CN201547939U - Improved electric water heater - Google Patents

Improved electric water heater Download PDF

Info

Publication number
CN201547939U
CN201547939U CN2009202196270U CN200920219627U CN201547939U CN 201547939 U CN201547939 U CN 201547939U CN 2009202196270 U CN2009202196270 U CN 2009202196270U CN 200920219627 U CN200920219627 U CN 200920219627U CN 201547939 U CN201547939 U CN 201547939U
Authority
CN
China
Prior art keywords
heating tube
heating
shaped portion
tube
inner bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202196270U
Other languages
Chinese (zh)
Inventor
邹国营
邹茂祥
张慧宝
张建皋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO SHUAIKANG WATER HEATER CO Ltd
Original Assignee
NINGBO SHUAIKANG WATER HEATER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO SHUAIKANG WATER HEATER CO Ltd filed Critical NINGBO SHUAIKANG WATER HEATER CO Ltd
Priority to CN2009202196270U priority Critical patent/CN201547939U/en
Application granted granted Critical
Publication of CN201547939U publication Critical patent/CN201547939U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to an improved electric water heater which comprises a housing, an inner container, a water inlet pipe communicated with the inner container, a water outlet pipe, a heating component, a temperature measuring device and a control part, wherein the heating component comprises a flange and a heating pipe mounted on the flange, the water outlet pipe extends into the inner container and is near to the top of the inner container, the heating pipe comprises a first heating pipe, the first heating pipe comprises a U-shaped part, the distance from the U-shaped part to the top of the inner container is 0.4R to 0.6R, the distance from a temperature measuring point of the temperature measuring device to the U-shaped part is 0.5R to 0.9R, and the temperature measuring point is positioned at the same horizontal line with the U-shaped part or above the horizontal line. The U-shaped part is closer to the upper part of the inner container, thereby being capable of realizing fast heating and meeting the low and fast water demand of a user. As the fast heating time is greatly shortened, water scales are difficult to accumulate on the surface of the heating pipe, therefore, the service life is effectively prolonged and the fast heating efficiency is significantly improved.

