole, penetrable fastening upright No. two plastic flagstones (91) of a bolt (11) and nut (6).
73, the groove of No. two adapter plates (73): being positioned at the top in case lid (7) bight, is that the boundary inserts two upright No. two plastic flagstones (91) with the turning, and a bolt (11) and nut (6) penetrate fastening.
74, the horizontal plate of No. three adapter plates (74): place the edge of case lid (7), the left back edge among the figure, right front edge are respectively near the horizontal plate (64) of an adapter plate of interior wall, exterior wall.Referring to No. three adapter plates (54) among Fig. 5, No. three adapter plates and exterior wall break joint (55), No. three adapter plates and interior wall break joint (56).
75, the diaphragm plate of No. three adapter plates (75): two, parallel to each other.
76, the interior wall fixed orifice (76) of No. three adapter plates: a pair of, square hole, No. four plastic flagstones (93) that a bolt (11) and the penetrable fastening interior wall of nut (6) are upright.
77, the exterior wall fixed orifice (77) of No. three adapter plates: a pair of, square hole, a bolt (11) and nut (6) are penetrable fastening, and the interior wall wallboard is anchored on adjacent exterior wall wallboard.Referring to No. three adapter plates among Fig. 5 and exterior wall break joint (55).
78, the exterior wall adapter plate (78) of No. three adapter plates: two, be symmetrically distributed, near the diaphragm plate (65) of an adapter plate of exterior wall.Referring to No. three adapter plates among Fig. 5 and exterior wall break joint (55).
79, the groove of No. three adapter plates (79): being positioned at the top at case lid (7) edge, is the boundary with the diaphragm plate (65) of an exterior wall and an adapter plate of exterior wall, inserts upright No. four plastic flagstones (93), and a bolt (11) and nut (6) penetrate fastening.
(7), Fig. 7 (board house top board schematic layout pattern) explanation
80, the protection face of No. seven plastic flagstones (80): be positioned at dotted rectangle, be covered on the adapter plate (52), No. two adapter plates (50), No. three adapter plates (54) at wallboard top.
81, the fixed orifice of No. seven plastic flagstones (81): be positioned at the door and window both sides, over against two fixed orifices of fixed orifice (71) the deflection both sides of the horizontal plate of the fixed orifice (66) of the horizontal plate of an adapter plate, No. two adapter plates.Referring to No. seven plastic flagstones (96) among Fig. 9.
82, Fig. 7 omits line (82): illustrate that mapping is omitted between two dotted lines.
(8), Fig. 8 (board house door and window structure scheme drawing) explanation
83, door and window wallboard (83): the shape of the door and window wallboard (83) of installation door, window is different.Referring to No. five plastic flagstones (94) among Fig. 9, No. six plastic flagstones (95).
84, the screw hole of door and window wallboard (84): the nested hole of screw tip.
85, door and window housing (85): door and window wallboard (83) inserts embedded door frame (85) outside window from both sides.
86, the screw hole of door and window housing (86): the screw middle part penetrates this hole.
87, door and window (87): with the door and window in general house.
88, door and window inside casing (88): medial surface supports door and window, and lateral surface and door and window housing (85) tighten together.
89, the screw hole of door and window inside casing (89): from the medial surface to the lateral surface, be funnel-form, be funnelform screw with head and be complementary.Screw successively passes through the screw hole (89) of door and window inside casing, the screw hole (86) of door and window housing, the screw hole (84) of door and window wallboard, and door and window inside casing (88), door and window housing (85), door and window wallboard (83) are tightened together.
(9), Fig. 9 (board house plastic flagstone overview scheme drawing) explanation
90, a plastic flagstone (90): length (highly) is the wallboard length (59) among Fig. 5, and width is the plastic flagstone width (60) among Fig. 5.Contain 4 square holes, be used for a bolt (11) and nut (6) penetrates fastening.Be inserted in the groove (68) of two adapter plates, can be used as wallboard on the edge of case lid (7), the correspondence position that is tiled in the room can be used as the floor.
91, No. two plastic flagstones (91): length (highly) is identical with a plastic flagstone (90), and width is No. two plastic flagstone width (61) among Fig. 5.Contain 4 square holes, be used for a bolt (11) and nut (6) penetrates fastening.Be inserted in the groove (68) of the groove (73) of No. two adapter plates and an adjacent adapter plate thereof, on the edge of case lid (7), can be used as wallboard, but the correspondence position that can not be tiled in the room because of the width problem is as the floor.
