CN201526039U - 适用于车辆进出的施工支洞进人口结构 - Google Patents
适用于车辆进出的施工支洞进人口结构 Download PDFInfo
- Publication number
- CN201526039U CN201526039U CN2009201994926U CN200920199492U CN201526039U CN 201526039 U CN201526039 U CN 201526039U CN 2009201994926 U CN2009201994926 U CN 2009201994926U CN 200920199492 U CN200920199492 U CN 200920199492U CN 201526039 U CN201526039 U CN 201526039U
- Authority
- CN
- China
- Prior art keywords
- lock chamber
- irrigation gallery
- chamber section
- construction
- diversion tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种适用于车辆进出的施工支洞进人口结构。本实用新型所要解决的技术问题是提供一种适用于车辆进出的施工支洞进人口结构,力图做到结构合理、使用方便、密封性好,不仅可满足人员进出,还可满足小型车辆进出。解决该问题的技术方案是:适用于车辆进出的施工支洞进人口结构,具有引水隧洞及与引水隧洞相连通的灌浆廊道,在灌浆廊道靠近引水隧洞侧设有一段钢管进人孔,其特征在于:在钢管进人孔外侧设置立方体的闸室段,闸室段外接灌浆廊道,并在闸室段和灌浆廊道之间设置可向闸室段转动的平面闸门。本实用新型主要适用于引水隧洞工程。
Description
技术领域
本发明涉及一种适用于车辆进出的施工支洞进人口结构。主要适用于引水隧洞工程。
背景技术
在较长的引水隧洞工程中,为加快施工进度,长引水隧洞沿线往往布置若干施工支洞。工程完工后有些支洞封堵,有些作为隧洞检修的永久通道予以保留,故施工支洞就要设置永久进人通道,一般采用进人孔的方式,由于常规的进人孔较小(一般直径1.2m),只能满足人员进出要求,无法满足小型车辆进出。在日常给隧洞检修时为减少检修人员的徒步来回时间及方便检修设备的搬运,需要通过车辆来运送,因此解决施工支洞适用于车辆进出的技术问题变的非常重要。
发明内容
本发明要解决的技术问题是:结合原有进人通道结构的特点,提供一种适用于车辆进出的施工支洞进人口结构,力图做到结构合理、使用方便、密封性好,不仅可满足人员进出,还可满足小型车辆进出。
本发明所采用的技术方案是:适用于车辆进出的施工支洞进人口结构,具有引水隧洞及与引水隧洞相连通的灌浆廊道,在灌浆廊道靠近引水隧洞侧设有一段钢管进人孔,其特征在于:在钢管进人孔外侧设置立方体的闸室段,闸室段外接灌浆廊道,并在闸室段和灌浆廊道之间设置可向闸室段转动的平面闸门。
所述平面闸门的尺寸为2.4m×2.0m。
所述平面闸门安装在闸室段与灌浆廊道的结合处,该闸门包括固定在所述结合处上部的顶枢、结合处下部的底枢以及可绕所述顶枢和底枢中心线之连线转动的门叶。
所述灌浆廊道内设置钢衬。
本发明的有益效果是:设置有适用于车辆进出的施工支洞进人口结构,可以很方便的将检修设备及检修人员通过车辆运送至隧洞内,减少检修人员的徒步来回时间。采用在施工支洞内部安装平面闸门,可以利用水流自身的压力封紧平面闸门,使平面闸门更加安全、可靠、稳定。在灌浆廊道内设置钢衬可以有效的防止内水外渗。另采用转动式平面闸门具有安装简单、施工工期短、成本低等特点。
附图说明
图1为本实施例的平面示意图
图2为图1的局部结构图
图3为图1的A向旋转图
具体实施方式
如图1、图2、图3所示,在给较长的引水隧洞4施工时,为加快施工进度,沿线往往布置若干施工支洞,工程完工后有些支洞封堵,有些作为隧洞检修的永久通道予以保留,故施工支洞就要设置永久进人通道,进人通道结构为具有与引水隧洞4相连通的灌浆廊道3,灌浆廊道3靠近引水隧洞4段设有一段进人孔5,灌浆廊道3另一端通向山体(或坡体等)外面。但由于一般施工支洞较长,需要给隧洞检修时,为减少检修人员的徒步来回时间及检修设备的搬运,采用车辆运送人员及设备,为满足施工支洞适用于车辆进出的需要,本例结合原有进人通道结构的特点,在钢管进人孔5外侧设置一个立方体的闸室段2,闸室段外侧连接灌浆廊道3,并在闸室段和灌浆廊道之间设置可向闸室段转动的平面闸门1。平面闸门1的尺寸为2.4m×2.0m,安装在闸室段2与灌浆廊道3的结合处,该闸门包括固定在所述结合处上部的顶枢1-1、结合处下部的底枢1-2以及可绕所述顶枢和底枢中心线之连线转动的门叶1-3。
另外为防止闸室段2内的水外渗到灌浆廊3里,在灌浆廊道3内置钢衬6,钢衬与平面闸门1埋件之间封焊,不留空隙。
Claims (5)
1.一种适用于车辆进出的施工支洞进人口结构,具有引水隧洞(4)及与引水隧洞相连通的灌浆廊道(3),在灌浆廊道靠近引水隧洞侧设有一段钢管进人孔(5),其特征在于:在钢管进人孔(5)外侧设置立方体的闸室段(2),闸室段外接灌浆廊道(3),并在闸室段和灌浆廊道之间设置可向闸室段转动的平面闸门(1)。
2.根据权利要求1所述的适用于车辆进出的施工支洞进人口结构,其特征在于:所述平面闸门(1)的尺寸为2.4m×2.0m。
3.根据权利要求1或2所述的适用于车辆进出的施工支洞进人口结构,其特征在于:所述平面闸门(1)安装在闸室段(2)与灌浆廊道(3)的结合处,该闸门包括固定在所述结合处上部的顶枢(1-1)、结合处下部的底枢(1-2)以及可绕所述顶枢和底枢中心线之连线转动的门叶(1-3)。
4.根据权利要求1或2所述的适用于车辆进出的施工支洞进人口结构,其特征在于:所述灌浆廊道(3)内设置钢衬(6)。
