CN201502869U - Adhesive centralized control system - Google Patents

Adhesive centralized control system Download PDF

Info

Publication number
CN201502869U
CN201502869U CN2009202238019U CN200920223801U CN201502869U CN 201502869 U CN201502869 U CN 201502869U CN 2009202238019 U CN2009202238019 U CN 2009202238019U CN 200920223801 U CN200920223801 U CN 200920223801U CN 201502869 U CN201502869 U CN 201502869U
Authority
CN
China
Prior art keywords
pipe
tackiness agent
jar
pressure
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202238019U
Other languages
Chinese (zh)
Inventor
王爱成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxiang East Industry Science and Technology Co Ltd
Original Assignee
Xinxiang East Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxiang East Industry Science and Technology Co Ltd filed Critical Xinxiang East Industry Science and Technology Co Ltd
Priority to CN2009202238019U priority Critical patent/CN201502869U/en
Application granted granted Critical
Publication of CN201502869U publication Critical patent/CN201502869U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an adhesive centralized control system which comprises a PLC controller. A level switch is fixed on an adhesive injecting container. A material delivery pump is communicated with the adhesive injecting container via a pipeline. Two material delivery pipes which are led out from the pipeline are respectively communicated with A and B temporary storage cans. One discharging pipe which is led out from each material delivery pipe is communicated with an increment pump. The discharging pipe is provided with A and B discharging valves. Sensors which are installed on the top ends of the A and B temporary storage cans are communicated with an input point of the PLC. An emptying opening on one side of the A and B temporary storage cans is connected with an emptying pipe in order to be communicated with a compressed air pipe. The other path is communicated with the emptying pipe. The other end of a booster pump is communicated with a high-pressure temporary storage can via a booster pipe. A pressure sensor is installed at the inlet of the high-pressure temporary storage can and is communicated with a main delivery pipeline via a pipe. An adhesive outlet pipe which is connected on the main delivery pipeline is connected with an adhesive outlet. The pressure sensor is installed on the pipe at the outlet of a pressure temporary storage can.

Description

The tackiness agent centralized control system
Technical field:
The utility model discloses a kind of tackiness agent centralized control system, is specially adapted to the automation control system of tobacco production industry adhesive application.
Background technique:
In each production and processing link of tobacco production industry, all need a large amount of different types of tackiness agents to carry out bonding at present.Because equipment manufacturers are for the facility of separate unit supply equipment, the manufacturing mechanism of current tobacco business all is that separate unit is integrated using tackiness agent to use the unit, the control system that lacks tackiness agent causes that to need the special messenger when producing be that the tackiness agent of every equipment uses point to add and clears up.Increase working strength of workers, and tackiness agent can not add quantitatively, remaining tackiness agent may cause waste, the consumption of tackiness agent to be not easy to statistics owing to rotten, increases cost of production.
Summary of the invention:
Task of the present utility model is to propose a kind of separate unit service that do not need manually to go, reduce a kind of tackiness agent centralized control system of labor intensity, task of the present utility model is finished like this, it comprises the PLC controller, it is characterized in that: stuff level switch is fixed on the tackiness agent filling container, material-handling pump is connected by pipeline and bonding charging point, draw on its pipeline two Material pipelines respectively with A, B connects for temporary jar, drawing a drainage conduit on the Material pipeline again respectively is communicated with the increase pump, on its drainage conduit A is housed, B jar blow-off valve, the input point that be equipped with on sensor and the PLC on the top that AB is temporary jar is connected, temporary jar of side of AB has and is connected with emptying pipe and compressed air hose connection on the evacuation port, another Lu Yuyu emptying pipe is connected, the other end of suction booster is connected for temporary jar by pressure inlet and high pressure, pressure transducer is contained in the ingress of temporary jar of high pressure and connects by pipe and main delivery pipe, be connected to the tackiness agent outer pipe on the main delivery pipe and link to each other, on the pipe in pressure buffer tank outlet port pressure transducer is housed with the tackiness agent outlet.On the Material pipeline of the temporary jar inlet of A, B A, B jar feeding valve are housed respectively, on the emptying pipe that A, B are temporary jar A, B jar exhaust-valve and pressure charging valve are housed respectively, high-pressure buffer valve and tackiness agent supply valve are housed on the tackiness agent outer pipe.The utlity model has following effect: the pretreatment of described tackiness agent and storage are by adopting the PLC controller, relevant temperature, pressure, flow transducer are as the observing and controlling condition, drive the tackiness agent pump by the binder materials suction pre-processing device of system's suction port with correspondence, pretreatment system carries out pretreatment by the processing mode that presets to tackiness agent, and it is stand-by that the tackiness agent after pretreatment is finished sucks memory device.And by the PROFIBUS-DP Field bus with use point to carry out communication, statistics is used the work state information of point.Described tackiness agent uses the monitoring of point and the supply of tackiness agent to adopt PLC controller, relevant control switch, pressure monitor sensor to use the state of point.And be connected with pretreatment system by the PROFIBUS-DP Field bus.After the tackiness agent that receives pretreatment system is ready to signal, according to the supply of the state opening and closing of using point to the tackiness agent that uses point.
Description of drawings:
Fig. 1 is a structural representation of the present utility model
Fig. 2 is the structural representation that tackiness agent uses point;
Drawing explanation: 1, emptying pipe, 2, compressed air hose, 3, A jar exhaust-valve, 4, A jar pressure charging valve, 5, B jar exhaust-valve, 6, B jar pressure charging valve, 7, sensor, 8, sensor, 9, A jar feeding valve, 10, A jar blow-off valve, 11, B jar feeding valve, 12, B jar blow-off valve, 13, material-handling pump, 14, tackiness agent filling container, 15, stuff level switch, 16, suction booster, 17, the supercharging feeding valve, 18, temporary jar of A, 19, temporary jar of B, 20, temporary jar of high pressure, 21, main delivery pipe, 22, pressure transducer, 23, the pressure buffer tank, 24, the high-pressure buffer valve, 25, pressure transducer, 26, the tackiness agent supply valve, 27, the tackiness agent outlet.
Embodiment:
Describe embodiment in detail in conjunction with above accompanying drawing: stuff level switch 15 is fixed on the tackiness agent filling container 14, be connected with pipeline on the tackiness agent filling container, be connected with a material-handling pump 13 on it, send conveyance conduit to draw two supply pipes from thing and be connected with A respectively, temporary jar 18 of B, 19 at A, on the materail tube of the inlet that B is temporary jar A is housed respectively, B jar feeding valve 9,11, draw a drainage conduit and suction booster 16 connections on the Material pipeline again respectively, on its drainage conduit A is housed, B jar blow-off valve 10,12, A, A is equipped with on the top that B is temporary jar, B sensor 7,8 go up input point with PLC connects, A, the side that B is temporary jar has an evacuation port, connect by emptying pipe and compressed air hose 2, another road and emptying pipe 1 are connected, A, be respectively equipped with A on the emptying pipe that B is temporary jar, B jar exhaust-valve 3,5 and pressure charging valve 4,6, the other end is connected for temporary jar 20 by pressure inlet and high pressure on the suction booster, and pressure transducer 22 is contained in the ingress of temporary jar of high pressure and connects by pipe and main delivery pipe 21.Main sending being connected to the tackiness agent outer pipe and connecting with tackiness agent outlet 27 on the pipeline 21, the pipe on pressure surge tank 23 (see figure 2)s export is contained in the centre of high-pressure buffer valve 24 and tackiness agent supply valve 26, at the end of pipe pressure transducer 25 is housed.When system moves, by manually adding tackiness agent to tackiness agent filling point 14, system PLC judges through the stuff level switch 15 of tackiness agent filling point: A keeps in jar 18 charging flow processs, closes blow-off valve 10, close feeding valve 11, open feeding valve 9, close pressure charging valve 4, open exhaust-valve 3 and start material-handling pump 13, tackiness agent is sucked a temporary jar A18, when sensor 7 detects material level and reaches, close feeding valve 9, close material-handling pump 13, close exhaust-valve 3, the temporary jar charging of A finishes, and enters preprocessing process.The working method that B is temporary jar 19 is identical with the temporary jar of A to be to carry out carrying out alternation with the temporary jar of A in order to raise the efficiency.Keep in jar 18 workflows through flow process, the A that carries out the board high-pressure delivery after the pretreatment: open blow-off valve 10 and open pressure charging valve 4, start suction booster 16, open supercharging feeding valve 17, be transported to high pressure temporary jar 20, when pressure transducer 22 detects pressure and reaches predetermined value, close feeding valve 17, close suction booster 16, be transported to each tackiness agent by main delivery pipe 21 and use point.The process of the storage of higher pressures above when pressure transducer 22 detects the pressure reduction, repeating.Tackiness agent uses the workflow (accompanying drawing 2) of point: carry 21 by main, arrive the tackiness agent that uses point and use the subordinate machine system of point by using the some opening and closing, open the time stage system when extension set and open high-pressure buffer valve 24, tackiness agent enters pressure surge tank 23, behind the predefined value that reaches pressure transducer 25, close the high-pressure buffer valve, simultaneously according to the control opening and closing tackiness agent supply valve 26 that uses point sensor.

Claims (2)

1. tackiness agent centralized control system, it comprises the PLC controller, it is characterized in that: stuff level switch is fixed on the tackiness agent filling container, material-handling pump is connected by pipeline and bonding charging point, draw on its pipeline two Material pipelines respectively with A, B connects for temporary jar, drawing a drainage conduit on the Material pipeline again respectively is communicated with the increase pump, on its drainage conduit A is housed, B jar blow-off valve, the input point that be equipped with on sensor and the PLC on the top that AB is temporary jar is connected, temporary jar of side of AB has and is connected with emptying pipe and compressed air hose connection on the evacuation port, another Lu Yuyu emptying pipe is connected, the other end of suction booster is connected for temporary jar by pressure inlet and high pressure, pressure transducer is contained in the ingress of temporary jar of high pressure and connects by pipe and main delivery pipe, be connected to the tackiness agent outer pipe on the main delivery pipe and link to each other, on the pipe in pressure buffer tank outlet port pressure transducer is housed with the tackiness agent outlet.
2. tackiness agent centralized control system according to claim 1, it is characterized in that: on the Material pipeline of the temporary jar inlet of A, B A, B jar feeding valve are housed respectively, on the emptying pipe that A, B are temporary jar A, B jar exhaust-valve and pressure charging valve are housed respectively, high-pressure buffer valve and tackiness agent supply valve are housed on the tackiness agent outer pipe.
CN2009202238019U 2009-09-27 2009-09-27 Adhesive centralized control system Expired - Fee Related CN201502869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202238019U CN201502869U (en) 2009-09-27 2009-09-27 Adhesive centralized control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202238019U CN201502869U (en) 2009-09-27 2009-09-27 Adhesive centralized control system

Publications (1)

Publication Number Publication Date
CN201502869U true CN201502869U (en) 2010-06-09

Family

ID=42453802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202238019U Expired - Fee Related CN201502869U (en) 2009-09-27 2009-09-27 Adhesive centralized control system

Country Status (1)

Country Link
CN (1) CN201502869U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388745A (en) * 2012-05-10 2013-11-13 攀钢集团攀枝花钢铁研究院有限公司 Liquid-containing binder supply device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388745A (en) * 2012-05-10 2013-11-13 攀钢集团攀枝花钢铁研究院有限公司 Liquid-containing binder supply device
CN103388745B (en) * 2012-05-10 2015-06-03 攀钢集团攀枝花钢铁研究院有限公司 Liquid-containing binder supply device

Similar Documents

Publication Publication Date Title
CN101842305A (en) Method and apparatus in a vacuum conveying system of material
CN202377164U (en) Conveying system of slurry for coating
CN202021502U (en) Water supply system for numerical control machine
CN202057464U (en) Mold water delivery detection machine
CN101661287B (en) Adhesive centralized control system
CN201842507U (en) Concentrated phase pneumatic conveying self-diagnosis self-removal dredging system
CN201502869U (en) Adhesive centralized control system
CN201817102U (en) Powder slurry conveying device
CN206827630U (en) A kind of Pneumatic Sample Transfer Machine
CN204197995U (en) A kind of diaphragm type powder delivery system
CN208070831U (en) A kind of zinc abstraction calcine trans-portation device
CN101934936A (en) Powder slurry delivering device
CN201339814Y (en) Full-automatic liquid conveying device
CN207996870U (en) The clear bottom system of slurry tank
CN202361080U (en) Intelligent control system for recycling of applied essence liquid
CN201224624Y (en) Combined type cone pump for pneumatic convey
CN2937766Y (en) Automatic integral supply device of liquid auxiliary material
CN212384214U (en) Cleaning device for pipeline of concentrating mill
CN101265591B (en) System and method for pneumatic conveying of fluoride salt to aluminum cell
CN212424654U (en) Powdery material feeding device
CN2709396Y (en) Ultrafine powder pneumatic conveying device
CN204923807U (en) Hot -blast recovery system of section secondary input
CN101244543A (en) Sanding system of container soldering joint
CN101293598B (en) Combined cone pump feed method and apparatus for pneumatic transmission
CN103464325B (en) A kind of gas control flush coater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100609

Termination date: 20100927