CN201502166U - Device for assembling and hoisting large-scale structure and pipeline - Google Patents
Device for assembling and hoisting large-scale structure and pipeline Download PDFInfo
- Publication number
- CN201502166U CN201502166U CN2009202079648U CN200920207964U CN201502166U CN 201502166 U CN201502166 U CN 201502166U CN 2009202079648 U CN2009202079648 U CN 2009202079648U CN 200920207964 U CN200920207964 U CN 200920207964U CN 201502166 U CN201502166 U CN 201502166U
- Authority
- CN
- China
- Prior art keywords
- connected node
- fixed
- following
- horizontal beam
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the field of brackets for support, in particular to a device for assembling and hoisting large-scale structure and pipeline. The device for assembling and hoisting large-scale structure and pipeline comprises a connection node A (11), a connection node B (12) and a lower horizontal beam (21), and is characterized by further comprising a connection node C (13), a connection node D (14), a connection node E (14), a lower diagonal strut beam (31), a lower diagonal draw bar (41) and a lower upright bar (51), wherein two ends of the lower diagonal strut beam (31) are respectively connected with the connection node A (11) and the connection node C (13). The device has convenient movement, installation and removal, can save the hosting and conveying cost, improves the safety performance and saves the construction period of online installation.
Description
Technical field
The utility model relates to supporting uses field of stents, is specially a kind of device that is used to assemble hoisting large-size structure and pipeline.
Background technology
Blast furnace is the common equipment of smelting iron industry, the relevant corollary equipment of blast furnace is a lot, the installation of some equipment or maintenance need operations on blast furnace, because blast furnace height height, so need build that the assembly platform structure is beneficial to fixed equipment and personnel transport during operation.At present, this platform structure based on the A-frame and the anti-suspension bracket of routine, mainly uses the temporary fixed of certain certain objects and personnel operation platform etc. usually.Though can play respective action, also exist long, defective such as cost is high, use is single, high-risk operations is many of platform structure construction period.
Summary of the invention
In order to overcome the defective of prior art, a kind of operating level variation is provided, can shortens the platform support that the construction period saves construction cost, reduces high-risk operations such as artificial lifting, the utility model discloses a kind of device that is used to assemble hoisting large-size structure and pipeline.
The utility model reaches goal of the invention by following technical solution:
A kind of device that is used to assemble hoisting large-size structure and pipeline, comprise connected node A, connected node B and following horizontal beam, on vertical supporting surface, fix a connected node A and a connected node B from top to bottom successively, one end and the connected node B of following horizontal beam are connected and fixed, it is characterized in that: also comprise connected node C, connected node D, connected node E, following raker beam, following diagonal member and following vertical rod, the soffit of the following horizontal beam other end is fixed a connected node C, one end and the connected node A of following raker beam are connected and fixed, it is leg-of-mutton carriage that the other end and connected node C are connected and fixed to constitute the cross section, the middle part of following raker beam upper surface is connected and fixed a connected node D, connected node D also respectively and following diagonal member, one end of following vertical rod is connected and fixed, the other end of following diagonal member and connected node B are connected and fixed, a connected node E is fixed at the middle part of following horizontal beam soffit, and the other end of following vertical rod and connected node E are connected and fixed.
The described device that is used to assemble hoisting large-size structure and pipeline, it is characterized in that: also comprise connected node F, connected node G, connected node H, last horizontal beam, last diagonal member and upper pright stanchion, a connected node F is fixed at the middle part of following horizontal beam upper surface, the upper fixed one connected node G of connected node B on vertical supporting surface, the two ends of last diagonal member respectively with connected node F, connected node G is connected and fixed, connected node G also is connected and fixed with an end of last horizontal beam, the middle part of last horizontal beam soffit is connected and fixed a connected node H, article two, two ends that are connected and fixed down horizontal beam and last horizontal beam of upper pright stanchion, another respectively with connected node F, connected node H is connected and fixed.
The described device that is used to assemble hoisting large-size structure and pipeline, it is characterized in that: also comprise connected node I and last raker beam, the upper fixed one connected node I of connected node G on vertical supporting surface, fixedly connected with an end, the connected node I of last horizontal beam respectively in the two ends of last raker beam.
