CN212424654U - Powdery material feeding device - Google Patents

Powdery material feeding device Download PDF

Info

Publication number
CN212424654U
CN212424654U CN202021617201.3U CN202021617201U CN212424654U CN 212424654 U CN212424654 U CN 212424654U CN 202021617201 U CN202021617201 U CN 202021617201U CN 212424654 U CN212424654 U CN 212424654U
Authority
CN
China
Prior art keywords
metering
valve
sending pump
pressure transmitter
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021617201.3U
Other languages
Chinese (zh)
Inventor
马振刚
潘德仁
陈敏敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Cleansky Environment Protection Technology Co ltd
Original Assignee
Tianjin Cleansky Environment Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Cleansky Environment Protection Technology Co ltd filed Critical Tianjin Cleansky Environment Protection Technology Co ltd
Priority to CN202021617201.3U priority Critical patent/CN212424654U/en
Application granted granted Critical
Publication of CN212424654U publication Critical patent/CN212424654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Transport Of Granular Materials (AREA)

Abstract

The application provides a powdery material feeding device, which comprises a storage bin and a metering sending pump, wherein a feeding valve is connected between the bottom of the storage bin and the top of the metering sending pump, and the storage bin is communicated with the metering sending pump through a first air valve; the metering and sending pump is provided with a first pressure transmitter and a material level meter; the side wall of the metering and sending pump is connected with a discharge pipeline, the discharge pipeline is connected with a discharge valve communicated with the metering and sending pump, and a second pressure transmitter is arranged on the discharge pipeline; the bottom of the metering sending pump is connected with a second air valve communicated with the air source main pipeline, a third air valve communicated with the air source main pipeline is arranged on the discharging pipeline, and a third pressure transmitter is arranged on the air source main pipeline. The beneficial effect of this application is: the metering bin and the sending bin are combined into a metering sending pump, so that the overall height of the equipment is reduced, the structure of the equipment is simplified, and the construction cost is reduced; the material can be effectively prevented from flowing backwards according to the air pressure monitoring of each pressure transmitter.

