CN201523180U - 500kV power transmission line overhead ground wire flying car - Google Patents

500kV power transmission line overhead ground wire flying car Download PDF

Info

Publication number
CN201523180U
CN201523180U CN2009202542108U CN200920254210U CN201523180U CN 201523180 U CN201523180 U CN 201523180U CN 2009202542108 U CN2009202542108 U CN 2009202542108U CN 200920254210 U CN200920254210 U CN 200920254210U CN 201523180 U CN201523180 U CN 201523180U
Authority
CN
China
Prior art keywords
ground wire
car
overhead ground
transmission line
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202542108U
Other languages
Chinese (zh)
Inventor
杨立春
张兰武
范昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATONG ULTRAHIGH PRESSURE ELECTRIC POWER SUPPLY Co OF NORTH CHINA GRID Co Ltd
State Grid Corp of China SGCC
Original Assignee
DATONG ULTRAHIGH PRESSURE ELECTRIC POWER SUPPLY Co OF NORTH CHINA GRID Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATONG ULTRAHIGH PRESSURE ELECTRIC POWER SUPPLY Co OF NORTH CHINA GRID Co Ltd filed Critical DATONG ULTRAHIGH PRESSURE ELECTRIC POWER SUPPLY Co OF NORTH CHINA GRID Co Ltd
Priority to CN2009202542108U priority Critical patent/CN201523180U/en
Application granted granted Critical
Publication of CN201523180U publication Critical patent/CN201523180U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to high-voltage power transmission line maintenance equipment, in particular to a 500kV power transmission line overhead ground wire flying car, solving the problems that the existing overhead ground wire flying car is not easy to implement prevention of car running and can not carry preformed wires along with the car, and the length of the flying car limits the detection range of an operator and the like. The 500kV power transmission line overhead ground wire flying car comprises a car frame which is provided with a pulley mechanism for realizing that the car frame slides along an overhead ground wire; the pulley mechanism comprises a fixed shaft fixed with the car frame, and a pulley sleeved on the fixed shaft; and the car frame is 1.6 to 1.8m long and is provided with a preformed wire containing box with the length of 1.5 to 1.7m. In addition, a bearing is additionally arranged between the pulley and the fixed shaft of the pulley mechanism, and the car frame is configured with a brake device. The 500kV power transmission line overhead ground wire flying car has simple and reasonable structure, the length of the flying car meets the needs of maintenance of the operator, and the flying car can carry the preformed wires along with the car, has good effect for preventing car running, and is convenient for the operator to implement preformed repair on the overhead ground wires or optical cables on the 500kV power transmission line overhead ground wire.

Description

500kV transmission line overhead ground wire driving
Technical field
The utility model relates to the ultra-high-tension power transmission line repair apparatus, specifically is a kind of being used on 500kV transmission line overhead ground wire overhead ground wire or optical cable to be implemented the preformed 500kV transmission line overhead ground wire driving of studying for a second time courses one has flunked.
Background technology
Work on the present domestic 500kV transmission line overhead ground wire, generally use the alloy aluminum driving of specification, be mainly used in disappearing by scarce (as disconnected strand of ground wire or optical cable) and installation lightning protection device (as anti-shock arrester) and be installed in work such as line detector on the overhead ground wire as 120cm * 42cm and 138cm * 42cm.
Along with the continuous development of power grid construction, the special operation on the overhead ground wire is frequent gradually, therefore some problems occurred when using driving, mainly shows the following aspects:
A practicality aspect
When 1, on 500kV transmission line overhead ground wire or optical cable, studying for a second time courses one has flunked bar and study for a second time courses one has flunked with preformed armor rods, require the driving electrician at first need to be studied for a second time courses one has flunked the optical cable surface recovery original state of part, and surperficial burr polished smooth, next preformed armor rods is studied for a second time courses one has flunked bar and should be contacted with optical cable closely, its blue line center should be positioned at the most serious place of damage, twine to both sides, winding direction should be consistent and closely even with ground wire (optical cable) strand system direction, and burst place of will breaking all covers.And preformed armor rods length is 1.5~1.7 meters, driving length is 0.42 meter, FROM when the operating personnel sits driving and carries out preformed studying for a second time courses one has flunked is about 1 meter, and can not guarantee that preformed armor rods studies for a second time courses one has flunked bar and should closely contact with ground wire (optical cable), preformed armor rods can only be cast aside curved, cause the preformed armor rods distortion, cause winding inhomogeneous gapped.
2, " 8.3.8.3 " bar requires in " State Grid Corporation of China's electric power safety working regulation ": " after the hanging ladder load, should keep ground wire and the human body must not be less than 3.9 meters to the safe distance of below live wire." general overhead ground wire (optical cable) is 8~13 meters with the live wire distance, after the actual hanging ladder load, ground wire sag minimum point approximately descends 2 meters, adds that the influence of tractive force that is subjected to the ground staff to draw driving to slide with pull rope descends 0.5 meter and driving itself highly again.By above analysis, calculating, at this moment ground wire and human body are approximately 4.12 meters to the minimum range of below live wire.Therefore when transmitting preformed armor rods (length is 1.5~1.7 meters), ground wire and human body are approximately 2.42~2.62 meters to the minimum range of below live wire, do not meet " safety " requirement.
The B design aspect
1,500kV transmission line major part is between location, hills and the high mountain high hill, average span is about 400 meters, pull out on the ubiquity or press down, and driving does not stop brake apparatus, so on this section, slide or during operation, the driving electrician can only go up at overhead ground wire (optical cable) with the safety belt fence twines several circles, in case sport car, but coasting distance is when longer, can the heavy wear fence, and the resistance that sliding speed is subjected to is bigger, causes ground traction driving personnel labor intensity to increase.
2, " 6.2.5 " bar requires in " State Grid Corporation of China's electric power safety working regulation ": " when the shaft tower work high above the ground, should use the dual fail-safe safety belt of back rope." go up operation at ground wire (optical cable), inconvenient because of using the back rope, adopt two fences of safety belt to carry out two protections, behind the arrival setting, sport car when preventing operation can only be untied a rhizosphere hurdle and twine several circles, has violated " safety " requirement.
C manufacturing process aspect
Two of driving walk movable pulley and adopt male connection, when therefore sliding, pulley respectively with alloy aluminum pipe and overhead ground wire friction, forms bigger resistance, the long-time or use meeting of growing distance is to the serious wear of pulley own; It is to be undertaken by working in coordination of ground electrician's dragline messenger that next driving electrician slides on ground wire (optical cable), and the far away and weather conditions at setting increase labour intensity and increase the activity duration for driving electrician and ground traction electrician.
Summary of the invention
The utility model is implemented to be difficult for, can not to carry problems such as the preformed armor rods and the driving length restriction operating personnel scope of repair with car in order to solve the anti-sport car of existing overhead ground wire driving, and a kind of 500kV transmission line overhead ground wire driving is provided.
The utility model is to adopt following technical scheme to realize: 500kV transmission line overhead ground wire driving, comprise vehicle frame, vehicle frame is provided with the pulley mechanism of realizing that vehicle frame slides along overhead ground wire, pulley mechanism comprises with the fixing fixed axis of vehicle frame and is placed on pulley on the fixed axis, the long 1.6-1.8 rice of vehicle frame, vehicle frame is provided with the preformed armor rods carrying case of 1.5-1.7 rice.
The utility model is a 1.6-1.8 rice with the Design of length of driving vehicle frame, has strengthened driving electrician's maintenance practical range, is convenient to the driving electrician and studies for a second time courses one has flunked bar with preformed armor rods ground wire (optical cable) is studied for a second time courses one has flunked, and can guarantee technological requirement; And set up the preformed armor rods carrying case and place preformed armor rods and study for a second time courses one has flunked bar, solved the driving electrician carry preformed armor rods inconvenient and when transmitting preformed armor rods with electrified body apart from not enough problem.
In addition, have additional bearing (being that pulley is fixed by bearing and fixed axis) between pulley mechanism middle pulley and fixed axis, and dispose brake gear on the vehicle frame.Described brake gear can adopt existing known products.Bearing the resistance that has reduced when driving slides is set, alleviated ground traction driving personnel's labour intensity, can alleviate wearing and tearing simultaneously to overhead ground wire (optical cable) and pulley itself; Because the setting of brake gear when the driving electrician goes up operation at overhead ground wire (optical cable), can freely be controlled driving and only stop, and provides guarantee to inherently safe, pulls out or presses down even meet, and still can effectively avoid sport car hidden danger.
The utility model is simple and reasonable for structure, and driving length satisfies the operating personnel and overhauls needs, can carry preformed armor rods with car, and anti-sport car is effective, and the convenient working personnel implement preformed studying for a second time courses one has flunked to overhead ground wire or optical cable on 500kV transmission line overhead ground wire.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the right view of Fig. 1;
Among the figure: the 1-vehicle frame; The 2-fixed axis; The 3-pulley; 4-preformed armor rods carrying case; The 5-bearing; 6,7-supporting bracket; The 8-back shaft; The 9-brake lever.
Embodiment
500kV transmission line overhead ground wire driving, comprise vehicle frame 1, vehicle frame 1 is provided with the pulley mechanism of realizing that vehicle frame 1 slides along overhead ground wire, pulley mechanism comprises with the fixing fixed axis 2 of vehicle frame 1 and is placed on pulley 3 on the fixed axis 2, vehicle frame 1 long 1.6-1.8 rice, vehicle frame 1 is provided with the preformed armor rods carrying case 4 of 1.5-1.7 rice.2 of pulley mechanism middle pulley 3 and fixed axis have additional bearing 5 (being that pulley is fixed by bearing and fixed axis), and dispose brake gear on the vehicle frame 1.During concrete enforcement, described brake gear comprises fixing, being placed between two supporting brackets, 6,7, two supporting brackets 6,7 of pulley 3 both sides with pulley mechanism fixed axis 2 and sets up and can rotate and head end is the brake lever 9 of wedge-like around back shaft 8 by back shaft 8.Like this, in driving is advanced, as braking, only need the tail end of brake lever 9 is pressed down, brake lever 9 turns clockwise around back shaft 8, and the head end of brake lever 9 is inserted between pulley 3 and the overhead ground wire, can realize brake.

Claims (3)

1. 500kV transmission line overhead ground wire driving, comprise vehicle frame (1), vehicle frame (1) is provided with the pulley mechanism of realizing that vehicle frame (1) slides along overhead ground wire, pulley mechanism comprises with the fixing fixed axis (2) of vehicle frame (1) and is placed on pulley (3) on the fixed axis (2), it is characterized in that: the long 1.6-1.8 rice of vehicle frame (1), vehicle frame (1) are provided with the preformed armor rods carrying case (4) of 1.5-1.7 rice.
2. 500kV transmission line overhead ground wire driving according to claim 1 is characterized in that: have additional bearing (5) between pulley mechanism middle pulley (3) and fixed axis (2), and dispose brake gear on the vehicle frame (1).
3. 500kV transmission line overhead ground wire driving according to claim 2, it is characterized in that: described brake gear comprises two supporting brackets (6,7) of fixing, being placed in pulley (3) both sides with pulley mechanism fixed axis (2), sets up and can rotate and head end is the brake lever (9) of wedge-like around back shaft (8) by back shaft (8) between two supporting brackets (6,7).
CN2009202542108U 2009-10-24 2009-10-24 500kV power transmission line overhead ground wire flying car Expired - Lifetime CN201523180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202542108U CN201523180U (en) 2009-10-24 2009-10-24 500kV power transmission line overhead ground wire flying car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202542108U CN201523180U (en) 2009-10-24 2009-10-24 500kV power transmission line overhead ground wire flying car

Publications (1)

Publication Number Publication Date
CN201523180U true CN201523180U (en) 2010-07-07

Family

ID=42509356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202542108U Expired - Lifetime CN201523180U (en) 2009-10-24 2009-10-24 500kV power transmission line overhead ground wire flying car

Country Status (1)

Country Link
CN (1) CN201523180U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231490A (en) * 2011-04-02 2011-11-02 武汉奋进科技有限公司 Manned traveling locomotive for high-voltage transmission line
CN102931610A (en) * 2012-10-08 2013-02-13 湖州电力局 Power transmission line repair flying vehicle
CN103995335A (en) * 2014-05-09 2014-08-20 国家电网公司 Broken strand repairing method of OPGW cable
CN104078891A (en) * 2014-07-24 2014-10-01 国家电网公司 Self-traction type conducting wire high-altitude electrified maintenance vehicle for electric transmission line
CN104836150A (en) * 2015-05-04 2015-08-12 国家电网公司 Extra-high voltage large crossing span ground wire obstacle-surmounting outgoing device
CN105098654A (en) * 2015-08-31 2015-11-25 国网青海省电力公司海东供电公司 Preformed armor rod winding outgoing working platform of power transmission circuit
CN105262000A (en) * 2015-11-19 2016-01-20 国网福建省电力有限公司 Routing apparatus for power transmission line maintenance operation

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231490B (en) * 2011-04-02 2014-06-25 武汉奋进科技有限公司 Manned traveling locomotive for high-voltage transmission line
CN102231490A (en) * 2011-04-02 2011-11-02 武汉奋进科技有限公司 Manned traveling locomotive for high-voltage transmission line
CN104518453A (en) * 2012-10-08 2015-04-15 湖州电力局 Electric transmission line maintenance coaster
CN102931610A (en) * 2012-10-08 2013-02-13 湖州电力局 Power transmission line repair flying vehicle
CN104518453B (en) * 2012-10-08 2016-04-06 湖州电力局 A kind of power transmission lines overhauling driving
CN102931610B (en) * 2012-10-08 2015-01-21 湖州电力局 Power transmission line repair flying vehicle
CN103995335A (en) * 2014-05-09 2014-08-20 国家电网公司 Broken strand repairing method of OPGW cable
CN104078891A (en) * 2014-07-24 2014-10-01 国家电网公司 Self-traction type conducting wire high-altitude electrified maintenance vehicle for electric transmission line
CN104836150A (en) * 2015-05-04 2015-08-12 国家电网公司 Extra-high voltage large crossing span ground wire obstacle-surmounting outgoing device
CN105098654A (en) * 2015-08-31 2015-11-25 国网青海省电力公司海东供电公司 Preformed armor rod winding outgoing working platform of power transmission circuit
CN105098654B (en) * 2015-08-31 2017-05-17 国网青海省电力公司海东供电公司 Preformed armor rod winding outgoing working platform of power transmission circuit
CN105262000A (en) * 2015-11-19 2016-01-20 国网福建省电力有限公司 Routing apparatus for power transmission line maintenance operation
CN105262000B (en) * 2015-11-19 2017-08-01 国网福建省电力有限公司 Power transmission lines overhauling operation routing device

Similar Documents

Publication Publication Date Title
CN201523180U (en) 500kV power transmission line overhead ground wire flying car
CN102623926B (en) Distant equipotential tackle and method for realizing charged equipotential access by using same
CN107264339A (en) Overhead system for portable digger
CN102545100B (en) Live installation tool for space bar of twin-bundled conductor
CN101364718A (en) Heavy cable laying system and laying method
CN102290742B (en) Tension stringing construction technology
CN202729483U (en) Vehicle-mounted manual/electric integral cable winch
CN204296493U (en) A kind of contact network in tunnel construction tension stringing vehicle
CN202084855U (en) Cable traction tool
CN202495706U (en) Electrified installation tool for double split conductor spacer
CN102969676A (en) Cable laying device adopting guiding type control of fixed pulleys
CN104659708A (en) Electric winch for power transmission line
CN206707934U (en) Cable protecting device of roller and the wind turbine tower that cable can be prevented to be damaged
CN208890236U (en) Novel conductive wire apparatus for suspension easy to use
CN201821038U (en) Special pulley for overhauling power transmission line
CN205544121U (en) Slip type prevents that string reversing line presss from both sides
CN211056399U (en) Be used for interval cable unwrapping wire auxiliary device
CN209948529U (en) Live lifting mechanism for three-phase lead of straight-line section of 10kV distribution network line
CN202308922U (en) Anti-dropping hook of electric insulation protection umbrella
CN203445571U (en) Live-line operation ice-shedding jump prevention wire winding device
CN208752271U (en) A kind of optical cable is autotomyed protective device
CN205150975U (en) Tensioning device of winch
CN104319721A (en) High-voltage power grid telescopic guide connection device
CN204925484U (en) Aerial fiber cable threading apparatus
CN105932627A (en) Slide-type anti-string-fall wire clamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NORTH CHINA GRID CO., LTD. DATONG SUPERHIGH-VOLTAG

Effective date: 20130902

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: NORTH CHINA GRID CO., LTD. DATONG SUPERHIGH-VOLTAGE POWER SUPPLY BRANCH

Effective date: 20130902

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 037006 DATONG, SHAANXI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130902

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Datong Ultrahigh Pressure Electric Power Supply Company Of North China Grid Co., Ltd.

Address before: 037006 No. three, 38 West Ring Road, Shanxi, Datong

Patentee before: Datong Ultrahigh Pressure Electric Power Supply Company Of North China Grid Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100707