92, No. three plastic flagstones (92): length is identical with a plastic flagstone (90), width is No. three plastic flagstone width (62) among Fig. 5, be subjected to go up most among Fig. 5, adapter plate (52) of below (the two sides exterior wall that does not promptly contain door and window) and the influence of No. two adapter plates (50), this width is less than No. two plastic flagstones (91).Contain 4 square holes, be complementary with a plastic flagstone (90) that is tiled in the room.Be tiled in the room and can be used as the floor near the position of No. two adapter plates (50) or No. three adapter plates (54).
93, No. four plastic flagstones (93): be inserted in the groove (68) of the groove (79) of No. three adapter plates and an adjacent adapter plate thereof, on the edge of case lid (7), can be used as the wallboard of interior wall corner.Length (highly), width, basic structure are identical with No. two plastic flagstones (91), but contain segmental defect in upper and lower two bights, and defect is close to the diaphragm plate (65) of an adapter plate of exterior wall.Referring to No. three adapter plates among Fig. 5 and exterior wall break joint (55).
94, No. five plastic flagstones (94): length (highly), width are identical with a plastic flagstone (90).Contain 4 square holes, be used for a bolt (11) and nut (6) penetrates fastening.Be used for the door and window housing (85) of nested door and substitute a plastic flagstone (90).The screw hole (84) of the door and window wallboard among the figure in the dotted line scheme drawing 8.
95, No. six plastic flagstones (95): length (highly), width are identical with a plastic flagstone (90).Contain 4 square holes, be used for a bolt (11) and nut (6) penetrates fastening.Be used for the door and window housing (85) of nested window and substitute a plastic flagstone (90).The screw hole (84) of the door and window wallboard among the figure in the dotted line scheme drawing 8.
96, No. seven plastic flagstones (96): as top board.Respectively there are 2 square holes both sides, in board house over against the door and window both sides two holes, the outside of an adapter plate (52) or No. two adapter plates (50), inverted No. two bolts (12) and nut (6) penetrate fastening.Fixed orifice (81) referring to No. seven plastic flagstones among Fig. 7.
(10), Figure 10 (board house top board tractive member and other element structure scheme drawing) explanation
97, top board drawing plate (97): contain structures such as base plate, nested hole, stayed pole.Top board drawing plate (97) is applied to two places, the upset of the base plate of wherein upper top board drawing plate (97), be close under No. seven plastic flagstones (96) bottom surface, an adapter plate (52) or No. two adapter plates (50) of door and window both sides, the base plate of the next top board drawing plate (97) does not overturn, is close to the end face of case lid (7), is fixed by numerous continuous top board tractive hook (98) tractives between the two.Nested hole is contained two, and two hole circle hearts distance equals the distance at center, No. seven plastic flagstone (96) two holes or the distance in two adjacent case lid fixed orifice (8) centers of circle, and No. two bolts (12) can nestedly be fixed.Stayed pole is lock shape or tunnel-like, is the tractive place of top board tractive hook (98).
98, top board tractive hook (98): be the S shape, numerous top board tractive hooks (98) is upper and lower to link to each other, and upper and lower end difference tractive is in the stayed pole of the top board drawing plate (97) of upper and lower.
99, ground adapter plate (99): board house such as partition are used in the quick structure of simple buildings such as frontier defense military camp, disaster relief shelter, then need be in smooth cement concrete fixed bottom boundary adapter plate (99).Ground adapter plate (99) contains structures such as base plate, fixed link.Base plate buries in cement concrete, and length equals the length of side of case lid (7).Fixed link contains four, the top is that threaded portion, its similar are in the threaded portion on No. two bolts (12) top, can nestedly fix an adapter plate (52), No. two adapter plates (50), become the footing of ground board house, can make up the ground board house identical on this basis with the chinampa board house.
(11), chinampa member, apparatus and uses thereof overview
1, casing (1): produce buoyancy, support the chinampa.
2, case lid (7): waterproof enters casing (1); Lay the chinampa platform.
3, a bolt (11): case lid (7) is anchored on the casing (1); The wallboard of board house is anchored on the adapter plate.
4, No. two bolts (12): substitute a bolt (11), and fixing facility on the island; The top board of fastening board house, and the top board tractive added be fixed in the chinampa platform.
5, No. three bolts (13): two casings (1) of fastening contraposition splicing; Seal the casing fixed block lateral aperture (3) at edge, chinampa, and fix the facility at this place.
6, nut (6): a fastening bolt (11), No. two bolts (12), No. three bolts (13) and adjacent member thereof.