5.根据权利要求3所述的适用于车辆进出的施工支洞进人口结构,其特征在于:所述灌浆廊道(3)内设置钢衬(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201994926U CN201526039U (zh) | 2009-10-29 | 2009-10-29 | 适用于车辆进出的施工支洞进人口结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201994926U CN201526039U (zh) | 2009-10-29 | 2009-10-29 | 适用于车辆进出的施工支洞进人口结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201526039U true CN201526039U (zh) | 2010-07-14 |
Family
ID=42517329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201994926U Expired - Fee Related CN201526039U (zh) | 2009-10-29 | 2009-10-29 | 适用于车辆进出的施工支洞进人口结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201526039U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251506A (zh) * | 2011-04-29 | 2011-11-23 | 中国水电顾问集团华东勘测设计研究院 | 高水头水电站压力钢管检修进人通道结构及其施工方法 |
CN104452700A (zh) * | 2014-11-04 | 2015-03-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于引水隧洞进人孔的侧翻式闷头结构 |
-
2009
- 2009-10-29 CN CN2009201994926U patent/CN201526039U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251506A (zh) * | 2011-04-29 | 2011-11-23 | 中国水电顾问集团华东勘测设计研究院 | 高水头水电站压力钢管检修进人通道结构及其施工方法 |
CN102251506B (zh) * | 2011-04-29 | 2013-03-20 | 中国水电顾问集团华东勘测设计研究院 | 高水头水电站压力钢管检修进人通道结构及其施工方法 |
CN104452700A (zh) * | 2014-11-04 | 2015-03-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于引水隧洞进人孔的侧翻式闷头结构 |
CN104452700B (zh) * | 2014-11-04 | 2016-01-06 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种用于引水隧洞进人孔的侧翻式闷头结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202645585U (zh) | 一种泄水减压的管片衬砌结构 | |
CN103557012A (zh) | 一种大变形巷道围岩注浆紧固承载结构及施工方法 | |
CN201526039U (zh) | 适用于车辆进出的施工支洞进人口结构 | |
CN102913249B (zh) | 斜井横向贯通正洞单喇叭挑高施工方法 | |
CN215669375U (zh) | 施工支洞与压力管道排水廊道及检修洞结合布置结构 | |
CN202900144U (zh) | 一种用于煤层顺层孔封孔装置 | |
CN103967444A (zh) | 瓦斯抽采钻孔两端自堵带压封孔工艺 | |
CN207277294U (zh) | 一种高水头电站压力钢管检修布置结构 | |
CN207131449U (zh) | 富水地区隧道仰拱排水结构 | |
CN102505671B (zh) | 用于多条引水隧洞的上跨式检修通道 | |
CN107591769B (zh) | 一种电力电缆管道防水封堵装置 | |
CN205400661U (zh) | 煤矿井下水力压裂封孔器 | |
CN206928255U (zh) | 高拱坝导流洞永久堵头的检修布置结构 | |
CN201394892Y (zh) | 具有密封装置的砂浆车 | |
CN201778316U (zh) | 水闸橡胶密封件 | |
CN201546209U (zh) | 一种施工支洞进人孔封孔门 | |
CN205400670U (zh) | 一种注浆管 | |
CN205025499U (zh) | 地铁联络通道冻结开挖防护门 | |
CN209873890U (zh) | 一种安全型防渗透井盖 | |
CN203879548U (zh) | 一种用于矿井巷道堵水的密闭墙 | |
CN209586399U (zh) | 一种地下管廊盾构施工防水结构 | |
CN209398362U (zh) | 一种花键插入式可闭锁空化射流钻杆钻头结构 | |
CN103132529B (zh) | 一种自动封堵式压浆接头 | |
CN203546685U (zh) | 一种优化的隧洞结构 | |
CN208965520U (zh) | 导流洞施工支洞用作生态供水洞的改造结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100714 Termination date: 20181029 |