Description

A kind of improved electric heater
Technical field
The utility model relates to a kind of water heater, and feature relates to a kind of improved electric heater.
Background technology
At present, the use of electric heater is very universal.Study for electric heater, core wherein is the installation that is provided with of heating tube.Existing electric heater is provided with 1 to 2 electric heating tube mostly in inner bag, and is located at the middle and lower part of inner bag, utilizes the physical characteristic of hot water come-up, helps the heating to whole courage water, shortens the heating stand-by period.But the type water heater water storage volume size and heat time heating time length contradiction can't coordinate, volume can't provide enough hot water in little short time, provide the volume of enough hot water big in short time, material consumption is too much, take too much installing space, cause the cost cost to become big and the important point is that power consumption is very big.Because waste of energy is bigger, often the user uses small part water, but will cause a large amount of wastes of the energy with putting in order the heating of courage water, and is more and more inapplicable in the overall situation of energy-saving and emission-reduction at present.
Existing for this reason water heater has proposed some and has improved, and reaches the purpose of a small amount of water, Fast Heating.As State Intellectual Property Office on July 15th, 2009 Granted publication, the patent No. is CN200820099413.X, the patent name utility model patent for " a kind of electric heater ".Include inner bag (1), be fixed on water inlet pipe (7), outlet pipe (4) and main heating tube (2) on the inner bag (1), wherein main heating tube (2) is contained in the bottom of inner bag (1) hollow cavity, it is characterized in that the delivery port (41) of described outlet pipe is equiped with the quick-heating type heating tube (3) that the hot water that flows out from outlet pipe (4) is carried out post bake.This patent promptly is provided with main heating tube in the bottom of inner bag, though be provided with the quick-heating type heating tube of post bake at the outlet pipe place, it makes complex structure, inconvenience is installed because of increased a quick-heating type heating tube in addition at the delivery port place, also increases production cost.
The utility model content
In order to solve above-mentioned the problems of the prior art, the utility model provides a kind of improved electric heater.With the Front-end Design of electric heating tube is the U-shaped warp architecture, increase the effective area of heating, and U-shaped portion is located between the 0.4R~0.6R of inner bag roof, the upper area of more close inner bag, water that can Fast Heating inner bag upper area, utilize the principle of hot water come-up, with the hot water heating, improve the efficiency of heating surface fast.And the hot water of heating is minimum to the heat conduction in waters, bottom, has further reduced losing of heat.
The main technical schemes that the utility model adopts is: a kind of improved electric heater, comprise shell, inner bag, the water inlet pipe that is communicated with described inner bag, outlet pipe, heating component, temperature measuring equipment and control assembly, described heating component comprises ring flange, be installed on the heating tube on the described ring flange, described outlet pipe stretches into the top of described inner bag and close described inner bag, described heating tube comprises first heating tube, described first heating tube comprises U-shaped portion, the distance at the described inner bag of described U-shaped portion's distance top is between 0.4R~0.6R, and the distance of the described U-shaped of the point for measuring temperature of described temperature measuring equipment distance portion is between 0.5R~0.9R, and be on same horizontal line or the horizontal line with U-shaped portion.
The utility model also adopts following attached technical scheme: described first heating tube also comprises horizontal part and rake, and the ratio of the power of the power of described rake and U-shaped portion is between 1: 2 to 1: 3;
Described heating tube also comprises second heating tube, and described second heating tube is located at the below of described first heating tube, and described first heating tube and second heating tube distance at interval is between 10 to 15mm;
The power of described first heating tube is that the power of 1500W, second heating tube is 1000W, and described first heating tube and second heating tube heat separately under the control of relay or parallel connection is heated simultaneously;
Described temperature measuring equipment comprises temperature tube, and what described temperature tube tilted is installed on the described ring flange, the angle a of described temperature tube and ring flange 75 spend spend to 65 between, the diameter of section of described temperature tube be 3mm to 10mm, length is that 200mm is to 220mm; The front end of described temperature tube is described point for measuring temperature;
Described heating tube also comprises the 3rd heating tube, described the 3rd heating tube apart from the distance of inner bag bottom between 0.25R~0.35R;
Described outlet pipe passes from the U-shaped portion of described first heating tube;
The angle of rake in described first heating tube and horizontal part and U-shaped portion is respectively between 55 to 65 degree;
The degree of depth that described first heating tube stretches into inner bag is between 0.2L~0.7L, and L is the length of inner bag;
The bending radius of described U-shaped portion at 17mm between the 23mm.
The beneficial effect that adopts the utility model to bring: (1) first heating tube of the present utility model is designed to have the warp architecture of rake, be installed in the inner bag to the extension of the top of inner bag, its U-shaped portion extends to apart between the 0.4R~0.6R of inner bag top, can be fast the water of inner bag in should the zone be heated.This heating mode can satisfy use hot water, the not too large again user's request of water consumption in some needs short time.As brushing teeth, washing one's face after getting up morning.Wash demands such as dish winter.The curved design of U-shaped portion has increased the contact heating surface area of heating tube with the waters, top to greatest extent.U-shaped portion promptly can heat fast and effectively apart from the position between the 0.4R~0.6R of inner bag top, and the water yield of heating just satisfies the water demand amount of user for a small amount of waters such as washing dish, wash one's face and rinse one's mouth.Make energy-conservation and satisfy the balance that reaches best between user's user demand.(2) point for measuring temperature is arranged on apart from the zone between the central point 0.5R~0.9R of U-shaped portion, neither can excessively closely cause the too sensitive frequent starting of thermometric, stop because of distance U-shaped portion.Again can be because of excessively far causing detection sensitivity to descend and uncontrollable water temperature.Control the variation of water temperature in the U-shaped portion heating region more accurately, prevent the water temperature overshoot, satisfy user's instructions for use.The power ratio of the power of (3) first heating tube rakes and U-shaped portion is made as between 1: 2 to 1: 3.Because rake is positioned at the below of U-shaped portion, rake can carry out the desire heating to water in advance when heating, waterborne floating after being heated heated by U-shaped portion again, and the time of water Fast Heating has further been shortened in the desire heating of rake, improves the Fast Heating efficient of water.(4) second heating tube is set below first heating tube, the first heating tube power is made as 1500W, and the second heating tube power is made as 1000W.Meeting water heater, the distribution of heating power is reached to greatest extent with on the basis of electric standard.When heating simultaneously by relay control parallel connection, the heating of second heating tube, waterborne floating again by the heating of first heating tube, the water firing rate is fast, significantly improves the efficient of heating.(5) temperature tube tilts to be installed on the ring flange and becomes 75 to spend to the angle between 65 degree with ring flange.After effectively preventing long-term the use, the moving down of temperature tube, crooked or fracture.Increase the service life.Guarantee the accurate, sensitive of thermometric.Diameter of section with temperature tube is designed to 3mm to 10mm simultaneously, and Design of length is that 200mm is to 220mm.Temperature tube in this size range can prevent that water heater from using situations such as the weight increase causes behind the foreign material such as temperature tube surface, back parcel incrustation scale bending, fracture for a long time.Accurate, the sensitivity that increase the service life and detect.(6) outlet pipe that stretches in the inner bag passes from U-shaped portion, more close U-shaped portion.The hot water of U-shaped portion heating can be discharged by outlet pipe the very first time, is beneficial to the quick use of hot water, avoids overlong time to cause the heat of water to scatter and disappear.And, since the point for measuring temperature of temperature tube be positioned at U-shaped portion near, more accurate near the control of the temperature of the hot water the U-shaped portion, fast, make hot water temperature that outlet pipe flows out more meet the instructions for use of user's reality, also respond the water temperature of user's conciliation more fast.Become the bending setting of angle between the rake of (7) first heating tubes and U-shaped portion and the horizontal part, the physical length that has effectively prolonged heating tube, the heating tube length of run is long, thereby has increased the contact area of heating tube and liquid, and the pyroconductivity of unit are increases; Under the certain situation of rated power, (W/cm2) is less for the thermic load on heating tube surface, has prolonged the service life of heating tube greatly; In addition, because the thermic load on heating tube surface is less, surface temperature is lower, is not easy to form incrustation scale, and the heat of heating tube can be delivered to heated liquid fast.And reduced heating tube and stretch into actual grade in the inner bag, the arm of force reduces, reduces heating tube and occurs from the situation of root fracture.Level, rake and U-shaped portion are positioned at the differing heights of inner bag respectively simultaneously, can improve the width range up and down of heating.
Description of drawings
Fig. 1 is the utility model inner container of electric water heater internal structure schematic diagram;
Fig. 2 is the overall structure figure of the utility model heating component;
Fig. 3 is the plan structure schematic diagram of the utility model heating component;
Fig. 4 is the utility model right view.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed description:
As shown in Figures 1 to 4, a kind of improved electric heater that provides for the utility model, comprise shell, inner bag 4, the water inlet pipe 6 that is communicated with described inner bag 4, outlet pipe 7, heating component, temperature measuring equipment and control assembly, described heating component comprises ring flange 5, be installed on the heating tube on the described ring flange 5, one end of described outlet pipe stretches into the top of described inner bag and close described inner bag, described heating tube comprises first heating tube 1, described first heating tube 1 comprises a of U-shaped portion, the distance at the described inner bag of the described U-shaped a of portion distance top is between 0.4R~0.6R, and the distance of the described U-shaped a of portion of the point for measuring temperature of described temperature measuring equipment distance is between 0.5R~0.9R, and be on same horizontal line or the horizontal line with a of U-shaped portion.
Above-mentioned U-shaped portion is that central point d with U-shaped portion is the datum mark measuring and calculating apart from the distance at inner bag top and point for measuring temperature apart from the distance of U-shaped portion.As shown in Figure 1, the central point d of U-shaped portion determines according to following scheme: at first measure the U-shaped portion spacing between two pipes up and down, get the intermediate point of this spacing and the horizontal line of pointing with the finger or gesticulate along this centre; Measure the spacing at two ends, the U-shaped portion left and right sides afterwards again, get the intermediate point of this spacing and draw a vertical line along this intermediate point, this vertical line and horizontal line intersect a bit is the central point d of described U-shaped portion.Wherein, when measuring the spacing at two ends, the U-shaped portion a left and right sides, leftmost end points is got the point tangent with the crooked position of a of U-shaped portion, rightmost end points is got the point of a of U-shaped portion and rake b joining place, the point of this joining place is the point that carries out the transition to horizontal component along the sweep of rake b, just the tangent point of a of U-shaped portion horizontal component and rake c sweep.
Adopt double pipe structure as a of U-shaped portion, i.e. the structure as shown in Figure 3 of the utility model employing.Central point also needs after finishing above-mentioned steps, get the intermediate point of two tube pitch among Fig. 3 and draw an axial vertical line (perpendicular to paper), get point (round dot shown in Figure 1) the picture axial vertical line (perpendicular to paper) that above-mentioned 2 steps are determined simultaneously, the point that the two lines intersect is the central point of U-shaped portion.In Fig. 1, because the horizontal view angle, two pipes of U-shaped portion forward lap, and its central point is described with three-dimensional system of coordinate, should be positioned at perpendicular on the paper position inwards.Overlook the visual angle from Fig. 3 and can see this central point d.
As shown in Figure 1, point for measuring temperature and a of U-shaped portion are on same horizontal line or the horizontal line also that the central point d with U-shaped portion is a benchmark.Draw a horizontal line along central point d, point for measuring temperature promptly is on this horizontal line or is positioned at this horizontal upper area.Can not be positioned at the zone of horizontal line bottom.
The utility model accompanying drawing only provides the structural representation of inner bag and heating tube, does not provide the structure of shell and control assembly.Inner bag is placed in the shell, tends between inner bag and shell to talk materials such as expanded material from some insulation, thermal isolation film in order to play insulating effect.Control assembly generally is installed on the shell.These structures all are existing technique known, and those skilled in the art knows these technology general knowledge, and can realize scheme of the present utility model on the basis of this specification.So no longer provide the concrete shell and the schematic diagram of control assembly here, also its mounting means, control mode do not given unnecessary details.
U-shaped portion can be fast between 0.4R~0.6R apart from the distance at inner bag top with water heating that should the zone in the inner bag.Satisfy and use hot water, the not too large again user's request of water consumption in some needs short time.As brushing teeth, washing one's face after getting up morning.Wash demands such as dish winter.And the water yield of heating just satisfies the water demand amount of user for a small amount of waters such as washing dish, wash one's face and rinse one's mouth.Make energy-conservation and satisfy the balance that reaches best between user's user demand.The curved design of a of U-shaped portion has increased the contact heating surface area of heating tube with the waters, top to greatest extent.In addition, owing to shorten the time of Fast Heating greatly, the surperficial more difficult long-pending scaling of U-shaped portion heating tube can be guaranteed to add significantly decline of thermal effect after long-term the use.Prolong the lifetime of using.
Point for measuring temperature is arranged on apart from the zone between the central point 0.5R~0.9R of U-shaped portion, neither can excessively closely cause the too sensitive frequent starting of thermometric, stop because of distance U-shaped portion.Again can be because of excessively far causing detection sensitivity to descend and uncontrollable water temperature.Control the variation of water temperature in the U-shaped portion heating region more accurately, prevent the water temperature overshoot, satisfy user's instructions for use, make the user more accurate the control of water temperature.
In the above-mentioned preferred version that the utility model provides: described first heating tube 1 also comprises horizontal part c and rake b, and the ratio of the power of the power of described rake b and a of U-shaped portion is between 1: 2 to 1: 3.Because rake b is positioned at the below of a of U-shaped portion, rake can carry out the desire heating to water in advance when heating, waterborne floating after being heated heated by U-shaped portion again, and the time of water Fast Heating has further been shortened in the desire heating of rake b, improves the Fast Heating efficient of water.
In the above-mentioned preferred version that the utility model provides: as shown in Figure 1, described heating tube also comprises second heating tube 2, described second heating tube 2 is located at the below of described first heating tube 1, and described first heating tube 1 and second heating tube 2 distance at interval are between 10 to 15mm.The power of described first heating tube 1 is that the power of 1500W, second heating tube 2 is 1000W, and described first heating tube 1 and second heating tube 2 heat separately under the control of relay or parallel connection is heated simultaneously.Second heating tube, 2, the first heating tube power are set below first heating tube 1 are made as 1500W, second heating tube, 2 power are made as 1000W.Meeting water heater, the distribution of heating power is reached to greatest extent with on the basis of electric standard.By relay control, realization is heated separately and parallel connection is heated simultaneously.When parallel connection is heated simultaneously, 2 heating of second heating tube, waterborne floating again by 1 heating of first heating tube, the water firing rate is fast, significantly improves the efficient of heating.
In the above-mentioned preferred version that the utility model provides: described temperature measuring equipment comprises temperature tube 8, what described temperature tube 8 tilted is installed on the described ring flange 5, as shown in Figure 2, the angle a of described temperature tube 8 and ring flange 5 spends between 65 degree 75, the diameter of section of described temperature tube 8 is that 3mm is to 10mm, length be 200mm to 220mm, the front end of described temperature tube 8 is described point for measuring temperature.
Temperature tube 8 tilts to be installed on the ring flange 5 and with ring flange spends for 5 one-tenth 75 to the angle between 65 degree.After this structural design can effectively prevent long-term the use, temperature tube 8 increased the service life because of the situation of gravity effect and surface area scaling weight moving down of increasing that the back produces, crooked or fracture.Guarantee the accurate, sensitive of thermometric.Diameter of section with temperature tube is designed to 3mm to 10mm simultaneously, and Design of length is that 200mm is to 220mm.Temperature tube in this size range further plays preventing that water heater from using situations such as the weight increase causes behind the foreign material such as back temperature tube 8 surface parcel incrustation scales bending, fracture for a long time.Accurate, the sensitivity that increase the service life and detect.
In the above-mentioned preferred version that the utility model provides: described heating tube also comprises the 3rd heating tube 3, described the 3rd heating tube 3 apart from the distance of inner bag 4 bottoms between 0.25R~0.35R.Be mainly used in the water of heating inner bag lower area or carry out the desire heating, to improve the efficiency of heating surface of whole courage water or 2/3 courage water with first heating tube, the second heating tube work of matching.
In the above-mentioned preferred version that the utility model provides: described outlet pipe passes from a of U-shaped portion of described first heating tube 1.The hot water of U-shaped portion heating can be discharged by outlet pipe 7 very first time, is beneficial to the quick use of hot water, avoids overlong time to cause the heat of water to scatter and disappear.And, since the point for measuring temperature of temperature tube 8 be positioned at U-shaped portion near, more accurate near the hot water temperature U-shaped portion control, fast, make hot water temperature that outlet pipe flows out more meet the instructions for use of user's reality, also respond the water temperature of user's conciliation more fast.
In the above-mentioned preferred version that the utility model provides: the angle of rake b in described first heating tube 1 and horizontal part c and a of U-shaped portion is spent between 65 degree 55 respectively.Become the bending setting of angle between the rake b of first heating tube 1 and U-shaped portion and the horizontal part c, effectively prolonged the physical length of heating tube, the heating tube length of run is long, thereby has increased the contact area of heating tube and liquid, and the pyroconductivity of unit are increases; Under the certain situation of rated power, (W/cm2) is less for the thermic load on heating tube surface, has prolonged the service life of heating tube greatly; In addition, because the thermic load on heating tube surface is less, surface temperature is lower, is not easy to form incrustation scale, and the heat of heating tube can be delivered to heated liquid fast.And reduced heating tube and stretch into actual grade in the inner bag, the arm of force reduces, reduces heating tube and occurs from the situation of root fracture.Level, rake and U-shaped portion are positioned at the differing heights of inner bag respectively simultaneously, can improve the width range up and down of heating.
In the above-mentioned preferred version that the utility model provides: the degree of depth that described first heating tube 1 stretches into inner bag is between 0.2L~0.7L, and L is the length of inner bag.In order to increase heating efficiency, the physical length of heating tube is bigger than the degree of depth that stretches into inner bag, and as heating tube curved incline not, because the factor of the factor of weight and incrustation scale weight, heating tube is easy to rupture from root.In above-mentioned preferred version,, heating tube is designed to the structure that U-shaped is crooked and tilt in order to prolong the length of heating tube.Make the degree of depth that stretches into inner bag different with physical length.Because the water heater liner that the utility model adopts is a horizontal type structure, therefore design the degree of depth that first heating tube 1 stretches into inner bag between 0.2L~0.7L, can improve the temperature that adds thermal effect, waters, balanced both sides in waters, the inner bag left and right sides.
Below, the utility model provides 3 specific embodiments based on above-mentioned preferred version.
First embodiment: as shown in Figures 1 to 4, the central point of a of U-shaped portion of first heating tube 1 is 0.52R apart from the distance at inner bag 4 tops, and point for measuring temperature is 0.6R apart from the distance of U-shaped portion central point.The a of U-shaped portion in first heating tube 1 is 1: 2.8 with the ratio of the power of rake b.The angle of rake b in first heating tube 1 and horizontal part c and a of U-shaped portion is 58 degree.The bending radius of U-shaped portion is 20mm.The degree of depth that first heating tube 1 stretches into inner bag is 0.7L.
The diameter of section of first heating tube 1 and second heating tube 2 is 8mm.The spacing distance of second heating tube, 2 distances, first heating tube is 12mm.The power of first heating tube 1 is 1500W, and the power of second heating tube is 1000W, and relay is controlled between first heating tube 1 and second heating tube 2 separately alternately heating work or in parallelly heated simultaneously.Temperature tube 8 is 69 degree with the angle of ring flange 5, and the diameter of section of temperature tube 8 is that 6mm, length are 218mm.The 3rd heating tube is 0.29R apart from the distance of inner bag bottom.
As shown in Figure 3, U-shaped portion is a double pipe structure, and the spacing between two pipes is 30mm.Outlet pipe passes the space between U-shaped portion 2 pipes, and the central point d among the figure is the central point of U-shaped portion.R is 167mm in this embodiment.
Second embodiment: the central point of a of U-shaped portion of first heating tube 1 is 0.4R apart from the distance at inner bag 4 tops, and point for measuring temperature is 0.5R apart from the distance of U-shaped portion central point.The a of U-shaped portion in first heating tube 1 is 1: 2 with the ratio of the power of rake b.The angle of rake b in first heating tube 1 and horizontal part c and a of U-shaped portion is 50 degree.The degree of depth that first heating tube 1 stretches into inner bag is 0.2L.
The diameter of section of first heating tube 1 and second heating tube 2 is 5mm.The spacing distance of second heating tube, 2 distances, first heating tube is 10mm.The power of first heating tube 1 is 1500W, and the power of second heating tube is 1000W, and relay is controlled between first heating tube 1 and second heating tube 2 separately alternately heating work or in parallelly heated simultaneously.Temperature tube 8 is 60 degree with the angle of ring flange 5, and the diameter of section of temperature tube 8 is that 4mm, length are 210mm.The 3rd heating tube 3 is 0.25R apart from the distance of inner bag bottom.
The a of U-shaped portion is a double pipe structure, and outlet pipe passes the space between U-shaped portion 2 pipes, and the central point d among the figure is the central point of U-shaped portion.This separation structure is identical with first embodiment, can be with reference among first embodiment shown in Figure 3.R is 160mm in this embodiment.
The 3rd embodiment: the central point of a of U-shaped portion of first heating tube 1 is 0.6R apart from the distance at inner bag 4 tops, and point for measuring temperature is 0.9R apart from the distance of U-shaped portion central point.The a of U-shaped portion in first heating tube 1 is 1: 3 with the ratio of the power of rake b.The angle of rake b in first heating tube 1 and horizontal part c and a of U-shaped portion is 60 degree.The degree of depth that first heating tube 1 stretches into inner bag is 0.4L.
The diameter of section of first heating tube 1 and second heating tube 2 is 10mm.The spacing distance of second heating tube, 2 distances, first heating tube is 15mm.The power of first heating tube 1 is 1500W, and the power of second heating tube is 1000W, and relay is controlled between first heating tube 1 and second heating tube 2 separately alternately heating work or in parallelly heated simultaneously.Temperature tube 8 is 70 degree with the angle of ring flange 5, and the diameter of section of temperature tube 8 is that 8mm, length are 222mm.The 3rd heating tube is 0.35R apart from the distance of inner bag bottom.
U-shaped portion is a double pipe structure, and outlet pipe passes the space between U-shaped portion 2 pipes, and the central point d among the figure is the central point of U-shaped portion.This separation structure is identical with first embodiment, can be with reference among first embodiment shown in Figure 3.R is 170mm in this embodiment.

Claims (10)

1. improved electric heater, comprise shell, inner bag (4), the water inlet pipe (6) that is communicated with described inner bag (4), outlet pipe (7), heating component, temperature measuring equipment and control assembly, described heating component comprises ring flange (5), be installed on the heating tube on the described ring flange, one end of described outlet pipe (7) stretches into the top of described inner bag (4) and close described inner bag (4), it is characterized in that: described heating tube comprises first heating tube (1), described first heating tube (1) comprises U-shaped portion (a), the distance at described U-shaped portion (a) the described inner bag of distance top is between 0.4R~0.6R, and the distance of the point for measuring temperature of the described temperature measuring equipment described U-shaped portion of distance (a) is between 0.5R~0.9R, and be on same horizontal line or the horizontal line with U-shaped portion (a).
2. heating component according to claim 1 is characterized in that: described first heating tube (1) also comprises horizontal part (c) and rake (b), and the ratio of the power of the power of described rake (b) and U-shaped portion (a) is between 1: 2 to 1: 3.
3. heating component according to claim 1, it is characterized in that: described heating tube also comprises second heating tube (2), described second heating tube (2) is located at the below of described first heating tube (1), and described first heating tube (1) and second heating tube (2) distance at interval is between 10 to 15mm.
4. heating component according to claim 3, it is characterized in that: the power of described first heating tube (1) is that the power of 1500W, second heating tube (2) is 1000W, and described first heating tube (1) and second heating tube (2) heat separately under the control of relay or parallel connection is heated simultaneously.
5. heating component according to claim 1, it is characterized in that: described temperature measuring equipment comprises temperature tube, what described temperature tube tilted is installed on the described ring flange, the angle a of described temperature tube and ring flange spends between 65 degree 75, the diameter of section of described temperature tube is that 3mm is to 10mm, length be 200mm to 220mm, the front end of described temperature tube is described point for measuring temperature.
6. heating component according to claim 1 is characterized in that: described heating tube also comprises the 3rd heating tube (3), described the 3rd heating tube (3) apart from the distance of inner bag (4) bottom between 0.25R~0.35R.
7. heating component according to claim 1 is characterized in that: described outlet pipe passes from the U-shaped portion (a) of described first heating tube (1).
8. heating component according to claim 2 is characterized in that: the angle of rake (b) in described first heating tube (1) and horizontal part (c) and U-shaped portion (a) is spent between 65 degree 55 respectively.
9. heating component according to claim 1 is characterized in that: the degree of depth that described first heating tube (1) stretches into inner bag is between 0.2L~0.7L, and L is the length of inner bag.
10. heating component according to claim 1 is characterized in that: the bending radius of described U-shaped portion (a) at 17mm between the 23mm.
CN2009202196270U 2009-10-26 2009-10-26 Improved electric water heater Expired - Lifetime CN201547939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202196270U CN201547939U (en) 2009-10-26 2009-10-26 Improved electric water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202196270U CN201547939U (en) 2009-10-26 2009-10-26 Improved electric water heater

Publications (1)

Publication Number Publication Date
CN201547939U true CN201547939U (en) 2010-08-11

Family

ID=42603114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202196270U Expired - Lifetime CN201547939U (en) 2009-10-26 2009-10-26 Improved electric water heater

Country Status (1)

Country Link
CN (1) CN201547939U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102466326A (en) * 2010-11-09 2012-05-23 樱花卫厨(中国)股份有限公司 Efficient heating device for water storage type electric water heater
CN103090532A (en) * 2013-01-08 2013-05-08 青岛经济技术开发区海尔热水器有限公司 Rapid electric water heater
CN104566992A (en) * 2013-10-09 2015-04-29 海尔集团公司 Control method of electric water heater and electric water heater
CN105155227A (en) * 2015-09-06 2015-12-16 无锡小天鹅股份有限公司 Washing machine
CN105934010A (en) * 2016-05-24 2016-09-07 平湖科能电器技术有限公司 Heating pipe
CN109724241A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Electric heater and its control method
CN109724243A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Multifunctional electric heater
CN109724242A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Can rapidly pre-warming electric heater
CN110701784A (en) * 2018-07-09 2020-01-17 芜湖美的厨卫电器制造有限公司 Inner container structure and water storage type electric water heater
CN113796739A (en) * 2021-10-21 2021-12-17 任少朋 Automatic wine warming device for white wine drinking
WO2023130756A1 (en) * 2022-01-10 2023-07-13 武汉海尔热水器有限公司 Heating inner container assembly and electric water heater

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102466326A (en) * 2010-11-09 2012-05-23 樱花卫厨(中国)股份有限公司 Efficient heating device for water storage type electric water heater
CN103090532A (en) * 2013-01-08 2013-05-08 青岛经济技术开发区海尔热水器有限公司 Rapid electric water heater
CN104566992A (en) * 2013-10-09 2015-04-29 海尔集团公司 Control method of electric water heater and electric water heater
CN105155227A (en) * 2015-09-06 2015-12-16 无锡小天鹅股份有限公司 Washing machine
CN105934010A (en) * 2016-05-24 2016-09-07 平湖科能电器技术有限公司 Heating pipe
CN109724241A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Electric heater and its control method
CN109724243A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Multifunctional electric heater
CN109724242A (en) * 2017-10-30 2019-05-07 芜湖美的厨卫电器制造有限公司 Can rapidly pre-warming electric heater
CN110701784A (en) * 2018-07-09 2020-01-17 芜湖美的厨卫电器制造有限公司 Inner container structure and water storage type electric water heater
CN113796739A (en) * 2021-10-21 2021-12-17 任少朋 Automatic wine warming device for white wine drinking
WO2023130756A1 (en) * 2022-01-10 2023-07-13 武汉海尔热水器有限公司 Heating inner container assembly and electric water heater

Similar Documents

Publication Publication Date Title
CN201547939U (en) Improved electric water heater
CN102183100A (en) Rapid electric auxiliary heating device for solar water heater
CN101256030A (en) Solar water heater capable of being used as balcony protection fence
CN201547938U (en) Three-pipe layered heating electric water heater
CN101411591B (en) Water-yielding device and instant heating type drinking machine
CN201964596U (en) Commercial continuous-discharge instant-boiling type boiling water generating device
CN201476311U (en) Layered heating unit and layered heating water heater
CN211854453U (en) High-temperature heating device for fermentation treatment of kitchen waste
CN102384775A (en) Dirty-resisting type water level sensing device and solar water heater adopting same
CN104006537B (en) Automatic pollution discharge formula heat storage water tank
CN201281447Y (en) Quickly heater
CN201476323U (en) Solar water heater
CN206890809U (en) A kind of heating system with shower waste function of recovering waste heat
CN204678312U (en) There is the boiler surfaces blowdown bootstrap system of measuring fixed amount utilization rate of waste heat
CN201218600Y (en) Water-saving system of water heater
CN206300360U (en) A kind of domestic solar-energy water heater system
CN202304942U (en) Anti-scale water level sensor and solar water heater using same
CN205299999U (en) Solar water heater heat -retaining heat exchange water tank
CN211084471U (en) Solar energy-saving hot water system
CN209310259U (en) Electric heater
CN202032760U (en) Rapid electricity auxiliary heating device for solar water heaters
CN200996740Y (en) Fast hot-circulating low-level water takeout device of heat-collecting pipe
CN202993591U (en) Efficient solar water heater with heat-pipe flat plate collector
CN202470512U (en) Water taking device for water tank of solar water heater
CN201706731U (en) Siphonic vacuum pipe solar water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100811

CX01 Expiry of patent term