CN201548624U - Equipment used for testing control panel of generating set - Google Patents

Equipment used for testing control panel of generating set Download PDF

Info

Publication number
CN201548624U
CN201548624U CN2009201940343U CN200920194034U CN201548624U CN 201548624 U CN201548624 U CN 201548624U CN 2009201940343 U CN2009201940343 U CN 2009201940343U CN 200920194034 U CN200920194034 U CN 200920194034U CN 201548624 U CN201548624 U CN 201548624U
Authority
CN
China
Prior art keywords
test board
simulation
equipment
generating set
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201940343U
Other languages
Chinese (zh)
Inventor
张婕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG WESTIN POWER CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201940343U priority Critical patent/CN201548624U/en
Application granted granted Critical
Publication of CN201548624U publication Critical patent/CN201548624U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model relates to the technical field of simulation testing equipment, in particular to simulation generating set equipment used for testing the control panel of a generating set. The equipment comprises a test board, a potentiometer, a functional keystroke and a power supply main switch; the working state of the machine set is displayed on the test board; the control panel is connected with the test board in a bidirectional manner and outputs control signals to the test board; the potentiometer is electrically connected with the test board for fine-tuning the working parameters on the test board; the functional keystroke is electrically connected with the test board and outputs analog signals to the test board; and the power supply main switch is connected to the circuit of the equipment. In the equipment, a meter and an indicator light on the panel can be used for displaying voltages of all phrases, battery voltage, machine set oil pressure, machine set water temperature, and other machine set operational parameters; the equipment has the functions of multi-term fine-tuning, various machine set breakdown simulation, machine set loading simulation, and remote machine set control simulation; and the equipment can meet the test requirements of the working of the control panel in the generating set, simplifies the test, improves the industrial work efficiency, and has the benefits of simple structure and convenient wiring.

Description

Testing equipment of generating set control screen
Technical field:
The utility model relates to the analog detection equipment technical field, refers in particular to a kind of simulation genset equipment that is used to test generating set control screen.
Background technology:
At present, have multiplely for the method for testing of generating set control screen, but operate or more loaded down with trivial details, and lack work simulation, in the while prior art, do not have an equipment can reach the testing apparatus that each parameter of genset is simulated; Under this background, the applicant is because the disappearance and the inconvenience of above-mentioned known testing equipment of generating set control screen, the spirit of adhering to the research innovation, keeping on improving, utilize its professional eye and professional knowledge, work out a kind of structure optimization, meet the simulation genset equipment that is used to test generator set controller of industry utilization.
The utility model content:
The purpose of this utility model is to provide a kind of and can simulates genset startup-operation-band and carry-various duties such as unit fault, can do various parameters of simulation and control, and the testing apparatus of carrying out data communication with generating set control screen.
For achieving the above object, the utility model adopts following technical scheme:
Testing equipment of generating set control screen, mainly comprise test board, control flow, potentiometer, function button and battery main switch, show the unit duty on the test board, express with Visual Display and auditory cues, test board is provided with bidirectional interface and connects tested control flow, and control flow output control signal is given test board; Potentiometer electrically connects test board, and the running parameter on the test board is finely tuned; Function button electrically connects test board, and the output simulating signal is given test board; Battery main switch is connected on the circuit of equipment.
Described test board is provided with the remote activation signal input port, communicates to connect remotely controlling computer by 485, realizes automatic start-up control and carries out data communication.
Described testing apparatus has manual and automatic originate mode.
Described function button includes remote activation simulation, low-voltage simulation, high voltage simulation, the simulation of high water temperature, low oil pressure simulation, low battery voltages simulation and band and carries simulation, satisfies the many-sided test of generating set control screen.
The simulation genset equipment of the test generating set control screen that the utility model provides can show unit operation parameters such as each phase voltage, cell voltage, unit oil pressure and unit water temperature by table on the panel and pilot lamp; The function, the simulation unit band that possess multinomial fine adjustment function, simulation unit various faults carry function and long-range unit control analog functuion; Satisfy the test request of generating set control screen work, simplify test, promote the industry work efficiency, and testing apparatus is simple in structure, easy-to-connect.
Description of drawings:
Accompanying drawing 1 is the utility model functional-block diagram;
Accompanying drawing 2 is the utility model one embodiment wiring diagram.
Embodiment:
Below lift preferred embodiment and cooperate graphic being described in detail as follows:
See also shown in Figure 1, it is the structural representation of the preferred embodiment of the utility model, the utility model is the relevant simulation genset equipment that is used to test generating set control screen, mainly comprise test board 1, potentiometer 3, function button 4 and battery main switch 5, show the unit duty on the test board 1, express with Visual Display and auditory cues, as showing or alarm by bright lamp, test board 1 is provided with bidirectional interface and connects tested control flow 2, control flow 2 output control signals are given test board, realize control; Potentiometer 3 electrically connects test board, and the running parameter on the test board is finely tuned, and comprises adjustment such as voltage, water temperature, oil pressure and DC control electricity; Function button 4 electrically connects test board, and the output simulating signal is given test board; Battery main switch 5 is connected on the circuit of equipment, comprises power knob and scram button.Test board is provided with the remote activation signal input port, communicates to connect remotely controlling computer by 485.
Testing apparatus of the present utility model has manual and automatic originate mode, and function button includes remote activation simulation, low-voltage simulation, high voltage simulation, the simulation of high water temperature, low oil pressure simulation, low battery voltages simulation and band and carries simulation.
Figure 2 shows that the utility model one embodiment wiring diagram, concrete test operation is as follows: one, the adjustment of test board parameter:
1, energized is pressed start button, starts test board.Test board working power pilot lamp is bright, and each phase power light is bright.
2,, adjust the operating voltage (DC12V or DC24V) of control flow with reference to D.C. voltmeter and select correct controller power supply according to the type of survey control flow.
3, check whether each failure button resets.Whether high voltage, low-voltage, high water temperature, low oil pressure, each fault simulation button of low battery voltages reset.Adjust the water temperature oil pressure with reference to the water temperature oil pressure gauge and detect knob, it is transferred to normal value, high water temperature fault value is 105 ℃, and the low oil pressure fault value is 140Kpa.
Two, according to the type wiring of control flow.
Dispose signal input output end on the test board, can be according to the different control flow type selecting different terminal connections methods and corresponding the joining of C10 interface (all can on the input/output port of test board, find corresponding terminal) of control flow as 30,31,61,80,50,4,10,54,66 above the C10 interface.Test board is exported to control flow three-phase supply U4, V4, W4, N to be received on the corresponding control flow on genset power input mouth U, V, W, the N.The three-phase power output end mouth joins with the corresponding input of test board fictitious load U5, V5, W5, N, and to install the unit connection identical with control flow.Also carry simulation unit band on the test board and carry remote activation control and control flow unit fault-signal output test, need during access the fault-signal output wire size 21 of control flow, self-starting signal input line numbers 29 are joined with test board, to realize set remote start-up control analog functuion and control flow unit fault-signal output test.
Three, energising test.
Confirm to switch on after the above wiring correctly, the every control function of control flow is tested.
1, simulation unit starting operation test: controller is switched to manual state, pressed start button about about 2 seconds, control flow output enabling signal, at this moment L2 (startup pilot lamp), L3 (throttle pilot lamp) light simultaneously, 3-4 after second the KM2 coil get electric closure, A.C. voltmeter, frequency meter show current input voltage and frequency on the test board, and the control flow safety detection is bright the opening of L5 (excitation pilot lamp) after 5 seconds, extinguishes automatically after the couple of seconds.After finishing, the controller startup is in normal operating condition, consult operating voltage, electric current, frequency, water temperature, oil pressure and the working power parameters such as (direct supplys) of each phase this moment on can slave controller, the numeric ratio on voltage, electric current, frequency, water temperature, oil pressure and the D.C. voltmeter on itself and the test board is right.But whether there is mistake from the wiring of comparison data access control screen.
2, simulation unit run with load test: controller is pressed SB3 (load button) after normal startup operation, and test board was done controller and loaded test this moment.The size that can show electric current, voltage, power and the frequency of current loading on the controller can be compared with the size of displayed value on electric current, voltage, power and the frequency meter on the test board.But it is whether normal from comparison data access control screen electric current, voltage, frequency isocorrelate road.For the sake of security, the band time of carrying shortens as far as possible because little load box can produce high temperature when band carried!
3, simulation unit self-starting control: controller is switched to auto state, press test board self-starting simulation test button, controller receives self-starting behind the self-starting signal, at this moment L2 (startup pilot lamp), L3 (throttle pilot lamp) light simultaneously, 3-4 after second the KM2 coil get electric closure, A.C. voltmeter, frequency meter show current input voltage and frequency on the test board, and the control flow safety detection is bright the opening of L5 (excitation pilot lamp) after 5 seconds, extinguishes automatically after the couple of seconds.The controller startup is finished and is in normal operating condition, can consult operating voltage, electric current, frequency, water temperature, oil pressure and the working power (direct supply) etc. of each phase this moment from control, and the numeric ratio on voltage, electric current, frequency, water temperature, oil pressure and the D.C. voltmeter on itself and the test board is right.Whether normal with this access control screen from opening operation circuit.
4, simulate high low voltage failure: adjusting RP1, RP2, RP3 can regulate the height of each phase voltage separately.High voltage, low voltage failure button are arranged on the test board.
When 1) doing the test of simulation high voltage fail; then when being in normal operation, presses by controller the high voltage fail testing button; this moment, controller detected the voltage input that is higher than fault value; then export the disorderly closedown signal; malfunction indicator lamp lights, and L1 (startup pilot lamp), L2 (throttle pilot lamp) extinguish simultaneously.Controller is in the high voltage fail stopped status.Abnormal with this access control device high voltage measuring ability.
When 2) simulating the low voltage failure test.Should press the low voltage failure testing button when controller is in normal operation, controller detected three-phase voltage and imported lowly this moment, then exported the disorderly closedown signal, and malfunction indicator lamp lights, and L1 (startup pilot lamp), L2 (throttle pilot lamp), extinguished simultaneously.Controller is in the low voltage failure stopped status, and is abnormal with this access control device low-voltage measuring ability
5, simulate high water temperature (low oil pressure) fault test: when controller is in running status, regulate the height that RP8 (RP7) can change water temperature (oil pressure) value.
Press high water temperature (low oil pressure) the fault test button simulation high water temperature of unit (low oil pressure) fault; controller detected the unit water temperature and was higher than (oil pressure is lower than) fault value this moment; then export the disorderly closedown signal; malfunction indicator lamp lights, and L1 (startup pilot lamp), L2 (throttle pilot lamp) extinguish simultaneously.When the wiring of control control flow was correct, controller was in high water temperature (low oil pressure) disorderly closedown state.Test by last art method, do not have corresponding output to illustrate that then the counterpart line function has the fault of existence, when emergent this part circuit is checked, corrected as controller.

Claims (4)

1. testing equipment of generating set control screen is characterized in that: comprise
Test board shows the unit duty, expresses with Visual Display and auditory cues, and test board is provided with bidirectional interface and connects tested control flow, and control flow output control signal is given test board;
Potentiometer electrically connects test board, and the running parameter on the test board is finely tuned;
Function button electrically connects test board, and the output simulating signal is given test board;
Battery main switch is connected on the circuit of equipment.
2. testing equipment of generating set control screen according to claim 1 is characterized in that: described test board is provided with the remote activation signal input port, communicates to connect remotely controlling computer by 485.
3. testing equipment of generating set control screen according to claim 1 is characterized in that: testing apparatus has manual and automatic originate mode.
4. testing equipment of generating set control screen according to claim 1 is characterized in that: function button includes remote activation simulation, low-voltage simulation, high voltage simulation, the simulation of high water temperature, low oil pressure simulation, low battery voltages simulation and band and carries simulation.
CN2009201940343U 2009-09-04 2009-09-04 Equipment used for testing control panel of generating set Expired - Lifetime CN201548624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201940343U CN201548624U (en) 2009-09-04 2009-09-04 Equipment used for testing control panel of generating set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201940343U CN201548624U (en) 2009-09-04 2009-09-04 Equipment used for testing control panel of generating set

Publications (1)

Publication Number Publication Date
CN201548624U true CN201548624U (en) 2010-08-11

Family

ID=42603800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201940343U Expired - Lifetime CN201548624U (en) 2009-09-04 2009-09-04 Equipment used for testing control panel of generating set