The utility model self structure is the shaped steel system, package unit is by horizontal beam, following raker beam, following diagonal member, following vertical rod and corresponding connected node constitute girder and the gusseted system of encorbelmenting down, can also be by last horizontal beam, go up raker beam, go up diagonal member, upper pright stanchion and corresponding connected node constitute the top stable frame and anti-stay bolt system, are the strong point with the structure that facility and pipeline were depended on.During use, after the main structure body assembling is finished, set up the utility model in the main body outside.Earlier in agent structure, as the fixedly connected node of welding on the structural planes such as blast furnace furnace wall, be connected and fixed down horizontal beam, raker beam, diagonal member and following vertical rod down down then, can adopt bolt connecting mode, with formation encorbelment girder and gusseted system, can fix structural member to be installed and facility on the top of horizontal beam down.After having fixed structural member and facility to be installed, can also continue to install horizontal beam, last raker beam, last diagonal member, upper pright stanchion and corresponding connected node, to constitute top stable frame and anti-stay bolt system, it is fixing to make that structural member to be installed and facility are surrounded by the stable frame that descends horizontal beam, last horizontal beam and upper pright stanchion to constitute, with further raising steadiness.During use, can determine quantity of the present utility model according to the length of structural member to be installed and facility.
The utility model can be applicable to the whole Transporting of large scale structure facility and agent structure peripheral conduits and installs, can well cooperate the assembling installation work of large-scale steel structure system and subsidiary pipeline facility, can move, install with agent structure, convenient disassembly, in the large-scale steel structure construction, can save lifting and cost of transportation, and its security performance of corresponding raising, save the online installation exercise duration.Improved in the past support as the action function of single operating level, and saving cost and control duration that simultaneously can be to a certain degree, the high-risk operations such as artificial lifting of large-sized structural parts reduced.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of the present utility model of last horizontal beam being installed, having been gone up diagonal member and upper pright stanchion;
Fig. 3 is the structural representation of the present utility model of last horizontal beam being installed, having been gone up diagonal member, upper pright stanchion and last raker beam;
Fig. 4 is a structural representation of the present utility model of having removed time raker beam, following diagonal member and following vertical rod;
Schematic top plan view when Fig. 5 is the utility model use.
The specific embodiment
Below further specify the utility model by specific embodiment.
Embodiment 1
A kind of device that is used to assemble hoisting large-size structure and pipeline, comprise connected node A11, connected node B12, following horizontal beam 21, connected node C13, connected node D14, connected node E14, following raker beam 31, following diagonal member 41 and following vertical rod 51, as shown in Figure 1, concrete structure is: fix a connected node A11 and a connected node B12 on blast furnace 3 from top to bottom successively, one end and the connected node B12 of following horizontal beam 21 are connected and fixed, the soffit of following horizontal beam 21 other ends is fixed a connected node C13, the two ends of following raker beam 31 respectively with connected node A11, it is leg-of-mutton carriage that connected node C13 is connected and fixed to constitute the cross section, the middle part of following raker beam 31 upper surfaces is connected and fixed a connected node D14, connected node D14 also respectively and following diagonal member 41, one end of following vertical rod 51 is connected and fixed, the other end of following diagonal member 41 and connected node B12 are connected and fixed, a connected node E15 is fixed at the middle part of following horizontal beam 21 soffits, and the other end of following vertical rod 51 and connected node E15 are connected and fixed.
In the present embodiment, following raker beam 31, down diagonal member 41 and following vertical rod 51 are made up of with the bottom surface splicing two channel-section steels, all adopt welding to fix with the connected node of blast furnace, and other connected nodes all adopt the bolt connection.
The present embodiment self structure is the shaped steel system, package unit by following horizontal beam 21, down raker beam 31, down diagonal member 41, vertical rod 51 and corresponding connected node constitute girder and the gusseted system of encorbelmenting down, are the strong point with the structure of blast furnace 3.During use, after the main structure body assembling of blast furnace 3 is finished, outside blast furnace 33, set up present embodiment.On the structural plane of blast furnace furnace wall 3, weld fixedly connected node earlier, be connected and fixed down horizontal beam 21, raker beam 31, diagonal member 41 and following vertical rod 51 down down then, can adopt bolt connecting mode, with formation encorbelment girder and gusseted system, at the fixing structural member 2 to be installed in top of horizontal beam 21 down.Can promptly be used to assemble the quantity of the device 1 of hoisting large-size structure and pipeline according to the length of structural member to be installed and facility decision present embodiment, as shown in Figure 5.
Embodiment 2
A kind of device that is used to assemble hoisting large-size structure and pipeline, as shown in Figure 2, concrete structure is: also comprise connected node F16, connected node G17, connected node H18, last horizontal beam 22, last diagonal member 42 and upper pright stanchion 52, a connected node F16 is fixed at the middle part of following horizontal beam 21 upper surfaces, the upper fixed one connected node G17 of connected node B2 on blast furnace 3, the two ends of last diagonal member 42 respectively with connected node F16, connected node G17 is connected and fixed, connected node G17 also is connected and fixed with an end of last horizontal beam 22, the middle part of last horizontal beam 22 soffits is connected and fixed a connected node H18, article two, 52 1 of upper pright stanchions are connected and fixed down the two ends of horizontal beam 21 and last horizontal beam 22, another respectively with connected node F16, connected node H18 is connected and fixed.Other structures are all same with embodiment 1.
The present embodiment self structure is the shaped steel system, package unit removes by horizontal beam 21, following raker beam 31, following diagonal member 41, following vertical rod 51 and corresponding connected node constitute girder and the gusseted system of encorbelmenting down, also by last horizontal beam 22, go up raker beam 32, go up diagonal member 42, upper pright stanchion 52 and corresponding connected node constitute the top stable frame and anti-stay bolt system, are the strong point with the structure of blast furnace 3.During use, after the main structure body assembling of blast furnace 3 is finished, set up present embodiment in blast furnace 3 outsides.On the structural plane of agent structure blast furnace furnace wall, weld fixedly connected node earlier, be connected and fixed down horizontal beam 21, raker beam 31, diagonal member 41 and following vertical rod 51 down down then, can adopt bolt connecting mode, with formation encorbelment girder and gusseted system, at the fixing structural member 2 to be installed in top of horizontal beam 21 down.After having fixed structural member to be installed 2, continue to install horizontal beam 22, last raker beam 32, last diagonal member 42, upper pright stanchion 52 and corresponding connected node, to constitute top stable frame and anti-stay bolt system, it is fixing to make that structural member to be installed 2 is surrounded by the stable frame that descends horizontal beam 21, last horizontal beam 22 and upper pright stanchion 52 to constitute, with further raising steadiness.During use, can promptly be used to assemble the quantity of the device 1 of hoisting large-size structure and pipeline according to the length of structural member to be installed 2 decision present embodiment.
Embodiment 3
A kind of device that is used to assemble hoisting large-size structure and pipeline, as shown in Figure 3, concrete structure is: also comprise connected node I19 and last raker beam 32, the upper fixed one connected node I19 of connected node G17 on vertical supporting surface, fixedly connected with an end, the connected node I19 of last horizontal beam 22 respectively in the two ends of last raker beam 32.Other structures are all same with embodiment 2.
After the raker beam 32, visual concrete condition is removed raker beam 31, diagonal member 41 and following vertical rod 51 down down on having installed, as shown in Figure 4, and to save the space.
Claims (3)
1. device that is used to assemble hoisting large-size structure and pipeline, comprise connected node A (11), connected node B (12) and following horizontal beam (21), on vertical supporting surface, fix a connected node A (11) and a connected node B (12) from top to bottom successively, one end of following horizontal beam (21) and connected node B (12) are connected and fixed, it is characterized in that: also comprise connected node C (13), connected node D (14), connected node E (14), following raker beam (31), following diagonal member (41) and following vertical rod (51), the soffit of following horizontal beam (21) other end is fixed a connected node C (13), the two ends of following raker beam (31) respectively with connected node A (11), it is leg-of-mutton carriage that connected node C (13) is connected and fixed to constitute the cross section, the middle part of following raker beam (31) upper surface is connected and fixed a connected node D (14), connected node D (14) also respectively and following diagonal member (41), one end of following vertical rod (51) is connected and fixed, the other end of following diagonal member (41) and connected node B (12) are connected and fixed, a connected node E (15) is fixed at the middle part of following horizontal beam (21) soffit, and the other end of following vertical rod (51) and connected node E (15) are connected and fixed.
2. the device that is used to assemble hoisting large-size structure and pipeline as claimed in claim 1, it is characterized in that: also comprise connected node F (16), connected node G (17), connected node H (18), last horizontal beam (22), last diagonal member (42) and upper pright stanchion (52), a connected node F (16) is fixed at the middle part of following horizontal beam (21) upper surface, the upper fixed one connected node G (17) of connected node B (2) on vertical supporting surface, the two ends of last diagonal member (42) respectively with connected node F (16), connected node G (17) is connected and fixed, connected node G (17) goes back and an end of last horizontal beam (22) is connected and fixed, the middle part of last horizontal beam (22) soffit is connected and fixed a connected node H (18), article two, (52) one of upper pright stanchions are connected and fixed down the two ends of horizontal beam (21) and last horizontal beam (22), another respectively with connected node F (16), connected node H (18) is connected and fixed.
3. the device that is used to assemble hoisting large-size structure and pipeline as claimed in claim 2, it is characterized in that: also comprise connected node I (19) and last raker beam (32), the upper fixed one connected node I (19) of connected node G (17) on vertical supporting surface, fixedly connected with an end, the connected node I (19) of last horizontal beam (22) respectively in the two ends of last raker beam (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202079648U CN201502166U (en) | 2009-08-17 | 2009-08-17 | Device for assembling and hoisting large-scale structure and pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202079648U CN201502166U (en) | 2009-08-17 | 2009-08-17 | Device for assembling and hoisting large-scale structure and pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201502166U true CN201502166U (en) | 2010-06-09 |
Family
ID=42453102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202079648U Expired - Fee Related CN201502166U (en) | 2009-08-17 | 2009-08-17 | Device for assembling and hoisting large-scale structure and pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201502166U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444416A (en) * | 2011-12-24 | 2012-05-09 | 中国煤炭科工集团太原研究院 | Fully mechanized mining face hydraulic support beam-type retracting device |
-
2009
- 2009-08-17 CN CN2009202079648U patent/CN201502166U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444416A (en) * | 2011-12-24 | 2012-05-09 | 中国煤炭科工集团太原研究院 | Fully mechanized mining face hydraulic support beam-type retracting device |
CN102444416B (en) * | 2011-12-24 | 2014-07-16 | 中国煤炭科工集团太原研究院 | Fully mechanized mining face hydraulic support beam-type retracting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN110984637B (en) | Steel structure modular installation method for steelmaking oxygen lance valve station | |
CN211143305U (en) | Steel structure building | |
CN201502166U (en) | Device for assembling and hoisting large-scale structure and pipeline | |
CN206634889U (en) | Elevator hoistways ins and outs | |
CN103601078A (en) | Suspension type hoisting equipment | |
CN103615103A (en) | Hanging type assembled movable platform | |
CN202899639U (en) | Concrete column structure | |
CN202954553U (en) | Full assembly tool type attachment lifting scaffold | |
CN215593700U (en) | Construction platform for welding steel box girder support by using method | |
JP2009161259A (en) | Selfsustaining frame for conveyor | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
JP4071249B2 (en) | Thread hanging jig | |
JP2008280165A (en) | Lifting structure of heavy article | |
CN204002841U (en) | A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction | |
CN203783106U (en) | Hanging assembling moving platform | |
CN202689494U (en) | Elevator shaft template support | |
CN214003793U (en) | Lifting platform for mounting inner component of pipe culvert | |
CN203903792U (en) | Gantry frame for placing equipment | |
CN218859561U (en) | Suspension chain support for paint spray booth | |
CN201190407Y (en) | Overhead moving platform | |
CN203640245U (en) | Scaffold structure for building exterior wall construction | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building | |
CN211257923U (en) | Inverted pull rod arch supporting device | |
CN217581121U (en) | Novel liftable external hanging rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100609 Termination date: 20170817 |
|