CN201531407U - Performance test system of a refrigeration compressor - Google Patents
Performance test system of a refrigeration compressor Download PDFInfo
- Publication number
- CN201531407U CN201531407U CN2009200746651U CN200920074665U CN201531407U CN 201531407 U CN201531407 U CN 201531407U CN 2009200746651 U CN2009200746651 U CN 2009200746651U CN 200920074665 U CN200920074665 U CN 200920074665U CN 201531407 U CN201531407 U CN 201531407U
- Authority
- CN
- China
- Prior art keywords
- water
- cooling
- heat exchanger
- performance test
- test system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Other Air-Conditioning Systems (AREA)
Abstract
The utility model discloses a performance test system of a refrigeration compressor, characterized in that: the performance test system comprises a main system (10), a water box (20), a cooling device (30) and a heat exchanger (40); wherein the main system at least comprises a condenser (12) and the condenser (12) comprises a cooling water pipe and a water outlet (121) of the cooling water pipe is connected with a water box (20) by the heat exchanger (40) and the water box (20) is also connected with a water inlet (122) of the cooling water pipe. The performance test system cools the high-temperature cooling water from the condenser (12) through the heat exchanger (40) and then discharges the cooled water into the water box (20) to be cooled again by the cooling device (30). Thus the energy consumption generated by cooling device (30) for reducing and controlling the water temperature in the water box (20) is reduced, therefore the energy consumption of the whole test system is reduced.
Description
Technical field
The utility model relates to a kind of system that refrigeration compressor is made a service test, and particularly relates to the system that a kind of employing second refrigeration agent calorimetric device method makes a service test to refrigeration compressor.
Background technique
In refrigeration industry, the second refrigeration agent calorimetric device method is adopted in the testing property of medium and small ability refrigeration compressor (refrigerator, refrigerator, domestic air conditioning, small central air conditioning with compressor etc.) mostly, and is stipulated by the GB/T5773-2004 standard.
See also Fig. 1, the system that the existing employing second refrigeration agent calorimetric device method makes a service test to refrigeration compressor comprises main system 10, water tank 20 and cooling equipment 30.Wherein main system 10 is exactly the system that the 5.1.1 joint of GB/T5773-2004 standard is drawn, as shown in Figure 2.At least comprise compressor 11, condenser 12 in the main system 10, throttle valve (expansion valve) 13, vaporizer 14 etc.Wherein vaporizer 14 is positioned at the top of a heat insulation pressurized container 140, and heater 141 is positioned at the bottom of described heat insulation pressurized container 140 and by the second refrigeration agent submergence.Described vaporizer 14, heat insulation pressurized container 140, heater 141, second refrigeration agent have been formed calorimeter instrument 15 jointly.In main system 10, in the condenser 12 cooling water pipeline is arranged, there is the cooling water that circulates that condenser 12 is cooled in this cooling water pipeline.The water outlet 121 of this cooling water pipeline will directly be discharged into water tank 20 by the higher water of condenser 12 back temperature, water in the water tank 20 cools by cooling equipment 30 and is controlled in the certain temperature range, and the water in the water tank 20 after the cooling is discharged into the water intake 122 of cooling water pipeline again.
Guaranteed the entering water temp of cooling water pipeline like this by water tank 20 and cooling equipment 30, thereby guaranteed the condensing temperature of condenser 12, also just correspondingly guarantee the exhaust pressure of compressor 11, finally can accurately control the working condition requirement that whole main system 10 satisfies performance test.
The model utility content
Technical problem to be solved in the utility model provides a kind of performance test system for refrigeration compressors, compares with existing performance test system for refrigeration compressors to reduce energy consumption.
For solving the problems of the technologies described above, the utility model performance test system for refrigeration compressors comprises main system 10, water tank 20, cooling equipment 30 and heat exchanger 40;
At least comprise condenser 12 in the described main system 10, have cooling water pipeline in the described condenser 12;
The water outlet 121 of described cooling water pipeline connects water tank 20 by heat exchanger 40;
Described water tank 20 connects the water intake 122 of described cooling water pipeline again.
As further improvement of the utility model, described heat exchanger 40 is air cooling heat exchanger or water cooling heat exchanger.
Also comprise compressor 11, throttle valve 13, vaporizer 14 in the described main system 10, described vaporizer 14 is on the top of a heat insulation pressurized container 140, a heater 141 is in the bottom of described heat insulation pressurized container 140 and by the second refrigeration agent submergence, and described vaporizer 14, heat insulation pressurized container 140, heater 141, second refrigeration agent have constituted calorimeter instrument 15 jointly.
The high-temperature cooling water that the utility model performance test system for refrigeration compressors flows out condenser 12 is earlier through 40 coolings of a heat exchanger, and then is discharged into water tank 20 and cooled off once more by cooling equipment 30.So just can reduce cooling equipment 30 in order to reduce and to control the energy consumption that water temperature produced in the water tank 20, thereby lower the energy consumption of a whole set of pilot system.
Description of drawings
Fig. 1 is the schematic representation of existing performance test system for refrigeration compressors;
Fig. 2 is the schematic representation of main system 10 among Fig. 1;
Fig. 3 is the schematic representation of the utility model performance test system for refrigeration compressors.
Description of reference numerals among the figure:
10 is main system; 11 is compressor; 12 is condenser; 121 is the cooling water pipeline water outlet; 122 is the cooling water pipeline water inlet; 13 is throttle valve (expansion valve); 14 is vaporizer; 140 is heat insulation pressurized container; 141 is heater; 20 is water tank; 30 is cooling equipment; 40 is heat exchanger.
Embodiment
See also Fig. 2, the utility model performance test system for refrigeration compressors comprises main system 10, water tank 20, cooling equipment 30 and heat exchanger 40.Wherein main system 10 is exactly the system that the 5.1.1 joint of GB/T 5773-2004 standard is drawn, as shown in Figure 2.At least comprise compressor 11, condenser 12 in the main system 10, throttle valve (expansion valve) 13, vaporizer 14 etc.Wherein vaporizer 14 is positioned at the top of a heat insulation pressurized container 140, and heater 141 is positioned at the bottom of described heat insulation pressurized container 140 and by the second refrigeration agent submergence.Described vaporizer 14, heat insulation pressurized container 140, heater 141, second refrigeration agent have been formed calorimeter instrument 15 jointly.
In main system 10, in the condenser 12 cooling water pipeline is arranged, there is the cooling water that circulates that condenser 12 is cooled in this cooling water pipeline.The water outlet 121 of this cooling water pipeline will be discharged into water tank 20 afterwards by heat exchanger 40 again by the higher water of condenser 12 back temperature.Heat exchanger 40 can be air cooling heat exchanger or water cooling heat exchanger etc.Water in the water tank 20 cools by cooling equipment 30 and is controlled in the certain temperature range, and the water in the water tank 20 after the cooling is discharged into the water intake 122 of cooling water pipeline again.
The utility model performance test system for refrigeration compressors will be lowered the temperature through heat exchanger 40 earlier for the first time by the cooling water of condenser 12 back higher temperatures, be discharged into water tank 20 again by cooling equipment 30 cooling for the second time.Wherein heat exchanger 40 can adopt normal temperature air or the cooling of normal-temperature water natural cooling, not consumes energy.So just, reduced cooling equipment 30 in order to reduce and to control the energy consumption that water temperature produced in the water tank 20, thereby made the whole test energy saving of system.
With a specific embodiment the utility model is elaborated below.
For example ambient temperature is lower than 35 ℃.In the main system 10, the condensing temperature of condenser 12 under standard condition is 54.4 ℃.Usually the cooling water of condenser 12 reads to adopt counter-current, therefore in the water temperature of cooling water pipeline drain opening 121 generally near 54.4 ℃.Water temperature in the cooling equipment 30 control water tanks 20 is below 40 ℃.The refrigerating capacity of the tested compressor 11 in the main system 10 is Q, and refrigerating efficiency (Energy Efficiency Ratio) COP is 3.The refrigerating efficiency COP that is used for the cooling equipment 30 of cooling water tank 20 also is 3.
According to pilot system shown in Figure 1, the energy consumption Pw=Q+Q/3+ of whole test system (Q+Q/3)/3.
According to pilot system shown in Figure 3, when heat exchanger 40 was enough big, cooling equipment 30 can not worked fully, and the energy consumption Pw=Q+Q/3 of whole test system so in the ideal case is than energy-conservation (Q+Q/3)/3 of existing pilot system.Compressor (the about 12000W of Q) standard condition test to the 5HP ability can save energy 25%, and test can save energy 25% to 3HP compressor (the about 7000W of Q) standard condition.