Description

Powdery material feeding device
Technical Field
The utility model relates to a powdery material feeding technical field, concretely relates to powdery material feeding device.
Background
But automatic material conveying device of measurement and continuous transport powdery material, its material volume that adds realizes through the volume measurement mode, and this kind of measurement mode includes measurement storehouse and sends the storehouse, stores the storehouse and sets up in the top of measurement storehouse, and conveyor installs in the bottom of storing the storehouse, because the measurement structure adopts two storehouse designs, so the whole height requirement of storing the storehouse is high, and the design load requirement is high, and the cost increases correspondingly. And because the feeding device equipment is more among the prior art, highly higher can not become the sled equipment, needs the site to be special constructor to carry out the construction, and site work volume is big, and the operation maintenance cost is high.
Disclosure of Invention
The utility model provides a powdery material feeding device is provided to above problem.
In a first aspect, the application provides a powdery material feeding device, which comprises a storage bin and a metering and sending pump, wherein the metering and sending pump is arranged below the storage bin, a feeding valve is connected between the bottom of the storage bin and the top of the metering and sending pump, and the storage bin is communicated with the metering and sending pump through a first air valve; the metering and sending pump is provided with a first pressure transmitter and a material level meter; the side wall of the metering and sending pump is connected with a discharge pipeline, the discharge pipeline is connected with a discharge valve communicated with the metering and sending pump, and a second pressure transmitter is arranged on the discharge pipeline; the bottom of the metering sending pump is connected with a second air valve communicated with the air source main pipeline, a third air valve communicated with the air source main pipeline is arranged on the discharge pipeline, and a third pressure transmitter is arranged on the air source main pipeline.
According to the technical scheme that this application embodiment provided, still include the controller, the controller configuration is used for control the opening or closing of feed valve, bleeder valve, first pneumatic valve, second pneumatic valve and third pneumatic valve is used for receiving the signal of first pressure transmitter, second pressure transmitter, third pressure transmitter and charge level indicator.
According to the technical scheme that this application embodiment provided, feed valve, bleeder valve and first air valve set up to two valve structures.
According to the technical scheme that this application embodiment provided, third pressure transmitter is connected with the controller electricity, pressure data transmission in the air supply trunk line that third pressure transmitter will detect to the controller.
According to the technical scheme provided by the embodiment of the application, the storage bin, the metering sending pump and the controller are integrated in the prying block.
According to the technical scheme provided by the embodiment of the application, the controller is set to be a PLC controller.
The invention has the beneficial effects that: the application provides a powdery material feeding device, which integrates a metering bin and a sending bin into a metering sending pump, so that the overall height of equipment is reduced, the structure of the equipment is simplified, and the construction cost is reduced; according to the air pressure monitoring of each pressure transmitter, the material in the discharging pipeline can be effectively prevented from flowing back to the storage bin through timely switching the material injection or discharging process, and the working stability of the whole set of equipment is ensured.
Drawings
FIG. 1 is a schematic structural diagram of a first embodiment of the present application;
FIG. 2 is a flow chart of a second embodiment of the present application;
the text labels in the figures are represented as: 100. a storage bin; 200. a metering delivery pump; 310. a feed valve; 320. a discharge valve; 410. a first air valve; 420. a second air valve; 430. a third air valve; 510. a first pressure transmitter; 520. a second pressure transmitter; 530. a third pressure transmitter; 600. a level gauge; 700. a discharge pipeline; 800. and a controller.
Detailed Description
In order that those skilled in the art will better understand the technical solutions of the present invention, the following detailed description of the present invention is provided in conjunction with the accompanying drawings, and the description of the present section is only exemplary and explanatory, and should not be construed as limiting the scope of the present invention in any way.
Fig. 1 is a schematic diagram of a first embodiment of the present application, which includes a storage bin 100 and a metering and sending pump 200, wherein the metering and sending pump 200 is disposed below the storage bin 100, a feeding valve 310 is connected between the bottom of the storage bin 100 and the top of the metering and sending pump 200, and the storage bin 100 is communicated with the metering and sending pump 200 through a first gas valve 410; the metering and sending pump 200 is provided with a first pressure transmitter 510 and a level indicator 600; the side wall of the metering and sending pump 200 is connected with a discharge pipeline 700, the discharge pipeline 700 is connected with a discharge valve 320 communicated with the metering and sending pump 200, and a second pressure transmitter 520 is arranged on the discharge pipeline 700; the bottom of the metering sending pump 200 is connected with a second air valve 420 communicated with an air source main pipeline, a third air valve 430 communicated with the air source main pipeline is arranged on the discharging pipeline 700, and a third pressure transmitter 530 is arranged on the air source main pipeline.