7, square hole rubber band (18): be nested between the rectangular body and nut (6) of bolt (5), regulate thickness and elasticity.
8, circular hole rubber band (19): be nested between the threaded portion and nut (6) of bolt (5), regulate thickness and elasticity.
9, anchor chain (9): connect No. three bolts (13) and anchor (10) on the edge, chinampa.
10, anchor (10): (10) are used to cast anchor.
11, nut driver (21): the fastening or nut that gets loose (6) by the groove (22) of nested rotary nut.
12, pliers: the fastening or nut that gets loose (6) by the peripheric surface of clamp rotary nut (6).
(12), suspension bridge member, apparatus and uses thereof overview
1, bunding (31) and bunding fixture (32): fixing bunding (31) one sides of suspension bridge, and be beneficial to current.The road that partition is used on the gully as suspension bridge connects, and then need build similar structure in the both sides of suspension bridge.
2, suspension bridge coupling link (33): interconnect, fixedly bridge plate (34) bears gravity.
3, bridge plate (34): lay bridge floor.
4, No. three bolts (13):, bridge plate (34) is anchored on suspension bridge coupling link (33) with nut (6).
5, nut (6):, bridge plate (34) is anchored on suspension bridge coupling link (33) with No. three bolts (13).
6, square hole rubber band (18): be nested between the rectangular body and nut (6) of No. three bolts (13), regulate thickness and elasticity.
7, circular hole rubber band (19): be nested between the threaded portion and nut (6) of No. three bolts (13), regulate thickness and elasticity.
8, nut driver (21): the fastening or nut that gets loose (6).
9, bottle opener: the bolt (26) of the fastening or suspension bridge coupling link that gets loose.
(13), board house member, apparatus and uses thereof overview
1, an adapter plate (52): the position at exterior wall, the non-turning of interior wall, fastening wallboard.
2, No. two adapter plates (50): at the position at exterior wall turning (corner location of a promptly whole board house), fastening wallboard.
3, No. three adapter plates (54): the position at the interior wall turning, fastening wallboard.
4, a plastic flagstone (90): stand upright on the top of two adapter plates (52), as wallboard; Be tiled in the room of this wallboard correspondence position, as the floor.
5, No. two plastic flagstones (91): stand upright on the top of No. two adapter plates (50) and an adjacent adapter plate (52) thereof, as wallboard.
6, No. three plastic flagstones (92): be tiled in the position of room, as the floor near No. two adapter plates (50), No. three adapter plates (54).
7, No. four plastic flagstones (93): stand upright on the top of No. three adapter plates (54) and an adjacent adapter plate (52) thereof, as wallboard.
8, No. five plastic flagstones (94): the door and window housing (85) of nested door, and substitute a plastic flagstone (90).
9, No. six plastic flagstones (95): the door and window housing (85) of nested window, and substitute a plastic flagstone (90).
10, No. seven plastic flagstones (96): as top board.
11, four jiaos of square bars: the corner location that is inserted in whole board house enriches little space to fill up.Referring to the four jiaos of square bar positions (63) among Fig. 5.
12, door: with general door.
13, window: with general window.
14, plastic film: be clipped between two-layer No. seven plastic flagstones (96), rainproof water droplet leaks to the room.
15, top board drawing plate (97):, the door and window both sides tractive of top board added be fixed in the chinampa platform with top board tractive hook (98).
16, top board tractive hook (98):, the door and window both sides tractive of top board added be fixed in the chinampa platform with top board drawing plate (97).
17, a bolt (11):, adjacent member is tightened together with nut (6).
18, nut (6):, adjacent member is tightened together with a bolt (11).
19, square hole rubber band (18): be nested between the rectangular body and nut (6) of a bolt (11), regulate thickness and elasticity.
20, circular hole rubber band (19): be nested between the threaded portion and nut (6) of a bolt (11), regulate thickness and elasticity.
21, nut driver (21): the fastening or nut that gets loose (6) by the groove (22) of nested rotary nut.
22, pliers: the fastening or nut that gets loose (6) by the peripheric surface of clamp rotary nut (6).
23, door and window screw: door and window inside casing (88), door and window housing (85), door and window wallboard (83) are tightened together.
24, electric wire electrical equipment: with daily life.
25, ground adapter plate (99): when simple buildings such as ground structure frontier defense military camp, disaster relief shelter, be used for fixing an adapter plate (52), No. two adapter plates (50).
The step method on (14), structure chinampa
1, peripheral casing is anchored on a certain casing (1):
A, another casing contraposition is spliced in the side of a certain casing (1);
B, No. three bolts (13) are nested among the two tanks contraposition bonded assembly casing fixed block lateral aperture (3);
C, at the two ends of No. three bolts (13), two nuts (6) are fastening;
D, above-mentioned B to the C step method of reference, another casing fixed block lateral aperture (3) of two tanks contraposition bonded assembly is nested fastening;
E, with reference to above-mentioned A to D step method, other three casings are anchored on the periphery of a certain casing (1).
2, case lid (7) is anchored on a certain casing (1):
F, nut (6) are anchored on the top of a bolt (11);
G, a bolt (11) are nested among the casing fixed block upright opening (4) from top to bottom;
H, another nut (6) are anchored on the bottom of a bolt (11) in the below of casing fixed block (2);
I, with reference to above-mentioned F to H step method, among nested three the casing fixed block upright openings (4) in addition that are anchored on a certain casing (1) of other three bolts (11);
J, case lid (7) contraposition cover on a certain casing (1);
K, in addition four nuts (6) are anchored on a certain casing (1) in the position of four case lid fixed orifices (8) with case lid (7).
3, the chinampa extends to required scale and shape:
With reference to above-mentioned 1 to 2 step method, make up the unit, chinampa repeatedly, the chinampa is expanded to needed scale and shape.
4, cast anchor (10) and hydropower installation of chinampa:
In the position of the casing fixed block lateral aperture (3) at edge, chinampa, install or be replaced by No. three bolts (13).Dispose numerous anchor chains (9) and anchor (10), the chain link on anchor chain (9) top is nested on No. three bolts of part (13) that equidistantly distribute, the two ends of fastening No. three bolts of two nuts (6) (13), and cast anchor (10) can prevent the chinampa excessive drift in the bottom.Water pipe hangs under No. three bolts (13), the edge that is communicated to the chinampa everywhere with the water position.The tractive of electric wire is then used the electric pole mode, and the root of electric pole is fixed in four adjacent No. two bolts (12) on four adjacent case lid fixed orifices (8), and electric wire is communicated to the board house room and uses electric position.
The step method of (15), structure suspension bridge
1, build bunding (31):
Near the coastline part, form bunding (31) with mixing earth finishing seashore, its width is provided with bunding fixture (32) greater than whole suspension bridge on it.
2, make up passage (36):
Over against the position of bunding (31),, form the satisfactory passage of width (36) on the chinampa to bunding (31) direction assembling unit, chinampa and near bunding (31).
3, connect suspension bridge coupling link (33):
The tractive hook (27) of suspension bridge coupling link is tractive mutually, the tractive hook (27) of the bolt of suspension bridge coupling link (26) sealing suspension bridge coupling link.Numerous suspension bridge coupling links (33) are connected to needed length, and two ends are individually fixed in No. two bolts (35) on bunding fixture (32), the passage, and nut (6) is fastening.
4, lay bridge plate (34):
The square hole of bridge plate (30) splices with vertical square hole (24) contraposition of suspension bridge coupling link, and No. three bolts (13) and nut (6) penetrate fastening.All lay a bridge plate (34) on every pair of suspension bridge coupling link (33).
The step method of (16), structure board house
1, fastening footing:
Design length, the width in whole board house and each room, No. two bolts (12) are installed or be replaced by to the case lid fixed orifice (8) of relevant position.An adapter plate (52) is placed on the position at exterior wall, the non-turning of interior wall, No. two adapter plates (50) are placed on the position (corner location of a promptly whole board house) at exterior wall turning, No. three adapter plates (54) are placed on the position at interior wall turning, the fixed orifice of the horizontal plate of the fastening adapter plate of nut (6)
(66), the fixed orifice of the horizontal plate of No. two adapter plates (71).Referring to the adapter plate (52) among Fig. 5, No. two adapter plates (50), No. three adapter plates (54).
2, fastening wallboard:
A plastic flagstone (90) is inserted in the top of two adapter plates (52); No. two plastic flagstones (91) are inserted in the top of No. two adapter plates (50) and an adjacent adapter plate (52) thereof; No. four plastic flagstones (93) are inserted in the top of No. three adapter plates (54) and an adjacent adapter plate (52) thereof.The square hole of fastening each wallboard bottom of a bolt (11) and nut (6).Dispose the identical adapter plate of a cover separately, the top of each wallboard is inserted in upset, makes the projection of adapter plate on birds-eye view of top, bottom overlapping; That is to say, be the plane of symmetry with the central water plane of wallboard, and the adapter plate of top, bottom goes to upper and lower symmetrical distribution.The square hole at a bolt (11) and fastening each wallboard top of nut (6), but a square hole (being used to lead into electric wire) is reserved at the wallboard top of each room window one side.Referring to the adapter plate (52) among Fig. 5, No. two adapter plates (50), No. three adapter plates (54).
3, door and window is installed:
With door and window inside casing (88), door and window housing (85), nest together as No. five plastic flagstones (94) or No. six plastic flagstones (95) of door and window wallboard (83), head is the screw hole (89) that funnelform screw successively passes through the door and window inside casing, the screw hole (86) of door and window housing, the screw hole (84) of door and window wallboard, door and window inside casing (88), door and window housing (85), door and window wallboard (83) are tightened together, form the door and window compound.Exterior wall, interior wall displacement at needs installation door and window substitute two plastic flagstones (90) with the door and window compound.Other is identical with the relevant step method of an adapter plate (52) in above-mentioned " 2, fastening wallboard " about step method for the door and window compound.
4, top board is installed:
In an adapter plate (52) at wallboard top, the top of No. two adapter plates (50), position shown in Figure 7, two holes, the outside of tiling series No. seven plastic flagstones (96), the fixed orifice (81) that makes No. seven plastic flagstones an adapter plate (52) or No. two adapter plates (50) over against the door and window both sides.The top of No. seven plastic flagstones (96) adds last layer plastic film, No. seven plastic flagstone of another floor (96) respectively, and inverted No. two bolts (12) and nut (6) penetrate the fixed orifice of fixed orifice (81), its next number adapter plate (52) or No. two adapter plates (50) of fixing No. seven plastic flagstones.
5, reinforce board house:
Adapter plate (52) under top board or the below of No. two adapter plates (50), the nested hole of inverted top board drawing plate (97) is nested in No. two bolts (12), and nut (6) is nested.The nested hole of another not inverted top board drawing plate (97) is nested in No. two bolts (12) on the door and window outside case lid fixed orifice (8), and nut (6) is fastening.Numerous top board tractive hooks (98) links to each other up and down, and upper and lower end difference tractive is in the stayed pole of the top board drawing plate (97) of upper and lower.Fastening No. two bolts of nut (6) (12) of top.
6, tiling floor:
For taking precautions against seawater invasion and attack room, in each room of board house, a plastic flagstone (90) and No. three plastic flagstones (92) tile.Wherein, a plastic flagstone (90) is over against a plastic flagstone (90), No. five plastic flagstones (94), No. six plastic flagstones (95) of door and window both sides; In the position near No. two adapter plates (50), No. three adapter plates (54), No. three plastic flagstones (92) then tile.
7, lay electric wire:
In window one side, electric wire hangs on the stayed pole of the top board drawing plate (97) under the top board.In the square hole that each wallboard top, room is reserved, electric wire leads into the room.
(17), safeguard the step method on chinampa
1, change the unit, chinampa: with reference to the reverse step method of " making up the step method on chinampa " 1 to 2 step method, the unit, chinampa that dismounting need be changed; With reference to " making up the step method on chinampa " 1 to 2 step method,, replenish the unit of having dismantled, chinampa with new structural member assembling unit, chinampa.
2, adjust the scale shape: with reference to " making up the step method on chinampa " 1 to 2 step method and reverse step method thereof, increase or unit, disengaging section chinampa, the chinampa adjustment can be varied to new scale and shape at the edge on chinampa.
The step method on (18), mobile chinampa
After receiving anchor (10), pull chinampa or No. three bolts (13) on edge, chinampa dependence casing (1) vertical surface and No. two bolts (12) on the horizontal surface by the naval vessel and one or more driving engines are installed, removable position, chinampa.To can be considered the navigation of chinampa formula aircraft carrier as the shift position, super-huge chinampa of air base.
(19), the step method of removing chinampa, suspension bridge, board house
With reference to the reverse step method of " making up the step method on chinampa ", " making up the step method of suspension bridge " or " making up the step method of board house ", can remove chinampa, suspension bridge or board house in the position, chinampa, then member is loaded boats and ships and transport the base back; Also can be with reference to above-mentioned " step method on mobile chinampa ", earlier the chinampa is moved to the dismounting base, with reference to the reverse step method of " making up the step method on chinampa ", " making up the step method of suspension bridge " or " making up the step method of board house ", remove chinampa, suspension bridge or board house again.

Claims (3)

1. one kind " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house " is characterized in that the constructional feature on chinampa is: between two tanks (1), bolt (5) and nut (6) are located to fix at casing fixed block lateral aperture (3); Between case lid (7) and casing (1), bolt (5) and nut (6) are located to fix at case lid fixed orifice (8) and casing fixed block upright opening (4); The chinampa extends to required scale and shape; In chinampa edge, bolt (5) and anchor (10) that the upper and lower end of numerous anchor chains (9) difference connect box fixed block lateral aperture (3) is located, the seabed is fixed in anchor formula mode in the chinampa; Fixedly affiliated facility suspension bridge, board house on the chinampa.
2. " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house " according to claim 1, it is characterized in that, the constructional feature of suspension bridge is: suspension bridge coupling link (33) interconnects, and bunding (31) and passage (36) are fixed in two ends, fixing bridge plate (34) on it; The structure of suspension bridge coupling link (33) contains the cube (23) of suspension bridge coupling link, the vertical square hole (24) of suspension bridge coupling link, the horizontal square hole (25) of suspension bridge coupling link, the bolt (26) of suspension bridge coupling link, the tractive hook (27) of suspension bridge coupling link.
3. " the affiliated facility suspension bridge of marine chinampa and detachable use thereof, board house " according to claim 1, it is characterized in that, the constructional feature of board house is: an adapter plate (52), No. two adapter plates (50), No. three adapter plates (54) are as footing, a plastic flagstone (90) to No. seven plastic flagstones (96) as wallboard, floor, top board or nested door and window, the top board tractive adds and is fixed in the chinampa; The structure of an adapter plate (52) contains the fixed orifice (67) of the diaphragm plate of the fixed orifice (66) of the horizontal plate of the diaphragm plate (65) of the horizontal plate (64) of an adapter plate, an adapter plate, an adapter plate, an adapter plate, the groove (68) of an adapter plate; The structure of No. two adapter plates (50) contains the fixed orifice (72) of the diaphragm plate of the fixed orifice (71) of the horizontal plate of the diaphragm plate (70) of the horizontal plate (69) of No. two adapter plates, No. two adapter plates, No. two adapter plates, No. two adapter plates, the groove (73) of No. two adapter plates; The structure of No. three adapter plates (54) contains the groove (79) of the exterior wall adapter plate (78) of the exterior wall fixed orifice (77) of the interior wall fixed orifice (76) of the diaphragm plate (75) of the horizontal plate (74) of No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates, No. three adapter plates; A plastic flagstone (90) contains 4 square holes, is inserted in the groove (68) of two adapter plates, can be used as wallboard on the edge of case lid (7), and the correspondence position that is tiled in the room can be used as the floor; No. two plastic flagstones (91) contain 4 square holes, be inserted in the groove (68) of the groove (73) of No. two adapter plates and an adjacent adapter plate thereof, can be used as wallboard on the edge of case lid (7); No. three plastic flagstones (92) contain 4 square holes, are tiled in the room and can be used as the floor near the position of No. two adapter plates (50) or No. three adapter plates (54); The length of No. four plastic flagstones (93), width, basic structure are identical with No. two plastic flagstones (91), but contain segmental defect in upper and lower two bights, be inserted in the groove (68) of the groove (79) of No. three adapter plates and an adjacent adapter plate thereof, on the edge of case lid (7), can be used as the wallboard of interior wall corner; The length of No. five plastic flagstones (94), width are identical with a plastic flagstone (90), contain the screw hole (84) of 4 square holes and a plurality of door and window wallboards, are used for the door and window housing (85) of nested door and substitute a plastic flagstone (90); The length of No. six plastic flagstones (95), width are identical with a plastic flagstone (90), contain the screw hole (84) of 4 square holes and a plurality of door and window wallboards, are used for the door and window housing (85) of nested window and substitute a plastic flagstone (90); No. seven plastic flagstones (96) are as top board, and respectively there are 2 square holes both sides, in board house over against the door and window both sides two holes, the outside of an adapter plate (52) or No. two adapter plates (50); The structure of top board drawing plate (97) contains base plate, nested hole, stayed pole, with top board tractive hook (98), the top board tractive added is fixed in the chinampa platform.
CN2009201703649U 2009-08-22 2009-08-22 Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled Expired - Lifetime CN201559797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201703649U CN201559797U (en) 2009-08-22 2009-08-22 Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201703649U CN201559797U (en) 2009-08-22 2009-08-22 Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled

Publications (1)

Publication Number Publication Date
CN201559797U true CN201559797U (en) 2010-08-25

Family

ID=42624943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201703649U Expired - Lifetime CN201559797U (en) 2009-08-22 2009-08-22 Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled

Country Status (1)

Country Link
CN (1) CN201559797U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079378A (en) * 2010-09-17 2011-06-01 朱惠芬 Method for developing South China Sea based on multi-purpose South China Sea travel and vacation training aircraft carrier
CN102108671A (en) * 2011-01-11 2011-06-29 卞洪登 Plastic foam interlocked floating bridge
CN106275304A (en) * 2016-09-12 2017-01-04 东莞市中上模具塑胶科技有限公司 A kind of buoyancy tank assembled Waterborne movable platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079378A (en) * 2010-09-17 2011-06-01 朱惠芬 Method for developing South China Sea based on multi-purpose South China Sea travel and vacation training aircraft carrier
CN102108671A (en) * 2011-01-11 2011-06-29 卞洪登 Plastic foam interlocked floating bridge
CN106275304A (en) * 2016-09-12 2017-01-04 东莞市中上模具塑胶科技有限公司 A kind of buoyancy tank assembled Waterborne movable platform

Similar Documents

Publication Publication Date Title
CN101992841B (en) Floating island on sea and detachable hanging bridge and plank house affiliated thereto
Hunt Thirsty planet: Strategies for sustainable water management
Bindu et al. Water bodies as a catalyst to growth and development-The case of Kodungallur town, Kerala
CN201559797U (en) Floating island on the sea and its affiliated hanging bridge and board houses which can be disassembled
Hernández-Delgado et al. Long-term impacts of non-sustainable tourism and urban development in small tropical islands coastal habitats in a changing climate: lessons learned from Puerto Rico
Ding et al. 14 The Yangtze River: Harmony between Humans and Nature
Bertrand The Arcachon Bay estuary: a “collage” of landscapes
Warwick et al. European marine biodiversity research sites
Mudie et al. The natural resources of San Dieguito and Batiquitos lagoons
Tolmazin Economic impact on the riverine-estuarine environment of the USSR: The Black Sea basin
Favro et al. Prirodna obilježja hrvatskog litoralnog prostora kao komparativna prednost za razvoj nautičkog turizma
Maragos Description of reefs and corals for the 1988 protected area survey of the Northern Marshall Islands
Lynch A field guide to Long Island Sound: coastal habitats, plant life, fish, seabirds, marine mammals, and other wildlife
JP7395046B1 (en) Freshwater storage tanks and freshwater storage tank aggregates installed in seawater
Wang et al. Utilization of water resources in Pingtian Lake wetland and its protection countermeasures
CN108217962B (en) Floating type aquatic ecological industrial chain urban water body maintenance method
Vallerani Inland Waterways as Modern Landscapes in Northeast Italy: Recovering a Cultural Heritage for Sustainable Governance
Mestvedt Borgen Urban Mutualism
Sen Coastal ecosystems: Risk factors for development and threats due to climate change
Colombini et al. Evolution, impacts and management of the wetlands of the Grosseto plain, Italy
Campostrini et al. Supporting Implementation of Maritime Spatial Planning in the Western Mediterranean region
Katupotha Islands of Sri Lanka
Campostrini et al. Develop a basin scale analysis/initial assessment strongly MSP oriented for the Western Mediterranean
KATUPOTHA et al. WATER OUTLETS (MOUTHS) OF THE COASTAL ZONES OF SRI LANKA: A COMPOSITE INVENTORY
Haga et al. Development and infrastructure of the Federated States of Micronesia

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20100825

Effective date of abandoning: 20090822

RGAV Abandon patent right to avoid regrant