CN201507429U - Vortex liquid discharge conveyer in natural gas exploitation - Google Patents
Vortex liquid discharge conveyer in natural gas exploitation Download PDFInfo
- Publication number
- CN201507429U CN201507429U CN2009200345444U CN200920034544U CN201507429U CN 201507429 U CN201507429 U CN 201507429U CN 2009200345444 U CN2009200345444 U CN 2009200345444U CN 200920034544 U CN200920034544 U CN 200920034544U CN 201507429 U CN201507429 U CN 201507429U
- Authority
- CN
- China
- Prior art keywords
- natural gas
- conveyer
- pit shaft
- gas
- gas transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a vortex liquid discharge conveyer in natural gas exploitation which comprises an intermediate compound, a spiral conduction blade, a positioning body and a gas conveying well barrel, which are connected into a whole. The vortex liquid discharge conveyer enhances the carrying quantity of accumulated liquid in the natural gas transportation through the rotary eccentric force generated by the spiral conduction blade which is impacted by high pressure of underground natural gas, does not need external forces, can reduce the underground accumulated liquid, stabilizes and improves the yield of natural gas.
Description
Technical field
The utility model relates to the vortex effluent conveyer in a kind of natural gas extraction, be specifically related in the oil gas well, utilize the pressure of down-hole rock gas and the helix structure of vortex effluent conveyer, make natural gas flow produce eddy current, the hydrops that rock gas carries in the gas well is discharged from outside the well simultaneously, improving rock gas and take the liquid conveying capacity and reduce the influence of down-hole hydrops to gas production, is the application that belongs to the downhole tool field.
Background technique
At present, rock gas is in exploitation, and meeting a large amount of hydrops of association in gas well comprise the crude oil of water, association and tiny solid etc.Rock gas is with the storage of mode with pressure between subsurface formations, and pressure is far longer than the barometric pressure on ground therebetween.Rock gas along the gas transmission pit shaft from delivered downhole, because of pressurized can carry some hydrops from the gas transmission pit shaft to ground.But along with the increase of gas production, hydrops also constantly increases therebetween, yet the hydrops amount that rock gas carries from the conveying of gas transmission pit shaft is far smaller than the production of hydrops.Block gas transmission pit shaft mouth along with the increase of hydrops, the down-hole will form a relative closed environment, and continuing to increase of hydrops will make borehole pressure increase, when pressure greatly to be equal to rock gas from down-hole formation separate out pressure the time, finally can block separating out of rock gas, influence is to gas extraction.For this reason, traditional way is regular to extract hydrops in well, guarantees gas extraction like this, but this way wastes time and energy, and efficient is lower.
The model utility content
The technical problems to be solved in the utility model is to overcome rock gas to carry the hydrops ability from directly carry the down-hole, traditional approach extracts the defective that the down-hole hydrops is wasted time and energy, and provide a kind of vortex effluent conveyer, this conveyer places in the gas transmission pit shaft of down-hole, be subjected to the down-hole hyperpressure, vortex effluent conveyer in the rock gas high speed impact gas transmission pit shaft, natural gas flow is subjected to powerful spiral centrifugal action to form eddy current, like this hydrops of rock gas and association therebetween along the well bore wall high speed rotating, produce component upwards hydrops is extracted out from the down-hole, and be transported to ground endlessly.
In order to solve the problems of the technologies described above, the technological scheme of this model utility is: vortex effluent conveyer is made up of conveyer body and gas transmission pit shaft.The conveyer body comprises intermediate, spiral stream guidance blade and positioning body.Intermediate is a cylindrical body, and the spiral stream guidance vanes fixed is connected on the intermediate, and its external diameter is slightly less than the internal diameter of gas transmission pit shaft.Positioning body is fixedlyed connected with intermediate, the conveyer body can freely drop into from gas transmission wellbore surface end, be placed on the appropriate location in the gas transmission pit shaft, this position is by the position and the gas producing technology conditional decision of hydrops, because of the difference of geologic structure, the hydrops of rock gas and association may be in the position of down-hole different heights.And in needs, can take out with pulling and running tool from the ground inlet end.The purpose that intermediate and spiral stream guidance blade are set is to utilize the hyperpressure of down-hole rock gas, natural gas flow is from gas transmission pit shaft inlet end, by vertically natural gas flow being converted to behind the positioning body between the cylindrical and well bore wall of intermediate, carry the natural gas flow high speed impact guide vane of hydrops, guide vane is spiral-shaped, natural gas flow is behind the guide vane of flowing through, produce powerful spiral centrifugal force, air-flow is carrying hydrops just along the tube wall high speed rotating of pit shaft, hydrops has produced upwards, and component makes that the rock gas of down-hole and hydrops are promptly detached, and along positioning body, guide vane and gas transmission pit shaft are transported to the ground surface end of gas transmission pit shaft, like this, improved the hydrops amount of carrying during the rock gas pit shaft is carried greatly, if only come direct transport gas with single gas transmission pit shaft, only depend on down-hole self high pressure, make rock gas carry hydrops and be transported to and reach two or three kilometer ground, and realize carrying endlessly, the hydrops amount that it carries is few.The purpose that positioning body is set is and the conveyer body can be fixedly mounted in the gas transmission pit shaft, and is unlikely to break away from the gas transmission pit shaft and fall in the well.
Further improvement to this model utility, one end of intermediate is fixedly connected with joint, and joint is commonly called as the fish head, is the cylindrical body that one one end has projection, this protruding diameter is greater than the diameter of cylindrical body remaining part, is beneficial to the input of whole conveyer body like this and fishes for.Because the length of gas transmission pit shaft is longer than the conveyer body far away, so generally be connected the protruding bottom of joint with the throw in catcher of an end tether rope, then from the ground surface end of gas transmission pit shaft, deliver the appropriate location of conveyer body to the gas transmission pit shaft always, when needs are fished for the conveyer body, can be connected the joint high spot once more and salvage to ground.
To the further improvement of this model utility, be fixedly connected with the water conservancy diversion cover at the other end of intermediate, the water conservancy diversion cover is the conduit of one section hollow out, promptly at an end of conduit, can there be a plurality of holes in the hole of being carved with hollow out on the tube wall, a plurality of shapes can be made in the hole, such as square, and circle etc.Be divided to outside the pipe by the rock gas in the water conservancy diversion sleeve pipe and hydrops hole, flow to the spiral stream guidance blade along intermediate then from hollow out.The purpose that water conservancy diversion cover is set is to adjust the flow direction of gas-liquid and reduces the resistance of gas-liquid in carrying.
To the further improvement of this model utility, positioning body is one section hollow tubular, and the one end is installed in the gas transmission pit shaft, and the other end and water conservancy diversion cover is fixedlyed connected, and rock gas and hydrops be by in the hollow tubular, then through in the pipe of water conservancy diversion cover and be divided to outside the pipe.Can reduce the resistance in the gas-liquid conveying so greatly.
Description of drawings
Below by the drawings and specific embodiments this model utility is further specified.
Fig. 1 is this vortex effluent conveyer structure and fundamental diagram.
Fig. 2 is the A-A cross-sectional view of water conservancy diversion cover.
Embodiment
Vortex effluent conveyer in the natural gas extraction as shown in Figure 1 is made up of gas transmission pit shaft 1 and conveyer body 10, and conveyer body 10 comprises joint 2, intermediate 3, spiral stream guidance blade 4, water conservancy diversion cover 5, positioning body 6.Wherein, gas transmission pit shaft 1 connects to form by the plurality of sections pit shaft and by gas transmission pit shaft connecting tube 8, two sections pit shafts are directly contact, promptly when the connection of two pit shafts because the needing nature to leave certain interval in the termination and connect threadably of sealing by gas transmission pit shaft connecting tube 8.Joint 2 and intermediate 3, intermediate 3 and water conservancy diversion cover 5, water conservancy diversion cover 5 is with positioning body 6 and is threaded, spiral stream guidance blade 4 is welded on the intermediate 3, one end of positioning body 6 is welded with positioning body voussoir 7, positioning body voussoir 7 is constituent elements of positioning body 6, two groups of bars that positioning body voussoir 7 is made up of spring steel, two groups of its natures of bar are outwards to open, keep certain elastic force, its end is that two bottom surfaces are straight, corresponding surface is the voussoir on inclined-plane, when work, voussoir is positioned at the not gap of contact segment formation, two sections gas transmission pit shaft 1 terminations, be subjected to the elastic force effect, voussoir just firmly is adjacent to the inwall of gas transmission pit shaft connecting tube 8, and when natural air-flow 9 upwards impacted vortex effluent conveyer, voussoir just was stuck in the clearance space that the end face of the inwall of gas transmission pit shaft connecting tube 8 and two sections gas transmission pit shafts 1 forms; Certainly, when will salvaging conveyer body 10, only need apply a pulling force bigger than rock gas impact force at joint 2, to be the inclined-plane unlikely stuck with regard to easier taking-up conveyer body 10 because of the voussoir end face.
As shown in Figure 2, be the A-A cross-sectional view of water conservancy diversion cover 5.
Claims (5)
1. the vortex effluent conveyer in the natural gas extraction, form by gas transmission pit shaft (1) and conveyer body (10), it is characterized in that: conveyer body (10) is positioned at gas transmission pit shaft (1), it is made up of intermediate (3), spiral stream guidance blade (4), positioning body (6), intermediate (3) is a cylindrical body, be fixedly connected with spiral stream guidance blade (4) on it, the external diameter of spiral stream guidance blade (4) is slightly less than the internal diameter of gas transmission pit shaft (1), one end of intermediate (3) is fixedly connected with positioning body (6), and positioning body (6) is fixedlyed connected with gas transmission pit shaft (1).
2. the vortex effluent conveyer in the natural gas extraction as claimed in claim 1, it is characterized in that: an end of intermediate (3) is fixedly connected with joint (2), joint (2) is the cylindrical body that one one end has projection, and this protruding diameter is greater than the diameter of cylindrical body remaining part.
3. the vortex effluent conveyer in the natural gas extraction as claimed in claim 1 is characterized in that: an end of intermediate (3) is fixedly connected with water conservancy diversion cover (5), and water conservancy diversion cover (5) is the conduit of one section hollow out, promptly is carved with the hole on tube wall.
4. the vortex effluent conveyer in the natural gas extraction as claimed in claim 1 is characterized in that: the hole on water conservancy diversion cover (5) tube wall is a plurality of, and the hole can be circular or square etc.
5. as the vortex effluent conveyer in claim 1 or the described natural gas extraction of claim 3, it is characterized in that: positioning body (6) is one section hollow tubular.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200345444U CN201507429U (en) | 2009-09-16 | 2009-09-16 | Vortex liquid discharge conveyer in natural gas exploitation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200345444U CN201507429U (en) | 2009-09-16 | 2009-09-16 | Vortex liquid discharge conveyer in natural gas exploitation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201507429U true CN201507429U (en) | 2010-06-16 |
Family
ID=42468556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009200345444U Expired - Fee Related CN201507429U (en) | 2009-09-16 | 2009-09-16 | Vortex liquid discharge conveyer in natural gas exploitation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201507429U (en) |
-
2009
- 2009-09-16 CN CN2009200345444U patent/CN201507429U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101655084B (en) | Vortex effluent conveyer in natural gas exploitation | |
CN106930688A (en) | A kind of eddy current type waterpower pulse axial impact instrument | |
CN106761404B (en) | Radially horizontal well hose assists feeder | |
CN203531785U (en) | Centralizer using liquid to assist in cleaning cuttings bed | |
CN101769271A (en) | Deep-well oil-extraction external flow-channel direct and reverse circulation freely-throwing jet injector oil production method and device | |
CN211008515U (en) | Pulse jet rock debris cleaning tool | |
CN102287152B (en) | Rotating spray sand cleaning method | |
CN110748311A (en) | Pulse jet rock debris cleaning tool | |
CN110067516A (en) | A kind of quick washing-, which is scraped, cuts combined type broken rock PDC drill bit | |
CN103184852A (en) | Underground clearing device | |
CN200989164Y (en) | Pulsation pumping pressure drilling device for lowering underwell differential pressure | |
CN203412552U (en) | Water and pulverized coal discharging coal-bed methane mining device | |
CN201507429U (en) | Vortex liquid discharge conveyer in natural gas exploitation | |
CN201991503U (en) | Nozzle-built-in hydraulic jet | |
CN202039794U (en) | High efficiency cleaning drill rod for rock cuttings bed | |
CN201273183Y (en) | Oil well head axial rotational flow desander | |
CN208330181U (en) | A kind of downhole tool rotating device | |
CN203430446U (en) | Horizontal well turbine sand cleaning device | |
CN2931757Y (en) | Double dual-flow channel drill bit for exploratory boring bergol | |
CN107387038B (en) | Underground full-hole vortex tool for drainage and gas production | |
RU109496U1 (en) | DEVICE FOR CLEANING WELLS FROM Sludge | |
CN113006680B (en) | Low-pressure-loss torsion impact drilling tool and rock breaking method | |
CN201196045Y (en) | Down-hole jet stream decompression device | |
CN207245656U (en) | A kind of high frequency hydroscillator | |
CN202544793U (en) | Guide vane device of downhole tool for gas recovery by liquid drainage by eddy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Xi'an Huayang Energy Technology Engineering Co., Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Xi'an Huayang Energy Technology Engineering Co., Ltd. Document name: Notification of Termination of Patent Right |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100616 Termination date: 20120916 |