In this embodiment, the metering bin and the delivery bin in the prior art are combined into the metering delivery pump 200, so that the overall height of the equipment is reduced, the structure of the equipment is simplified, the manufacturing cost is saved, the overall integration of the equipment on a skid block is possible, and the construction steps on a construction site are simplified. Acquire the atmospheric pressure numerical value in the measurement delivery pump 200 through first pressure change ware, acquire the atmospheric pressure numerical value in the ejection of compact pipeline 700 through second pressure transmitter 520, acquire the atmospheric pressure numerical value in the air supply trunk line through third pressure transmitter 530, the process of reinforced and the ejection of compact is switched through the atmospheric pressure numerical value of each monitoring to make equipment stabilize reinforced and ejection of compact work.
In a preferred embodiment, the system further comprises a controller 800, wherein the controller 800 is configured to control the opening or closing of the inlet valve 310, the outlet valve 320, the first gas valve 410, the second gas valve 420 and the third gas valve 430, and is configured to receive signals of the first pressure transmitter 510, the second pressure transmitter 520, the third pressure transmitter 530 and the level gauge 600. In the preferred embodiment, the controller 800 is used as a control center of the whole set of equipment, and can control each valve and receive the detection data of each transmitter. Preferably, the controller 800 is provided as a PLC controller 800. In this embodiment, the third pressure transmitter 530 is electrically connected to the controller 800, and the third pressure transmitter 530 transmits the detected pressure data in the main air source pipeline to the controller 800.
In a preferred embodiment, the inlet valve 310, the outlet valve 320, and the first gas valve 410 are provided in a dual valve configuration. In this embodiment, because the discharging pipeline 700 is communicated with the main air source pipeline through the third air valve 430, pressure is always present in the discharging pipeline 700, and the material can be effectively prevented from flowing back to the storage bin 100 through the pressure difference control between the discharging pipeline 700 and the main air source pipeline and the double-valve structural design of the feeding valve 310, the discharging valve 320 and the first air valve 410, so that the normal operation of the device is affected.
In a preferred embodiment, the storage bin 100, the metering and dispensing pump 200, and the controller 800 are integrated within a skid. In the preferred embodiment, all parts of the equipment are integrated in the prying block, so that the equipment is convenient to integrate, transfer and install, the workload of field construction is reduced, and the working efficiency is improved.
Fig. 2 is a flowchart of a second embodiment of the present application, and the present embodiment is a control method for the first embodiment, including the following steps:
and S1, opening the feeding valve and the first gas valve.
After the feeding valve and the first air valve are opened, the powdery material in the storage bin enters the metering and sending pump under the action of gravity.
And S2, receiving the volume signal in the metering sending pump of the level gauge.
As material enters the metering and sending pump, a level gauge arranged at a set position senses the volume of the material in the metering and sending pump.
And S3, closing the feeding valve and the first air valve when the volume signal reaches the first set value.
When the volume of the material in the metering and sending pump reaches a first set value, the volume of the material in the metering and sending pump reaches the feeding volume, and the feeding valve and the first air valve are closed at the moment, so that the storage bin does not feed the material into the metering and sending pump any more.
And S4, opening the second air valve and the third air valve.
And S5, receiving a first air pressure signal in the metering sending pump sent by the first pressure transmitter.
And after the second air valve is opened, the air source in the main air source pipeline is introduced into the metering sending pump, and a first pressure regulator arranged on the metering sending pump detects a first air pressure signal in the metering sending pump.
And S6, when the first air pressure signal reaches a second set value, the discharge valve is opened.
When the air pressure value in the metering sending pump reaches a second set value, the metering sending pump has a discharging condition, and the discharging valve is opened, so that the material in the metering sending pump flows into the discharging pipeline.
And S7, receiving a second air pressure signal in the discharge pipeline sent by the second pressure transmitter.
And S8, when the difference value between the second air pressure signal and the first air pressure signal reaches a third set value, closing the discharge valve, the second air valve and the third air valve.
When the pressure difference between the air pressure in the discharging pipeline and the air pressure in the metering sending pump reaches a third set value, the discharging cycle is ended, and the metering sending pump outputs materials with set volume outwards, so that the discharging valve, the second air valve and the third air valve are closed.
In a preferred embodiment, the opening the inlet valve and the first gas valve further comprises the following steps:
receiving a third air pressure signal in the main air source pipeline sent by a third pressure transmitter;
receiving a second air pressure signal in the discharge pipeline sent by a second pressure transmitter;
and when the numerical value of the third air pressure signal is greater than that of the second air pressure signal, the feeding valve and the first air valve are opened.
The principles and embodiments of the present application are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts of the present application. The foregoing is only a preferred embodiment of the present application, and it should be noted that there are objectively infinite specific structures due to the limited character expressions, and it will be apparent to those skilled in the art that a plurality of modifications, decorations or changes may be made without departing from the principle of the present application, and the technical features described above may be combined in a suitable manner; such modifications, variations, combinations, or adaptations of the invention using its spirit and scope, as defined by the claims, may be directed to other uses and embodiments, or may be learned by practice of the invention.

