CN201537490U - Cascade mini ring random packing - Google Patents
Cascade mini ring random packing Download PDFInfo
- Publication number
- CN201537490U CN201537490U CN2009202462480U CN200920246248U CN201537490U CN 201537490 U CN201537490 U CN 201537490U CN 2009202462480 U CN2009202462480 U CN 2009202462480U CN 200920246248 U CN200920246248 U CN 200920246248U CN 201537490 U CN201537490 U CN 201537490U
- Authority
- CN
- China
- Prior art keywords
- ladder
- fillet
- ring
- packing
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
The utility model relates to a cascade mini ring random packing, which belongs to the technical field of gas-liquid and liquid-liquid mass transfer separation devices in petroleum refining, petrochemical, chemical, light and environmental protection industries. The packing presents a four-layer cascade, a first step and a fourth step are respectively formed by a semicircular saddle, a second step and a third step are respectively formed by two semicircular saddles which are respectively positioned on two sides of a plane formed by a first connecting edge and a second connecting edge, and the two semicircular saddles intersect at the center of a packing ring to form an X-shaped structure supported in the middle of a ring body. The cascade mini ring random packing has the advantages that two ends of the four-layer cascade are connected together so as to increase self strength of the packing and also increase specific surface area and spraying spots of the packing, thereby increasing production capacity and mass transfer efficiency; the second step and the third step are mutually connected through a middle connecting piece to be supported in the middle of the ring body so as to lead the gas-liquid to be uniformly distributed; and the second step and the third step intersect mutually in the middle of the packing, thereby effectively resolving the problem of mutual nesting of packings.
Description
Technical field
The utility model relates to a kind of multi-step ring bulk loading filling material, belongs to gas-liquid, the liquid liquid mass transfer separation equipment technical field of oil refining, petrochemical industry, chemical industry, light industry and environment-protecting industrial.
Background technology
Gas-liquid, liquid liquid mass transfer separation equipment field at oil refining, petrochemical industry, chemical industry, light industry and environment-protecting industrial, filler is the critical piece in rectifying, absorption, washing, the extraction tower, it generally can be divided into structured packing and dumped packing, dumped packing is because processing and manufacturing is fairly simple, installation and removal are convenient, be convenient to clean, thereby wider range of application is arranged.
Using more at present in China's industry, dumped packing is annular packing or saddle ring filler, for example Pall ring, ring intalox etc., these fillers are limit by configuration, its manufacturing procedure is comparatively complicated, the general operation ability moulding that needs at least more than three roads or three roads, and its overall specific area is less, and the spray point is few, and production capacity and mass-transfer efficiency still are subjected to certain limitation.
The applicant has proposed a kind of new multi-step ring bulk loading filling material in application number is 200810119362.7 Chinese patent.This filler processing is simple, by twice even procedure processing, one-shot forming; Surfaces externally and internally is fully unlimited, and the interior tendon sheet is evenly cut apart space in the ring, and the spray point is many, and liquid dispersion is effective.By in the experiment tower of diameter 600mm, test and the Pall ring of same specification and ring intalox relatively, treating capacity and ring intalox are suitable, but mass-transfer efficiency is higher more than 50% than ring intalox.
But constitute in four parallel ladders of this filler, second ladder and the 3rd ladder are made up of two semi-ring saddles respectively, two semi-ring saddles lay respectively at the same side on the plane that is formed by first fillet and second fillet, do not have alternating share, are easy to generate axial intussusception phenomenon.Intussusception not only increases the filler filling number in the unit volume, and can cause reducing of the interior gas passage of tower, influences the disposal ability of tower.
Summary of the invention
The purpose of this utility model is to propose a kind of multi-ladder dumped packing, change the structure of existing multi-ladder dumped packing, make it can adapt to gas-liquid contact processes such as rectifying, absorption, can be applied to extraction again and wait liquid liquid contact mass transfer process, improve the combination property of filler, and simplify the manufacturing procedure of filler.
The multi-step ring bulk loading filling material that the utility model proposes, both wings are first fillet and second fillet, first fillet is connected first ladder, second ladder, the 3rd ladder and four-step with second fillet from both sides, first ladder, second ladder, the 3rd ladder and four-step are parallel to each other, constitute four layers of ladder, described first ladder is begun by first fillet, comprises first inner arc, first outer arc, second inner arc, second outer arc, the 3rd inner arc, finishes to second fillet; Described second ladder is begun by first fillet, comprise first inner arc half, the first transition outer arc, first straightway, second straightway, the second transition outer arc and the 3rd straightway, finish to second fillet; Described the 3rd ladder is begun by first fillet, comprise the 6th inner arc half, the 3rd transition outer arc, the 4th straightway, the 5th straightway, the 4th transition outer arc and the 6th straightway, finish to second fillet; Described four-step is begun by first fillet, comprises the 6th inner arc, arc, the 5th inner arc, the 3rd outer arc and the 4th inner arc all round, finishes to second fillet; Described second ladder is connected by brace with the 3rd ladder, and staggered in the central authorities of packing ring, forms the X-shaped structure, is supported in annular central; From the front of filler, be the ring-type of forming by a plurality of saddle types, two big semi-ring saddles up and down of filler are first ladder and four-step, not in one plane, four little semi-ring saddles in the ring are intersected in the brace of filler central authorities, form the X-shaped structure; Filler becomes four layers of ladder, and wherein first ladder and four-step are made up of a semi-ring saddle, and second ladder and the 3rd ladder are made up of two semi-ring saddles respectively, and two semi-ring saddles lay respectively at the both sides on the plane that is formed by first fillet and second fillet.
The multi-step ring bulk loading filling material that the utility model proposes, its advantage is: the two ends of four layers of ladder link together, form an integral body, increased the intensity of filler itself, each line segment that constitutes ladder is by the camber line smooth connection, can increase the specific area and the spray point of filler again, to improve production capacity and mass-transfer efficiency.Second ladder and the 3rd ladder interconnect by the brace of centre, are supported in ring body central authorities, from radially evenly cutting apart area the ring, also from axially evenly cutting apart filling space, gas-liquid can evenly be distributed.Simultaneously, two semi-ring saddles that constitute second ladder and the 3rd ladder lay respectively at the both sides on the plane that is formed by first fillet and second fillet, and central authorities are interlaced at filler, efficiently solve the mutual intussusception problem between the filler that has patent.
Description of drawings
Fig. 1 is the shaft side figure of the multi-step ring that the utility model proposes
Fig. 2 is that the A of Fig. 1 is to view
Fig. 3 is that the B of Fig. 1 is to view
Among Fig. 1-Fig. 3,1 is first fillet, and 2 is first inner arcs, 3 is first outer arcs, and 4 is second inner arcs, and 5 is second outer arcs, 6 is the 3rd inner arcs, and 7 is second fillets, and 8 is the 4th inner arcs, 9 is the 3rd outer arcs, and 10 is the 5th inner arcs, and 11 is arcs all round, 12 is the 6th inner arcs, and 13 is first transition outer arcs, and 14 is first straightways, 15 is second straightways, and 16 is second transition outer arcs, and 17 is the 3rd straightways, 18 is the 3rd transition outer arcs, and 19 is the 4th straightways, and 20 is the 5th straightways, 21 is the 4th transition outer arcs, and 22 is the 6th straightways, the 23rd, and brace, 24 is first ladders, 25 is second ladders, and 26 is the 3rd ladders, and 27 is four-steps.
The specific embodiment
The multi-step ring bulk loading filling material that the utility model proposes, its structure as shown in Figure 1, both wings are first fillet 1 and second fillet 7, it is first ladder 24, second ladder 25, the 3rd ladder 26 and four-step 27 that first fillet 1 is connected from both sides with second fillet 7, first ladder 24, second ladder 25, the 3rd ladder 26 and four-step 27 are parallel to each other, constitute four layers of ladder, described first ladder 24 is by 1 beginning of first fillet, comprise first inner arc 2, first outer arc 3, second inner arc 4, second outer arc 5, the 3rd inner arc 6, to 7 end of second fillet; Described second ladder 25 is by the beginning of first fillet 1, comprise first inner arc 2 half, the first transition outer arc 13, first straightway 14, second straightway 15, the second transition outer arc 16 and the 3rd straightway 17, finish to second fillet 7; Described the 3rd ladder 26 is by the beginning of first fillet 1, comprise the 6th inner arc 12 half, the 3rd transition outer arc 18, the 4th straightway 19, the 5th straightway 20, the 4th transition outer arc 21 and the 6th straightway 22, finish to second fillet 7; Described four-step 27 is by the beginning of first fillet 1, comprises the 6th inner arc 12, the arc 11, the 5th inner arc 10, the 3rd outer arc 9 and the 4th inner arc 8 all round, finishes to second fillet 7; Described second ladder 25 is connected by brace 23 with the 3rd ladder 26, and staggered in the central authorities of packing ring, forms the X-shaped structure, is supported in annular central; From the front of filler, be the ring-type of forming by a plurality of saddle types, two big semi-ring saddles up and down of filler are first ladder 24 and the four-step 27, not in one plane, four little semi-ring saddles in the ring are intersected in the brace of filler central authorities, form the X-shaped structure; Filler becomes four layers of ladder, wherein first ladder 24 and four-step 27 are made up of a semi-ring saddle, second ladder 25 and the 3rd ladder 26 are made up of two semi-ring saddles respectively, and two semi-ring saddles lay respectively at the both sides on the plane that is formed by first fillet 1 and second fillet 7.
The multi-step ring bulk loading filling material of the utility model design, the ring-type of looking and forming into by a plurality of saddle types from the front, it is two big semi-ring saddles up and down, i.e. first ladder 24 and the four-step 27, not not in one plane, four little semi-ring saddles in the ring are intersected in the brace of filler central authorities, form the X-shaped structure, as shown in Figure 1.A from the side is to seeing, as shown in Figure 2, filler becomes four layers of ladder, wherein first ladder 24 and four-step 27 are made up of two semi-ring saddles, second ladder 25 and the 3rd ladder 26 are made up of two semi-ring saddles respectively, and two semi-ring saddles lay respectively at the both sides on the plane that is formed by first fillet 1 and second fillet 7.B from the side is to seeing, as shown in Figure 3, as can be seen from the figure, an end of second ladder 25 and the 3rd ladder 26 directly links to each other with second fillet 7.
Among the embodiment of the present utility model, the diameter of filler and height dimension are:
Embodiment one: filler diameter 75mm, packed height 25mm, blade diameter length ratio 3;
Embodiment two: filler diameter 50mm, packed height 16mm, blade diameter length ratio 3.1;
Embodiment three: filler diameter 38mm, packed height 14mm, blade diameter length ratio 2.7;
Embodiment four: filler diameter 25mm, packed height 12mm, blade diameter length ratio 2.1.
More than explanation and description only are several embodiments that adopt for those skilled in the art can better understand the utility model, protection domain of the present utility model are not construed as limiting.Under the situation that does not break away from the scope that claim protects, the utility model can carry out any correction and change.
Claims (1)
1. multi-step ring bulk loading filling material, it is characterized in that the filler both wings are first fillet and second fillet, first fillet is connected first ladder, second ladder, the 3rd ladder and four-step with second fillet from both sides, first ladder, second ladder, the 3rd ladder and four-step are parallel to each other, constitute four layers of ladder, described first ladder is begun by first fillet, comprises first inner arc, first outer arc, second inner arc, second outer arc, the 3rd inner arc, finishes to second fillet; Described second ladder is begun by first fillet, comprise first inner arc half, the first transition outer arc, first straightway, second straightway, the second transition outer arc and the 3rd straightway, finish to second fillet; Described the 3rd ladder is begun by first fillet, comprise the 6th inner arc half, the 3rd transition outer arc, the 4th straightway, the 5th straightway, the 4th transition outer arc and the 6th straightway, finish to second fillet; Described four-step is begun by first fillet, comprises the 6th inner arc, arc, the 5th inner arc, the 3rd outer arc and the 4th inner arc all round, finishes to second fillet; Described second ladder is connected by brace with the 3rd ladder, and staggered in the central authorities of packing ring, forms the X-shaped structure, is supported in annular central; From the front of filler, be the ring-type of forming by a plurality of saddle types, two big semi-ring saddles up and down of filler are first ladder and four-step, not in one plane, four little semi-ring saddles in the ring are intersected in the brace of filler central authorities, form the X-shaped structure; Filler becomes four layers of ladder, and wherein first ladder and four-step are made up of a semi-ring saddle, and second ladder and the 3rd ladder are made up of two semi-ring saddles respectively, and two semi-ring saddles lay respectively at the both sides on the plane that is formed by first fillet and second fillet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202462480U CN201537490U (en) | 2009-10-23 | 2009-10-23 | Cascade mini ring random packing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202462480U CN201537490U (en) | 2009-10-23 | 2009-10-23 | Cascade mini ring random packing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201537490U true CN201537490U (en) | 2010-08-04 |
Family
ID=42588940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202462480U Expired - Fee Related CN201537490U (en) | 2009-10-23 | 2009-10-23 | Cascade mini ring random packing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201537490U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102649043A (en) * | 2011-02-24 | 2012-08-29 | 梁泰安 | Round spherical combined packing |
CN103480321A (en) * | 2013-08-30 | 2014-01-01 | 北京泽华化学工程有限公司 | Packing body, as well as layer piece, tower and mixer of packing body |
CN107138124A (en) * | 2017-05-18 | 2017-09-08 | 天津大学 | Asymmetric bicyclic foam random packing with inclination angle |
-
2009
- 2009-10-23 CN CN2009202462480U patent/CN201537490U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102649043A (en) * | 2011-02-24 | 2012-08-29 | 梁泰安 | Round spherical combined packing |
CN103480321A (en) * | 2013-08-30 | 2014-01-01 | 北京泽华化学工程有限公司 | Packing body, as well as layer piece, tower and mixer of packing body |
US10052609B2 (en) | 2013-08-30 | 2018-08-21 | Beijing Zehua Chemical Engineering Co., Ltd. | Tower packing element, tower packing, and packing tower and mixer comprising the same |
CN107138124A (en) * | 2017-05-18 | 2017-09-08 | 天津大学 | Asymmetric bicyclic foam random packing with inclination angle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201537490U (en) | Cascade mini ring random packing | |
CN1037824C (en) | Packing element | |
CN101693183B (en) | Application of random packing with multiple cascade rings in rectification and absorbent gas-liquid contacting process or extract transmision process | |
CN202700503U (en) | Pall ring | |
CN100579646C (en) | Multi-step ring bulk loading filling material | |
CN202638432U (en) | Enhanced multi-step ring random packing | |
KR20210021563A (en) | Flexible joint structure of exhaust pipe | |
EP1814645B1 (en) | Method for scrubbing flue gas flows from diesel engines and corresponding power station | |
MY153445A (en) | Sealed tubular connection used in the oil industry | |
CN201249120Y (en) | Multi-step ring bulk filing material | |
CN107303481B (en) | Plastic structured packing | |
CN105221189B (en) | Riveted structure for the spacer sleeve on turbocharger nozzle ring capable of changing cross sections | |
KR20150045061A (en) | gas purification device filler | |
CN201521585U (en) | Cambered disc spring | |
CN209519782U (en) | PPH La Er ring | |
CN205731278U (en) | Environment-friendly type proppant | |
CN201711159U (en) | Pall ring filler | |
CN210409744U (en) | Lubricating oil filter core | |
CN202823396U (en) | Composite ripple structured packing with guiding ripples | |
KR20040065194A (en) | A filter of oil-water separator | |
CN204372213U (en) | A kind of guiding valve guide rail, seat ring structure and guiding valve | |
CN202052474U (en) | High-efficiency and high-strength corrugated ceramic film filter pipe and ceramic film superfilter | |
CN214599082U (en) | Plum blossom flat ring filler | |
CN215277377U (en) | Hollow petal column catalyst | |
CN206240493U (en) | Porous porcelain knob |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100804 Termination date: 20101023 |