Claims (3)
1. a performance test system for refrigeration compressors is characterized in that, comprises main system (10), water tank (20), cooling equipment (30) and heat exchanger (40);
At least comprise condenser (12) in the described main system (10), described condenser has cooling water pipeline in (12);
The water outlet of described cooling water pipeline (121) connects water tank (20) by heat exchanger (40);
Described water tank (20) connects the water intake (122) of described cooling water pipeline again.
2. performance test system for refrigeration compressors according to claim 1 is characterized in that, described heat exchanger (40) is air cooling heat exchanger or water cooling heat exchanger.
3. performance test system for refrigeration compressors according to claim 1, it is characterized in that, also comprise compressor (11), throttle valve (13), vaporizer (14) in the described main system (10), described vaporizer (14) is on the top of a heat insulation pressurized container (140), a heater (141) is in the bottom of described heat insulation pressurized container (140) and by the second refrigeration agent submergence, and described vaporizer (14), heat insulation pressurized container (140), heater (141), second refrigeration agent have constituted calorimeter instrument (15) jointly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200746651U CN201531407U (en) | 2009-11-09 | 2009-11-09 | Performance test system of a refrigeration compressor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200746651U CN201531407U (en) | 2009-11-09 | 2009-11-09 | Performance test system of a refrigeration compressor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201531407U true CN201531407U (en) | 2010-07-21 |
Family
ID=42526811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009200746651U Expired - Lifetime CN201531407U (en) | 2009-11-09 | 2009-11-09 | Performance test system of a refrigeration compressor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201531407U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102338075A (en) * | 2011-10-15 | 2012-02-01 | 合肥天鹅制冷科技有限公司 | Performance test device and test method for refrigeration compressor |
CN112267997A (en) * | 2020-11-26 | 2021-01-26 | 中家院(北京)检测认证有限公司 | Compressor performance testing system and method |
-
2009
- 2009-11-09 CN CN2009200746651U patent/CN201531407U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102338075A (en) * | 2011-10-15 | 2012-02-01 | 合肥天鹅制冷科技有限公司 | Performance test device and test method for refrigeration compressor |
CN112267997A (en) * | 2020-11-26 | 2021-01-26 | 中家院(北京)检测认证有限公司 | Compressor performance testing system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105928235B (en) | Double-condenser data center cooling system with phase change cold-storage and its control method | |
CN203478768U (en) | Full-year combined refrigerating unit | |
CN211739389U (en) | Energy-saving cold supply system for natural cooling cold accumulation | |
CN201531407U (en) | Performance test system of a refrigeration compressor | |
CN203824151U (en) | LNG (liquefied natural gas) cold energy utilization device of LNG power driving vessel | |
CN202371926U (en) | Environment cold source refrigerating system | |
CN1137359C (en) | Lithium bromide absorption type refrigerator suitable for large temp differnece and able to fully utilize energy | |
CN202166170U (en) | Water-cooling heat-exchange circulating device | |
CN201497638U (en) | Water cooled central air conditioner experimental bench | |
CN104964994B (en) | Double case asynchronous system concrete freezing-thawing test devices and test method | |
CN102980346A (en) | Industrial equipment cooling system and control method thereof | |
CN202973719U (en) | Industrial equipment cooling system | |
CN202085655U (en) | Hot water generator for milk cooling tank | |
CN202008224U (en) | Directly-heated constant temperature type air energy water heater | |
CN211060714U (en) | Low-temperature cooling heat exchange system | |
CN103615774A (en) | Auxiliary device for pump system, control method for auxiliary device and pump system | |
CN211476384U (en) | Air-conditioning pipeline system for ensuring year-round refrigeration of water chilling unit | |
CN210801598U (en) | Water heater for recycling waste heat of subway transformer | |
CN109282421B (en) | Fault diagnosis simulation device for water chilling unit | |
CN209484908U (en) | A kind of air-cooled direct-expansion-type supercooled water ice slurry unit | |
CN102128494A (en) | Directly-heated constant-temperature air-powered water heater | |
CN202204150U (en) | High-efficiency dual temperature air source water heating system | |
CN218565576U (en) | Auxiliary energy recoverer of refrigeration equipment | |
CN201383349Y (en) | Split-type double-temperature cold water machine | |
CN212805890U (en) | Integrated unit of central air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100721 |