Claims (6)

1. The powdery material feeding device is characterized by comprising a storage bin (100) and a metering and sending pump (200), wherein the metering and sending pump (200) is arranged below the storage bin (100), a feeding valve (310) is connected between the bottom of the storage bin (100) and the top of the metering and sending pump (200), and the storage bin (100) is communicated with the metering and sending pump (200) through a first air valve (410);
the metering and sending pump (200) is provided with a first pressure transmitter (510) and a level indicator (600);
the side wall of the metering sending pump (200) is connected with a discharge pipeline (700), the discharge pipeline (700) is connected with a discharge valve (320) communicated with the metering sending pump (200), and a second pressure transmitter (520) is arranged on the discharge pipeline (700);
the bottom of the metering sending pump (200) is connected with a second air valve (420) communicated with the air source main pipeline, a third air valve (430) communicated with the air source main pipeline is arranged on the discharging pipeline (700), and a third pressure transmitter (530) is arranged on the air source main pipeline.
2. The powdery material feeding device according to claim 1, further comprising a controller (800), wherein the controller (800) is configured to control the opening or closing of the feeding valve (310), the discharging valve (320), the first air valve (410), the second air valve (420) and the third air valve (430), and to receive signals of the first pressure transmitter (510), the second pressure transmitter (520), the third pressure transmitter (530) and the level gauge (600).
3. Powdered material feeding device according to claim 1, characterized in that the inlet valve (310), the outlet valve (320) and the first air valve (410) are arranged in a double valve structure.
4. Powdery material feeding device according to claim 2, characterized in that the third pressure transmitter (530) is electrically connected to the controller (800), the third pressure transmitter (530) transmitting detected pressure data in the main gas source pipe to the controller (800).
5. Powdered material feeding device according to claim 2, characterized in that the storage bin (100), the metering and sending pump (200) and the controller (800) are integrated in a skid.
6. The powdery material feeding device according to claim 2, wherein the controller (800) is provided as a PLC controller.
CN202021617201.3U 2020-08-06 2020-08-06 Powdery material feeding device Active CN212424654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021617201.3U CN212424654U (en) 2020-08-06 2020-08-06 Powdery material feeding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021617201.3U CN212424654U (en) 2020-08-06 2020-08-06 Powdery material feeding device

Publications (1)

Publication Number Publication Date
CN212424654U true CN212424654U (en) 2021-01-29

Family

ID=74274712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021617201.3U Active CN212424654U (en) 2020-08-06 2020-08-06 Powdery material feeding device

Country Status (1)

Country Link
CN (1) CN212424654U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113086648A (en) * 2021-04-12 2021-07-09 浙江中创科联智能装备技术有限公司 Conveying and metering device for powder auxiliaries for printing and dyeing industry
CN114056938A (en) * 2020-08-06 2022-02-18 天津科林斯凯环保科技有限公司 Powdery material feeding device and feeding control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114056938A (en) * 2020-08-06 2022-02-18 天津科林斯凯环保科技有限公司 Powdery material feeding device and feeding control method
CN113086648A (en) * 2021-04-12 2021-07-09 浙江中创科联智能装备技术有限公司 Conveying and metering device for powder auxiliaries for printing and dyeing industry
CN113086648B (en) * 2021-04-12 2022-07-12 浙江中创科联智能装备技术有限公司 Conveying and metering device for powder auxiliaries for printing and dyeing industry

Similar Documents

Publication Publication Date Title
CN212424654U (en) Powdery material feeding device
CN102145814A (en) Safe energy-saving pneumatic ash removal system
CN201520548U (en) Pneumatic pressure delivering device capable of automatic weighing
CN203568486U (en) Pneumatic conveying device
CN201729280U (en) Pneumatic feeding milk powder metering and filling machine
CN201722127U (en) Multi-head liquid filling machine based on electronic weighing
CN202214012U (en) Pneumatic conveying device
CN108147133A (en) A kind of silicone sealant raw material intelligence transport system for building
CN102285535A (en) Safe energy-saving dynamic pneumatic ash handling system
CN201279836Y (en) Pneumatic conveying apparatus of additive weighing scale
CN114056938A (en) Powdery material feeding device and feeding control method
CN210862874U (en) Dynamic bin pump metering device
CN210214114U (en) Automatic pneumatic conveying system of steady voltage
CN107520035B (en) Sand processing and dust removing device and method
CN205998656U (en) Air conveying automatic formulation equipment in high precision
CN1955090B (en) Distribution method of implementing remote weighing transporting
CN102152971A (en) Rational positive-pressure pneumatic pressure ash handling system
CN205471632U (en) Pulse air conveying pump
CN201068334Y (en) Shaftless screw conveyer
CN102935945A (en) Single efficient continuous delivery pump
CN201249114Y (en) Catalytic cracking catalyst automatic metering feeder
CN205773284U (en) Molasses automatic pumping device
CN208878363U (en) Activated carbon powder automatic feeding device and system
CN203143702U (en) Material conveying and detecting system
CN207985422U (en) A kind of multi-functional aggregate-storing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant