CN201503375U - Radial loading and testing investment of drilling jack - Google Patents

Radial loading and testing investment of drilling jack Download PDF

Info

Publication number
CN201503375U
CN201503375U CN2009202236511U CN200920223651U CN201503375U CN 201503375 U CN201503375 U CN 201503375U CN 2009202236511 U CN2009202236511 U CN 2009202236511U CN 200920223651 U CN200920223651 U CN 200920223651U CN 201503375 U CN201503375 U CN 201503375U
Authority
CN
China
Prior art keywords
oil cylinder
testing
oil
investment
displacement sensors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202236511U
Other languages
Chinese (zh)
Inventor
袁兆华
李运奎
杜卫长
胡全舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
袁兆华
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 袁兆华 filed Critical 袁兆华
Priority to CN2009202236511U priority Critical patent/CN201503375U/en
Application granted granted Critical
Publication of CN201503375U publication Critical patent/CN201503375U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model relates to a radial loading and testing investment of a drilling jack, which can effectively solve the problems of high testing expense, troublesome operation, poor quality, long cycle and low efficiency. In order to solve the problems, the radial loading and testing investment adopts the technical scheme that the radial loading and testing investment comprises an oil cylinder, displacement sensors and communication cables; an oil feeding nozzle tip and an oil returning nozzle tip are arranged on the oil cylinder; horizontal pistons which stretch into the oil cylinder are uniformly distributed on the periphery of the oil cylinder; a bearing plate is installed at the outer end part of each horizontal piston to form a jack structure sharing one oil cylinder together; junction boxes of the displacement sensors are installed in the center in a sealing chamber inside the oil cylinder; the displacement sensors corresponding to all the horizontal pistons are installed on the junction boxes of the displacement sensors; and the junction boxes of the displacement sensors are led outside through the communication cables. The radial loading and testing investment has the advantages of novel and simple structure, convenient operation, low cost, saved time and labor, high efficiency and accurate testing, and is an innovation on radial pressurized equipment.

Description

Boring lifting jack radial loaded and tester
One, technical field
The utility model relates to the core component of hole diameter to applied voltage test equipment, particularly a kind of boring lifting jack radial loaded and tester.
Two, background technology
In large hydraulic engineering is built, carry out the radially purpose of applied voltage test of tunnel flat jack, be according to tunnel hole week suffered evenly radially the deformation values of internal water pressure and surperficial rock mass inquire into design parameters such as the deformation modulus of rock mass and unit resistance coefficient.Boring lifting jack radial loaded and tester are according to " Hydraulic and Hydro-Power Engineering rock test rules " (SL264-2001) tunnel flat jack computing formula and boundary condition requirement during radially pressurization is tested, to distortion Δ R, calculate rock mass deformation modulus E by the surperficial overall diameter of the hole wall rock mass of the unit pressure P that acts on borehole wall, measurement by following formula 0With the resistance coefficient K of unit 0
E 0 = φP ( 1 + μ ) R ΔR
K 0 = φ · p ΔR · R 100
In the formula:
μ-Poisson ratio;
R-examination hole radius;
φ-distortion correction factor.
The at present domestic above-mentioned parameter that obtains mainly is to adopt radially applied voltage test of tunnel flat jack, excavation test hole, processing experiment equipment, and the installation and checkout of equipment etc. wastes time and energy, and testing expenses reach hundreds thousand of (not containing excavation test hole expense), and experimentation cost is very high; And the test section rock mass need manually add and cut a hole into round hole, deposit concrete piece, and reaction frame and testing tool equipment that pressure-bearing is installed, and deposit concrete and equipment installation procedure be complexity very; Blasting Excavation test hole causes the tunnel country rock to be disturbed, bigger to the test result influence, the installation of environmental baseline such as temperature, humidity and testing apparatus also has to a certain degree influence to test result in the tunnel in addition, and the restriction of tested equipment, can't carry out full section to load; Test normally needs with people more than 20, and the test period is longer, and the time spent reaches 2-3 month (time that does not contain excavation test hole), and the participation testing crew is many, the time is long, efficient is low, thus its improvement and innovate imperative.
Three, utility model content
At above-mentioned situation, for overcoming the defective of prior art, the purpose of the utility model just provides a kind of boring lifting jack radial loaded and tester, the test of carrying out at tunnel changed in the boring finish, can effectively solve the testing expenses height like this, troublesome poeration, test period is long, inefficient problem, the technical scheme of its solution is: include oil cylinder, displacement transducer and communication cable, oil-feed and oil return oil nozzle are arranged on the oil cylinder, the oil cylinder periphery is evenly equipped with and stretches into in-oil cylinder horizontal piston, on each horizontal piston outer end bearing plate is housed, constitute the jack structure of a shared oil cylinder, the displacement transducer terminal box is equipped with at the center in the closed chamber of oil cylinder inner face, be equipped with on the displacement transducer terminal box and the corresponding displacement transducer of each horizontal piston, the displacement transducer terminal box picks out the outside through communication cable.The utility model novel structure, simple, easy to use, expense is low, saving of work and time, efficient height, test accurately, be the radially innovation on the pressurized equipment.
Four, description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is a side view of the present utility model.
Five, embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described in further detail.
Provide by Fig. 1 Fig. 2, the utility model includes oil cylinder, displacement transducer and communication cable, oil-feed and oil return oil nozzle 8 are arranged on the oil cylinder 4, oil cylinder 4 peripheries are evenly equipped with the horizontal piston 2 that stretches in the oil cylinder 4, on each horizontal piston outer end bearing plate 6 is housed, constitute the jack structure of a shared oil cylinder, displacement transducer terminal box 1 is equipped with at the center in the closed chamber 3 of oil cylinder inner face, be equipped with on the displacement transducer terminal box and the corresponding displacement transducer 5 of each horizontal piston, the displacement transducer terminal box picks out the outside through communication cable 7.
In order to guarantee result of use, 8 the bearing plates that outer rim be arc surface of said bearing plate 6 for being made by the aluminum alloy materials of lightweight adopt spherical the connection with horizontal piston 2, by bolt; Said horizontal piston 2 is 8.
Operating position of the present utility model is before boring lifting jack radial loaded and tester installation, displacement transducer 5 is connected with readout instrument by communication cable 7, oil-feed on the hydraulic jack is connected with tensimeter with high-pressure oil pump with oil return oil nozzle 8 usefulness oil pipes, debugs and confirms that instrument and equipment is working properly.
After boring is finished, will hole with drilling rod (or wire rope) and to carry out precompressed after lifting jack radial loaded and tester slowly are put into assigned address, the precompressed value is 5% of a maximum test pressure value.Exert pressure to the full section of borehole wall step by step according to testing regulations.When different pressures articulates bearing plate 6 and acts on borehole wall by lifting jack, record horizontal piston 2 strokes by displacement transducer 5, just hole wall rock mass radial-deformation is passed to readout instrument by communication cable 7, reading of data.
The utility model boring lifting jack radial loaded and tester are to design by φ 60cm boring aperture, diameter and height ratio 1: 1, by changing plug-in bearing plate and being connected catcher, also can in big diameter boreholes such as aperture φ 70cm, φ 80cm, φ 90cm, φ 100cm, test.Plug-in bearing plate (all highly are 60cm) adopts ball-type to be connected with horizontal piston, by bolt.In order to reduce weight of equipment, consider that bearing plate adopts the aluminum alloy materials processing of lightweight.
Test loads by 8 horizontal pistons of boring lifting jack radial loaded and tester and bears, and the design nominal output is 4800kN, and the horizontal piston range is 20mm, maximum working pressure (MWP) 34MPa, horizontal piston diameter 150mm.In the boring in above-mentioned different apertures, act on hole wall scar stress and see the following form 1.
The different aperturings of table 1 are in hole wall scar stress level
Figure G2009202236511D00031
In the closed chamber of boring lifting jack radial loaded and tester, 8 corresponding horizontal pistons with each of displacement transducer are fixedly connected, are used for surveying interior 8 direction hole walls rock mass deformation of reading to hole.In sealing fixation of sensor pedestal of indoor design and terminal box, consider that the closed chamber space is limited, with steel chord type displacement transducer (needing customized specially).Displacement transducer standard range 20mm, accuracy requirement 0.1%F.S.
The utility model is with reference to tunnel flat jack pressurization test design radially, the test that in 2m test hole, loads with flat jack, be placed in the boring that the aperture is 0.6-1.0m, adopting boring lifting jack radial loaded and tester to finish loads and deformation measurement, to match with other equipment in test, comprise oil pump, tensimeter, displacement transducer, readout instrument, equipment fixed mount etc., in the present embodiment, be to design by φ 60cm boring aperture, diameter and height ratio 1: 1, by changing plug-in bearing plate and being connected catcher, also can be at aperture φ 70cm, φ 80cm, φ 90cm, test in the borings such as φ 100cm, wide application, convenient, flexible, testing expenses are low, test figure is accurate, saving of work and time, economic and social benefit is remarkable.

Claims (4)

1. boring lifting jack radial loaded and tester, include oil cylinder, displacement transducer and communication cable, oil-feed and oil return oil nozzle (8) are arranged on the oil cylinder (4), it is characterized in that, oil cylinder (4) periphery is evenly equipped with the horizontal piston (2) that stretches in the oil cylinder (4), each horizontal piston (2) is equipped with bearing plate (6) on the outer end, constitute the jack structure of a shared oil cylinder, displacement transducer terminal box (1) is equipped with at the center in the closed chamber (3) of oil cylinder inner face, be equipped with on the displacement transducer terminal box (1) and the corresponding displacement transducer of each horizontal piston (2) (5), displacement transducer terminal box (1) picks out the outside through communication cable (7).
2. boring lifting jack radial loaded according to claim 1 and tester is characterized in that, said bearing plate (6) is 8 bearing plates of arc surface for the outer rim of being made by the aluminum alloy materials of lightweight.
3. boring lifting jack radial loaded according to claim 1 and tester is characterized in that, said bearing plate (6) adopts spherical the connection with horizontal piston (2), by bolt.
4. boring lifting jack radial loaded according to claim 1 and tester is characterized in that, said horizontal piston (2) is 8.
CN2009202236511U 2009-09-22 2009-09-22 Radial loading and testing investment of drilling jack Expired - Lifetime CN201503375U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202236511U CN201503375U (en) 2009-09-22 2009-09-22 Radial loading and testing investment of drilling jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202236511U CN201503375U (en) 2009-09-22 2009-09-22 Radial loading and testing investment of drilling jack

Publications (1)

Publication Number Publication Date
CN201503375U true CN201503375U (en) 2010-06-09

Family

ID=42454307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202236511U Expired - Lifetime CN201503375U (en) 2009-09-22 2009-09-22 Radial loading and testing investment of drilling jack

Country Status (1)

Country Link
CN (1) CN201503375U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864944A (en) * 2010-05-14 2010-10-20 中国科学院武汉岩土力学研究所 Drilling hole transverse perforation device of rock destruction characteristic and ground stress parameter measurement
CN101949288A (en) * 2010-08-16 2011-01-19 黄河勘测规划设计有限公司 Direct-shear measuring method of drilling rock mass specimen preparation
CN108331044A (en) * 2018-04-19 2018-07-27 南通蓝岛海洋工程有限公司 A kind of deformation of steel-pipe pile reinforces and detection device
CN108362566A (en) * 2018-01-05 2018-08-03 南方科技大学 A kind of high throughput creep test device load loading system and compression creep equipment
CN109946159A (en) * 2019-04-24 2019-06-28 天地科技股份有限公司 Coal body elasticity modulus in-situ measurement device
CN111912718A (en) * 2020-09-03 2020-11-10 铁科院(深圳)研究设计院有限公司 Multi-type loading surface loading equipment
CN112710536A (en) * 2020-12-14 2021-04-27 广东省水利水电科学研究院 Cement soil compressive strength quality detection device and test method
CN112730074A (en) * 2020-12-14 2021-04-30 广东省水利水电科学研究院 Plastic concrete compressive strength quality detection device and test method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864944A (en) * 2010-05-14 2010-10-20 中国科学院武汉岩土力学研究所 Drilling hole transverse perforation device of rock destruction characteristic and ground stress parameter measurement
CN101949288A (en) * 2010-08-16 2011-01-19 黄河勘测规划设计有限公司 Direct-shear measuring method of drilling rock mass specimen preparation
CN101949288B (en) * 2010-08-16 2013-03-13 黄河勘测规划设计有限公司 Direct-shear measuring method of drilling rock mass specimen preparation
CN108362566A (en) * 2018-01-05 2018-08-03 南方科技大学 A kind of high throughput creep test device load loading system and compression creep equipment
CN108331044A (en) * 2018-04-19 2018-07-27 南通蓝岛海洋工程有限公司 A kind of deformation of steel-pipe pile reinforces and detection device
CN109946159A (en) * 2019-04-24 2019-06-28 天地科技股份有限公司 Coal body elasticity modulus in-situ measurement device
CN111912718A (en) * 2020-09-03 2020-11-10 铁科院(深圳)研究设计院有限公司 Multi-type loading surface loading equipment
CN112710536A (en) * 2020-12-14 2021-04-27 广东省水利水电科学研究院 Cement soil compressive strength quality detection device and test method
CN112730074A (en) * 2020-12-14 2021-04-30 广东省水利水电科学研究院 Plastic concrete compressive strength quality detection device and test method

Similar Documents

Publication Publication Date Title
CN201503375U (en) Radial loading and testing investment of drilling jack
CN104133050B (en) Porous rock effective stress coefficient and porosity method of testing simultaneously under stress condition
CN202330236U (en) Rock mechanical test device under gas seepage-creep combined action
CN104089826B (en) The test device of soil body compression modulus and intensity and method of testing thereof in deep hole
CN101532930B (en) Pile model power-cycle test system
CN202522465U (en) Multielement pile foundation simulation test box
CN103076270A (en) Toroidal fissured rock sample, MHC coupled seepage experimental device of sample and use method of device
CN102494981A (en) Device for testing gas seepage and creepage coupling action of rocks
CN107101875A (en) The universal high pressure confined pressure calibration instrument of many bores of hollow inclusion geostress survey self sealss
CN103398902A (en) Test apparatus for flexible loading and instantaneously unloading of high geostress, and test method
CN103868799A (en) Rock mechanical characteristic analyzer for non-conventional oil-gas reservoir stratum
CN104359607B (en) A kind of testing arrangement and method of testing of composite explosives acting ability
CN103076225A (en) Triaxial test device for asphalt mixture and test method
CN110411823A (en) Frameless rock triaxial tests instrument and working method
CN103278380A (en) High-temperature external pressure device for petroleum tubular good full-scale evaluation
CN106644689B (en) A kind of adjustable lateral pressure loading device and its test method for the test of rock twin shaft
CN107255598B (en) Confining pressure device for enabling soil sample to be taken out easily in Hopkinson test
CN204154579U (en) The proving installation of soil body compression deformation modulus and intensity in a kind of deep hole
CN201247116Y (en) High-ground stress quasi-3D visible model testing bench frame apparatus
CN104677631B (en) Hydraulic pressure device for measuring force, system and its measuring method of intermediate bearing
CN101435206A (en) Pile body self-rebound force balance loading case
CN202547876U (en) Reverse self-locking compression device
CN112326476A (en) Testing method and device for rock multi-field coupling rheological test under action of dynamic load
CN2432546Y (en) Rock mass three-dimensional pressure monitor
CN109682738B (en) Surveying device and surveying method for mineral resource permeability

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YELLOW RIVER ENGINEERING CONSULTING CO., LTD.

Free format text: FORMER OWNER: YUAN ZHAOHUA

Effective date: 20110217

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yuan Zhaohua

Inventor after: Li Yunkui

Inventor after: Du Weichang

Inventor after: Hu Quanzhou

Inventor after: Fang Jingnian

Inventor after: Liu Zhe

Inventor before: Yuan Zhaohua

Inventor before: Li Yunkui

Inventor before: Du Weichang

Inventor before: Hu Quanzhou

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YUAN ZHAOHUA LI YUNKUI DU WEIZHANG HU QUANZHOU TO: YUAN ZHAOHUA LI YUNKUI DU WEIZHANG HU QUANZHOU FANG JINGNIAN LIU ZHE

Free format text: CORRECT: ADDRESS; FROM: 450003 HUANGHE SURVEY PLANNING AND DESIGN RESEARCH INSTITUTE CO., LTD., NO. 109, JINSHUI ROAD, ZHENGZHOU CITY, HE'NAN PROVINCE TO: 450003 NO. 109, JINSHUI ROAD, ZHENGZHOU CITY, HE'NAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110217

Address after: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee after: Yellow River Engineering Consulting Co., Ltd.

Address before: 109 Research Institute of the Yellow River survey and Design Co., Ltd., Jinshui Road, Henan, Zhengzhou 450003

Patentee before: Yuan Zhaohua

CX01 Expiry of patent term

Granted publication date: 20100609

CX01 Expiry of patent term