Country Status (1)

Country Link
CN (1) CN201548624U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106249082A (en) * 2016-08-30 2016-12-21 潍柴重机股份有限公司 A kind of generating set control screen test method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106249082A (en) * 2016-08-30 2016-12-21 潍柴重机股份有限公司 A kind of generating set control screen test method and device
CN106249082B (en) * 2016-08-30 2020-06-02 潍柴重机股份有限公司 Generating set control panel test device

Similar Documents

Publication Publication Date Title
CN103308797B (en) Intelligent automatic standby power supply switching device calibration system
CN106019002A (en) Verification test platform for battery management system and test method thereof
CN110905733B (en) Become oar cabinet test system
CN203069753U (en) Final-inspection bench for vacuum circuit breaker
CN101650400A (en) Testing equipment of generating set control screen
CN101762787A (en) Tester of program guidance (PG) motor
CN103777137A (en) Electronic circuit breaker with self-checking function and self-diagnosis method thereof
CN201548624U (en) Equipment used for testing control panel of generating set
CN103092184B (en) A kind of automatic testing stand of integrated protection and monitoring device
CN210466822U (en) All-round comprehensive training system
CN112034298A (en) Switch test device
CN201796097U (en) Comprehensive test equipment of one-board product
CN107393368A (en) A kind of functional simulation control flow applied to diesel-driven generator control system
CN209514024U (en) Prepared auto restart switch test instrument
CN115951138A (en) Automatic standby power supply switching device and uninterrupted power supply verification method of outlet loop of automatic standby power supply switching device
CN204330904U (en) A kind of frequency converter test device
CN216248910U (en) Fault detection equipment for electric valve control system
CN203287451U (en) Intelligent verification system of automatic switching apparatus of stand-by power supply
CN202110249U (en) Automatic testing system for air-conditioning control mainboard
CN201421560Y (en) Electrical control reliability automatic test device
CN101968519B (en) Electric control reliability automatic testing device
CN211319056U (en) Frequency converter debugging device
CN217305361U (en) Periodic power on/off test device
CN202975255U (en) Apparatus for testing transistor
CN202393880U (en) Split-type marine onsite detecting device of air breaker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WESTINPOWER (SHANTOU FREE TRADE ZONE) CO., LTD.

Free format text: FORMER OWNER: ZHANG JIE

Effective date: 20101224

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Jie

Inventor after: Chen Jiwen

Inventor after: Zhang Yukai

Inventor after: Wu Dabo

Inventor before: Zhang Jie

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 523000 ROOM 1005, TOWER A, TIANCHENGYUAN, LICHENG GARDEN, CHANGPING TOWN, DONGGUAN CITY, GUANGDONG PROVINCE TO: 515071 BUILDING 1, GENERAL FACTORY BUILDING, COMMODITY EXHIBITION CENTER, FREE TRADE ZONE, SHANTOU, GUANGDONG PROVINCE

Free format text: CORRECT: INVENTOR; FROM: ZHANG JIE TO: ZHANG JIE CHEN JIWEN ZHANG YUKAI WU DABO

TR01 Transfer of patent right

Effective date of registration: 20101224

Address after: 515071, Guangdong Shantou Free Trade Zone Commodity Exhibition Center General Factory Building 1

Patentee after: Westinpower (Shantou F.T.Z) Co., Ltd.

Address before: 523000 Guangdong city in Dongguan Province town of Changping City Belvedere Garden Court A block room 1005

Patentee before: Zhang Jie

C56 Change in the name or address of the patentee

Owner name: GUANGDONG WESTINPOWER CO., LTD.

Free format text: FORMER NAME: WESTINPOWER (SHANTOU FREE TRADE ZONE) CO., LTD.

CP03 Change of name, title or address

Address after: 515071 Xidian Industrial Zone, Shantou Free Trade Zone, Guangdong

Patentee after: Guangdong Westin Power Co.,Ltd.

Address before: 515071, Guangdong Shantou Free Trade Zone Commodity Exhibition Center General Factory Building 1

Patentee before: Westinpower (Shantou F.T.Z) Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20100811

Effective date of abandoning: 20161017

C20 Patent right or utility model deemed to be abandoned or is abandoned